| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| B01451297 ↗ | 450 NOSTRAND AVENUE BROOKLYN | — | Permit Issued | — | 09/28/2026 | Owner CARTIS, LLC | WORK TO THE CELLAR & COMMERCIAL SPACE AT THE BASEMENT OF AN EXISTING 4-STORY, MIXED-USE BUILDING. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUP… |
| B01396882 ↗ | 552 16 STREET BROOKLYN | Alteration | Permit Issued | 05/22/2026 | 09/23/2026 | Contractor AUTHENTIC PLBG CORP | WORK TO EXISTING 1-FAMILY 2 STORY BUILDING PLUS BASEMENT. INTERIOR WORK TO ADD NEW TOILET ROOM TO 1ST FLOOR. NO CHANGE TO USE, OCCUPANCY OR … |
| M01296037 ↗ | 630 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 04/29/2026 | 09/22/2026 | Contractor DONATO PLUMBING, INC | PLUMBING WORK TO APARTMENT 10A ON THE 10TH FLOOR OF AN EXISTING 13 STORY BUILDING. ALTERATIONS TO INCLUDE REPLACED, AND NEW PLUMBING FIXTURE… |
| M01383327 ↗ | 20 WEST 84 STREET MANHATTAN | Alteration | Filed — no permit on record | 08/27/2026 | — | Filer SA-DA ARCHITECTURE | — |
| M01432326 ↗ | 449 EAST 83 STREET MANHATTAN | Alteration CO | Filed — no permit on record | 07/22/2026 | — | — | |
| M01370518 ↗ | 230 CENTRAL PARK SOUTH MANHATTAN | Alteration | Permit Issued | 06/26/2026 | 07/14/2026 | Contractor STROYBAT INC | WORK TO APT 9B/10A ON THE 9TH AND 10TH FLOORS OF AN EXISTING 17-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE REPLACED, RELOCATE… |
| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| B01451297 ↗ | 450 NOSTRAND AVENUE BROOKLYN | — | Permit Issued | — | 09/28/2026 | Owner CARTIS, LLC | WORK TO THE CELLAR & COMMERCIAL SPACE AT THE BASEMENT OF AN EXISTING 4-STORY, MIXED-USE BUILDING. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUP… |
| B01396882 ↗ | 552 16 STREET BROOKLYN | Alteration | Permit Issued | 05/22/2026 | 09/23/2026 | Contractor AUTHENTIC PLBG CORP | WORK TO EXISTING 1-FAMILY 2 STORY BUILDING PLUS BASEMENT. INTERIOR WORK TO ADD NEW TOILET ROOM TO 1ST FLOOR. NO CHANGE TO USE, OCCUPANCY OR … |
| M01296037 ↗ | 630 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 04/29/2026 | 09/22/2026 | Contractor DONATO PLUMBING, INC | PLUMBING WORK TO APARTMENT 10A ON THE 10TH FLOOR OF AN EXISTING 13 STORY BUILDING. ALTERATIONS TO INCLUDE REPLACED, AND NEW PLUMBING FIXTURE… |
| M01383327 ↗ | 20 WEST 84 STREET MANHATTAN | Alteration | Filed — no permit on record | 08/27/2026 | — | Filer SA-DA ARCHITECTURE | — |
| M01432326 ↗ | 449 EAST 83 STREET MANHATTAN | Alteration CO | Filed — no permit on record | 07/22/2026 | — | — | |
| M01370518 ↗ | 230 CENTRAL PARK SOUTH MANHATTAN | Alteration | Permit Issued | 06/26/2026 | 07/14/2026 | Contractor STROYBAT INC | WORK TO APT 9B/10A ON THE 9TH AND 10TH FLOORS OF AN EXISTING 17-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE REPLACED, RELOCATE… |
| M01115327 ↗ | 141 2 AVENUE MANHATTAN | Alteration | Permit Issued | 09/26/2024 | 07/08/2026 | Contractor DUALCORE CONSTRUCTION MGT Filer HIGHRISE GROUP | PLUMBING WORK TO APT 1, 2, 3, 5, 7, 11, 15 17, 19, AND 20 OF AN EXISTING 6-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE NEW, RE… |
| M01342093 ↗ | 488 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 02/05/2026 | 07/06/2026 | Contractor JAMES CRUZ | WORK TO COMMERCIAL SPACE AT THE 1ST FLOOR OF A 23 STORY, COMMERCIAL BUILDING. ALTERATIONS TO INCLUDE INTERIOR COMMERCIAL FIT-OUT WORK. NO CH… |
| B01153247 ↗ | 123 ST MARKS AVENUE BROOKLYN | Alteration | Permit Issued | 12/24/2024 | 06/30/2026 | Contractor XIA CONSTRUCTION MNGMT* | WORK TO EXISTING 2-FAMILY 4 STORY BUILDING. ALTERATIONS TO CONSIST OF ONE STORY REAR ENLARGEMENT AND WORK TO BASEMENT, 1ST AND 2ND FLOORS. N… |
| M01172813 ↗ | 161 EAST 79 STREET MANHATTAN | Alteration | Signed-off | 02/28/2025 | 06/02/2026 | Contractor DH EAGLE PLBG & HTG INC | WORK TO APT 9A ON THE 9TH FLOOR OF AN EXISTING 12 STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF REPLACED PLUMBING FIXTURES. NO… |
| B01000829 ↗ | 343 HOYT STREET BROOKLYN | Alteration CO | Permit Issued | 02/26/2024 | 04/30/2026 | Contractor MOKEN HOME IMPROVEMENT | JOB FILED TO SHOW WORK WITH FOOTING, FRAMING REPLACEMENT, FRAMING SISTERING, NEW CMU BEARING WALL, NEW STEEL MOMENT FRAME AS PER PLANS ATT… |
| M01115280 ↗ | 151 2 AVENUE MANHATTAN | Alteration | Permit Issued | 09/26/2024 | 04/24/2026 | Owner RYCO CAPITAL Contractor TRI CONTRACTING INC | WORK TO CELLAR, COMMON AREAS, APT. 0A, 1A, 1B, 1C, 1D, 2A, 2C, 2D, 2E, 3E, 3C, 3D, 4A, 4B, 4C, 4D, 4E, 5A, 5B, 5C, 5D AND 5E OF EXISTING BU… |
| B01220961 ↗ | 260 CLINTON AVENUE BROOKLYN | Alteration | Signed-off | 05/23/2025 | 04/09/2026 | Contractor NORTHBRIDGE CONTRACTING L | WORK TO THE BASEMENT AND 1ST FLOOR OF AN EXISTING 2-FAMILY, 4-STORY + ATTIC BUILDING. ALTERATIONS TO INCLUDE THE CREATION OF A NEW STOOP & D… |
| M01260621 ↗ | 152 7 AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 07/25/2025 | 03/04/2026 | Contractor BABA CONSTRUCTION CORP | WORK TO COMMERCIAL SPACE AT THE 1ST FLOOR OF A 5 STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE INTERIOR PARTITION WORK AND THE I… |
| B00835202 ↗ | 444 15 STREET BROOKLYN | Alteration | Permit Issued | 03/03/2023 | 03/02/2026 | Owner Apex Management Group Contractor NORTHBRIDGE CONTRACTING L Filer HTX BUILDING CONSULTING | PLUMBING WORK TO RENOVATE UNITS #1L and 1R @ 1ST FLOOR, 3L and 3R @ 3RDFLOOR & CELLAR .NO CHANGE TO USE, EGRESS OR OCCUPANR |
| M01288903 ↗ | 55 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 09/18/2025 | 02/10/2026 | Contractor HITE CONSTRUCTION Filer SA-DA ARCHITECTURE | WORK TO APT 9CD ON THE 9TH FLOOR OF AN EXISTING 17 STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF RELOCATED, REPLACED, AND NEW … |
| B01324419 ↗ | 1450 FULTON STREET BROOKLYN | Alteration | Signed-off | 12/01/2025 | 12/23/2025 | Owner THE MANN GROUP Contractor RKA PIPING AND HEATING | WORK TO THE CELLAR & COMMERCIAL SPACE AT THE 1ST FLOOR OF AN EXISTING 4-STORY, MIXED-USE BUILDING. NO CHANGE TO ZONING, USE, EGRESS, OR OCCU… |
| B01310694 ↗ | 1450 FULTON STREET BROOKLYN | Alteration | Filed — no permit on record | 12/08/2025 | — | Owner THE MANN GROUP | — |
| B01276526 ↗ | 219 KANE STREET BROOKLYN | Alteration CO | Permit Issued | 09/16/2025 | 11/17/2025 | Contractor NORTHBRIDGE CONTRACTING L | REPLACEMENT OF REAR DECK AND STRUCTURAL MODIFICATIONS RELATING TO ARCHITECTURAL RENOVATION SCOPE. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUP… |
| M01187294 ↗ | 328 EAST 89 STREET MANHATTAN | Alteration | Permit Issued | 03/07/2025 | 11/17/2025 | Contractor ARMANI DESIGN AND DEVELOP | WORK TO THE CELLAR AND APARTMENT 1W ON THE 1ST FLOOR OF AN EXISTING 5-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF REPLACED,… |
| B00455058 ↗ | 1450 FULTON STREET BROOKLYN | Alteration | Signed-off | 01/27/2021 | 11/14/2025 | Owner THE MANN GROUP Contractor NICHOLAS SUIDA | WORK TO THE CELLAR OF AN EXISTING 4 STORY, MULTIPLE DWELING BUILDING, ALTERATION TO CONSIST OF THE INSTALATION OF (3) NEW BOILERS IN THE CE… |
| M01091294 ↗ | 156 2 AVENUE MANHATTAN | Alteration | Signed-off | 08/07/2024 | 11/13/2025 | Owner RYCO CAPITAL Contractor DUALCORE CONSTRUCTION MGT | WORK TO APTS 2A,2B,2D,2E,2F,3A,3B,3C,3D,3E,3F,4B,4C,4E,4F,5A,5B,5C,5D,5E,5F,6B,6D,6E&6F IN A 6-STORY BUILDING. ALTERATIONS TO INCLUDE NEW, R… |
| B01070118 ↗ | 343 HOYT STREET BROOKLYN | Alteration | Permit Issued | 07/09/2024 | 10/28/2025 | Contractor UNICORN BUILDERS GROUP LL | INSTALLATION OF PLYWOOD CONSTRUCTION FENCE AS PER THE PLANS. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. |
| B01069892 ↗ | 260 CLINTON AVENUE BROOKLYN | Alteration CO | Permit Issued | 08/23/2024 | 10/15/2025 | Contractor NORTHBRIDGE CONTRACTING L | Structural alteration and new metal deck and stairs in the rear yard. |
| B01292043 ↗ | 1206 NOSTRAND AVENUE BROOKLYN | Alteration | Filed — no permit on record | 10/02/2025 | — | — | |
| B01127498 ↗ | 159 CARLTON AVENUE BROOKLYN | Alteration | Permit Issued | 12/23/2024 | 09/26/2025 | Contractor BRUKLYN BUILDERS INC | WORK TO THE 2ND AND 3RD FLOORS OF AN EXISTING 4-STORY RESIDENTIAL BUILDING. ALTERATIONS TO CONSIST OF RELOCATION OF EXISTING LOT LINE WINDOW… |
| M01284197 ↗ | 61 WEST 70 STREET MANHATTAN | Alteration | Filed — no permit on record | 09/12/2025 | — | — | |
| M00922741 ↗ | 18 MERCER STREET MANHATTAN | Alteration | Signed-off | 10/09/2023 | 09/09/2025 | Contractor O&L EXPERT CONTRACTING IN | WORK TO APT 6 ON THE 6TH FLOOR OF AN EXISTING 6-FAMILY, 6-STORY JLWQ BUILDING. ALTERATIONS TO CONSIST OF INTERIOR PARTITION WORK. NO CHANGE … |
| M01223631 ↗ | 127 2 AVENUE MANHATTAN | Alteration | Signed-off | 05/12/2025 | 09/04/2025 | Contractor DUALCORE CONSTRUCTION MGT | CONSTRUCT NEW ELECTRICAL METER ROOM AT THE FRONT OF THE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01065707 ↗ | 1170 5 AVENUE MANHATTAN | Alteration | Signed-off | 08/12/2024 | 08/05/2025 | Contractor HITE CONSTRUCTION | WORK TO APARTMENT 4A ON THE 4TH FLOOR OF AN EXISTING 15 STORY + PENTHOUSE BUILDING. ALTERATIONS TO INCLUDE NEW AND RELOCATED PARTITIONS. NO … |
| B01134007 ↗ | 232 BERGEN STREET BROOKLYN | Alteration | Signed-off | 01/06/2025 | 07/31/2025 | Contractor T & T PLUMBING INC | PLUMBING WORK TO AN EXISTING 4-STORY BUILDING. ALTERATIONS TO CONSIST OF NEW, REMOVED, REPLACED AND RELOCATED PLUMBING FIXTURES. NO CHANGES … |
| B01261192 ↗ | 219 KANE STREET BROOKLYN | Alteration | Permit Issued | 07/28/2025 | 07/30/2025 | Contractor NORTHBRIDGE CONTRACTING L | INTERIOR DEMOLITION WORK AT THE BASEMENT AND 1ST-3RD FLOORS OF A 4 STORY, 2-FAMILY DWELLING. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY … |
| M01052042 ↗ | 1070 PARK AVENUE MANHATTAN | Alteration | Signed-off | 06/12/2024 | 07/21/2025 | Contractor HITE CONSTRUCTION | WORK TO APARTMENT 6-B ON THE 6TH FLOOR OF AN EXISTING 15 STORY + PENTHOUSE BUILDING. ALTERATIONS TO INCLUDE RELOCATED, AND REPLACED PLUMBING… |
| B01133945 ↗ | 232 BERGEN STREET BROOKLYN | Alteration | Signed-off | 01/06/2025 | 05/09/2025 | Contractor REDIRECTING LIC INC | MECHANICAL AND STRUCTURAL WORK TO AN EXISTING 4-STORY BUILDING. ALTERATIONS TO CONSIST OF NEW MECHANICAL UNITS WITH DUNNAGE AND NEW EXHAUSTS… |
| M01216499 ↗ | 1289 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 04/28/2025 | 05/07/2025 | Contractor ENGLISH PAINTING CO LLC | WORK TO APARTMENT 16A ON THE 16TH FLOOR OF AN EXISTING 18 STORY BUILDING. ALTERATIONS TO INCLUDE NEW PARTITION AND CEILINGS. NO CHANGE TO ZO… |
| B00966871 ↗ | 167 DECATUR STREET BROOKLYN | Alteration | Signed-off | 01/12/2024 | 05/05/2025 | Contractor VAIR CONTRACTING INC | EXTERIOR WORK TO ADD AND RELOCATE WINDOWS AND ADD REAR DECK TO AN EXISTING 2-FAMILY, 3-STORY BUILDING. NO CHANGE TO ZONING, USE, EGRESS, OR … |
| B01039589 ↗ | 167 DECATUR STREET BROOKLYN | Alteration | Signed-off | 05/06/2024 | 05/05/2025 | Contractor VAIR CONTRACTING INC | INSTALLATION OF PLYWOOD CONSTRUCTION FENCE AS PER THE PLANS. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. |
| B01214171 ↗ | 350 MYRTLE AVENUE BROOKLYN | Alteration | Filed — no permit on record | 04/24/2025 | — | Owner CERYNEIAN MGT, LLC | — |
| M00995803 ↗ | 4 BOND STREET MANHATTAN | Alteration | Signed-off | 03/14/2024 | 04/09/2025 | Owner 4 BOND STREET REALTY LLC Contractor NAPOLI CONSTRUCTION OF NY | PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01084060 ↗ | 129 2 AVENUE MANHATTAN | Alteration | Signed-off | 07/30/2024 | 03/12/2025 | Owner RYCO CAPITAL Contractor DUALCORE CONSTRUCTION MGT | WORK TO APT 5, 11, 15 AND 20 OF AN EXISTING 6-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE RELOCATED PARTITIONS. NO CHANGE TO … |
| M01115330 ↗ | 131 2 AVENUE MANHATTAN | Alteration | Signed-off | 09/30/2024 | 03/07/2025 | Owner RYCO CAPITAL Contractor DUALCORE CONSTRUCTION MGT | WORK TO APT.10 AT THE 4TH FLOOR OF AN EXISTING 6-STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE RELOCATED PARTITIONS. NO CHANGE T… |
| B00516025 ↗ | 155 EVERGREEN AVENUE BROOKLYN | Alteration | Signed-off | 03/17/2022 | 03/06/2025 | Owner THE MANN GROUP Contractor AMC PLBG, HTG & CLNG, INC | WORK TO APT 1R, 1ST FL APT WITH ACCESSORY CELLAR SPACE IN AN EXTG 2 STORY MULTIPLE DWELLING BUILDING. WORK TO INCLUDE NEW & RELOCATED PL FIX… |
| M01088477 ↗ | 332 WEST 85 STREET MANHATTAN | Alteration | Signed-off | 08/05/2024 | 02/18/2025 | Contractor GENESIS PLBG AND HTG CORP | WORK TO APT 1C ON THE 1ST FLOOR OF AN EXISTING 5 STORY BUILDING. WORK TO CONSIST OF NEW AND REPLACED PLUMBING FIXTURES. NO CHANGE TO EGRESS,… |
| M00927681 ↗ | 150 WEST 56 STREET MANHATTAN | Alteration | Permit Issued | 10/06/2023 | 02/03/2025 | Contractor MUNSEY ENTERPRISES LLC | WORK TO COMBINE APARTMENTS 65.03 AND 66.03 WITH EXISTING 65.01/02/04 AND 66.01/02/04 AT THE DESIGNATED 65TH AND 66TH (CONSTRUCTION 62ND AND … |
| B01132710 ↗ | 232 BERGEN STREET BROOKLYN | Alteration CO | Permit Issued | 11/19/2024 | 12/23/2024 | Contractor REDIRECTING LIC INC | ALTERATION TYPE C/O FILED TO RELOCATE OCCUPANCY DISTRIBUTION FOR AN EXISTING 4-STORY + CELLAR BUILDING. NEW CERTIFICATE OF OCCUPANCY REQUEST… |
| M01115293 ↗ | 151 2 AVENUE MANHATTAN | Alteration | Permit Issued | 09/26/2024 | 12/20/2024 | Owner RYCO CAPITAL Contractor OMADA CONSTRUCTION CORP | WORK TO APT. 1A OF AN EXISTING 6-STORY,MULTIPLE DWELLING BUILDING TO CORRECT VIOLATION 35374468J. ALTERATIONS TO INCLUDE RELOCATED PARTITI… |
| M01087137 ↗ | 332 WEST 85 STREET MANHATTAN | Alteration | Permit Issued | 08/05/2024 | 12/11/2024 | Contractor ENGLISH PAINTING CO LLC | WORK TO APT 1C ON THE 1ST FL OF AN EXTG 5 STORY BUILDING. WORK TO INCLUDE INTERIOR PARTITION WORK, INSTALLATION OF NEW HVAC UNIT AND NEW BAT… |
| B01145523 ↗ | 232 BERGEN STREET BROOKLYN | Alteration | Signed-off | 11/21/2024 | 11/29/2024 | Contractor REDIRECTING LIC INC | APPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS AND FINISHES IN THE CELLAR, BASEMENT, 1ST THRU 3RD FLOOR AS PER PLANS … |
| M01068403 ↗ | 237 EAST 33 STREET MANHATTAN | Alteration | Signed-off | 09/13/2024 | 10/28/2024 | Contractor MILLER PLBG & HTG INC | WORK TO APARTMENT 5A ON THE 4TH FLOOR OF AN EXISTING 5-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF INTERIOR PARTITION WORK… |
| M01022287 ↗ | 2211 BROADWAY MANHATTAN | Alteration | Signed-off | 03/26/2024 | 10/22/2024 | Owner GUMLEY HAFT, LLC Contractor MUNSEY ENTERPRISES LLC | WORK TO APT PHA ON THE 12TH FLOOR OF AN EXISTING 12-STORY MULTIPLE DWELLING, MIXED USE BUILDING. WORK TO INCLUDE INTERIOR PARTITION WORK. NO… |
| B01122452 ↗ | 260 CLINTON AVENUE BROOKLYN | Alteration | Permit Issued | 10/07/2024 | 10/10/2024 | Contractor NORTHBRIDGE CONTRACTING L | APPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES IN THE CELLAR, BASEMENT, 1ST THRU 3RD FLOOR, A… |
| M00921347 ↗ | 324 EAST 89 STREET MANHATTAN | Alteration | Signed-off | 08/22/2023 | 09/17/2024 | Contractor LEVEL 10 CONSTRUCTION | WORK TO APT 2E & 2W ON THE 2ND FL, 4W AND 4E ON 4TH FL AND APT 5E ON THE 5TH FL OF AN EXTG 5-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS … |
| B00857298 ↗ | 396 WASHINGTON AVENUE BROOKLYN | Alteration CO | Permit Issued | 04/25/2023 | 09/12/2024 | Owner 388 AMZI HILL LLC Contractor BIG BEAR CUSTOM BUILD,INC | ALT 1 FILED TO REAPPORTION THE DWELLING UNITS IN AN EXTG 5-STORY MULTIPLE DWELLING BUILDING. NEW CERTIFICATE OF OCCUPANCY REQUESTED. ALTERAT… |
| M01029283 ↗ | 239 EAST 33 STREET MANHATTAN | Alteration | Signed-off | 05/02/2024 | 09/05/2024 | Contractor MILLER PLBG & HTG INC | PLUMBING WORK TO APT 1D AT THE BASEMENT OF A 5-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE NEW AND RELOCATED PLUMBING FIXTURES… |
| M01085547 ↗ | 145 2 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 08/06/2024 | — | — | — |
| M01085485 ↗ | 145 2 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 07/30/2024 | — | Owner RYCO CAPITAL | — |
| M01028910 ↗ | 239 EAST 33 STREET MANHATTAN | Alteration CO | Permit Issued | 04/19/2024 | 07/25/2024 | Contractor LEVEL 10 CONSTRUCTION | ALTERATION TYPE CO FILED TO CONVERT AN EXISTING DOCTOR'S OFFICE INTO A DWELLING UNIT IN THE BASEMENT OF A 5-STORY, MULTIPLE DWELLING BUILDIN… |
| B00976625 ↗ | 260 CORNELIA STREET BROOKLYN | Alteration | Signed-off | 02/20/2024 | 07/18/2024 | Contractor DYNAMIC BUILDING DEVELOPE | WORK TO CELLAR, 1ST, 2ND, & 3RD FLOOR OF AN EXISTING 3-STORY + CELLAR MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE MINOR PLAN WORK AND… |
| Q00992299 ↗ | 1812 GREENE AVENUE QUEENS | Alteration | Signed-off | 01/25/2024 | 07/17/2024 | Contractor A&I GENERAL CONSTRUCTION | WORK TO CELLAR, APT 1 ON THE 1ST FL AND APT 2 ON THE 2ND FL OF AN EXTG 2-STORY, 2-FAMILY BUILDING. ALTERATIONS TO CONSIST OF INTERIOR PARTIT… |
| M00943903 ↗ | 160 MOTT STREET MANHATTAN | Alteration | Signed-off | 10/13/2023 | 06/27/2024 | Owner PHYLCAROL REALTY CORP. Contractor AMAZING BUILDERS AND RENO | WORK TO APTS 1C/D ON THE 1ST FL, APT 2A/B ON THE 2ND FL, AND APT 3C/D ON THE 3RD FL OF EXTG 6-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS… |
| M01038086 ↗ | 20 WEST 84 STREET MANHATTAN | Alteration | Signed-off | 04/26/2024 | 06/25/2024 | Contractor NICE PLUMBING CORP | WORK TO APARTMENT 2C & 2D ON THE 2ND FLOOR OF AN EXISTING 9 STORY + PENTHOUSE + CELLAR BUILDING. ALTERATIONS TO INCLUDE REMOVED, RELOCATED, … |
| M00921377 ↗ | 324 EAST 89 STREET MANHATTAN | Alteration | Signed-off | 08/23/2023 | 06/05/2024 | Contractor ROCK E SMALL PLBG&HTG INC | WORK TO THE CELLAR, APT. 4E & 4W ON THE 4TH FL, & APT 5E ON THE 5TH FL OF AN EXTG 5 STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIS… |
| B00817981 ↗ | 1401 BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 09/06/2023 | 05/30/2024 | Owner NORTHBRIDGE CONTRACTING Contractor NORTHBRIDGE CONTRACTING L | WORK TO 2ND AND 3RD FLOORS OF A THREE STORY, 4 FAMILY BUILDING. ALTERATIONS TO CONSIST OF INTERIOR PARTITIONS WORK, NO CHANGE TO ZONING, USE… |
| M00992041 ↗ | 4 BOND STREET MANHATTAN | Alteration CO | Permit Issued | 03/14/2024 | 05/30/2024 | Owner 4 BOND STREET REALTY LLC Contractor NAPOLI CONSTRUCTION OF NY | ALT. TYPE CO FILED TO CHANGE OCCUPANCY OF 1ST FLOOR & MEZZANINE OF AN EXTG 4-STORY + PENTHOUSE, MDL BUILDING FROM UG 16/17 TO UG 6. ADDITION… |
| M01038153 ↗ | 20 WEST 84 STREET MANHATTAN | Alteration | Signed-off | 05/07/2024 | 05/28/2024 | Contractor STROYBAT INC | WORK TO APT 2C AND APT 2D ON THE 2ND FLOOR OF A 9-STORY + PENTHOUSE, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE INTERIOR PARTITION W… |
| Q00996086 ↗ | 17-11 LINDEN STREET QUEENS | Alteration | Signed-off | 01/26/2024 | 05/23/2024 | Owner RIDGEWOOD GROUP Contractor DNSH INC | WORK TO APT 1A AND APT 1B AT THE 1ST FLOOR OF AN EXISTING 4-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE THE INSTALLATION OF NE… |
| M01005257 ↗ | 494 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 03/12/2024 | 05/17/2024 | Contractor GENESIS PLBG AND HTG CORP | WORK TO (1)COMMERCIAL SPACE ON THE 1ST FLOOR OF AN EXISTING 16-FAMILY, 5 STORY + CELLAR BUILDING. ALTERATIONS TO CONSIST OF INTERIOR PARTITI… |
| M01036945 ↗ | 20 WEST 84 STREET MANHATTAN | Alteration | Signed-off | 04/25/2024 | 05/06/2024 | Contractor A TEAM CONTRACTING G | WORK TO APT 2C & 2D ON THE 2ND FLOOR OF A 9-STORY + PENTHOUSE, MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF INTERIOR DEMOLITION WOR… |
| M00953562 ↗ | 140 WEST 4 STREET MANHATTAN | Alteration | Signed-off | 10/27/2023 | 04/08/2024 | Contractor SAFETECH ENTERPRISES CORP | WORK TO THE FRONT FACADE AT THE 1ST FLOOR OF A 6-STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF DOOR, STAIR AND RAILING RE-FINI… |
| M00953790 ↗ | 142 WEST 4 STREET MANHATTAN | Alteration | Signed-off | 10/27/2023 | 04/08/2024 | Contractor SAFETECH ENTERPRISES CORP | WORK TO THE FRONT FACADE AT THE 1ST FLOOR OF A 6-STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF DOOR, STAIR AND RAILING RE-FINI… |
| B00814891 ↗ | 913 UNION STREET BROOKLYN | Alteration | Signed-off | 03/28/2023 | 04/03/2024 | Contractor NAPOLI CONSTRUCTION OF NY | WORK TO BASEMENT, 1ST-4TH FLOORS AND ROOF OF AN EXISTING 4 FAMILY, 5 STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF A NEW HVAC … |
| B00808838 ↗ | 115 PACIFIC STREET BROOKLYN | Alteration | Signed-off | 04/10/2023 | 03/14/2024 | Contractor XIA CONSTRUCTION MNGMT* | WORK TO EXISTING 5-FAMILY, 4-STORY + BASEMENT BUILDING. ALTERATIONS TO CONSIST OF NEW MECHANICAL UNITS WITH DUNNAGE, AND NEW TOILET & KITCHE… |
| B00837188 ↗ | 115 PACIFIC STREET BROOKLYN | Alteration | Signed-off | 03/10/2023 | 02/09/2024 | Contractor SEA-DAR ENTERPRISE D/B/A | WORK TO EXISTING 5-FAMILY, 5 STORY BUILDING. ALTERATIONS TO CONSIST OF INTERIOR PARTITION WORK AND WINDOW REPLACEMENT. NO CHANGE TO ZONING,… |
| M00961114 ↗ | 116 PINEHURST AVENUE MANHATTAN | Alteration | Signed-off | 12/14/2023 | 02/05/2024 | Contractor OCONNOR CONTRACTING OF | WORK TO COMBINE APTS. B-63 & B-64 PER TPPN 3/97 ON THE 6TH FLOOR ON AN EXISTING 6 STORY MULTIPLE DWELLING BUILDING. NO CHANGE TO USE, EGRESS… |
| M00740878 ↗ | 433 PARK AVENUE SOUTH MANHATTAN | Alteration | Filed — no permit on record | 02/01/2024 | — | Owner DDF CORP | — |
| M00681219 ↗ | 1128 PARK AVENUE MANHATTAN | Alteration | Signed-off | 03/09/2022 | 01/30/2024 | Contractor LANDMARK HOME IMPROVEMENT | WORK TO APARTMENT 123 ON THE 12TH FLOOR OF AN EXISTING 15 STORY+PENTHOUSE BUILDING. ALTERATIONS TO INCLUDE NEW AND RELOCATED PARTITIONS. NO … |
| M00928208 ↗ | 37 CARMINE STREET MANHATTAN | Alteration | Permit Issued | 10/03/2023 | 01/09/2024 | Contractor NAPOLI CONSTRUCTION OF NY | INTERIOR ALTERATIONS TO ONE TENANT SPACE AT 1ST FLOOR AND CELLAR IN AN EXISTING 5-STORY BUILDING. WORK TO CONSIST OF NEW INTERIOR PARTITIONS… |
| B00808875 ↗ | 115 PACIFIC STREET BROOKLYN | Alteration | Signed-off | 04/11/2023 | 01/02/2024 | Contractor S & L PLUMBING INC | PLUMBING WORK AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B00845275 ↗ | 1529 GREENE AVENUE BROOKLYN | Alteration | Signed-off | 05/01/2023 | 12/22/2023 | Owner RIDGEWOOD GROUP Contractor DNSH INC | WORK TO THE CELLAR, 1ST-3RD FLOORS AND ROOF OF AN EXISTING 3-STORY, 3 FAMILY MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF NEW MECHA… |
| B00818737 ↗ | 1401 BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 10/12/2023 | 11/16/2023 | Owner NORTHBRIDGE CONTRACTING Contractor KATAN P & H INC | WORK TO 2ND AND 3RD FLOORS OF A THREE STORY, 4 FAMILY BUILDING. ALTERATIONS TO CONSIST OF NEW, REMOVED, AND RELOCATED PLUMBING FIXTURES. NO… |
| M00922750 ↗ | 18 MERCER STREET MANHATTAN | Alteration | Signed-off | 10/11/2023 | 10/19/2023 | Contractor ZEFI MECHANICAL INC | WORK TO APT 6 ON THE 6TH FLOOR OF AN EXISTING 6-FAMILY, 6-STORY JLWQ BUILDING. ALTERATIONS TO INCLUDE NEW, REMOVED, AND RELOCATED PLUMBING F… |
| M00936426 ↗ | 324 EAST 89 STREET MANHATTAN | Alteration | Filed — no permit on record | 10/10/2023 | — | — | — |
| M00727533 ↗ | 467 WEST 22 STREET MANHATTAN | Alteration | Signed-off | 06/02/2022 | 09/29/2023 | Owner PERSONAL Contractor ENGLISH PAINTING CO LLC | GENERAL CONSTRUCTION FOR INTERIOR PARTITIONS & NEW NON-EGRESS STAIR FOR COMBINATION OF APARTMENTS TO EXISTING CEL/1ST FLOOR DUPLEX AND 2ND F… |
| M00859989 ↗ | 97 AVENUE B MANHATTAN | Alteration | Signed-off | 05/31/2023 | 09/29/2023 | Contractor DPH PLUMBING & HTG CORP | WORK TO APARTMENTS 1C & 2C AT THE 1ST AND 2ND FLOOR OF AN EXISTING 6-STORY, MULTIPLE FAMILY BUILDING. ALTERATIONS TO INCLUDE REMOVED AND REP… |
| B00483178 ↗ | 39 CLIFTON PLACE BROOKLYN | Alteration | Signed-off | 07/08/2021 | 09/26/2023 | Contractor STAR PLUMBING & HTNG LLC | WORK TO APARTMENT 2 AT THE 2ND FLOOR OF AN EXISTING 3-FAMILY + COMMERCIAL, 3 STORY BUILDING. ALTERATIONS TO INCLUDE NEW AND RELOCATED PLUMBI… |
| M00916737 ↗ | 237 EAST 33 STREET MANHATTAN | Alteration | Signed-off | 08/10/2023 | 09/21/2023 | Contractor REDIRECTING LIC INC | WORK TO APARTMENT 2A ON THE 1ST FLOOR OF AN EXISTING 5-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF INTERIOR FINISH WORK AND… |
| B00808994 ↗ | 913 UNION STREET BROOKLYN | Alteration | Signed-off | 03/28/2023 | 09/18/2023 | Contractor INFINITI ESC PLUMBING COR | PLUMBING WORK TO BASEMENT, FLOORS 1.2.3.4 AND ROOF OF AN EXISTING 4 FAMILY, 5 STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF NE… |
| M00921378 ↗ | 324 EAST 89 STREET MANHATTAN | Alteration | Signed-off | 08/23/2023 | 09/07/2023 | Contractor LEVEL 10 CONSTRUCTION | WORK TO APT 4E AND 4W ON 4TH FLOOR AND APT 5E ON THE 5TH FLOOR OF AN EXISTING 5-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF… |
| M00916780 ↗ | 237 EAST 33 STREET MANHATTAN | Alteration | Signed-off | 08/15/2023 | 08/24/2023 | Contractor T & T PLUMBING INC | WORK TO APARTMENT 2A ON THE 1ST FLOOR OF AN EXISTING 5-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF PLUMBING FIXTURE REPLACE… |
| B00813988 ↗ | 913 UNION STREET BROOKLYN | Alteration | Signed-off | 03/21/2023 | 07/18/2023 | Contractor NAPOLI CONSTRUCTION OF NY | WORK TO BASEMENT, FLOORS 1,2,3,4 AND ROOF OF AN EXISTING 4 FAMILY, 5 STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF NEW INTERIO… |
| M00859973 ↗ | 97 AVENUE B MANHATTAN | Alteration | Signed-off | 05/31/2023 | 07/18/2023 | Contractor ENGLISH PAINTING CO LLC | ALTERATION FILED TO COMBINE APARTMENTS 1C & 2C ON THE 1ST AND 2ND FLOORS AS PER TPPN 03/97. WORK TO INCLUDE THE INSTALLATION OF A NEW CONVEN… |
| B00811734 ↗ | 327 HENRY STREET BROOKLYN | Alteration | Signed-off | 04/06/2023 | 07/12/2023 | Contractor INFINITI ESC PLUMBING COR | WORK TO INSTALL NEW BOILER FOR APT 3R IN THE CELLAR AS PER PLANS ATTACHED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B00568330 ↗ | 27A ST MARKS AVENUE BROOKLYN | Alteration | Signed-off | 09/11/2021 | 07/08/2023 | Contractor NORTHBRIDGE CONTRACTING L | WORK TO A THREE STORY, 5 FAMILY BUILDING. ALTERATIONS TO CONSIST OF INTERIOR PARTITIONS WORK AND INSTALLATION OF NEW MECHANICAL UNITS AND DU… |
| B00474459 ↗ | 260 PRESIDENT STREET BROOKLYN | Alteration | Signed-off | 04/19/2021 | 06/15/2023 | Contractor KG USA MANAGEMENT INC | WORK TO THE CELLAR, BASEMENT, FL 1-4, & ROOF OF AN EXISTING 5-STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF INSTALLATION OF 5 … |
| B00483204 ↗ | 39 CLIFTON PLACE BROOKLYN | Alteration | Signed-off | 07/08/2021 | 06/14/2023 | Owner GRAND CLIFTON LLC Contractor CCM LIGHTING CORP | WORK TO APARTMENT 2 AT THE 2ND FLOOR OF AN EXISTING 3-FAMILY + COMMERCIAL, 3 STORY BUILDING. ALTERATIONS TO INCLUDE INTERIOR PARTITION WORK.… |
| B00295462 ↗ | 126 BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 03/12/2020 | 06/02/2023 | Contractor MAZGAN AIR CONDITIONING A | MECHANICAL WORK TO CELLAR, 1ST FLOOR, 2ND FLOOR, 3RD FLOOR, 4TH FLOOR, AND ROOF OF AN EXISTING 5-FAMILY BUILDING WITH COMMERCIAL. NO CHANGE … |
| B00295461 ↗ | 126 BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 01/23/2020 | 05/30/2023 | Contractor PRIME PIPING & HEATING IN | PLUMBING WORK ON CELLAR, FIRST, SECOND, THIRD, FOURTH FLOORS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, EGRESS UNDER THIS APPLICATION. |
| B00724311 ↗ | 329 HENRY STREET BROOKLYN | Alteration | Signed-off | 06/22/2022 | 05/22/2023 | Contractor GLENNS PLUMBING SVCS INC | PLUMBING WORK AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B00845291 ↗ | 1529 GREENE AVENUE BROOKLYN | Alteration | Signed-off | 05/01/2023 | 05/19/2023 | Owner RIDGEWOOD GROUP Contractor PLBG P & H INC | PLUMBING WORK TO THE CELLAR AND 1ST-3RD FLOORS OF AN EXISTING 3-STORY, 3 FAMILY MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF NEW, R… |
| B00845249 ↗ | 1529 GREENE AVENUE BROOKLYN | Alteration | Signed-off | 03/30/2023 | 05/01/2023 | Owner RIDGEWOOD GROUP Contractor DNSH INC | WORK TO THE CELLAR, 1ST-3RD FLOORS AND ROOF OF AN EXISTING 3-STORY, 3 FAMILY MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSISTS OF INTERIOR… |
| Person | Filings | Most recent |
|---|---|---|
| Alexander Stoltz | 323 | 08/25/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| GREEN SOLUTIONS ENGINEERING & ENERG | 5 | 08/25/2026 |
| R.J. MCGEE ENGINEERING, PLLC | 5 | 03/24/2026 |
| HANINGTON ENGINEERING CONSULTANTS | 2 | 01/26/2026 |
| ADB ASSOCIATES | 1 | 08/25/2026 |
| JAMES CHAI ARCHITECT, P.C. | 1 | 09/24/2025 |
| LEVIN ENGINEERING PLLC | 1 | 08/27/2026 |
| MADRIAGA ENGINEERING P.C. | 1 | 08/28/2026 |
| PVE ENGINEERING | 1 | 08/15/2025 |
| URBAN ENGINEERING, PC | 1 | 05/11/2026 |
| Name | Jobs together | Most recent |
|---|---|---|
| T&T PLUMBING INC | 10 | 08/25/2026 |
| LACHMAN CONSTRUCTION & DE | 9 | 11/15/2022 |
| KG MANAGEMENT CNSLTNG INC | 8 | 06/29/2022 |
| NORTHBRIDGE CONTRACTING L | 8 | 08/28/2026 |
| DONATO PLUMBING, INC | 7 | 08/25/2026 |
| NAPOLI CONSTRUCTION OF NY | 7 | 10/10/2025 |
| CROSSFIELD P & H CORP | 6 | 07/17/2023 |
| INFINITI ESC PLUMBING COR | 6 | 10/10/2025 |
| KG USA MANAGEMENT INC | 6 | 06/20/2023 |
| DUALCORE CONSTRUCTION MGT | 5 | 08/25/2026 |
| REDIRECTING LIC INC | 5 | 08/25/2026 |
| STROYBAT INC | 5 | 06/29/2026 |
| XIA CONSTRUCTION MNGMT* | 5 | 07/22/2026 |
| ENGLISH PAINTING CO LLC | 4 | 04/28/2025 |
| HITE CONSTRUCTION INC | 4 | 05/21/2026 |
| LANDMARK HOME IMPROVEMENT | 4 | 07/21/2023 |
| RELIABLE GENERAL CONTRACT | 4 | 04/14/2022 |
| AMC PLBG, HTG & CLNG, INC | 3 | 05/09/2025 |
| AROUND THE CLOCK CNSN GRP | 3 | 08/17/2022 |
| CASE PLUMBING LLC | 3 | 07/22/2026 |
| CSC RENO LLC | 3 | 07/17/2023 |
| DMA CONTRACTING INC | 3 | 01/28/2022 |
| DNSH INC | 3 | 06/14/2024 |
| JMW PLUMBING, INC | 3 | 07/26/2023 |
| KATAN P & H INC | 3 | 05/16/2024 |
| Name | Jobs together | Most recent |
|---|---|---|
| THE MANN GROUP | 9 | 06/08/2026 |
| RYCO CAPITAL | 7 | 08/25/2026 |
| RIDGEWOOD GROUP | 6 | 06/14/2024 |
| TKR PROPERTY SERVICES, INC. | 4 | 08/27/2026 |
| GUMLEY HAFT | 3 | 11/06/2024 |
| MIDWOOD MANAGEMENT CORP | 3 | 06/08/2022 |
| MONARCH REALTY HOLDINGS, LLC | 3 | 11/19/2025 |
| NORTHBRIDGE CONTRACTING | 3 | 05/16/2024 |
| PARTNERS PATH | 3 | 06/19/2023 |
| RM-SM PROPERTIES UWS L.P. | 3 | 09/12/2025 |
| 250-254 WEST 82ND OWNERS, INC | 2 | 01/23/2020 |
| 4 BOND STREET REALTY LLC | 2 | 10/10/2025 |
| ASP | 2 | 01/28/2022 |
| DDF CORP | 2 | 02/01/2024 |
| DOUGLAS ELLIMAN | 2 | 01/20/2022 |
| MACKTEZ CORPORATION | 2 | 11/30/2022 |
| MAXWELL-KATES, INC. | 2 | 05/15/2023 |
| MIDWOOD INVESTMENT & DEVELOPMENT | 2 | 04/14/2022 |
| PERSONAL | 2 | 07/26/2023 |
| 230 BOERUM LLC | 1 | 06/14/2022 |
| 388 AMZI HILL LLC | 1 | 02/12/2024 |
| 771 61ST STREET REALTY LLC | 1 | 03/25/2022 |
| Apex Management Group | 1 | 09/24/2025 |
| Broadway Continental Corp. | 1 | 08/25/2026 |
| CARTIS, LLC | 1 | — |
| Name | Jobs together | Most recent |
|---|---|---|
| BIG ORANGE EXPEDITING, INC | 95 | 08/25/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 7 | 02/12/2024 |
| ACCRETE CONSTRUCTION INC | 1 | 06/14/2022 |
| HIGHRISE GROUP | 1 | 08/25/2026 |
| HTX BUILDING CONSULTING | 1 | 09/24/2025 |