| Owner | Filings | Most Recent |
|---|---|---|
| Soho Aoa Owner LLC Oss | 177 | 07/08/2026 |
| Richmond Hill Company LLC - Ear | 97 | 03/21/2026 |
| Soho Aoa Owner | 61 | 07/08/2026 |
| Earle Kazis Associates | 8 | 03/21/2026 |
| 752 Wea One | 3 | 07/08/2026 |
| 242 East 14th Street Joint Vent | 3 | 03/21/2026 |
| Oss 2016 | 1 | 03/22/2026 |
| Crowne Architectural Systems | 1 | 03/21/2026 |
| Spring Americas Associates | 1 | 03/21/2026 |
| W and M Operating Co | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Robert Derector Associates | 14 | 09/10/2026 |
| TPG Architecture | 2 | 09/08/2026 |
| Andrew Formichella | 1 | 09/01/2026 |
| Devote Arch & Design Studio | 2 | 07/06/2026 |
| Frederick Taylor Associates - Architects | 1 | 04/10/2026 |
| Abs Engineering | 2 | 03/17/2026 |
| Severud Associates | 2 | 03/02/2026 |
| BP Architects | 2 | 02/27/2026 |
| Ashraf | 6 | 01/28/2026 |
| HT Associates | 3 | 11/18/2025 |
| Friedman Engineering | 3 | 06/10/2025 |
| Cpengineering | 2 | 05/14/2025 |
| Civilcraft Engineering | 1 | 04/17/2025 |
| Vocon | 2 | 03/10/2025 |
| Burck Schellenberg Architecture | 1 | 12/23/2024 |
| Gace | 1 | 10/24/2024 |
| Loring Consulting Engineers | 2 | 01/31/2024 |
| Leon Skvirsky PE | 1 | 05/09/2023 |
| Pace Engineering | 3 | 02/13/2023 |
| Newtec Engineering | 1 | 09/28/2021 |
| Thornton Tomasetti | 1 | 07/13/2021 |
| Gensler | 1 | 06/14/2021 |
| WB Engineers & Consultants | 9 | 03/17/2021 |
| Atelier NY Architecture | 1 | 02/01/2021 |
| Ryan Soames Engineering | 9 | 07/20/2020 |
| Lilker Associates Consulting Engineering | 1 | 02/04/2020 |
| HC Engineering | 1 | 05/16/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| Milrose Consultants | 42 | 03/21/2026 |
| Raymond Ho Architect | 34 | 03/21/2026 |
| Codegreen | 4 | 03/21/2026 |
| William Vitacco Associates | 1 | 03/21/2026 |
| Metropolis Group | 8 | 03/21/2026 |
| Pyramid Restoration NY | 6 | 03/21/2026 |
| Smep Design & Consultation | 6 | 03/21/2026 |
| HT Associates | 3 | 03/21/2026 |
| JP Expedite | 2 | 03/21/2026 |
| KD Designs | 1 | 03/21/2026 |
| Platinum Services NY | 8 | 03/21/2026 |
| Synergy Building Consultants | 1 | 03/21/2026 |
| Building Brothers | 2 | 03/21/2026 |
| Atelier New York Architecture | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Structure Tone | General Contractor | 14 | 07/08/2026 |
| L&K Partners | General Contractor | 8 | 07/08/2026 |
| Eastbrook Contracting | General Contractor | 8 | 07/08/2026 |
| Platinum Services NY | Scaffold | 7 | 10/06/2026 |
| LW Interior Remodeling | General Contractor | 6 | 03/21/2026 |
| Our Team Contracting | General Contractor | 5 | 07/11/2026 |
| Run Rite Mechanical | specialty_contractor | 4 | 07/08/2026 |
| TMS Plumbing & Heating | Fire Protection | 4 | 07/08/2026 |
| Capitol Fire Sprinkler Co | Fire Protection | 3 | 07/08/2026 |
| Titan Construction Services | General Contractor | 3 | 03/21/2026 |
| Full Capacity Fire | Fire Protection | 2 | 07/08/2026 |
| L&J PLG & Heating Co of NY | Plumbing | 2 | 07/08/2026 |
| Colonial Crafters | General Contractor | 2 | 04/09/2026 |
| Donnelly Mechanical | specialty_contractor | 2 | 03/21/2026 |
| All Pro Plumbing & Heating | Fire Protection | 2 | 07/08/2026 |
| JRM Construction Management | General Contractor | 2 | 10/02/2026 |
| A&A Plumbing | Plumbing | 2 | 07/08/2026 |
| Arch Plumbing & Heating | Plumbing | 2 | 07/08/2026 |
| Jam Electrical | Electrical | 2 | 03/21/2026 |
| Allstate Sprinkler | Fire Protection | 1 | 07/08/2026 |
| A & M Warshaw Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| AP Plumbing & HVAC | Plumbing | 1 | 07/08/2026 |
| Bedrock Mechanical | Fire Protection | 1 | 07/08/2026 |
| Mega Plumbing | Fire Protection | 1 | 10/03/2026 |
| Mega Plumbing | Plumbing | 1 | 10/03/2026 |
| WNW & Sons Plumbing & Heating | Fire Protection | 1 | 07/08/2026 |
| XH&RC Plumbing and Heating | Plumbing | 1 | 06/28/2026 |
| XH&RC Plumbing and Heating | Fire Protection | 1 | 06/28/2026 |
| Antonio Ceriello Electric | Electrical | 1 | 03/21/2026 |
| Powergen Electric | Electrical | 1 | 03/21/2026 |
| Ceriello Antonio | Electrical | 1 | 03/21/2026 |
| Advanced Electric Design | Electrical | 1 | 03/21/2026 |
| Freedom Electl & Data | Electrical | 1 | 03/22/2026 |
| Green Michael | Electrical | 1 | 03/21/2026 |
| Richard Wehner Electrical Cont | Electrical | 1 | 03/21/2026 |
| Spectrum Electric | Electrical | 1 | 03/22/2026 |
| Volt Electric NYC | Electrical | 1 | 03/22/2026 |
| Green City Box Trans | General Contractor | 1 | 04/09/2026 |
| Pyramid Restoration NY | specialty_contractor | 1 | 07/08/2026 |
| Retail Project Mangement | General Contractor | 1 | 07/08/2026 |
| Sentinel Builders | General Contractor | 1 | 07/08/2026 |
| Cad Signs NYC | Sign hanger | 1 | 07/08/2026 |
| Paul Signs | Sign hanger | 1 | 07/08/2026 |
| Accurate Mechanical | Fire Protection | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Outsource Special Inspection | 2827 | 3 | 09/10/2026 |
| PSI Agency | 254 | 3 | 03/17/2026 |
| Shahrish Shuvo Engineering | 8524 | 2 | 03/02/2026 |
| BP Architects | 2712 | 1 | 02/27/2026 |
| Flushing Engineering Service | 4373 | 3 | 11/18/2025 |
| Butterfield & O'Connor | 4189 | 1 | 08/23/2025 |
| KZ Engineering | 4665 | 1 | 08/11/2025 |
| Special Testing & Consulting | 1688 | 2 | 06/10/2025 |
| Socotec Engineering | 4983 | 1 | 05/07/2025 |
| AA Building & Inspection | 1519 | 1 | 04/17/2025 |
| Milrose Consultants | 2003 | 5 | 03/11/2025 |
| Sag Engineering & Consulting | 608 | 8 | 02/18/2025 |
| Codegreen | 510 | 4 | 10/24/2024 |
| Catalpa Special Inspectio | 2004 | 2 | 01/31/2024 |
| Pace Engineering | 1679 | 3 | 02/13/2023 |
| Eti Consultants | 7694 | 4 | 12/14/2021 |
| Obaid Mian | 849 | 1 | 09/28/2021 |
| Architectural Engineering | 6111 | 10 | 07/20/2020 |
| WB Engineering | 533 | 6 | 06/09/2020 |
| Skyline Engineering | 267 | 1 | 02/04/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Supported Scaffold | Permit Issued | Platinum Services NY | 10/05/2026 |
| DOB NOW | Plumbing | Permit Issued | Mega Plumbing | 10/02/2026 |
| DOB NOW | Sprinklers | Permit Issued | Mega Plumbing | 10/02/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JRM Construction Management | 10/01/2026 |
| DOB NOW | General Construction | Permit Issued | JRM Construction Management | 10/01/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Platinum Services NY | 08/14/2026 |
| DOB NOW | General Construction | Permit Issued | Our Team Contracting | 07/10/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Platinum Services NY | 05/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | Full Capacity Fire | 05/20/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | L&K Partners | 05/14/2026 |
| DOB NOW | General Construction | Permit Issued | Retail Project Mangement | 05/01/2026 |
| DOB NOW | Suspended Scaffold | Signed-off | Structural Preservation System | 04/30/2026 |
| DOB NOW | General Construction | Permit Issued | L&K Partners | 04/21/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Colonial Crafters | 03/25/2026 |
| DOB NOW | Plumbing | Signed-off | Arch Plumbing & Heating | 03/24/2026 |
| DOB NOW | General Construction | Signed-off | Colonial Crafters | 03/05/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | Platinum Services NY | 02/25/2026 |
| DOB NOW | General Construction | Signed-off | Our Team Contracting | 01/08/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | Streamline Consultants NY | 12/16/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | Streamline Consultants NY | 12/16/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | Streamline Consultants NY | 12/05/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | Streamline Consultants NY | 12/03/2025 |
| DOB NOW | Sprinklers | Signed-off | WNW & Sons Plumbing & Heating | 11/13/2025 |
| DOB NOW | General Construction | Permit Issued | Pyramid Restoration NY | 10/21/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | Platinum Services NY | 10/17/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | Streamline Consultants NY | 08/20/2025 |
| DOB NOW | Plumbing | Signed-off | Arch Plumbing & Heating | 07/10/2025 |
| DOB NOW | General Construction | Signed-off | Our Team Contracting | 07/01/2025 |
| DOB NOW | Sprinklers | Signed-off | XH&RC Plumbing and Heating | 06/27/2025 |
| DOB NOW | Plumbing | Signed-off | XH&RC Plumbing and Heating | 06/27/2025 |
| DOB NOW | General Construction | Signed-off | Green City Box Trans | 05/30/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | Structural Preservation System | 05/09/2025 |
| DOB NOW | Sprinklers | Signed-off | Capitol Fire Sprinkler Co | 04/18/2025 |
| DOB NOW | Plumbing | Signed-off | A&A Plumbing | 04/11/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Structure Tone | 04/08/2025 |
| DOB NOW | General Construction | Signed-off | Structure Tone | 04/02/2025 |
| DOB NOW | General Construction | Signed-off | Structure Tone | 03/31/2025 |
| DOB NOW | Sprinklers | Signed-off | Capitol Fire Sprinkler Co | 03/25/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Structure Tone | 03/24/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | Platinum Services NY | 02/27/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/17/2026 | Signed-off | Colonial Crafters | Air Conditioning Systems | Cooling Skypeak DSH060D-4 50,500 BTU · Condensing Unit ×1 |
| 11/18/2025 | Signed-off | Green City Box Trans | Heating and Air Conditioning Systems | Heat / Cool Sigma SIGMA SDSH096C 96,800 BTU · Wshp ×2 |
| 09/28/2021 | Permit Issued | Donnelly Mechanical | Air Conditioning Systems | Cooling Carrier M#50PCH048SCC5ECJ1 48,000 BTU · Rooftop Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/10/2026 | Permit Issued | Real Plumbing | Sprinkler System |
| 11/18/2025 | Signed-off | XH&RC Plumbing and Heating | 18 heads |
| 06/10/2025 | Signed-off | HQ Fire Protection | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/10/2026 | Permit Issued | Real Plumbing | Water/Sanitary |
| 03/17/2026 | Signed-off | Arch Plumbing & Heating | Water/Sanitary |
| 11/18/2025 | Signed-off | XH&RC Plumbing and Heating | Water/Sanitary |
| 06/10/2025 | Signed-off | Arch Plumbing & Heating | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/07/2026 | Permit Issued | RE-Con Electric | General Wiring |
| 10/08/2025 | Permit Issued | RE-Con Electric | General Wiring |
| 04/21/2025 | Complete | Ennell Group Electric | General Wiring |
| 04/03/2025 | Complete | Ennell Group Electric | General Wiring |
| 02/11/2025 | Complete | RE-Con Electric | — |
| 02/11/2025 | Complete | RE-Con Electric | — |
| 02/11/2025 | Complete | RE-Con Electric | — |
| 01/15/2025 | Permit Issued | A.S.K. Electrical | General Wiring |
| 01/08/2025 | Complete | Ennell Group Electric | General Wiring |
| 03/13/2024 | Complete | Freedom Electric & Data | General Wiring |
| 03/11/2024 | Permit Issued | Robert Chimenti | 5 meters, 1 new_meters |
| 03/28/2022 | Permit Issued | Illuminous Electric | General Wiring |
| 07/06/2021 | Complete | RX Electric | General Wiring |
| 07/06/2021 | Permit Issued | RX Electric | — |
| 09/17/2020 | Complete | RE-Con Electric | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/17/2025 | Permit Issued | Pyramid Restoration NY | Masonry |
| 10/24/2024 | Permit Issued | L&K Partners | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/28/2026 | Permit Issued | Platinum Services NY | Sidewalk Shed |
| 08/23/2025 | Permit Issued | Platinum Services NY | Scaffold |
| 08/10/2025 | — | — | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/09/2026 | Permit Issued | Streamline Consultants NY | — |
| 07/09/2026 | Permit Issued | Streamline Consultants NY | — |
| 08/11/2025 | Permit Issued | Streamline Consultants NY | Suspended Scaffold (SC) |
| 05/07/2025 | Signed-off | Structural Preservation System | Suspended Scaffold (SC) |
| 02/18/2025 | Signed-off | Structural Preservation System | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 05/05/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/30/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/30/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/02/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/13/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/13/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/21/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/16/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/14/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/05/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 10/08/2025 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 09/25/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/12/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/02/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/28/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/28/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/20/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/25/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/21/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/16/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/04/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/01/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/05/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/29/2021 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/23/2021 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/08/2026 | Heating Systems | JONAR MADRIAGA | special |
| 06/17/2026 | Final | PING MAN HO | progress |
| 04/02/2026 | Structural Steel - High Strength Bolting | Shahrish Shuvo | special |
| 04/02/2026 | Structural Steel - Welding | Shahrish Shuvo | special |
| 04/02/2026 | Structural Steel - Details | Shahrish Shuvo | special |
| 04/02/2026 | Final | Shahrish Shuvo | progress |
| 04/02/2026 | Post-installed Anchors | Shahrish Shuvo | special |
| 03/17/2026 | Final | Jeffrey Taylor | progress |
| 03/17/2026 | Fire-Resistance Rated Construction | Jeffrey Taylor | progress |
| 03/16/2026 | Maintenance information | MAURICIO ANDRADE | energy_progress |
| 03/16/2026 | Duct leakage testing, insulation and design | MAURICIO ANDRADE | energy_progress |
| 03/16/2026 | HVAC-R and service water heating system controls | MAURICIO ANDRADE | energy_progress |
| 03/16/2026 | HVAC-R and service water heating equipment | MAURICIO ANDRADE | energy_progress |
| 03/16/2026 | Electrical motors and elevators | MAURICIO ANDRADE | energy_progress |
| 03/16/2026 | Shutoff dampers | MAURICIO ANDRADE | energy_progress |
| 03/16/2026 | Fire-Resistant Penetrations and Joints | MAURICIO ANDRADE | special |
| 03/16/2026 | Post-installed Anchors | MAURICIO ANDRADE | special |
| 03/16/2026 | Energy Code Compliance Inspections | MAURICIO ANDRADE | progress |
| 03/16/2026 | HVAC-R and service water piping design and insulation | MAURICIO ANDRADE | energy_progress |
| 03/02/2026 | Structural Steel - High Strength Bolting | Shahrish Shuvo | special |
| 03/02/2026 | Final | Shahrish Shuvo | progress |
| 03/02/2026 | Structural Steel - Details | Shahrish Shuvo | special |
| 03/02/2026 | Post-installed Anchors | Shahrish Shuvo | special |
| 03/02/2026 | Structural Steel - Welding | Shahrish Shuvo | special |
| 02/27/2026 | Lighting controls | Fernando Papale | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Hebbia | Office | Floor 8 | Project M01352551 |
| Flaiton Health | Office | Floor 4 | Project M01152173 |
| Flowcode | Office | Floor 4 | Project M01153437 |
| Warby Parker | Retail | Floors 6–8 | Project M01128643 Project M01128658 Project M01128668 Project M01128674 |
| Spear Physical Therapy | Medical / Healthcare | Floor 1 | Project M00861797 |
| Origins | Office | Floors 10, 11 | Project M00540585 Project M00520761 |
| Estée Lauder Companies | Office | Floor 10 | Project M00520789 Project M00520800 |
| Flatiron Health | Office | Floors 3, 5, 6 | Project M00339150 Project M00339196 |