| Owner | Filings | Most Recent |
|---|---|---|
| MAG PARTNERS | 50 | 09/13/2026 |
| VIK XS SERVICES | 33 | 07/08/2026 |
| WEST 28TH RESIDENTIAL | 32 | 03/21/2026 |
| 241 WEST 28TH STREET OWNER | 9 | 03/21/2026 |
| ROCK GROUP NY | 8 | 07/08/2026 |
| DORIA | 5 | 07/08/2026 |
| 241 WEST 28TH OWNER | 4 | 03/21/2026 |
| 241 WEST 28TH STREET | 4 | 03/21/2026 |
| 249 W 28TH STREET PROPERTIES, LLC | 1 | 03/22/2026 |
| BRENMAC CONSTRUCTION | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ALL CITY ENGINEERING P.C. | 3 | 03/18/2026 |
| MINTROPY | 4 | 03/12/2026 |
| CQ&J CORPORATION | 3 | 03/05/2026 |
| TANG STUDIO ARCHITECT, LLC | 1 | 02/17/2026 |
| AKF ENGINEERS, LLP | 34 | 01/16/2026 |
| COOKFOX ARCHITECTS | 3 | 01/15/2026 |
| NEW YORK ENGINEERS LLC | 3 | 01/08/2026 |
| SCOTT LASKY ARCHITECT | 1 | 01/07/2026 |
| SKYLINE RIGGING | 1 | 09/09/2024 |
| THORNTON TOMASETTI | 2 | 08/20/2024 |
| OSPINO ENGINEERING PLLC | 7 | 01/31/2023 |
| G. BLINN CONSULTING, LLC | 12 | 08/16/2022 |
| LOMBARDO PROFESSIONAL ENGINEERING | 1 | 10/07/2021 |
| VALJATO ENGINEERING PC | 5 | 09/30/2021 |
| DOKA USA | 1 | 08/10/2021 |
| ASIF JAMIL, RA | 1 | 05/17/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| METROPOLIS GROUP INC | 98 | 03/21/2026 |
| TANG STUDIO LLC | 2 | 03/21/2026 |
| LOMBARDO BUILDING CONSULTANTS | 2 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 24 | 03/21/2026 |
| JME BUILDING CONSULTING, LLC | 6 | 03/21/2026 |
| VALJATO ENGINEERING P C | 4 | 03/21/2026 |
| GREEN STUDIO | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| S&E BRIDGE & SCAFFOLD LLC. | General Contractor | 19 | 07/08/2026 |
| VIK XS SERVICES INC | General Contractor | 14 | 07/08/2026 |
| HIGHRISE SAFETY SYSTEMS I | General Contractor | 11 | 07/08/2026 |
| TT MECHANICAL CORP | Plumbing | 10 | 07/08/2026 |
| TTM GROUP CORP | Fire Protection | 9 | 07/08/2026 |
| ROCK GROUP NY CORP | General Contractor | 7 | 07/08/2026 |
| GREGORY BOWMAN | Electrical | 4 | 03/21/2026 |
| MAC INTERIOR CONSTRUCTION | General Contractor | 3 | 03/21/2026 |
| MOOVES GROUP LLC | General Contractor | 2 | 07/16/2026 |
| CRANA ELECTRIC, INC | Electrical | 2 | 03/22/2026 |
| WILLOWFIELD DEVELOPMENT | General Contractor | 2 | 04/09/2026 |
| PACE PLUMBING CORP | Plumbing | 2 | 07/08/2026 |
| PEAK PLUMBING SOLUTIONS LLC | Plumbing | 2 | 07/08/2026 |
| PROMETHEAN BUILDERS LLC | General Contractor | 2 | 04/09/2026 |
| KING ROSE OF NY, INC | General Contractor | 2 | 04/09/2026 |
| EASTERN AIR INC | General Contractor | 1 | 07/08/2026 |
| KING, ARTHUR | Electrical | 1 | 03/21/2026 |
| ABDUL AZIZ | Electrical | 1 | 03/21/2026 |
| PUNCHLIST PLUS LLC | General Contractor | 1 | 07/08/2026 |
| GAIRY SEEPERSAUD | Electrical | 1 | 03/21/2026 |
| ROYAL HVAC SYSTEMS INC | General Contractor | 1 | 07/08/2026 |
| FRANK PUGLIESE | Electrical | 1 | 03/21/2026 |
| URBAN ATELIER GROUP LLC | General Contractor | 1 | 03/21/2026 |
| BEDROCK PLBG. & HTG., INC | Plumbing | 1 | 07/08/2026 |
| BLUEWATER PLBG& HTG INC | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ALPHA ENGINEERING LLC | 3448 | 3 | 03/18/2026 |
| TWIG SPECIAL INSPECTIONS | 885 | 7 | 03/12/2026 |
| JUST CONSULTING ENGINEERI | 5865 | 3 | 03/12/2026 |
| TANG STUDIO LLC | 6949 | 1 | 02/17/2026 |
| DELTA TESTING LABS | 687 | 31 | 01/16/2026 |
| RYAN SPECIAL ENGINEERING | 2018 | 4 | 01/08/2026 |
| SKYLINE RIGGING | 7880 | 1 | 09/09/2024 |
| VALJATO ENGINEERING PC | 2486 | 5 | 09/30/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | MIDTOWN PLBG & HTNG CORP | 08/04/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | MOOVES GROUP LLC | 07/15/2026 |
| DOB NOW | General Construction | Permit Issued | MOOVES GROUP LLC | 07/10/2026 |
| DOB NOW | Plumbing | Signed-off | BLUEWATER PLBG& HTG INC | 03/06/2026 |
| DOB NOW | Sprinklers | Signed-off | BLUEWATER P&H, INC | 02/24/2026 |
| DOB NOW | Mechanical Systems | Signed-off | PROMETHEAN BUILDERS LLC | 02/20/2026 |
| DOB NOW | General Construction | Signed-off | PROMETHEAN BUILDERS LLC | 02/20/2026 |
| DOB NOW | Plumbing | Signed-off | BEDROCK PLBG. & HTG., INC | 02/10/2026 |
| DOB NOW | General Construction | Signed-off | KING ROSE OF NY, INC | 02/03/2026 |
| DOB NOW | Mechanical Systems | Signed-off | KING ROSE OF NY, INC | 02/03/2026 |
| DOB NOW | Sprinklers | Signed-off | BEDROCK MECHANICAL INC | 02/03/2026 |
| DOB NOW | Sprinklers | Signed-off | CITYWIDE PLBG, HTG &SPRKL | 10/15/2025 |
| DOB NOW | Mechanical Systems | Signed-off | ROYAL HVAC SYSTEMS INC | 07/30/2025 |
| DOB NOW | Sprinklers | Permit Issued | TTM GROUP CORP | 07/28/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | DORIA SCAFFOLDING | 06/17/2025 |
| DOB NOW | Plumbing | Signed-off | PEAK PLUMBING SOLUTIONS L | 06/16/2025 |
| DOB NOW | General Construction | Signed-off | MAC INTERIOR CONSTRUCTION | 06/03/2025 |
| DOB NOW | Plumbing | Signed-off | METROTECH MECHANICAL CORP | 04/07/2025 |
| DOB NOW | Sprinklers | Signed-off | UNIVERSAL FIRE SPR LLC | 04/07/2025 |
| DOB NOW | General Construction | Signed-off | WILLOWFIELD DEVELOPMENT | 04/03/2025 |
| DOB NOW | Mechanical Systems | Signed-off | WILLOWFIELD DEVELOPMENT | 04/03/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | DORIA, INC | 09/10/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | PUNCHLIST PLUS LLC | 08/21/2024 |
| DOB NOW | Sprinklers | Permit Issued | TTM GROUP CORP | 08/20/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | VIK XS SERVICES INC | 02/29/2024 |
| DOB NOW | Sprinklers | Signed-off | TTM GROUP CORP | 01/19/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 07/13/2023 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | VIK XS SERVICES INC | 04/20/2023 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | VIK XS SERVICES INC | 04/20/2023 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | VIK XS SERVICES INC | 04/20/2023 |
| DOB NOW | Standpipe | Signed-off | TT MECHANICAL CORP | 03/14/2023 |
| DOB NOW | Plumbing | Signed-off | TT MECHANICAL CORP | 03/14/2023 |
| DOB NOW | Sprinklers | Signed-off | TTM GROUP CORP | 02/02/2023 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | VIK XS SERVICES INC | 01/10/2023 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | VIK XS SERVICES INC | 12/14/2022 |
| DOB NOW | Standpipe | Signed-off | TTM GROUP CORP | 12/08/2022 |
| DOB NOW | Construction Fence | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 09/27/2022 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 07/21/2022 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | S&E BRIDGE & SCAFFOLD LLC | 07/21/2022 |
| DOB NOW | Boiler Equipment | Signed-off | TT MECHANICAL CORP | 07/12/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 03/18/2026 | Permit Issued | MOOVES GROUP LLC | Ventilation Systems | Ventilation Greenheck SP-B110 75 CFM · Exhaust Fan ×1 |
| 03/12/2026 | Signed-off | ROYAL HVAC SYSTEMS INC | Heating and Air Conditioning Systems, Ventilation Systems | |
| 01/16/2026 | Signed-off | PROMETHEAN BUILDERS LLC | Air Conditioning Systems | Cooling Climatemaster CLIMATEMASTER MODEL # SE-060 1,900 CFM · Wshp ×1 |
| 01/08/2026 | Signed-off | KING ROSE OF NY, INC | Air Conditioning Systems | Cooling Bosch BOSCH - MODEL # CL-048 1,435 CFM · Heat Pump Outdoor ×1 BOSCH MODEL # CL-048 1,435 CFM · Heat Pump Outdoor ×1 |
| 01/15/2025 | Permit Issued | PUNCHLIST PLUS LLC | Air Conditioning Systems | Cooling Comfort Aire HBV012A1C30CCT 375 CFM · Wshp ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/18/2026 | — | — | Sprinkler System |
| 03/12/2026 | Signed-off | DYNAMIC PLBNG & SPRKR COR | Sprinkler System |
| 01/16/2026 | Signed-off | BLUEWATER P&H, INC | Sprinkler System |
| 01/08/2026 | Signed-off | BEDROCK MECHANICAL INC | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/18/2026 | Permit Issued | MIDTOWN PLBG & HTNG CORP | Water/Sanitary |
| 03/12/2026 | Signed-off | PEAK PLUMBING SOLUTIONS L | Water/Sanitary |
| 01/16/2026 | Signed-off | BLUEWATER PLBG& HTG INC | Water/Sanitary |
| 01/08/2026 | Signed-off | BEDROCK PLBG. & HTG., INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/20/2026 | Complete | PATRIOT ELECTRIC CORP | General Wiring |
| 07/28/2026 | Permit Issued | CITYONE ELECTRICAL CORP | General Wiring |
| 06/30/2026 | Permit Issued | PATRIOT ELECTRIC CORP | 1 meters, 1 new_meters |
| 02/12/2026 | Permit Issued | RAMDEEN'S ELEC. CONTR.COR | General Wiring |
| 10/12/2025 | Complete | EURO ELEC'L CONTRG, INC | General Wiring |
| 06/17/2025 | Complete | ELPO ELECTRICAL CONTG INC | General Wiring |
| 06/09/2025 | Complete | EURO ELEC'L CONTRG, INC | General Wiring |
| 02/14/2024 | Complete | ROBERT CHIMENTI | 2 meters, 1 new_meters |
| 06/15/2023 | Complete | CRANA ELECTRIC, INC | General Wiring |
| 08/10/2021 | Complete | NASH ELECTRIC SERVICES IN | General Wiring |
| 08/03/2021 | Complete | NASH ELECTRIC SERVICES IN | — |
| 07/28/2021 | Complete | NASH ELECTRIC SERVICES IN | — |
| 07/16/2021 | Complete | KNIGHT ELEC'L SERV. CORP. | General Wiring |
| 09/25/2020 | Complete | HORSEPOWER ELECTRIC.& | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/20/2024 | Permit Issued | URBAN ATELIER GROUP LLC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/16/2026 | Signed-off | BLUEWATER PLBG& HTG INC | Tenant Protection Plan 72 Hour |
| 01/08/2026 | Signed-off | BEDROCK PLBG. & HTG., INC | Tenant Protection Plan 72 Hour |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/16/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 04/24/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/23/2026 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 04/21/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/21/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/31/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/23/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/18/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/18/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/10/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/04/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/21/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/19/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/30/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/08/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/03/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/19/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 11/19/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 11/19/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/15/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/20/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/15/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/03/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 04/09/2026 | Ventilation and air distribution system | CALVIN TRAN | energy_progress |
| 04/09/2026 | HVAC-R and service water heating equipment | CALVIN TRAN | energy_progress |
| 04/09/2026 | HVAC-R and service water piping design and insulation | CALVIN TRAN | energy_progress |
| 04/09/2026 | HVAC-R and service water heating system controls | CALVIN TRAN | energy_progress |
| 04/09/2026 | Maintenance information | CALVIN TRAN | energy_progress |
| 04/09/2026 | Final | CALVIN TRAN | progress |
| 04/09/2026 | Energy Code Compliance Inspections | CALVIN TRAN | progress |
| 04/09/2026 | Tenant Protection Plan Compliance | Dave Wall | special |
| 04/09/2026 | Post-installed Anchors | — | special |
| 04/09/2026 | Mechanical Systems | XIAOJUN WANG | special |
| 03/09/2026 | Final | CALVIN TRAN | progress |
| 03/09/2026 | Fire-Resistant Penetrations and Joints | AHMED ISA | special |
| 03/09/2026 | Fire-Resistant Penetrations and Joints | Dave Wall | special |
| 03/09/2026 | Post-installed Anchors | AHMED ISA | special |
| 03/09/2026 | Tenant Protection Plan Compliance | AHMED ISA | special |
| 03/09/2026 | Fire-Resistant Penetrations and Joints | AHMED ISA | special |
| 03/09/2026 | Tenant Protection Plan Compliance | AHMED ISA | special |
| 03/09/2026 | Energy Code Compliance Inspections | AHMED ISA | progress |
| 03/09/2026 | HVAC-R and service water piping design and insulation | AHMED ISA | energy_progress |
| 03/09/2026 | HVAC-R and service water heating equipment | AHMED ISA | energy_progress |
| 03/09/2026 | Maintenance information | AHMED ISA | energy_progress |
| 03/09/2026 | HVAC-R and service water heating system controls | AHMED ISA | energy_progress |
| 03/09/2026 | Tenant Protection Plan Compliance | Dave Wall | special |
| 03/09/2026 | Lighting controls | CALVIN TRAN | energy_progress |
| 03/09/2026 | Interior lighting power | CALVIN TRAN | energy_progress |