| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01408221 ↗ | 244 WEST 72 STREET MANHATTAN | Alteration | Permit Issued | 05/27/2026 | 09/28/2026 | Design THE VILNITS GROUP Owner CITY URBAN REALTY Contractor MJM CONSTR ASSOCIATES LLC Filer cur244w72 holding llc | Renovation of Apt 16E. Minor partition work and kitchen and bathroom renovation. No change to use, egress or occupancy. |
| B01396882 ↗ | 552 16 STREET BROOKLYN | Alteration | Permit Issued | 05/22/2026 | 09/23/2026 | Design SA-DA ARCHITECTURE Contractor AUTHENTIC PLBG CORP | WORK TO EXISTING 1-FAMILY 2 STORY BUILDING PLUS BASEMENT. INTERIOR WORK TO ADD NEW TOILET ROOM TO 1ST FLOOR. NO CHANGE TO USE, OCCUPANCY OR … |
| M01296037 ↗ | 630 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 04/29/2026 | 09/22/2026 | Design SA-DA ARCHITECTURE Contractor DONATO PLUMBING, INC | PLUMBING WORK TO APARTMENT 10A ON THE 10TH FLOOR OF AN EXISTING 13 STORY BUILDING. ALTERATIONS TO INCLUDE REPLACED, AND NEW PLUMBING FIXTURE… |
| M01432326 ↗ | 449 EAST 83 STREET MANHATTAN | Alteration CO | Filed — no permit on record | 07/22/2026 | — | Design SA-DA ARCHITECTURE | — |
| M01370518 ↗ | 230 CENTRAL PARK SOUTH MANHATTAN | Alteration | Permit Issued | 06/26/2026 | 07/14/2026 | Design SA-DA ARCHITECTURE Contractor STROYBAT INC | WORK TO APT 9B/10A ON THE 9TH AND 10TH FLOORS OF AN EXISTING 17-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE REPLACED, RELOCATE… |
| M01115327 ↗ | 141 2 AVENUE MANHATTAN | Alteration | Permit Issued | 09/26/2024 | 07/08/2026 | Design ADB ASSOCIATES Contractor DUALCORE CONSTRUCTION MGT Filer HIGHRISE GROUP | PLUMBING WORK TO APT 1, 2, 3, 5, 7, 11, 15 17, 19, AND 20 OF AN EXISTING 6-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE NEW, RE… |
| Name | Projects together | Most recent |
|---|---|---|
| THE VILNITS GROUP | 9 | 06/05/2026 |
| R.J. MCGEE ENGINEERING, PLLC | 8 | 03/24/2026 |
| GREEN SOLUTIONS ENGINEERING & ENERG | 5 | 08/25/2026 |
| LEVIN ENGINEERING PLLC | 4 | 03/04/2025 |
| ALL CITY ENGINEERING, P.C. | 2 | 04/18/2025 |
| EJC ENGINEERING, PLLC | 2 | 11/13/2025 |
| ESNYC CONSULTING INC | 2 | 01/06/2026 |
| FUSION SYSTEMS ENGINEERING, DPC | 2 | 04/21/2021 |
| HANINGTON ENGINEERING CONSULTANTS | 2 | 01/26/2026 |
| JAMES CHAI ARCHITECT, P.C. | 2 | 09/24/2025 |
| MELAMED ARCHITECT PC | 2 | 04/18/2025 |
| URBAN ENGINEERING, PC | 2 | 05/11/2026 |
| WELLS ENGINEERING, PLLC | 2 | 05/23/2023 |
| ADB ASSOCIATES | 1 | 08/25/2026 |
| ALBERT MONTOYA ARCHITECT | 1 | 05/25/2023 |
| CHARLES G. MICHEL ENGINEERING, PC. | 1 | 06/16/2026 |
| COLLECTIF ENGINEERING PLLC | 1 | 01/06/2026 |
| JACK GREEN ASSOCIATES | 1 | 02/02/2023 |
| LIZARDOS ENGINEERING | 1 | 05/15/2024 |
| MADRIAGA ENGINEERING P.C. | 1 | 08/28/2026 |
| MARTOS ENGINEERING | 1 | 03/14/2025 |
| N Y ARCHITECTS INC. | 1 | 09/03/2024 |
| NYRON HALL ENGINEERING LLC | 1 | 03/23/2023 |
| PRAMODRAY SHAH, P.E. | 1 | 11/02/2022 |
| PVE ENGINEERING | 1 | 08/15/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| T&T PLUMBING INC | 12 | 08/25/2026 |
| KG MANAGEMENT CNSLTNG INC | 8 | 06/29/2022 |
| DONATO PLUMBING, INC | 7 | 08/25/2026 |
| NAPOLI CONSTRUCTION OF NY | 7 | 10/10/2025 |
| NORTHBRIDGE CONTRACTING L | 7 | 08/28/2026 |
| CROSSFIELD P & H CORP | 6 | 07/17/2023 |
| DUALCORE CONSTRUCTION MGT | 6 | 08/25/2026 |
| INFINITI ESC PLUMBING COR | 6 | 10/10/2025 |
| KG USA MANAGEMENT INC | 6 | 06/20/2023 |
| MJM CONSTR ASSOCIATES LLC | 6 | 06/05/2026 |
| XIA CONSTRUCTION MNGMT* | 6 | 07/22/2026 |
| AMC PLBG, HTG & CLNG, INC | 5 | 05/09/2025 |
| LACHMAN CONSTRUCTION & DE | 5 | 11/15/2022 |
| BEAM ENTERPRISES INC | 4 | 05/27/2026 |
| CASE PLUMBING LLC | 4 | 07/22/2026 |
| ENGLISH PAINTING CO LLC | 4 | 04/28/2025 |
| HITE CONSTRUCTION INC | 4 | 05/21/2026 |
| REDIRECTING LIC INC | 4 | 08/25/2026 |
| AROUND THE CLOCK CNSN GRP | 3 | 08/17/2022 |
| CSC RENO LLC | 3 | 07/17/2023 |
| DNSH INC | 3 | 06/14/2024 |
| JKO USA MANAGEMENT INC | 3 | 04/18/2025 |
| JMW PLUMBING, INC | 3 | 07/26/2023 |
| KATAN P & H INC | 3 | 05/16/2024 |
| LANDMARK HOME IMPROVEMENT | 3 | 07/21/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| THE MANN GROUP | 11 | 06/08/2026 |
| RYCO CAPITAL | 8 | 08/25/2026 |
| CITY URBAN REALTY | 6 | 05/27/2026 |
| RIDGEWOOD GROUP | 6 | 06/14/2024 |
| RM-SM PROPERTIES UWS L.P. | 6 | 09/12/2025 |
| 388 AMZI HILL LLC | 3 | 11/13/2025 |
| GUMLEY HAFT | 3 | 11/06/2024 |
| MIDWOOD MANAGEMENT CORP | 3 | 06/08/2022 |
| MONARCH REALTY HOLDINGS, LLC | 3 | 11/19/2025 |
| NORTHBRIDGE CONTRACTING | 3 | 05/16/2024 |
| TKR PROPERTY SERVICES, INC. | 3 | 03/10/2025 |
| 250-254 WEST 82ND OWNERS, INC | 2 | 01/23/2020 |
| 4 BOND STREET REALTY LLC | 2 | 10/10/2025 |
| 7 HILLS CORP | 2 | 05/25/2023 |
| ASP | 2 | 01/28/2022 |
| Apex Management Group | 2 | 09/24/2025 |
| CARNEGIE HILL PROPERTIES | 2 | 05/23/2023 |
| DDF CORP | 2 | 02/01/2024 |
| DOUGLAS ELLIMAN | 2 | 01/20/2022 |
| MACKTEZ CORPORATION | 2 | 11/30/2022 |
| MAXWELL-KATES, INC. | 2 | 05/15/2023 |
| MIDWOOD INVESTMENT & DEVELOPMENT | 2 | 04/14/2022 |
| PARTNERS PATH | 2 | 06/19/2023 |
| PERSONAL | 2 | 07/26/2023 |
| 771 61ST STREET REALTY LLC | 1 | 03/25/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| BIG ORANGE EXPEDITING, INC | 96 | 08/25/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 9 | 11/13/2025 |
| LEVIN ENGINEERING PLLC | 3 | 03/04/2025 |
| Modo RenovationsLLC | 3 | 11/07/2025 |
| cur244w72 holding llc | 3 | 05/27/2026 |
| BMB BUILDING CONSULTING INC. | 2 | 04/18/2025 |
| CSM&R DESIGNS | 2 | 05/25/2023 |
| LLOYD NOEL BUILDING CONSULTANT | 2 | 05/23/2023 |
| ARCHVISION DESIGN STUDIO | 1 | 01/06/2026 |
| BURNHAM NATIONWIDE INC | 1 | 05/15/2024 |
| EC BUILDING CONSULTANTS, INC. | 1 | 06/16/2026 |
| HIGHRISE GROUP | 1 | 08/25/2026 |
| HTX BUILDING CONSULTING | 1 | 09/24/2025 |
| SUPPORT BUILDINGS OF NEW YORK | 1 | 02/02/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01408221 ↗ | 244 WEST 72 STREET MANHATTAN | Alteration | Permit Issued | 05/27/2026 | 09/28/2026 | Design THE VILNITS GROUP Owner CITY URBAN REALTY Contractor MJM CONSTR ASSOCIATES LLC Filer cur244w72 holding llc | Renovation of Apt 16E. Minor partition work and kitchen and bathroom renovation. No change to use, egress or occupancy. |
| B01396882 ↗ | 552 16 STREET BROOKLYN | Alteration | Permit Issued | 05/22/2026 | 09/23/2026 | Design SA-DA ARCHITECTURE Contractor AUTHENTIC PLBG CORP | WORK TO EXISTING 1-FAMILY 2 STORY BUILDING PLUS BASEMENT. INTERIOR WORK TO ADD NEW TOILET ROOM TO 1ST FLOOR. NO CHANGE TO USE, OCCUPANCY OR … |
| M01296037 ↗ | 630 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 04/29/2026 | 09/22/2026 | Design SA-DA ARCHITECTURE Contractor DONATO PLUMBING, INC | PLUMBING WORK TO APARTMENT 10A ON THE 10TH FLOOR OF AN EXISTING 13 STORY BUILDING. ALTERATIONS TO INCLUDE REPLACED, AND NEW PLUMBING FIXTURE… |
| M01432326 ↗ | 449 EAST 83 STREET MANHATTAN | Alteration CO | Filed — no permit on record | 07/22/2026 | — | Design SA-DA ARCHITECTURE | — |
| M01370518 ↗ | 230 CENTRAL PARK SOUTH MANHATTAN | Alteration | Permit Issued | 06/26/2026 | 07/14/2026 | Design SA-DA ARCHITECTURE Contractor STROYBAT INC | WORK TO APT 9B/10A ON THE 9TH AND 10TH FLOORS OF AN EXISTING 17-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE REPLACED, RELOCATE… |
| M01115327 ↗ | 141 2 AVENUE MANHATTAN | Alteration | Permit Issued | 09/26/2024 | 07/08/2026 | Design ADB ASSOCIATES Contractor DUALCORE CONSTRUCTION MGT Filer HIGHRISE GROUP | PLUMBING WORK TO APT 1, 2, 3, 5, 7, 11, 15 17, 19, AND 20 OF AN EXISTING 6-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE NEW, RE… |
| M01342093 ↗ | 488 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 02/05/2026 | 07/06/2026 | Design SA-DA ARCHITECTURE Contractor JAMES CRUZ | WORK TO COMMERCIAL SPACE AT THE 1ST FLOOR OF A 23 STORY, COMMERCIAL BUILDING. ALTERATIONS TO INCLUDE INTERIOR COMMERCIAL FIT-OUT WORK. NO CH… |
| B01153247 ↗ | 123 ST MARKS AVENUE BROOKLYN | Alteration | Permit Issued | 12/24/2024 | 06/30/2026 | Design SA-DA ARCHITECTURE Contractor XIA CONSTRUCTION MNGMT* | WORK TO EXISTING 2-FAMILY 4 STORY BUILDING. ALTERATIONS TO CONSIST OF ONE STORY REAR ENLARGEMENT AND WORK TO BASEMENT, 1ST AND 2ND FLOORS. N… |
| M01277129 ↗ | 108 WOOSTER STREET MANHATTAN | Alteration | Permit Issued | 11/19/2025 | 06/18/2026 | Design COLLECTIF ENGINEERING PLLC Contractor SF CONSTRUCTION EXPERTS Filer ARCHVISION DESIGN STUDIO | GROUND FLOOR RETAIL UPGRADES FOR ALTERATION TYPE 2. WORK LIMITED TO INSIDE THE DEMISED PREMISES ONLY ON APPROXIMATELY 1,100 GSF OF IMPACTED … |
| M01412743 ↗ | 244 WEST 72 STREET MANHATTAN | Alteration | Permit Issued | 06/05/2026 | 06/11/2026 | Design THE VILNITS GROUP Contractor MJM CONSTR ASSOCIATES LLC | Renovation of Apt 10C, 11C, 16C and 14E. Minor partition work and kitchen and bathroom renovation. No change to use, egress or occupancy. |
| B01335514 ↗ | 550 VANDERBILT AVENUE BROOKLYN | Alteration | Permit Issued | 03/10/2026 | 06/05/2026 | Contractor WHITE LEAF MECHANICAL COR | Proposed removal of one washer and dryer, one sink, one dishwasher, and one gas stove and associated gas piping. All other plumbing fixtures… |
| M01172813 ↗ | 161 EAST 79 STREET MANHATTAN | Alteration | Signed-off | 02/28/2025 | 06/02/2026 | Design SA-DA ARCHITECTURE Contractor DH EAGLE PLBG & HTG INC | WORK TO APT 9A ON THE 9TH FLOOR OF AN EXISTING 12 STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF REPLACED PLUMBING FIXTURES. NO… |
| B01000829 ↗ | 343 HOYT STREET BROOKLYN | Alteration CO | Permit Issued | 02/26/2024 | 04/30/2026 | Design PVE ENGINEERING Contractor MOKEN HOME IMPROVEMENT | JOB FILED TO SHOW WORK WITH FOOTING, FRAMING REPLACEMENT, FRAMING SISTERING, NEW CMU BEARING WALL, NEW STEEL MOMENT FRAME AS PER PLANS ATT… |
| M01115280 ↗ | 151 2 AVENUE MANHATTAN | Alteration | Permit Issued | 09/26/2024 | 04/24/2026 | Design SA-DA ARCHITECTURE Owner RYCO CAPITAL Contractor TRI CONTRACTING INC | WORK TO CELLAR, COMMON AREAS, APT. 0A, 1A, 1B, 1C, 1D, 2A, 2C, 2D, 2E, 3E, 3C, 3D, 4A, 4B, 4C, 4D, 4E, 5A, 5B, 5C, 5D AND 5E OF EXISTING BU… |
| B01008758 ↗ | 343 HOYT STREET BROOKLYN | Alteration | Permit Issued | 06/06/2024 | 04/15/2026 | Design LEVIN ENGINEERING PLLC Contractor UNICORN BUILDERS GROUP LL | INSTALLATION OF MECHANCIAL SYSTEM FOR ENTIRE BUILDING IN CONJUCTION # B01000829. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01260621 ↗ | 152 7 AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 07/25/2025 | 03/04/2026 | Design SA-DA ARCHITECTURE Contractor BABA CONSTRUCTION CORP | WORK TO COMMERCIAL SPACE AT THE 1ST FLOOR OF A 5 STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE INTERIOR PARTITION WORK AND THE I… |
| B00835202 ↗ | 444 15 STREET BROOKLYN | Alteration | Permit Issued | 03/03/2023 | 03/02/2026 | Design JAMES CHAI ARCHITECT, P.C. Owner Apex Management Group Contractor NORTHBRIDGE CONTRACTING L Filer HTX BUILDING CONSULTING | PLUMBING WORK TO RENOVATE UNITS #1L and 1R @ 1ST FLOOR, 3L and 3R @ 3RDFLOOR & CELLAR .NO CHANGE TO USE, EGRESS OR OCCUPANR |
| M01288903 ↗ | 55 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 09/18/2025 | 02/10/2026 | Contractor HITE CONSTRUCTION Filer SA-DA ARCHITECTURE | WORK TO APT 9CD ON THE 9TH FLOOR OF AN EXISTING 17 STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF RELOCATED, REPLACED, AND NEW … |
| M01339374 ↗ | 244 WEST 72 STREET MANHATTAN | Alteration | Signed-off | 12/29/2025 | 02/05/2026 | Design THE VILNITS GROUP Contractor MJM CONSTR ASSOCIATES LLC | Renovation of Apt PH2. Partition work and kitchen and bathroom renovation. No change to use, egress or occupancy. |
| B01324419 ↗ | 1450 FULTON STREET BROOKLYN | Alteration | Signed-off | 12/01/2025 | 12/23/2025 | Design SA-DA ARCHITECTURE Owner THE MANN GROUP Contractor RKA PIPING AND HEATING | WORK TO THE CELLAR & COMMERCIAL SPACE AT THE 1ST FLOOR OF AN EXISTING 4-STORY, MIXED-USE BUILDING. NO CHANGE TO ZONING, USE, EGRESS, OR OCCU… |
| B01310694 ↗ | 1450 FULTON STREET BROOKLYN | Alteration | Filed — no permit on record | 12/08/2025 | — | Design SA-DA ARCHITECTURE Owner THE MANN GROUP | — |
| M01278536 ↗ | 244 WEST 72 STREET MANHATTAN | Alteration | Permit Issued | 08/28/2025 | 12/04/2025 | Design THE VILNITS GROUP Owner CITY URBAN REALTY Contractor MJM CONSTR ASSOCIATES LLC Filer cur244w72 holding llc | Renovation of Apt 4F, 5A, 5B, 5C, 5E, 6C, 9A, 9B, 9C, 9D, 10A, 10B, 11D, 11E, 12E, 12F, 14B, 14C, 14E, 15A, 15C and 16D. Minor partition wo… |
| B01276526 ↗ | 219 KANE STREET BROOKLYN | Alteration CO | Permit Issued | 09/16/2025 | 11/17/2025 | Design SA-DA ARCHITECTURE Contractor NORTHBRIDGE CONTRACTING L | REPLACEMENT OF REAR DECK AND STRUCTURAL MODIFICATIONS RELATING TO ARCHITECTURAL RENOVATION SCOPE. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUP… |
| M01187294 ↗ | 328 EAST 89 STREET MANHATTAN | Alteration | Permit Issued | 03/07/2025 | 11/17/2025 | Design SA-DA ARCHITECTURE Contractor ARMANI DESIGN AND DEVELOP | WORK TO THE CELLAR AND APARTMENT 1W ON THE 1ST FLOOR OF AN EXISTING 5-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF REPLACED,… |
| B00455058 ↗ | 1450 FULTON STREET BROOKLYN | Alteration | Signed-off | 01/27/2021 | 11/14/2025 | Design SA-DA ARCHITECTURE Owner THE MANN GROUP Contractor NICHOLAS SUIDA | WORK TO THE CELLAR OF AN EXISTING 4 STORY, MULTIPLE DWELING BUILDING, ALTERATION TO CONSIST OF THE INSTALATION OF (3) NEW BOILERS IN THE CE… |
| B00858007 ↗ | 396 WASHINGTON AVENUE BROOKLYN | Alteration | Signed-off | 02/12/2024 | 11/14/2025 | Design EJC ENGINEERING, PLLC Owner 388 AMZI HILL LLC Contractor BROADTRADE SERVICE GROUP | Mechanical work as per proposed plans submitted. |
| M01278119 ↗ | 244 WEST 72 STREET MANHATTAN | Alteration | Signed-off | 08/27/2025 | 11/14/2025 | Design THE VILNITS GROUP Contractor MJM CONSTR ASSOCIATES LLC | Renovation of Apt PH1. Partition work and kitchen and bathroom renovation. No change to use, egress or occupancy. |
| M01318311 ↗ | 244 WEST 72 STREET MANHATTAN | Alteration | Permit Issued | 11/12/2025 | 11/14/2025 | Design THE VILNITS GROUP Owner CITY URBAN REALTY Contractor MJM CONSTR ASSOCIATES LLC Filer cur244w72 holding llc | Cosmetic renovation of existing lobby and public hallways. No change to use, egress or occupancy. |
| M01091294 ↗ | 156 2 AVENUE MANHATTAN | Alteration | Signed-off | 08/07/2024 | 11/13/2025 | Design SA-DA ARCHITECTURE Owner RYCO CAPITAL Contractor DUALCORE CONSTRUCTION MGT | WORK TO APTS 2A,2B,2D,2E,2F,3A,3B,3C,3D,3E,3F,4B,4C,4E,4F,5A,5B,5C,5D,5E,5F,6B,6D,6E&6F IN A 6-STORY BUILDING. ALTERATIONS TO INCLUDE NEW, R… |
| B01069892 ↗ | 260 CLINTON AVENUE BROOKLYN | Alteration CO | Permit Issued | 08/23/2024 | 10/15/2025 | Design SA-DA ARCHITECTURE Contractor NORTHBRIDGE CONTRACTING L | Structural alteration and new metal deck and stairs in the rear yard. |
| B01008264 ↗ | 343 HOYT STREET BROOKLYN | Alteration | Permit Issued | 06/06/2024 | 10/14/2025 | Design LEVIN ENGINEERING PLLC Contractor VSP MECHANICAL INC Filer LEVIN ENGINEERING PLLC | INSTALLATION OF PLUMBING SYSTEM FOR ENTIRE BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| B01127498 ↗ | 159 CARLTON AVENUE BROOKLYN | Alteration | Permit Issued | 12/23/2024 | 09/26/2025 | Design SA-DA ARCHITECTURE Contractor BRUKLYN BUILDERS INC | WORK TO THE 2ND AND 3RD FLOORS OF AN EXISTING 4-STORY RESIDENTIAL BUILDING. ALTERATIONS TO CONSIST OF RELOCATION OF EXISTING LOT LINE WINDOW… |
| M01284189 | 59 WEST 70 STREET MANHATTAN | Alteration | Filed — no permit on record | 09/12/2025 | — | — | — |
| M01284197 ↗ | 61 WEST 70 STREET MANHATTAN | Alteration | Filed — no permit on record | 09/12/2025 | — | Design SA-DA ARCHITECTURE | — |
| M00922741 ↗ | 18 MERCER STREET MANHATTAN | Alteration | Signed-off | 10/09/2023 | 09/09/2025 | Design SA-DA ARCHITECTURE Contractor O&L EXPERT CONTRACTING IN | WORK TO APT 6 ON THE 6TH FLOOR OF AN EXISTING 6-FAMILY, 6-STORY JLWQ BUILDING. ALTERATIONS TO CONSIST OF INTERIOR PARTITION WORK. NO CHANGE … |
| M01223631 ↗ | 127 2 AVENUE MANHATTAN | Alteration | Signed-off | 05/12/2025 | 09/04/2025 | Design SA-DA ARCHITECTURE Contractor DUALCORE CONSTRUCTION MGT | CONSTRUCT NEW ELECTRICAL METER ROOM AT THE FRONT OF THE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01065707 ↗ | 1170 5 AVENUE MANHATTAN | Alteration | Signed-off | 08/12/2024 | 08/05/2025 | Design SA-DA ARCHITECTURE Contractor HITE CONSTRUCTION | WORK TO APARTMENT 4A ON THE 4TH FLOOR OF AN EXISTING 15 STORY + PENTHOUSE BUILDING. ALTERATIONS TO INCLUDE NEW AND RELOCATED PARTITIONS. NO … |
| B01134007 ↗ | 232 BERGEN STREET BROOKLYN | Alteration | Signed-off | 01/06/2025 | 07/31/2025 | Design SA-DA ARCHITECTURE Contractor T & T PLUMBING INC | PLUMBING WORK TO AN EXISTING 4-STORY BUILDING. ALTERATIONS TO CONSIST OF NEW, REMOVED, REPLACED AND RELOCATED PLUMBING FIXTURES. NO CHANGES … |
| B01261192 ↗ | 219 KANE STREET BROOKLYN | Alteration | Permit Issued | 07/28/2025 | 07/30/2025 | Design SA-DA ARCHITECTURE Contractor NORTHBRIDGE CONTRACTING L | INTERIOR DEMOLITION WORK AT THE BASEMENT AND 1ST-3RD FLOORS OF A 4 STORY, 2-FAMILY DWELLING. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY … |
| M01052042 ↗ | 1070 PARK AVENUE MANHATTAN | Alteration | Signed-off | 06/12/2024 | 07/21/2025 | Design SA-DA ARCHITECTURE Contractor HITE CONSTRUCTION | WORK TO APARTMENT 6-B ON THE 6TH FLOOR OF AN EXISTING 15 STORY + PENTHOUSE BUILDING. ALTERATIONS TO INCLUDE RELOCATED, AND REPLACED PLUMBING… |
| M01210651 ↗ | 244 WEST 72 STREET MANHATTAN | Alteration | Signed-off | 04/24/2025 | 05/16/2025 | Design THE VILNITS GROUP Owner CITY URBAN REALTY Contractor BEAM ENTERPRISES INC Filer Modo RenovationsLLC | Renovation of Apt 4A, 12A, 3D and 12D. Minor partition work and kitchen and bathroom renovation. No change to use, egress or occupancy. |
| M01210656 ↗ | 244 WEST 72 STREET MANHATTAN | Alteration | Signed-off | 04/24/2025 | 05/16/2025 | Design THE VILNITS GROUP Owner CITY URBAN REALTY Contractor BEAM ENTERPRISES INC Filer Modo RenovationsLLC | Renovation of Apt 2C, 3E, 4E and 10E. Minor partition work and kitchen and bathroom renovation. No change to use, egress or occupancy. |
| M01210660 ↗ | 244 WEST 72 STREET MANHATTAN | Alteration | Signed-off | 04/24/2025 | 05/16/2025 | Design THE VILNITS GROUP Owner CITY URBAN REALTY Contractor BEAM ENTERPRISES INC Filer Modo RenovationsLLC | Renovation of Apt 6B, 8F, 14F and 15F. Minor partition work and kitchen and bathroom renovation. No change to use, egress or occupancy. |
| B01133945 ↗ | 232 BERGEN STREET BROOKLYN | Alteration | Signed-off | 01/06/2025 | 05/09/2025 | Design SA-DA ARCHITECTURE Contractor REDIRECTING LIC INC | MECHANICAL AND STRUCTURAL WORK TO AN EXISTING 4-STORY BUILDING. ALTERATIONS TO CONSIST OF NEW MECHANICAL UNITS WITH DUNNAGE AND NEW EXHAUSTS… |
| M01216499 ↗ | 1289 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 04/28/2025 | 05/07/2025 | Design SA-DA ARCHITECTURE Contractor ENGLISH PAINTING CO LLC | WORK TO APARTMENT 16A ON THE 16TH FLOOR OF AN EXISTING 18 STORY BUILDING. ALTERATIONS TO INCLUDE NEW PARTITION AND CEILINGS. NO CHANGE TO ZO… |
| B00966871 ↗ | 167 DECATUR STREET BROOKLYN | Alteration | Signed-off | 01/12/2024 | 05/05/2025 | Design SA-DA ARCHITECTURE Contractor VAIR CONTRACTING INC | EXTERIOR WORK TO ADD AND RELOCATE WINDOWS AND ADD REAR DECK TO AN EXISTING 2-FAMILY, 3-STORY BUILDING. NO CHANGE TO ZONING, USE, EGRESS, OR … |
| M01172908 ↗ | 161 EAST 79 STREET MANHATTAN | Alteration | Signed-off | 03/31/2025 | 05/05/2025 | Design R.J. MCGEE ENGINEERING, PLLC Contractor NIKA CONTRACTING GROUP CO | INSTALLATION OF NEW HVAC SYSTEM AS PER THE PLANS. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY PROPOSED UNDER THIS APPLICATION. |
| B01214171 ↗ | 350 MYRTLE AVENUE BROOKLYN | Alteration | Filed — no permit on record | 04/24/2025 | — | Design SA-DA ARCHITECTURE Owner CERYNEIAN MGT, LLC | — |
| M00995803 ↗ | 4 BOND STREET MANHATTAN | Alteration | Signed-off | 03/14/2024 | 04/09/2025 | Design SA-DA ARCHITECTURE Owner 4 BOND STREET REALTY LLC Contractor NAPOLI CONSTRUCTION OF NY | PLUMBING WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M01194940 ↗ | 141 2 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 03/14/2025 | — | Design MARTOS ENGINEERING Owner RYCO CAPITAL | — |
| M01084060 ↗ | 129 2 AVENUE MANHATTAN | Alteration | Signed-off | 07/30/2024 | 03/12/2025 | Design SA-DA ARCHITECTURE Owner RYCO CAPITAL Contractor DUALCORE CONSTRUCTION MGT | WORK TO APT 5, 11, 15 AND 20 OF AN EXISTING 6-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE RELOCATED PARTITIONS. NO CHANGE TO … |
| M01115330 ↗ | 131 2 AVENUE MANHATTAN | Alteration | Signed-off | 09/30/2024 | 03/07/2025 | Design SA-DA ARCHITECTURE Owner RYCO CAPITAL Contractor DUALCORE CONSTRUCTION MGT | WORK TO APT.10 AT THE 4TH FLOOR OF AN EXISTING 6-STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE RELOCATED PARTITIONS. NO CHANGE T… |
| B00516025 ↗ | 155 EVERGREEN AVENUE BROOKLYN | Alteration | Signed-off | 03/17/2022 | 03/06/2025 | Design SA-DA ARCHITECTURE Owner THE MANN GROUP Contractor AMC PLBG, HTG & CLNG, INC | WORK TO APT 1R, 1ST FL APT WITH ACCESSORY CELLAR SPACE IN AN EXTG 2 STORY MULTIPLE DWELLING BUILDING. WORK TO INCLUDE NEW & RELOCATED PL FIX… |
| B00858012 ↗ | 396 WASHINGTON AVENUE BROOKLYN | Alteration | Signed-off | 02/05/2024 | 02/27/2025 | Design EJC ENGINEERING, PLLC Owner 388 AMZI HILL LLC Contractor DC BUILDING SERVICES INC | Filing for Plumbing work as per proposed plans submitted. |
| M00927681 ↗ | 150 WEST 56 STREET MANHATTAN | Alteration | Permit Issued | 10/06/2023 | 02/03/2025 | Design SA-DA ARCHITECTURE Contractor MUNSEY ENTERPRISES LLC | WORK TO COMBINE APARTMENTS 65.03 AND 66.03 WITH EXISTING 65.01/02/04 AND 66.01/02/04 AT THE DESIGNATED 65TH AND 66TH (CONSTRUCTION 62ND AND … |
| M01032995 ↗ | 246 WEST 108 STREET MANHATTAN | Alteration | Signed-off | 11/13/2024 | 01/22/2025 | Design R.J. MCGEE ENGINEERING, PLLC Contractor PROCORE MECHANICAL CORP | REMOVAL OF AN EXISTING GAS METER, BOILER, AND ASSOCIATED PIPING AS PER THE SUBMITTED PLANS. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY U… |
| B01132710 ↗ | 232 BERGEN STREET BROOKLYN | Alteration CO | Permit Issued | 11/19/2024 | 12/23/2024 | Design SA-DA ARCHITECTURE Contractor REDIRECTING LIC INC | ALTERATION TYPE C/O FILED TO RELOCATE OCCUPANCY DISTRIBUTION FOR AN EXISTING 4-STORY + CELLAR BUILDING. NEW CERTIFICATE OF OCCUPANCY REQUEST… |
| M01115293 ↗ | 151 2 AVENUE MANHATTAN | Alteration | Permit Issued | 09/26/2024 | 12/20/2024 | Design SA-DA ARCHITECTURE Owner RYCO CAPITAL Contractor OMADA CONSTRUCTION CORP | WORK TO APT. 1A OF AN EXISTING 6-STORY,MULTIPLE DWELLING BUILDING TO CORRECT VIOLATION 35374468J. ALTERATIONS TO INCLUDE RELOCATED PARTITI… |
| M01087137 ↗ | 332 WEST 85 STREET MANHATTAN | Alteration | Permit Issued | 08/05/2024 | 12/11/2024 | Design SA-DA ARCHITECTURE Contractor ENGLISH PAINTING CO LLC | WORK TO APT 1C ON THE 1ST FL OF AN EXTG 5 STORY BUILDING. WORK TO INCLUDE INTERIOR PARTITION WORK, INSTALLATION OF NEW HVAC UNIT AND NEW BAT… |
| M01129267 ↗ | 156 2 AVENUE MANHATTAN | Alteration | Signed-off | 10/22/2024 | 11/22/2024 | Design URBAN ENGINEERING, PC Contractor DUALCORE CONSTRUCTION MGT | New Cellar concrete slab on grade. No change to use, egress or occupancy. |
| M01068403 ↗ | 237 EAST 33 STREET MANHATTAN | Alteration | Signed-off | 09/13/2024 | 10/28/2024 | Design SA-DA ARCHITECTURE Contractor MILLER PLBG & HTG INC | WORK TO APARTMENT 5A ON THE 4TH FLOOR OF AN EXISTING 5-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF INTERIOR PARTITION WORK… |
| M01022287 ↗ | 2211 BROADWAY MANHATTAN | Alteration | Signed-off | 03/26/2024 | 10/22/2024 | Design SA-DA ARCHITECTURE Owner GUMLEY HAFT, LLC Contractor MUNSEY ENTERPRISES LLC | WORK TO APT PHA ON THE 12TH FLOOR OF AN EXISTING 12-STORY MULTIPLE DWELLING, MIXED USE BUILDING. WORK TO INCLUDE INTERIOR PARTITION WORK. NO… |
| M00921347 ↗ | 324 EAST 89 STREET MANHATTAN | Alteration | Signed-off | 08/22/2023 | 09/17/2024 | Design SA-DA ARCHITECTURE Contractor LEVEL 10 CONSTRUCTION | WORK TO APT 2E & 2W ON THE 2ND FL, 4W AND 4E ON 4TH FL AND APT 5E ON THE 5TH FL OF AN EXTG 5-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS … |
| B00857298 ↗ | 396 WASHINGTON AVENUE BROOKLYN | Alteration CO | Permit Issued | 04/25/2023 | 09/12/2024 | Design SA-DA ARCHITECTURE Owner 388 AMZI HILL LLC Contractor BIG BEAR CUSTOM BUILD,INC | ALT 1 FILED TO REAPPORTION THE DWELLING UNITS IN AN EXTG 5-STORY MULTIPLE DWELLING BUILDING. NEW CERTIFICATE OF OCCUPANCY REQUESTED. ALTERAT… |
| M01029283 ↗ | 239 EAST 33 STREET MANHATTAN | Alteration | Signed-off | 05/02/2024 | 09/05/2024 | Design SA-DA ARCHITECTURE Contractor MILLER PLBG & HTG INC | PLUMBING WORK TO APT 1D AT THE BASEMENT OF A 5-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE NEW AND RELOCATED PLUMBING FIXTURES… |
| M01085547 ↗ | 145 2 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 08/06/2024 | — | Design SA-DA ARCHITECTURE | — |
| M01085485 ↗ | 145 2 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 07/30/2024 | — | Design SA-DA ARCHITECTURE Owner RYCO CAPITAL | — |
| M01028910 ↗ | 239 EAST 33 STREET MANHATTAN | Alteration CO | Permit Issued | 04/19/2024 | 07/25/2024 | Design SA-DA ARCHITECTURE Contractor LEVEL 10 CONSTRUCTION | ALTERATION TYPE CO FILED TO CONVERT AN EXISTING DOCTOR'S OFFICE INTO A DWELLING UNIT IN THE BASEMENT OF A 5-STORY, MULTIPLE DWELLING BUILDIN… |
| B00976625 ↗ | 260 CORNELIA STREET BROOKLYN | Alteration | Signed-off | 02/20/2024 | 07/18/2024 | Design SA-DA ARCHITECTURE Contractor DYNAMIC BUILDING DEVELOPE | WORK TO CELLAR, 1ST, 2ND, & 3RD FLOOR OF AN EXISTING 3-STORY + CELLAR MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE MINOR PLAN WORK AND… |
| Q00992299 ↗ | 1812 GREENE AVENUE QUEENS | Alteration | Signed-off | 01/25/2024 | 07/17/2024 | Design SA-DA ARCHITECTURE Contractor A&I GENERAL CONSTRUCTION | WORK TO CELLAR, APT 1 ON THE 1ST FL AND APT 2 ON THE 2ND FL OF AN EXTG 2-STORY, 2-FAMILY BUILDING. ALTERATIONS TO CONSIST OF INTERIOR PARTIT… |
| M00943903 ↗ | 160 MOTT STREET MANHATTAN | Alteration | Signed-off | 10/13/2023 | 06/27/2024 | Design SA-DA ARCHITECTURE Owner PHYLCAROL REALTY CORP. Contractor AMAZING BUILDERS AND RENO | WORK TO APTS 1C/D ON THE 1ST FL, APT 2A/B ON THE 2ND FL, AND APT 3C/D ON THE 3RD FL OF EXTG 6-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS… |
| M00921377 ↗ | 324 EAST 89 STREET MANHATTAN | Alteration | Signed-off | 08/23/2023 | 06/05/2024 | Design SA-DA ARCHITECTURE Contractor ROCK E SMALL PLBG&HTG INC | WORK TO THE CELLAR, APT. 4E & 4W ON THE 4TH FL, & APT 5E ON THE 5TH FL OF AN EXTG 5 STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIS… |
| B00817981 ↗ | 1401 BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 09/06/2023 | 05/30/2024 | Design SA-DA ARCHITECTURE Owner NORTHBRIDGE CONTRACTING Contractor NORTHBRIDGE CONTRACTING L | WORK TO 2ND AND 3RD FLOORS OF A THREE STORY, 4 FAMILY BUILDING. ALTERATIONS TO CONSIST OF INTERIOR PARTITIONS WORK, NO CHANGE TO ZONING, USE… |
| M00992041 ↗ | 4 BOND STREET MANHATTAN | Alteration CO | Permit Issued | 03/14/2024 | 05/30/2024 | Design SA-DA ARCHITECTURE Owner 4 BOND STREET REALTY LLC Contractor NAPOLI CONSTRUCTION OF NY | ALT. TYPE CO FILED TO CHANGE OCCUPANCY OF 1ST FLOOR & MEZZANINE OF AN EXTG 4-STORY + PENTHOUSE, MDL BUILDING FROM UG 16/17 TO UG 6. ADDITION… |
| M01015567 ↗ | 970 5 AVENUE MANHATTAN | Alteration | Signed-off | 05/10/2024 | 05/29/2024 | Design LIZARDOS ENGINEERING Owner NEW YORK UNIVERSITY Contractor BROSNA CONSTRUCTION CORPO Filer BURNHAM NATIONWIDE INC | Plumbing modifications as per plans |
| M01038153 ↗ | 20 WEST 84 STREET MANHATTAN | Alteration | Signed-off | 05/07/2024 | 05/28/2024 | Design SA-DA ARCHITECTURE Contractor STROYBAT INC | WORK TO APT 2C AND APT 2D ON THE 2ND FLOOR OF A 9-STORY + PENTHOUSE, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE INTERIOR PARTITION W… |
| M01041710 ↗ | 20 WEST 84 STREET MANHATTAN | Alteration | Signed-off | 05/10/2024 | 05/28/2024 | Design LEVIN ENGINEERING PLLC Contractor STROYBAT INC Filer LEVIN ENGINEERING PLLC | INSTALLATION OF MECHANICAL SYSTEM IN CONJUCTION WITH ALTERATION APPLICATION # M01036945. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00996086 ↗ | 17-11 LINDEN STREET QUEENS | Alteration | Signed-off | 01/26/2024 | 05/23/2024 | Design SA-DA ARCHITECTURE Owner RIDGEWOOD GROUP Contractor DNSH INC | WORK TO APT 1A AND APT 1B AT THE 1ST FLOOR OF AN EXISTING 4-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO INCLUDE THE INSTALLATION OF NE… |
| M01005257 ↗ | 494 AMSTERDAM AVENUE MANHATTAN | Alteration | Signed-off | 03/12/2024 | 05/17/2024 | Design SA-DA ARCHITECTURE Contractor GENESIS PLBG AND HTG CORP | WORK TO (1)COMMERCIAL SPACE ON THE 1ST FLOOR OF AN EXISTING 16-FAMILY, 5 STORY + CELLAR BUILDING. ALTERATIONS TO CONSIST OF INTERIOR PARTITI… |
| M01036945 ↗ | 20 WEST 84 STREET MANHATTAN | Alteration | Signed-off | 04/25/2024 | 05/06/2024 | Design SA-DA ARCHITECTURE Contractor A TEAM CONTRACTING G | WORK TO APT 2C & 2D ON THE 2ND FLOOR OF A 9-STORY + PENTHOUSE, MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF INTERIOR DEMOLITION WOR… |
| B00738770 ↗ | 911 ERSKINE STREET BROOKLYN | Alteration | Signed-off | 05/24/2022 | 05/01/2024 | Design N Y ARCHITECTS INC. Owner SALLYS RESTAURANT LLC Contractor RKA PIPING AND HEATING | Modification to existing Sprinkler system. No change in use occupancy or means of egress under this application. |
| M00953562 ↗ | 140 WEST 4 STREET MANHATTAN | Alteration | Signed-off | 10/27/2023 | 04/08/2024 | Design SA-DA ARCHITECTURE Contractor SAFETECH ENTERPRISES CORP | WORK TO THE FRONT FACADE AT THE 1ST FLOOR OF A 6-STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF DOOR, STAIR AND RAILING RE-FINI… |
| M00953790 ↗ | 142 WEST 4 STREET MANHATTAN | Alteration | Signed-off | 10/27/2023 | 04/08/2024 | Design SA-DA ARCHITECTURE Contractor SAFETECH ENTERPRISES CORP | WORK TO THE FRONT FACADE AT THE 1ST FLOOR OF A 6-STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF DOOR, STAIR AND RAILING RE-FINI… |
| B00814891 ↗ | 913 UNION STREET BROOKLYN | Alteration | Signed-off | 03/28/2023 | 04/03/2024 | Design SA-DA ARCHITECTURE Contractor NAPOLI CONSTRUCTION OF NY | WORK TO BASEMENT, 1ST-4TH FLOORS AND ROOF OF AN EXISTING 4 FAMILY, 5 STORY MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF A NEW HVAC … |
| B00808838 ↗ | 115 PACIFIC STREET BROOKLYN | Alteration | Signed-off | 04/10/2023 | 03/14/2024 | Design SA-DA ARCHITECTURE Contractor XIA CONSTRUCTION MNGMT* | WORK TO EXISTING 5-FAMILY, 4-STORY + BASEMENT BUILDING. ALTERATIONS TO CONSIST OF NEW MECHANICAL UNITS WITH DUNNAGE, AND NEW TOILET & KITCHE… |
| B00837188 ↗ | 115 PACIFIC STREET BROOKLYN | Alteration | Signed-off | 03/10/2023 | 02/09/2024 | Design SA-DA ARCHITECTURE Contractor SEA-DAR ENTERPRISE D/B/A | WORK TO EXISTING 5-FAMILY, 5 STORY BUILDING. ALTERATIONS TO CONSIST OF INTERIOR PARTITION WORK AND WINDOW REPLACEMENT. NO CHANGE TO ZONING,… |
| M00740878 ↗ | 433 PARK AVENUE SOUTH MANHATTAN | Alteration | Filed — no permit on record | 02/01/2024 | — | Design SA-DA ARCHITECTURE Owner DDF CORP | — |
| M00681219 ↗ | 1128 PARK AVENUE MANHATTAN | Alteration | Signed-off | 03/09/2022 | 01/30/2024 | Design SA-DA ARCHITECTURE Contractor LANDMARK HOME IMPROVEMENT | WORK TO APARTMENT 123 ON THE 12TH FLOOR OF AN EXISTING 15 STORY+PENTHOUSE BUILDING. ALTERATIONS TO INCLUDE NEW AND RELOCATED PARTITIONS. NO … |
| M00773344 ↗ | 61 WEST 70 STREET MANHATTAN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 07/15/2022 | 01/16/2024 | Design MELAMED ARCHITECT PC Contractor JKO USA MANAGEMENT | STRUCTURAL AND DEMO WORK AS PER PLANS FILED HEREWITH IN CONJUNCTION WITH ALT1 WORK. |
| M00928208 ↗ | 37 CARMINE STREET MANHATTAN | Alteration | Permit Issued | 10/03/2023 | 01/09/2024 | Design SA-DA ARCHITECTURE Contractor NAPOLI CONSTRUCTION OF NY | INTERIOR ALTERATIONS TO ONE TENANT SPACE AT 1ST FLOOR AND CELLAR IN AN EXISTING 5-STORY BUILDING. WORK TO CONSIST OF NEW INTERIOR PARTITIONS… |
| B00808875 ↗ | 115 PACIFIC STREET BROOKLYN | Alteration | Signed-off | 04/11/2023 | 01/02/2024 | Design SA-DA ARCHITECTURE Contractor S & L PLUMBING INC | PLUMBING WORK AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B00845275 ↗ | 1529 GREENE AVENUE BROOKLYN | Alteration | Signed-off | 05/01/2023 | 12/22/2023 | Design SA-DA ARCHITECTURE Owner RIDGEWOOD GROUP Contractor DNSH INC | WORK TO THE CELLAR, 1ST-3RD FLOORS AND ROOF OF AN EXISTING 3-STORY, 3 FAMILY MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF NEW MECHA… |
| B00818737 ↗ | 1401 BEDFORD AVENUE BROOKLYN | Alteration | Signed-off | 10/12/2023 | 11/16/2023 | Design SA-DA ARCHITECTURE Owner NORTHBRIDGE CONTRACTING Contractor KATAN P & H INC | WORK TO 2ND AND 3RD FLOORS OF A THREE STORY, 4 FAMILY BUILDING. ALTERATIONS TO CONSIST OF NEW, REMOVED, AND RELOCATED PLUMBING FIXTURES. NO… |
| B00794194 ↗ | 138 PACIFIC STREET BROOKLYN | Alteration | Signed-off | 08/19/2022 | 11/09/2023 | Design R.J. MCGEE ENGINEERING, PLLC Contractor S & L PLUMBING INC | PLUMBING AND SPRINKLERS WORK AS PER PLANS FILED HEREWITH, NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| M00922750 ↗ | 18 MERCER STREET MANHATTAN | Alteration | Signed-off | 10/11/2023 | 10/19/2023 | Design SA-DA ARCHITECTURE Contractor ZEFI MECHANICAL INC | WORK TO APT 6 ON THE 6TH FLOOR OF AN EXISTING 6-FAMILY, 6-STORY JLWQ BUILDING. ALTERATIONS TO INCLUDE NEW, REMOVED, AND RELOCATED PLUMBING F… |
| M00936426 ↗ | 324 EAST 89 STREET MANHATTAN | Alteration | Filed — no permit on record | 10/10/2023 | — | Design SA-DA ARCHITECTURE | — |
| M00727533 ↗ | 467 WEST 22 STREET MANHATTAN | Alteration | Signed-off | 06/02/2022 | 09/29/2023 | Design SA-DA ARCHITECTURE Owner PERSONAL Contractor ENGLISH PAINTING CO LLC | GENERAL CONSTRUCTION FOR INTERIOR PARTITIONS & NEW NON-EGRESS STAIR FOR COMBINATION OF APARTMENTS TO EXISTING CEL/1ST FLOOR DUPLEX AND 2ND F… |
| M00859989 ↗ | 97 AVENUE B MANHATTAN | Alteration | Signed-off | 05/31/2023 | 09/29/2023 | Design SA-DA ARCHITECTURE Contractor DPH PLUMBING & HTG CORP | WORK TO APARTMENTS 1C & 2C AT THE 1ST AND 2ND FLOOR OF AN EXISTING 6-STORY, MULTIPLE FAMILY BUILDING. ALTERATIONS TO INCLUDE REMOVED AND REP… |
| B00483178 ↗ | 39 CLIFTON PLACE BROOKLYN | Alteration | Signed-off | 07/08/2021 | 09/26/2023 | Design SA-DA ARCHITECTURE Contractor STAR PLUMBING & HTNG LLC | WORK TO APARTMENT 2 AT THE 2ND FLOOR OF AN EXISTING 3-FAMILY + COMMERCIAL, 3 STORY BUILDING. ALTERATIONS TO INCLUDE NEW AND RELOCATED PLUMBI… |
| M00916737 ↗ | 237 EAST 33 STREET MANHATTAN | Alteration | Signed-off | 08/10/2023 | 09/21/2023 | Design SA-DA ARCHITECTURE Contractor REDIRECTING LIC INC | WORK TO APARTMENT 2A ON THE 1ST FLOOR OF AN EXISTING 5-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF INTERIOR FINISH WORK AND… |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 08/20/2026 | Lighting in dwelling units | 161 EAST 79 STREET | Alexander Stoltz | energy_progress |
| 08/20/2026 | Insulation placement and R values | 161 EAST 79 STREET | Alexander Stoltz | energy_progress |
| 08/20/2026 | Energy Code Compliance Inspections | 161 EAST 79 STREET | Alexander Stoltz | progress |
| 08/20/2026 | Final | 161 EAST 79 STREET | Alexander Stoltz | progress |
| 08/20/2026 | Fire-Resistant Penetrations and Joints | 161 EAST 79 STREET | Alexander Stoltz | special |
| 08/20/2026 | Structural Stability – Alterations of existing buildings | 161 EAST 79 STREET | Karol Zdancewicz | special |
| 07/07/2026 | Sprinkler Systems | 550 VANDERBILT AVENUE | Charles Michel | special |
| 07/07/2026 | Fire-Resistant Penetrations and Joints | 550 VANDERBILT AVENUE | Alexander Stoltz | special |
| 07/07/2026 | Tenant Protection Plan Compliance | 550 VANDERBILT AVENUE | Alexander Stoltz | special |
| 06/11/2026 | Tenant Protection Plan Compliance | 550 VANDERBILT AVENUE | — | special |
| 06/11/2026 | Sprinkler Systems | 550 VANDERBILT AVENUE | Charles Michel | special |
| 06/11/2026 | Fire-Resistant Penetrations and Joints | 550 VANDERBILT AVENUE | Alexander Stoltz | special |
| 06/09/2026 | Fire-Resistant Penetrations and Joints | 1450 FULTON STREET | Alexander Stoltz | special |
| 06/09/2026 | Tenant Protection Plan Compliance | 1450 FULTON STREET | Alexander Stoltz | special |
| 06/05/2026 | Lighting in dwelling units | 244 WEST 72 STREET | ILYA VILNITS | energy_progress |
| 06/05/2026 | Lighting controls | 244 WEST 72 STREET | ILYA VILNITS | energy_progress |
| 06/05/2026 | Energy Code Compliance Inspections | 244 WEST 72 STREET | ILYA VILNITS | progress |
| 06/05/2026 | Final | 244 WEST 72 STREET | ILYA VILNITS | progress |
| 06/05/2026 | Tenant Protection Plan Compliance | 244 WEST 72 STREET | Alexander Stoltz | special |
| 06/05/2026 | Fire-Resistant Penetrations and Joints | 244 WEST 72 STREET | ILYA VILNITS | special |
| 06/04/2026 | Tenant Protection Plan Compliance | 1450 FULTON STREET | Alexander Stoltz | special |
| 06/04/2026 | Fire-Resistant Penetrations and Joints | 1450 FULTON STREET | Alexander Stoltz | special |
| 06/02/2026 | Lighting in dwelling units | 239 EAST 33 STREET | Alexander Stoltz | energy_progress |
| 06/02/2026 | Energy Code Compliance Inspections | 239 EAST 33 STREET | Alexander Stoltz | progress |
| 06/02/2026 | Tenant Protection Plan Compliance | 239 EAST 33 STREET | Alexander Stoltz | special |
| 06/02/2026 | Fire-Resistant Penetrations and Joints | 239 EAST 33 STREET | Alexander Stoltz | special |
| 05/27/2026 | Lighting in dwelling units | 244 WEST 72 STREET | ILYA VILNITS | energy_progress |
| 05/27/2026 | Lighting controls | 244 WEST 72 STREET | ILYA VILNITS | energy_progress |
| 05/27/2026 | Energy Code Compliance Inspections | 244 WEST 72 STREET | ILYA VILNITS | progress |
| 05/27/2026 | Final | 244 WEST 72 STREET | ILYA VILNITS | progress |
| 05/27/2026 | Tenant Protection Plan Compliance | 244 WEST 72 STREET | Alexander Stoltz | special |
| 05/27/2026 | Fire-Resistant Penetrations and Joints | 244 WEST 72 STREET | ILYA VILNITS | special |
| 05/21/2026 | Tenant Protection Plan Compliance | 141 2 AVENUE | Alexander Stoltz | special |
| 05/20/2026 | Energy Code Compliance Inspections | 552 16 STREET | Alexander Stoltz | progress |
| 05/13/2026 | Shutoff dampers | 156 2 AVENUE | Brian Bisram | energy_progress |
| 05/13/2026 | Permanent certificate | 156 2 AVENUE | Brian Bisram | energy_progress |
| 05/13/2026 | Maintenance information | 156 2 AVENUE | Brian Bisram | energy_progress |
| 05/13/2026 | HVAC-R and service water heating system controls | 156 2 AVENUE | Brian Bisram | energy_progress |
| 05/13/2026 | HVAC-R and service water heating equipment | 156 2 AVENUE | Brian Bisram | energy_progress |
| 05/13/2026 | HVAC-R and service water piping design and insulation | 156 2 AVENUE | Brian Bisram | energy_progress |
| 05/13/2026 | Mechanical Systems | 156 2 AVENUE | Brian Bisram | special |
| 05/13/2026 | Tenant Protection Plan Compliance | 156 2 AVENUE | Alexander Stoltz | special |
| 05/13/2026 | Fire-Resistant Penetrations and Joints | 156 2 AVENUE | Alexander Stoltz | special |
| 05/13/2026 | Energy Code Compliance Inspections | 156 2 AVENUE | Brian Bisram | progress |
| 05/13/2026 | Final | 156 2 AVENUE | Brian Bisram | progress |
| 05/04/2026 | Final | 552 16 STREET | Alexander Stoltz | progress |
| 05/04/2026 | Mechanical Systems | 552 16 STREET | Alexander Stoltz | special |
| 04/28/2026 | Fire-Resistant Penetrations and Joints | 630 PARK AVENUE | Alexander Stoltz | special |
| 04/28/2026 | Post-installed Anchors | 630 PARK AVENUE | Alexander Stoltz | special |
| 04/28/2026 | Fire-Resistance Rated Construction | 630 PARK AVENUE | Alexander Stoltz | progress |