← Back
Over six families without stores
237 EAST 33 STREET
MANHATTAN · BIN 1020114
💬 Discuss this project
1926Year Built
4Stories
C1Building Class
R8BZoning
6,078 sfGross Floor Area
10Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: SPARTON E33 DE LLC · 1,819 sf lot · 3.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof3p · 1 filing · 20 docs
Floor 41p · 1 filing · 12 docs
Floor 32p · 1 filing · 20 docs
Floor 26p · 3 filings · 20 docs
Floor 13p · 3 filings · 20 docs
Cellar4p · 2 filings · 20 docs
Basement2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
APEX GROUP NY CORP503/22/2026
SPARTON E33 DE LLC103/22/2026
237 9 OWNERS303/22/2026
SPARTON E33 LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SA-DA ARCHITECTURE809/19/2024
ENTHINK ENGINEERS LLC103/17/2023
A&B WORLD CONSULTING205/20/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BIG ORANGE EXPEDITING803/21/2026
YBL NY403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SIENA CONSTRUCTION LTDGeneral Contractor307/08/2026
SENAD MEHOVICElectrical203/21/2026
APEX GROUP NY CORPGeneral Contractor203/21/2026
PIPESTYLISTS, INCPlumbing207/08/2026
AUTHENTIC PLBG CORPPlumbing107/08/2026
MILLER PLBG & HTG INCPlumbing107/08/2026
REDIRECTING LIC INCGeneral Contractor107/08/2026
ANDR SERVICES GROUPGeneral Contractor104/09/2026
KG USA MANAGEMENT INCGeneral Contractor107/08/2026
MORTELLARO, JOSEPHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SA-DA ARCHITECTURE2640809/19/2024
A&B WORLD CONSULTING, INC5704205/20/2022
Building Lifecycle
All (131)Filed (11)Permit Issued (10)Signed Off (7)Violation (60)Inspection (11)Objection (2)Special Inspection (30)
06/22/2026
Signed off — Alteration
JOB FILED TO REPLACE KITCHEN SINK AND BATHROOM FIXTURE AS PER BUILD TO REMOVE ECB VIOLATION#34505643Z. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M00734429-I1
02/17/2026
Signed off — Alteration
PLUMBING WORK TO APARTMENT 5A ON THE 4TH FLOOR OF AN EXISTING 5-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF NEW, REMOVED, AND RELOCATED PLUMBING FIXTURES. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01068403-I1
02/17/2026
Signed off — Alteration
PLUMBING WORK TO APARTMENT 5A ON THE 4TH FLOOR OF AN EXISTING 5-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF NEW, REMOVED, AND RELOCATED PLUMBING FIXTURES. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01068403-S1
01/09/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/14/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/28/2024
Permit issued — Plumbing
M01068403-S1-PL
10/08/2024
Permit issued — General Construction
M01068403-I1-GC
09/19/2024
Filed — Alteration
PLUMBING WORK TO APARTMENT 5A ON THE 4TH FLOOR OF AN EXISTING 5-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF NEW, REMOVED, AND RELOCATED PLUMBING FIXTURES. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01068403-S1
09/13/2024
Filed — Alteration
PLUMBING WORK TO APARTMENT 5A ON THE 4TH FLOOR OF AN EXISTING 5-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF NEW, REMOVED, AND RELOCATED PLUMBING FIXTURES. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01068403-I1
06/19/2024
Special inspection requirement — Tenant Protection Plan Compliance
Alexander Stoltz
10/16/2023
Signed off — Alteration
WORK TO APARTMENT 2A ON THE 1ST FLOOR OF AN EXISTING 5-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF INTERIOR FINISH WORK AND WINDOW REPLACEMENT. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M00916737-I1
10/03/2023
Signed off — Alteration
M00916780-I1
09/27/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/21/2023
Permit issued — General Construction
M00916737-I1-GC
09/20/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/24/2023
Permit issued — Plumbing
M00916780-I1-PL
08/15/2023
Filed — Alteration
M00916780-I1
08/10/2023
Filed — Alteration
WORK TO APARTMENT 2A ON THE 1ST FLOOR OF AN EXISTING 5-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF INTERIOR FINISH WORK AND WINDOW REPLACEMENT. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M00916737-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/21/2023
Signed off — Alteration
WORK TO THE CELLAR, BASEMENT, 1ST-4TH FLOORS, AND ROOF OF AN EXISTING 5-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF INTERIOR PARTITION WORK AND WINDOW REPLACEMENT. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M08023231-I1
06/20/2023
Special inspection requirement — Shutoff dampers
Alexander Stoltz
06/20/2023
Special inspection requirement — Interior lighting power
Alexander Stoltz
06/20/2023
Special inspection requirement — Fenestration areas
Alexander Stoltz
06/20/2023
Special inspection requirement — Exterior lighting power
Alexander Stoltz
06/20/2023
Special inspection requirement — Lighting in dwelling units
Alexander Stoltz
06/20/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Alexander Stoltz
06/20/2023
Special inspection requirement — Air barrier - visual inspection
Alexander Stoltz
06/20/2023
Special inspection requirement — Lighting controls
Alexander Stoltz
06/20/2023
Special inspection requirement — Fenestration air leakage
Alexander Stoltz
06/20/2023
Special inspection requirement — Insulation placement and R values
Alexander Stoltz
06/20/2023
Special inspection requirement — Heating Systems
Alexander Stoltz
06/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Stoltz
06/20/2023
Special inspection requirement — Mechanical Systems
Alexander Stoltz
06/20/2023
Special inspection requirement — Final
Alexander Stoltz
06/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Alexander Stoltz
06/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
Alexander Stoltz
06/16/2023
Signed off — Alteration
WORK TO THE CELLAR, BASEMENT, AND 1ST-4TH FLOORS OF AN EXISTING 5-STORY MULIPLE DWELLING BUILDING. ALTERATION TO CONSIST OF NEW, REMOVED AND RELOCATED PLUMBING FIXTURES. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M08023310-I1
06/07/2023
Filed — Alteration
WORK TO THE CELLAR, BASEMENT, AND 1ST-4TH FLOORS OF AN EXISTING 5-STORY MULIPLE DWELLING BUILDING. ALTERATION TO CONSIST OF NEW, REMOVED AND RELOCATED PLUMBING FIXTURES. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M08023310-P1
06/02/2023
Filed — Alteration
WORK TO THE CELLAR, BASEMENT, 1ST-4TH FLOORS, AND ROOF OF AN EXISTING 5-STORY, MULTIPLE DWELLING BUILDING. ALTERATIONS TO CONSIST OF INTERIOR PARTITION WORK AND WINDOW REPLACEMENT. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M08023231-P1
06/02/2023
Inspection — Pass-Final SD - Up to 3 Requested Floors
Pass
View inspection ↗
04/04/2023
Inspection — Pass-Final Scaffold Withdrawal
Pass
View inspection ↗
03/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Stoltz
03/29/2023
Special inspection requirement — Tenant Protection Plan Compliance
Alexander Stoltz
03/29/2023
Special inspection requirement — Energy Code Compliance Inspections
Alexander Stoltz
03/29/2023
Special inspection requirement — Maintenance information
Alexander Stoltz
03/29/2023
Special inspection requirement — HVAC-R and service water heating equipment
Alexander Stoltz
03/29/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Alexander Stoltz
03/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Stoltz
03/29/2023
Special inspection requirement — Heating Systems
Alexander Stoltz
03/29/2023
Special inspection requirement — Mechanical Systems
Alexander Stoltz
03/29/2023
Special inspection requirement — Energy Code Compliance Inspections
Alexander Stoltz
03/29/2023
Special inspection requirement — Final
Alexander Stoltz
03/29/2023
Special inspection requirement — Fire-Resistance Rated Construction
Alexander Stoltz
03/29/2023
Special inspection requirement — Interior lighting power
Alexander Stoltz
03/22/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
03/17/2023
Filed — Alteration
M00845524-I1
03/17/2023
Permit issued — Supported Scaffold
M00845524-I1-SF
03/17/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/17/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/08/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
Latest 60 of 131 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMILLER PLBG & HTG INC10/28/2024
DOB NOWGeneral ConstructionSigned-offANDR SERVICES GROUP10/08/2024
DOB NOWGeneral ConstructionSigned-offREDIRECTING LIC INC09/21/2023
DOB NOWPlumbingSigned-offT & T PLUMBING INC08/24/2023
DOB NOWSupported ScaffoldPermit IssuedAPEX GROUP NY CORP03/17/2023
DOB NOWPlumbingSigned-offT & T PLUMBING INC01/11/2023
DOB NOWGeneral ConstructionSigned-offKG USA MANAGEMENT INC01/09/2023
DOB NOWGeneral ConstructionPermit IssuedSIENA CONSTRUCTION LTD10/28/2022
DOB NOWPlumbingSigned-offAUTHENTIC PLBG CORP08/03/2022
DOB NOWGeneral ConstructionPermit IssuedSIENA CONSTRUCTION LTD07/29/2022
BISBLISSUEDPARKSET PLUMBING CO INC05/21/2002
BISBLISSUEDA & C COMBUSTION SERVICE02/25/1997
3 projects · most recent 11/05/2024
General Wiring
FiledStatusContractorScope
11/05/2024Permit IssuedLENS ELECTRIC, INCGeneral Wiring
02/16/2024CompleteE & M ELECTRICAL NY CORPGeneral Wiring
05/30/2023CompleteE & M ELECTRICAL NY CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
01/09/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/02/2023Pass-Final SD - Up to 3 Requested FloorsPassView ↗
04/04/2023Pass-Final Scaffold WithdrawalPassView ↗
03/22/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/17/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/08/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
06/19/2024Tenant Protection Plan ComplianceAlexander Stoltzspecial
06/20/2023Shutoff dampersAlexander Stoltzenergy_progress
06/20/2023Interior lighting powerAlexander Stoltzenergy_progress
06/20/2023Fenestration areasAlexander Stoltzenergy_progress
06/20/2023Exterior lighting powerAlexander Stoltzenergy_progress
06/20/2023Lighting in dwelling unitsAlexander Stoltzenergy_progress
06/20/2023Fenestration and door U-factor and product ratingsAlexander Stoltzenergy_progress
06/20/2023Air barrier - visual inspectionAlexander Stoltzenergy_progress
06/20/2023Lighting controlsAlexander Stoltzenergy_progress
06/20/2023Fenestration air leakageAlexander Stoltzenergy_progress
06/20/2023Insulation placement and R valuesAlexander Stoltzenergy_progress
06/20/2023Heating SystemsAlexander Stoltzspecial
06/20/2023Fire-Resistant Penetrations and JointsAlexander Stoltzspecial
06/20/2023Mechanical SystemsAlexander Stoltzspecial
06/20/2023FinalAlexander Stoltzprogress
06/20/2023Energy Code Compliance InspectionsAlexander Stoltzprogress
06/20/2023Fire-Resistance Rated ConstructionAlexander Stoltzprogress
03/29/2023Fire-Resistant Penetrations and JointsAlexander Stoltzspecial
03/29/2023Tenant Protection Plan ComplianceAlexander Stoltzspecial
03/29/2023Energy Code Compliance InspectionsAlexander Stoltzprogress
03/29/2023Maintenance informationAlexander Stoltzenergy_progress
03/29/2023HVAC-R and service water heating equipmentAlexander Stoltzenergy_progress
03/29/2023HVAC-R and service water piping design and insulationAlexander Stoltzenergy_progress
03/29/2023Fire-Resistant Penetrations and JointsAlexander Stoltzspecial
03/29/2023Heating SystemsAlexander Stoltzspecial
Latest 25 of 40.
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
09/02/2026M00734403-I1Request digital key ↗
09/02/2026M00734429-I1Request digital key ↗
09/01/2026M08023310-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications51
▸DOB NOWProgress Inspector Seal & Signature30
09/02/2026M08023231-P1Open ↗
09/02/2026M08023231-P1Open ↗
09/02/2026M08023231-P1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/02/2026M00734403-I1Open ↗
09/02/2026M00734429-I1Open ↗
09/01/2026M08023310-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/02/2026M08023231-P1Open ↗
09/02/2026M08023231-P1Open ↗
09/02/2026M08023231-P1Open ↗
Showing 3 of 10 on file for this type
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/02/2026M00734403-I1Open ↗
09/02/2026M00734429-I1Open ↗
09/01/2026M08023310-P1Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms1
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M08023231-P1Open ↗