← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
23 WEST 20TH STREET
MANHATTAN · BIN 1015492
💬 Discuss this project
1927Year Built
16Stories
RMBuilding Class
C6-4AZoning
80,907 sfGross Floor Area
15Units
LL97 CoveredRent Stabilized0 Active Violations
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 9,200 sf lot · 8.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofOthership Spa - Flatiron3p · 1 filing · 12 docs
Floor 7Skyway Development Group70p · 5 filings · 20 docs
Floor 6Skyway Development Group61p · 5 filings · 20 docs
Floor 5Skyway Development Group74p · 5 filings · 20 docs
Floor 4Skyway Development Group61p · 5 filings · 20 docs
Floor 3Skyway Development Group81p · 8 filings · 20 docs
Floor 2Skyway Development Group63p · 5 filings · 20 docs
Floor 1Felicity House, Othership Spa - Flatiron170p · 13 filings · 20 docs
MezzanineOthership Spa - Flatiron113p · 5 filings · 20 docs
CellarOthership Spa - Flatiron121p · 8 filings · 20 docs
Site & exteriorSkyway Development Group18p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Skyway Development Group5909/13/2026
19-25 West 20 St Property2803/21/2026
19 West 20th Street Owner903/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Gensler405/22/2026
WB Engineers & Consultants603/21/2025
Kahn Architecture & Design103/21/2025
Leon Skvirsky PE207/17/2024
Gace106/24/2024
HNY Consulting Engineers1005/24/2024
Thornton Tomasetti203/29/2024
Tohfaz Uddin PE311/15/2023
The Switzer Group205/17/2023
SW Engineering Company205/21/2021
Jgarchitects104/05/2021
Scalar Architecture207/30/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Metropolis Group2603/21/2026
Synergy Building Consultants303/21/2026
Building Brothers403/21/2026
Codegreen1503/21/2026
JM Zoning203/21/2026
AE Design Solution403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold1307/08/2026
L&K PartnersGeneral Contractor803/21/2026
BuildopsGeneral Contractor603/21/2026
Schimenti Construction CoGeneral Contractor407/08/2026
CS BridgeScaffold307/08/2026
Mac FelderPlumbing207/08/2026
Active SignsSign hanger207/08/2026
P & D MechanicalFire Protection107/08/2026
Schlesinger Elect'l ContractingElectrical103/22/2026
Smart Plumbing & HeatingPlumbing107/08/2026
Tuxedo Electrical ContractingElectrical103/22/2026
K.W. Construction & RenovationGeneral Contractor107/08/2026
Reidy Contracting GroupScaffold107/08/2026
Abco-Peerless SprinklerFire Protection107/08/2026
Bedrock Plumbing & HeatingPlumbing107/08/2026
Capitol Fire Sprinkler CoFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Codegreen5101005/22/2026
Skyline Engineering267803/21/2025
W. Allen Engineering664406/24/2024
Winton Group Architecture4343105/21/2021
Building Lifecycle
All (180)Filed (37)Permit Issued (30)Signed Off (24)Violation (42)Inspection (11)Objection (6)Special Inspection (30)
09/25/2026
Signed off — Alteration CO
General construction to the Cellar, Floor 1, and Mezzanine - 1 to create health spa in accordance with plans filed herewith.
M00889069-I1
06/29/2026
Violation issued (ECB, closed)
Construction
06/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
HATIM ELSAID
06/02/2026
Special inspection requirement — Sprayed fire-resistant materials
HATIM ELSAID
06/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
HATIM ELSAID
05/22/2026
Filed — Alteration CO
General construction to the Cellar, Floor 1, and Mezzanine - 1 to create health spa in accordance with plans filed herewith.
M00889069-P2
05/21/2026
Special inspection requirement — Sprayed fire-resistant materials
HATIM ELSAID
05/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
HATIM ELSAID
05/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
HATIM ELSAID
06/05/2025
Signed off — Alteration
MODIFICATION OF EXISTING SPRINKLER SYSTEM.
M01193067-I1
05/30/2025
Signed off — Alteration
M01193048-I1
05/22/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/12/2025
Signed off — Alteration
REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS SUCH AS HUNG STEEL LINTEL REPLACEMENT, MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, CRACK REPAIR OF BRICK & CONCRETE MASONRY UNITS, PATCHING AND CRACK REPAIR OF STONE.
M01049402-I1
05/05/2025
Signed off — Alteration
installation of mechanical units along with related duct work.
M01193059-I1
04/30/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/01/2025
Permit issued — Mechanical Systems
M01193059-I1-MS
03/28/2025
Permit issued — Sprinklers
M01193067-I1-EW-SP
03/25/2025
Permit issued — General Construction
M01193048-I1-GC
03/25/2025
Permit issued — Structural
M01049402-I1-ST
03/21/2025
Filed — Alteration
MODIFICATION OF EXISTING SPRINKLER SYSTEM.
M01193067-I1
03/21/2025
Filed — Alteration
M01193048-I1
03/21/2025
Filed — Alteration
installation of mechanical units along with related duct work.
M01193059-I1
03/14/2025
Signed off — Alteration
installation of mechanical system along with associated duct work.
M00833443-I1
03/11/2025
Special inspection requirement — Post-installed Anchors
Matthew Wavro
03/11/2025
Special inspection requirement — Final
Matthew Wavro
03/11/2025
Special inspection requirement — Mechanical Systems
Matthew Wavro
03/11/2025
Special inspection requirement — Sprinkler Systems
Matthew Wavro
03/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
02/04/2025
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED DOUBLE FACED BLADE SIGN (OTHERSHIP)
M01032127-I1
02/04/2025
Signed off — Alteration
INSTALL EXTERIOR NON-ILLUMINATED DOUBLE FACED BLADE SIGN (OTHERSHIP)
M01032102-I1
01/31/2025
Signed off — Alteration
M00983507-I1
01/29/2025
Signed off — Alteration
M00833392-I1
01/27/2025
Signed off — Alteration
Installation of Plumbing fixtures along with related piping.
M00833467-I1
01/27/2025
Signed off — Alteration
installation of sprinkler fixtures along with related piping.
M00833457-I1
12/13/2024
Special inspection requirement — Final
Matthew Wavro
12/13/2024
Special inspection requirement — Mechanical Systems
Matthew Wavro
12/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
12/12/2024
Filed — Alteration
installation of mechanical system along with associated duct work.
M00833443-P1
10/30/2024
Special inspection requirement — Final
Matthew Wavro
10/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
10/30/2024
Special inspection requirement — Mechanical Systems
Matthew Wavro
08/08/2024
Permit issued — Sign
M01032102-I1-SG
08/08/2024
Permit issued — Sign
M01032127-I1-SG
07/17/2024
Filed — Alteration
INSTALL EXTERIOR NON-ILLUMINATED DOUBLE FACED BLADE SIGN (OTHERSHIP)
M01032127-I1
07/17/2024
Filed — Alteration
INSTALL EXTERIOR NON-ILLUMINATED DOUBLE FACED BLADE SIGN (OTHERSHIP)
M01032102-I1
07/16/2024
Signed off — Alteration
M00960827-I1
07/16/2024
Signed off — Alteration
M00960836-I1
06/27/2024
Signed off — Alteration
Plumbing modifications to the Cellar, Floor 1, and Mezzanine - 1 as per plans filed herewith. No change in use, egress, or occupancy.
M00889247-I1
06/24/2024
Filed — Alteration
REPAIR OF EXISTING EXTERIOR FACADE ELEMENTS SUCH AS HUNG STEEL LINTEL REPLACEMENT, MORTAR JOINT REPOINTING, OUTER WYTHE BRICK REPLACEMENT, CRACK REPAIR OF BRICK & CONCRETE MASONRY UNITS, PATCHING AND CRACK REPAIR OF STONE.
M01049402-I1
06/20/2024
Permit issued — Plumbing
M00833467-I1-PL
05/29/2024
Signed off — Alteration
Sprinkler modifications to the Cellar, Floor 1, and Mezzanine - 1 as per plans filed herewith. No change in use, egress, or occupancy.
M00889248-I1
05/29/2024
Signed off — Alteration
Structural modifications to the Cellar, Floor 1, and Mezzanine - 1 as per plans filed herewith. No change in use, egress, or occupancy.
M00889252-I1
05/28/2024
Signed off — Alteration
Mechanical modifications to the Cellar, Floor, and Mezzanine - 1 as per plans filed herewith. No change in use, egress, or occupancy.
M00889237-I1
05/24/2024
Filed — Alteration
Plumbing modifications to the Cellar, Floor 1, and Mezzanine - 1 as per plans filed herewith. No change in use, egress, or occupancy.
M00889247-P5
05/21/2024
Filed — Alteration
Plumbing modifications to the Cellar, Floor 1, and Mezzanine - 1 as per plans filed herewith. No change in use, egress, or occupancy.
M00889247-P4
05/17/2024
Filed — Alteration
Plumbing modifications to the Cellar, Floor 1, and Mezzanine - 1 as per plans filed herewith. No change in use, egress, or occupancy.
M00889247-P3
05/10/2024
Filed — Alteration
Sprinkler modifications to the Cellar, Floor 1, and Mezzanine - 1 as per plans filed herewith. No change in use, egress, or occupancy.
M00889248-P2
05/10/2024
Special inspection requirement — Sprinkler Systems
HATIM ELSAID
05/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
HATIM ELSAID
05/09/2024
Special inspection requirement — Sprinkler Systems
HATIM ELSAID
Latest 60 of 180 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offL&K Partners04/01/2025
DOB NOWSprinklersSigned-offP & D Mechanical03/28/2025
DOB NOWGeneral ConstructionSigned-offL&K Partners03/25/2025
DOB NOWStructuralSigned-offK.W. Construction & Renovation03/25/2025
DOB NOWSignSigned-offActive Signs08/08/2024
DOB NOWSignSigned-offActive Signs08/08/2024
DOB NOWPlumbingSigned-offMac Felder06/20/2024
DOB NOWSuspended ScaffoldSigned-offSummit Development02/20/2024
DOB NOWSprinklersSigned-offCapitol Fire Sprinkler Co11/30/2023
DOB NOWSidewalk ShedSigned-offCS Bridge11/16/2023
DOB NOWSupported ScaffoldSigned-offCS Bridge11/15/2023
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating11/09/2023
DOB NOWGeneral ConstructionPermit IssuedSchimenti Construction Co10/20/2023
DOB NOWStructuralSigned-offSchimenti Construction Co10/18/2023
DOB NOWMechanical SystemsSigned-offSchimenti Construction Co10/18/2023
DOB NOWMechanical SystemsSigned-offL&K Partners05/03/2023
DOB NOWPlumbingSigned-offMac Felder05/03/2023
DOB NOWSprinklersSigned-offAbco-Peerless Sprinkler04/29/2023
DOB NOWGeneral ConstructionSigned-offL&K Partners04/27/2023
DOB NOWMechanical SystemsSigned-offBuildops10/25/2021
DOB NOWPlumbingSigned-offSmart Plumbing & Heating04/27/2021
DOB NOWGeneral ConstructionSigned-offBuildops04/23/2021
DOB NOWConstruction FenceSigned-offReidy Contracting Group09/22/2020
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding03/02/2020
DOB NOWSidewalk ShedSigned-offSpring Scaffolding01/06/2020
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding12/16/2019
DOB NOWSidewalk ShedSigned-offSpring Scaffolding12/27/2018
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding12/26/2018
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding07/30/2018
DOB NOWSidewalk ShedSigned-offSpring Scaffolding07/26/2018
BIS—ISSUEDSkyway Development Group12/19/2023
BIS—ISSUEDReidy Contracting Group09/14/2022
BISSDISSUEDMo Contracting01/27/2022
BISPLISSUEDGW Mechanical08/19/2021
BISOTISSUEDReidy Contracting Group06/22/2021
BISEQISSUEDReidy Contracting Group06/22/2021
BIS—ISSUEDReidy Contracting Group06/22/2021
BISMHISSUEDReidy Contracting Group06/22/2021
BISFSISSUEDChampion Combustion02/17/2021
BISBLISSUEDGW Mechanical01/12/2021
+ 34 more permits on file
12 projects · most recent 07/16/2024
General Wiring
FiledStatusContractorScope
07/16/2024CompleteLive Wire Electric 1General Wiring
04/02/2024CompleteSchlesinger Elect'l ContractingGeneral Wiring
11/10/2023CompleteNash Electric Services—
07/18/2022CompleteEnterprise Electrical SystemsGeneral Wiring
04/25/2022CompleteApollo Electric InsdusGeneral Wiring
02/15/2022CompleteApollo Electric Insdus—
01/04/2022CompleteFSM ElectricalGeneral Wiring
04/13/2021CompleteWarren Johnson ElectricGeneral Wiring
09/10/2019CompleteTuxedo Electrical Contracting—
09/19/2018CancelledApollo ElectricGeneral Wiring
07/17/2018CompleteTop Shelf Electric—
06/19/2018CancelledApollo Electric—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
05/22/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/30/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/07/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/07/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/19/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/22/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/16/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/20/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/29/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
06/02/2026Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
06/02/2026Sprayed fire-resistant materialsHATIM ELSAIDspecial
06/02/2026Fire-Resistance Rated ConstructionHATIM ELSAIDprogress
05/21/2026Sprayed fire-resistant materialsHATIM ELSAIDspecial
05/21/2026Fire-Resistance Rated ConstructionHATIM ELSAIDprogress
05/21/2026Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
03/11/2025Post-installed AnchorsMatthew Wavrospecial
03/11/2025FinalMatthew Wavroprogress
03/11/2025Mechanical SystemsMatthew Wavrospecial
03/11/2025Sprinkler SystemsMatthew Wavrospecial
03/11/2025Fire-Resistant Penetrations and JointsMatthew Wavrospecial
12/13/2024FinalMatthew Wavroprogress
12/13/2024Mechanical SystemsMatthew Wavrospecial
12/13/2024Fire-Resistant Penetrations and JointsMatthew Wavrospecial
10/30/2024FinalMatthew Wavroprogress
10/30/2024Fire-Resistant Penetrations and JointsMatthew Wavrospecial
10/30/2024Mechanical SystemsMatthew Wavrospecial
05/10/2024Sprinkler SystemsHATIM ELSAIDspecial
05/10/2024Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
05/09/2024Sprinkler SystemsHATIM ELSAIDspecial
05/09/2024Fire-Resistant Penetrations and JointsHATIM ELSAIDspecial
04/08/2024FinalLEON SKVIRSKYprogress
01/31/2024Sprinkler SystemsHATIM ELSAIDspecial
01/31/2024Mechanical SystemsHATIM ELSAIDspecial
01/31/2024FinalHATIM ELSAIDprogress
Latest 25 of 47.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Felicity HouseCommunity FacilityFloor 1
Project M01193048 Alteration · LOC Issued · 03/21/2025
Project M01193059 Alteration · LOC Issued · 03/21/2025
Project M01193067 Alteration · LOC Issued · 03/21/2025
Othership Spa - FlatironFitness / RecreationCellar, Floor 1, Mezzanine
Project M00889237 Alteration · LOC Issued · 10/05/2023
Project M00889247 Alteration · LOC Issued · 10/05/2023
Project M00889248 Alteration · LOC Issued · 10/05/2023
Project M00889252 Alteration · LOC Issued · 10/05/2023
Project M00889069 Alteration CO · CO Issued · 06/28/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 633 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch35
09/06/2026M00061406-I1Request digital key ↗
09/06/2026M00061408-I1Request digital key ↗
09/04/2026M00492644-I1Request digital key ↗
Showing 3 of 35 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/28/2026M00968912-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/04/2026M00379756-I1Request digital key ↗
▸Applications & Permits128
▸BISPLAN / WORK APPROVAL APPLICATION62
11/19/2025123918430Open ↗
11/18/2025123918430Open ↗
12/05/2023123918430Open ↗
Showing 3 of 62 on file for this type
▸BISWORK PERMIT APPLICATION39
12/19/2023123918430Open ↗
09/15/2022121204080Open ↗
07/12/2022121204080Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWLPC Approval/Permit25
08/17/2026M00889069-P2Open ↗
08/13/2026M00889247-P5Open ↗
08/13/2026M01032102-I1Open ↗
Showing 3 of 25 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
12/20/2023123918430Open ↗
02/10/2021121204080Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISVERIFY TAX LOT2
01/14/2025123918430Open ↗
01/17/2023121204080Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP2
01/14/2025123918430Open ↗
01/12/2023121204080Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M00889069-I1Open ↗
▸Seals & Professional Certifications120
▸DOB NOWDPL-1: Design Professional Seal & Signature36
09/06/2026M00061406-I1Open ↗
09/06/2026M00061408-I1Open ↗
09/03/2026M00492130-I1Open ↗
Showing 3 of 36 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
03/17/2022123440936Open ↗
Showing 1 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/02/2026M00524425-I1Open ↗
09/02/2026M00524425-I1Open ↗
09/02/2026M00524425-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/02/2026M00524425-I1Open ↗
09/01/2026M00833392-I1Open ↗
09/01/2026M00833392-I1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
04/27/2021123440936Open ↗
Showing 1 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/01/2020140917186Open ↗
▸Trade Schedules & Equipment45
▸BISEQUIPMENT USE PERMITS20
11/23/2021121204080Open ↗
10/22/2021121204080Open ↗
10/22/2021121204080Open ↗
Showing 3 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING9
11/05/2021121204080Open ↗
10/29/2021121204080Open ↗
07/16/2021123267990Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
11/23/2021121204080Open ↗
10/22/2021121204080Open ↗
10/22/2021121204080Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
12/20/2022123382730Open ↗
05/02/2022123192348Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
12/10/2021123196326Open ↗
12/10/2021123196326Open ↗
▸BISSTANDPIPE SYSTEMS2
12/28/2021123196335Open ↗
12/28/2021123267990Open ↗
▸BISSPRINKLER SYSTEMS1
12/28/2021123267990Open ↗
▸BISHEATING SYSTEMS1
03/17/2022123196344Open ↗
▸Safety & Tenant Protection10
▸BISSTREET TREE CHECKLIST4
10/10/2023123918430Open ↗
08/02/2023123918430Open ↗
07/01/2020140917186Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Checklist3
08/17/2026M00889069-P1Open ↗
08/17/2026M00889069-P2Open ↗
08/15/2026M00889069-I1Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE SIGNOFF1
01/14/2025123918430Open ↗
▸Environmental & Asbestos53
▸DOB NOWDEP ACP-5: Asbestos Assessment Report28
09/06/2026M00061408-I1Open ↗
08/31/2026M00833457-I1Open ↗
08/31/2026M00833392-I1Open ↗
Showing 3 of 28 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION7
01/27/2026123918430Open ↗
03/17/2022123196344Open ↗
03/14/2022121204080Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
08/02/2023123918430Open ↗
Showing 1 of 2 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026M00524425-I1Open ↗
08/13/2026M00492644-I1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance1
▸BISNYCECC ANALYSIS1
11/03/2023123918430Open ↗
▸Inspections & Test Reports30
▸BISTECHNICAL REPORT: RESPONSIBILITY19
04/18/2022121204080Open ↗
04/18/2022121204080Open ↗
04/18/2022121204080Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS2
04/18/2022121204080Open ↗
04/12/2022123056888Open ↗
▸BISSTRUCTURAL STEEL - DETAILS2
04/18/2022121204080Open ↗
04/12/2022123056888Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING2
04/18/2022121204080Open ↗
04/12/2022123056888Open ↗
▸BISSTRUCTURAL STEEL - WELDING2
04/18/2022121204080Open ↗
04/12/2022123056888Open ↗
▸BISDEEP FOUNDATIONS / PILES1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs63
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
12/30/2022123382730Open ↗
12/27/2022123196344Open ↗
05/05/2022123192348Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE11
11/19/2025123918430Open ↗
11/18/2025123918430Open ↗
11/03/2023123918430Open ↗
Showing 3 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
01/27/2022123196335Open ↗
01/27/2022123196335Open ↗
Showing 2 of 10 on file for this type
▸BISLANDMARKS APPROVAL9
08/02/2023123918430Open ↗
07/01/2020140917186Open ↗
Showing 2 of 9 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/13/2026M00833392-P1Open ↗
08/13/2026M00833457-I1Open ↗
08/13/2026M00833467-I1Open ↗
Showing 3 of 9 on file for this type
▸BISLANDMARKS SIGNOFF7
01/11/2024123918430Open ↗
12/30/2022123382730Open ↗
12/27/2022123196344Open ↗
Showing 3 of 7 on file for this type
▸BISFINAL2
04/12/2022123056888Open ↗
03/17/2022123267990Open ↗
▸BISSUPERSEDING LETTER2
01/27/2022123196335Open ↗
Showing 1 of 2 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership31
▸BISCOST AFFIDAVIT17
12/21/2022123382730Open ↗
05/03/2022123192348Open ↗
Showing 2 of 17 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW39
03/11/2025123918430Open ↗
01/12/2023121204080Open ↗
12/27/2022123382730Open ↗
Showing 3 of 9 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
09/15/2022121204080Open ↗
Showing 1 of 4 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
11/03/2023123918430Open ↗
▸Filing & Intake Forms49
▸BISADDITIONAL INFORMATION25
12/15/2023123918430Open ↗
11/03/2023123918430Open ↗
10/10/2023123918430Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING COVER SHEET15
07/26/2023123918430Open ↗
Showing 1 of 15 on file for this type
▸BISBOROUGH INTAKE FORM9
01/27/2022123196335Open ↗
05/25/2021123196335Open ↗
Showing 2 of 9 on file for this type
▸Other Documents35
▸DOB NOWProof of Historic Building12
08/17/2026M00889069-P2Open ↗
08/13/2026M00889069-P1Open ↗
08/13/2026M00889069-I1Open ↗
Showing 3 of 12 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
11/03/2023123918430Open ↗
10/10/2023123918430Open ↗
10/10/2023123918430Open ↗
Showing 3 of 7 on file for this type
▸BISSupporting Document: Fee Exempt4
10/10/2023123918430Open ↗
10/10/2023123918430Open ↗
07/26/2023123918430Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification3
08/17/2026M00889069-P1Open ↗
08/17/2026M00889069-P2Open ↗
08/15/2026M00889069-I1Open ↗
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BIS* ENVIRONMENTAL 'E' DEP NOTICE OF SATISFACTION2
04/25/2022123267990Open ↗
04/12/2022123056888Open ↗
▸BISEMERGENCY & STANDBY POWER SYSTEMS (GENERATORS)1
01/27/2022123196326Open ↗
▸BISAI-1 APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFUEL-OIL STORAGE AND FUEL-OIL PIPING SYSTEMS1
01/27/2022123196326Open ↗
▸DOB NOWCalculations1
08/13/2026M00983507-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M00983507-I1Open ↗