← Back
Other college and university
225 STEUBEN STREET
BROOKLYN · BIN 3055116
💬 Discuss this project
1972Year Built
1Stories
W6Building Class
R7-1Zoning
158,540 sfGross Floor Area
1Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Other college and university · 156,700 sf lot · 1.01 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 15 docs
Floor 22p · 1 filing · 20 docs
Floor 19p · 1 filing · 20 docs
Mezzanine1p · 1 filing · 4 docs
CellarUnder Construction1p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.403/21/2026
MBE CODE & ZONING LLC1403/21/2026
LAWRENCE K SHAPIRO ASSOCIATES203/21/2026
METROPOLIS GROUP INC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RICHTER & RATNER CONTRACTINGGeneral Contractor707/08/2026
SRCC CORPGeneral Contractor203/21/2026
TALISEN CONSTRUCTION CORPGeneral Contractor207/08/2026
AMERICAN STANDARD PLUMBING &Fire Protection107/08/2026
ASHLAR MECHANICAL CORPFire Protection107/08/2026
ENOBRAC PLUMBING, INCFire Protection107/08/2026
GO PRO FIRE PROTECTION CFire Protection107/08/2026
DEBORAH BRADLEY CONS & MGGeneral Contractor107/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
COMMERICAL PLBG SVCES LLCPlumbing107/08/2026
CLEANTHIS MEIMAROGLOUElectrical103/21/2026
ENOBRAC PLUMBING, INCPlumbing107/08/2026
LMEC ELECTRIC INCElectrical103/22/2026
MEIMAROGLOU CLEANTHISElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK ENGINEERING PC678304/03/2026
FENAGH, INC6942510/28/2024
SGM ENGINEERING2366307/27/2022
Building Lifecycle
All (93)Filed (14)Permit Issued (17)Signed Off (4)Violation (5)Inspection (9)Objection (14)Special Inspection (30)
04/23/2026
Permit issued — General Construction
B01356204-I1-GC
04/07/2026
Signed off — Alteration
Modification of sprinkler system for the 001 and 002 FLRS. No change in use, egress or occupancy.
B00976418-I1
04/03/2026
Filed — Alteration
INSTALLATION OF STORMWATER MANAGEMENT SYSTEM (SUBSURFACE INFILTRATION TANKS) PER DEP PRIVATE PROPERTY GREEN INFRASTRUCTURE RETROFIT INCENTIVE PROGRAM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B01356204-I1
03/20/2026
Violation issued (FDNY_ORDER, closed)
02/25/2026
Objection resolved — Addressed
02/18/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
MAX POLICASTRO
02/18/2026
Special inspection requirement — Subgrade Inspections
Ari Kamo
02/05/2026
Special inspection requirement — Final
Russell Dudley
01/26/2026
Permit issued — Structural
B01260279-I1-GC-CX
01/22/2026
Objection resolved — Addressed
01/22/2026
Objection resolved — Addressed
01/22/2026
Objection resolved — Addressed
01/14/2026
Special inspection requirement — Concrete - Cast-In-Place
Ari Kamo
01/14/2026
Special inspection requirement — Final
Craig Hargrove
01/14/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Ari Kamo
01/14/2026
Special inspection requirement — Post-installed Anchors
Ari Kamo
01/13/2026
Filed — Alteration
SUPPORT OF EXCAVATION (PHASE 1) TO ACCESS FOUNDATION WALLS FOR WATERPROOFING OF PORTION OF WALLS BELOW GRADE LEVEL AS PER PLANS.
B01260279-P1
12/19/2025
Filed — Alteration
SUPPORT OF EXCAVATION (PHASE 1) TO ACCESS FOUNDATION WALLS FOR WATERPROOFING OF PORTION OF WALLS BELOW GRADE LEVEL AS PER PLANS.
B01260279-S1
12/19/2025
Objection raised — Other
12/19/2025
Objection raised — Other
12/19/2025
Objection raised — Other
12/19/2025
Objection raised — Other
12/11/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
12/09/2025
Special inspection requirement — Final
Craig Hargrove
12/09/2025
Special inspection requirement — Concrete - Cast-In-Place
Ari Kamo
12/09/2025
Special inspection requirement — Post-installed Anchors
Ari Kamo
12/09/2025
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Ari Kamo
09/23/2025
Violation issued (FDNY_ORDER, closed)
08/06/2025
Filed — Alteration
SUPPORT OF EXCAVATION (PHASE 1) TO ACCESS FOUNDATION WALLS FOR WATERPROOFING OF PORTION OF WALLS BELOW GRADE LEVEL AS PER PLANS.
B01260279-I1
07/30/2025
Violation issued (FDNY_ORDER, closed)
07/16/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/24/2025
Signed off — Alteration
Modification of sprinkler system for the 001 and 002 FLRS. No change in use, egress or occupancy.
B00976418-S2
06/06/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/03/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/19/2025
Permit issued — Sprinklers
B00976418-S3-EW-SP
05/19/2025
Permit issued — Plumbing
B00976418-S2-PL
11/25/2024
Filed — Alteration
Modification of sprinkler system for the 001 and 002 FLRS. No change in use, egress or occupancy.
B00976418-P2
10/28/2024
Filed — Alteration
Modification of sprinkler system for the 001 and 002 FLRS. No change in use, egress or occupancy.
B00976418-P3
10/21/2024
Special inspection requirement — Post-installed Anchors
AILANTO DANIEL MINAWI
10/21/2024
Special inspection requirement — Final
AILANTO DANIEL MINAWI
10/21/2024
Special inspection requirement — Fire-Resistance Rated Construction
AILANTO DANIEL MINAWI
10/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
10/16/2024
Filed — Alteration
Modification of sprinkler system for the 001 and 002 FLRS. No change in use, egress or occupancy.
B00976418-P1
09/13/2024
Special inspection requirement — Sprinkler Systems
AILANTO DANIEL MINAWI
07/03/2024
Permit issued — Sprinklers
B00976418-S3-EW-SP
07/03/2024
Permit issued — Plumbing
B00976418-S2-PL
05/24/2024
Permit issued — Mechanical Systems
B00976418-S1-MS
05/24/2024
Permit issued — General Construction
B00976418-I1-GC
05/24/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/21/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/03/2024
Permit issued — General Construction
B00976418-I1-GC
05/03/2024
Permit issued — Mechanical Systems
B00976418-S1-MS
02/21/2024
Permit issued — Plumbing
B00976418-S2-PL
02/20/2024
Permit issued — Sprinklers
B00976418-S3-EW-SP
02/15/2024
Permit issued — General Construction
B00976418-I1-GC
02/15/2024
Permit issued — Mechanical Systems
B00976418-S1-MS
02/07/2024
Filed — Alteration
Modification of sprinkler system for the 001 and 002 FLRS. No change in use, egress or occupancy.
B00976418-S2
02/07/2024
Filed — Alteration
Modification of sprinkler system for the 001 and 002 FLRS. No change in use, egress or occupancy.
B00976418-S3
02/07/2024
Filed — Alteration
Modification of sprinkler system for the 001 and 002 FLRS. No change in use, egress or occupancy.
B00976418-S1
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDEBORAH BRADLEY CONS & MG04/23/2026
DOB NOWStructuralPermit IssuedSRCC CORP01/26/2026
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C05/19/2025
DOB NOWPlumbingSigned-offCOMMERICAL PLBG SVCES LLC05/19/2025
DOB NOWSprinklersSigned-offAMERICAN STANDARD PLUMBIN07/03/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.07/03/2024
DOB NOWMechanical SystemsSigned-offRICHTER & RATNER CONTRACTING05/24/2024
DOB NOWGeneral ConstructionSigned-offRICHTER & RATNER CONTRACTING05/24/2024
DOB NOWGeneral ConstructionSigned-offRICHTER & RATNER CONTRACTING05/03/2024
DOB NOWMechanical SystemsSigned-offRICHTER & RATNER CONTRACTING05/03/2024
DOB NOWPlumbingSigned-offENOBRAC PLUMBING, INC02/21/2024
DOB NOWSprinklersSigned-offENOBRAC PLUMBING, INC02/20/2024
DOB NOWGeneral ConstructionSigned-offRICHTER & RATNER CONTRACTING02/15/2024
DOB NOWMechanical SystemsSigned-offRICHTER & RATNER CONTRACTING02/15/2024
DOB NOWMechanical SystemsSigned-offTALISEN CONSTRUCTION CORP02/17/2023
DOB NOWSprinklersSigned-offASHLAR MECHANICAL CORP10/13/2022
DOB NOWGeneral ConstructionSigned-offTALISEN CONSTRUCTION CORP07/20/2022
BISSPISSUEDAURA PLUMBING INC07/24/2019
BISOTISSUEDTALISEN CONSTRUCTION CORP04/22/2019
BISMHISSUEDTALISEN CONSTRUCTION CORP04/22/2019
BISOTISSUEDTALISEN CONSTRUCTION CORP04/22/2019
BISOTISSUEDTALISEN CONSTRUCTION CORP04/22/2019
BISMHISSUEDTALISEN CONSTRUCTION CORP04/22/2019
BISPLISSUEDWILLIAM C. GERAKARIS P&H11/02/2018
BISOTISSUEDTALISEN CONSTRUCTION CORP10/24/2018
BISMHISSUEDTALISEN CONSTRUCTION CORP10/24/2018
BISOTISSUEDTALISEN CONSTRUCTION CORP10/24/2018
BISSPISSUEDBEDROCK MECHANICAL INC08/22/2018
BISPLISSUEDWILLIAM C. GERAKARIS P&H08/14/2018
BISMHISSUEDTALISEN CONSTRUCTION CORP08/06/2018
BISOTISSUEDTALISEN CONSTRUCTION CORP08/06/2018
BISSPISSUEDJOHN'S PLBG & HTG, INC07/25/2016
BISPLISSUEDJOHN'S PLBG & HTG, INC07/15/2016
BISMHISSUEDSJS CONSTRUCTION CO., INC.07/12/2016
BISOTISSUEDSJS CONSTRUCTION CO., INC.07/01/2016
BISPLISSUEDTOP DOG PLBG & HTG CORP02/09/2015
BISSPISSUEDCASE PLUMBING LLC02/02/2015
BISMHISSUEDJTL CONSTRUCTION CORP11/28/2014
BISOTISSUEDJTL CONSTRUCTION CORP11/28/2014
BISOTISSUEDLEGACY BUILDERS/DEVELOPERS CORP06/28/2013
+ 3 more permits on file
1 project · most recent 11/25/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
11/25/2024Signed-offRICHTER & RATNER CONTRACTHeating and Air Conditioning Systems
Heat / Cool
Renewaire RD4XIN 3,160 CFM ×1
1 project · most recent 11/25/2024
Sprinkler System
FiledStatusContractorScope
11/25/2024Signed-offGO PRO FIRE PROTECTION CSprinkler System
1 project · most recent 11/25/2024
Water/Sanitary
FiledStatusContractorScope
11/25/2024Signed-offCOMPLETE PLBG SAFETY LLCWater/Sanitary
8 projects · most recent 02/16/2024
General Wiring Lighting
FiledStatusContractorScope
02/16/2024CompleteLMEC ELECTRIC INCGeneral Wiring, Lighting
07/12/2022CompleteAMERGY ELECTRIC OF NY INCGeneral Wiring
01/10/2022Permit IssuedSHUIR ELEC'L CONTR'S CORP—
03/29/2019CompleteWILLDAN ELECTRICAL OF NY—
03/29/2019CompleteWILLDAN ELECTRICAL OF NY—
01/14/2019Permit IssuedECO ELECTRICAL SERVCS LLCGeneral Wiring
12/11/2018CompleteELECTROTEC OF NY ELECL IN—
07/09/2018Permit IssuedM.T.ELECTRIC CORPGeneral Wiring, Lighting
2 projects · most recent 01/13/2026
Concrete
FiledStatusContractorScope
01/13/2026Permit IssuedSRCC CORPConcrete
11/25/2024Signed-offGO PRO FIRE PROTECTION C1 scope_items
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/06/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/03/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/24/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/21/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/09/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/02/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/02/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
02/18/2026Subsurface Investigations (Borings/Test Pits)MAX POLICASTROspecial
02/18/2026Subgrade InspectionsAri Kamospecial
02/05/2026FinalRussell Dudleyprogress
01/14/2026Concrete - Cast-In-PlaceAri Kamospecial
01/14/2026FinalCraig Hargroveprogress
01/14/2026Subsurface Conditions – Fill Placement & In-Place DensityAri Kamospecial
01/14/2026Post-installed AnchorsAri Kamospecial
12/11/2025Excavations - Sheeting, Shoring, and Bracing—special
12/09/2025FinalCraig Hargroveprogress
12/09/2025Concrete - Cast-In-PlaceAri Kamospecial
12/09/2025Post-installed AnchorsAri Kamospecial
12/09/2025Subsurface Conditions – Fill Placement & In-Place DensityAri Kamospecial
10/21/2024Post-installed AnchorsAILANTO DANIEL MINAWIspecial
10/21/2024FinalAILANTO DANIEL MINAWIprogress
10/21/2024Fire-Resistance Rated ConstructionAILANTO DANIEL MINAWIprogress
10/21/2024Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
09/13/2024Sprinkler SystemsAILANTO DANIEL MINAWIspecial
02/07/2024Shutoff dampersAILANTO DANIEL MINAWIenergy_progress
02/07/2024Post-installed AnchorsAILANTO DANIEL MINAWIspecial
02/07/2024Energy Code Compliance InspectionsAILANTO DANIEL MINAWIprogress
02/07/2024Electrical motors and elevatorsAILANTO DANIEL MINAWIenergy_progress
02/07/2024Maintenance informationAILANTO DANIEL MINAWIenergy_progress
02/07/2024HVAC-R and service water heating equipmentAILANTO DANIEL MINAWIenergy_progress
02/07/2024Interior lighting powerAILANTO DANIEL MINAWIenergy_progress
02/07/2024HVAC-R and service water heating system controlsAILANTO DANIEL MINAWIenergy_progress
Latest 25 of 45.
▾Documents — 407 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/29/2026B00746284-I1Request digital key ↗
08/26/2026B00976418-P2Request digital key ↗
08/26/2026B00976418-P3Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits52
▸BISPLAN / WORK APPROVAL APPLICATION23
01/10/2020321815648Open ↗
12/13/2019321719618Open ↗
07/30/2018321815648Open ↗
Showing 3 of 23 on file for this type
▸BISWORK PERMIT APPLICATION22
07/26/2019321815648Open ↗
11/05/2018321815648Open ↗
10/26/2018321815648Open ↗
Showing 3 of 22 on file for this type
▸BISPLACE OF ASSEMBLY5
07/30/2025321414288Open ↗
07/22/2025321414288Open ↗
07/14/2017321414297Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
12/03/2019321815648Open ↗
12/03/2019321815648Open ↗
▸Seals & Professional Certifications149
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION71
03/05/2020321815648Open ↗
03/05/2020321815648Open ↗
03/05/2020321815648Open ↗
Showing 3 of 71 on file for this type
▸DOB NOWProgress Inspector Seal & Signature27
09/02/2026B01260279-I1Open ↗
09/01/2026B00746291-I1Open ↗
09/01/2026B00746291-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature15
08/29/2026B00746298-I1Open ↗
08/29/2026B00746284-I1Open ↗
08/26/2026B00976418-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026B01260279-I1Open ↗
09/01/2026B00746291-I1Open ↗
09/01/2026B00746291-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
07/31/2025321414288Open ↗
06/29/2018321761321Open ↗
06/22/2018321719618Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
06/29/2018321761321Open ↗
06/29/2018321761606Open ↗
06/29/2018321761606Open ↗
Showing 3 of 11 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment19
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
07/30/2018321815648Open ↗
06/29/2018321761321Open ↗
06/29/2018321761606Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
08/19/2015321014166Open ↗
08/13/2015321014219Open ↗
05/08/2015321014219Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
05/08/2015321014219Open ↗
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST7
07/14/2016321354066Open ↗
07/14/2016321354100Open ↗
Showing 2 of 7 on file for this type
▸Environmental & Asbestos24
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
09/04/2018321761321Open ↗
07/23/2018321761606Open ↗
06/22/2018321719618Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/29/2026B00746284-I1Open ↗
08/19/2026B01260279-P2Open ↗
08/19/2026B01260279-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/26/2026B00976418-S3Open ↗
08/26/2026B00976418-S2Open ↗
08/26/2026B00976418-S1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
10/26/2018321815648Open ↗
10/25/2018321815648Open ↗
08/24/2018321761321Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance40
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS25
03/05/2020321815648Open ↗
03/05/2020321815648Open ↗
02/24/2020321815648Open ↗
Showing 3 of 25 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
03/05/2020321815648Open ↗
01/03/2020321761606Open ↗
01/11/2017321354048Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections5
02/11/2015321014200Open ↗
Showing 1 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00746291-I1Open ↗
▸Inspections & Test Reports3
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
01/03/2020321761606Open ↗
▸DOB NOWSOIL REPORT1
08/17/2026B01356204-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/17/2026B01356204-I1Open ↗
▸Approvals, Objections & Sign-offs38
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
08/29/2026B00746284-I1Open ↗
08/19/2026B01260279-P1Open ↗
08/19/2026B01260279-I1Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
03/05/2020321815648Open ↗
01/03/2020321761606Open ↗
09/30/2019321761321Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
07/14/2016321354066Open ↗
07/14/2016321354100Open ↗
06/17/2016321354048Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/14/2017321414297Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership28
▸BISCOST AFFIDAVIT28
03/05/2020321815648Open ↗
01/03/2020321761606Open ↗
09/30/2019321761321Open ↗
Showing 3 of 28 on file for this type
▸Filing & Intake Forms30
▸BISEFILING COVER SHEET16
07/30/2018321815648Open ↗
07/30/2018321815648Open ↗
07/30/2018321815648Open ↗
Showing 3 of 16 on file for this type
▸BISADDITIONAL INFORMATION10
08/04/2025321414288Open ↗
07/31/2025321414288Open ↗
12/12/2019321761606Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM3
03/05/2020321815648Open ↗
01/03/2020321761606Open ↗
09/30/2019321761321Open ↗
▸BISeFiling Job Application Cover Sheet1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
07/14/2017321414297Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
05/15/2019321414288Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026B00746291-I1Open ↗