DOB12/01/2024Failure to display energy efficiency score and energy efficiency grade as per Admin. Code sec. 28-309.12.3
ECB04/11/2024Failure to submit an acceptable required cycle 9B report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #904611. Remedy: submit acceptable requ$1K due
DOB12/01/2023Failure to display energy efficiency score and energy efficiency grade as per Admin. Code sec. 28-309.12.3Issued 2023; DOB's record still lists it as active
ECB03/30/202127-929.1 AC27-929.1,failure to complete installation of full system ofautomatic sprinklers&file final sprinkler report prepared by registered design professional in office bldg 100' or more in hy in existence o$84 due
ECB12/23/2019AC279291-failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by july 1,2019,in an office building 100 fee$6K due
ECB06/17/2024A. C. 27-929.1, failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional in an office building 100 feet or morNothing owed — awaiting certificate of correction
ECB04/21/202327-929.1 failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional in an office building 100 feet or more in heNothing owed — awaiting certificate of correction
ECB04/21/2020Sec. 27-929.1 ac 27-929.1 failure to complete the installation of a full system of automatic sprinklers & file a final sprinkler report prepared by a registered design professional by 7/1/19,in an office bldgNothing owed — awaiting certificate of correction
ECB01/28/2020Failure to maintain ext bldg facade & appurtenances.as noted EXPOSURE1SEVERAL locations w/spalled bricks,vertical crack in bricks above 1ST fl.exp:4-spalled masonry in several locations,exposed rebar spalling cNothing owed — awaiting certificate of correction
ECB08/02/2010Failure to file an architect / engineer report certifying exit / directional signal signs are connected to emergency power source / storage battery equipment. Remedy: file architect / engineer report.Nothing owed — awaiting certificate of correction
ECB02/09/201044H9.44H11.52H11.42B10.100H11.42 replace worn contacts on p relay and relay and replace shut wire on sfs relay 100 replace worn saddle on lobby hall doorNothing owed — awaiting certificate of correction
Old · issued 3+ years ago and still listed by DOB; nothing on the city's records either way
DOB02/22/2023Failed to file FISP cycle 9B technical report by 2/21/2023Issued 2023; DOB's record still lists it as active
DOB12/01/2022Failure to display energy efficiency score and energy efficiency grade as per Admin. Code sec. 28-309.12.3Issued 2022; DOB's record still lists it as active
DOB12/01/2021Failure to display energy efficiency score and energy efficiency grade as per Admin. Code sec. 28-309.12.3Issued 2021; DOB's record still lists it as active
DOB04/29/2021Failure to display energy efficiency score and energy efficiency grade as per Admin. Code sec. 28-309.12.3Issued 2021; DOB's record still lists it as active
DOB09/03/2019Failed to file final sprinkler report by july 1, 2019Issued 2019; DOB's record still lists it as active