| Owner | Filings | Most Recent |
|---|---|---|
| SL GREEN REALTY | 869 | 09/30/2026 |
| NEWMARK KNIGHT FRANK | 45 | 07/08/2026 |
| T-MOBILE | 4 | 03/22/2026 |
| METROPOLITAN TRANSPORTATION AUTHORITY | 1 | 03/22/2026 |
| BLADE CONTRATING INC | 6 | 03/22/2026 |
| 245 PARK AVENUE PROPERTY LLC | 48 | 03/22/2026 |
| BLADE CONTRACTING INC. 1 | 1 | 03/22/2026 |
| 245 PROPERTY AVENUE PROPE | 1 | 03/22/2026 |
| BOP 245 PARK | 26 | 03/22/2026 |
| BROOKFIELD PROPERTIES | 13 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 05/05/2017 | $2.2B | — | BOP 245 PARK LLC → 245 PARK AVENUE PROPERTY LLC | $1,393/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| LANGAN ENGINEERING | 2 | 09/03/2026 |
| OMER FENIK, RA | 4 | 08/11/2026 |
| ROBERT DERECTOR ASSOCIATES | 65 | 08/03/2026 |
| GENSLER | 22 | 07/08/2026 |
| MG ENGINEERING D.P.C. | 114 | 06/29/2026 |
| LOFFREDO BROOKS ARCHITECTS P.C. | 25 | 06/26/2026 |
| FOGARTY FINGER ARCHITECTURE PLLC | 8 | 06/08/2026 |
| TED MOUDIS ASSOCIATES | 5 | 05/19/2026 |
| GILSANZ MURRAY STEFICEK LLP | 13 | 05/12/2026 |
| SOCOTEC, INC. | 4 | 04/28/2026 |
| CFS ENGINEERING, DPC | 10 | 03/25/2026 |
| BRAND ACCESS SOLUTIONS | 15 | 03/19/2026 |
| SEVERUD ASSOCIATES | 9 | 03/19/2026 |
| METHOD ARCHITECTS PLLC | 1 | 03/19/2026 |
| KOHN PEDERSEN FOX | 13 | 03/09/2026 |
| ALL CITY ENGINEERING PC | 3 | 01/26/2026 |
| BIX ELLENBECKER | 1 | 01/26/2026 |
| SYSKA HENNESSY GROUP | 9 | 08/28/2025 |
| TPG ARCHITECTURE, LLP | 1 | 08/06/2024 |
| BRADLEY KALMANS | 6 | 03/06/2024 |
| CONAPAC SERVICES, DBA | 4 | 09/29/2023 |
| CHIPMAN DESIGN ARCHITECTURE | 4 | 09/06/2023 |
| GRANT ENGINEERING CONSULTANTS, LLC | 2 | 06/15/2023 |
| MURDOCH ENGINEERING | 3 | 03/08/2023 |
| SSM DESIGN LLP D/B/A SPECTOR GROUP | 1 | 02/16/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| RIZZO GROUP | 193 | 03/21/2026 |
| D R BROWN | 14 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 183 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 26 | 03/21/2026 |
| SMEP DESIGN & CONSULTATION LLC | 6 | 03/21/2026 |
| CONVERSANO ASSOCIATES, INC. | 2 | 03/21/2026 |
| METROPOLIS GROUP INC | 14 | 03/21/2026 |
| ADG | 4 | 03/21/2026 |
| CONSTRUCTION PERMIT SERVICES | 3 | 03/21/2026 |
| AE DESIGN SOLUTION | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JT MAGEN & COMPANY INC | General Contractor | 170 | 09/30/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 31 | 07/23/2026 |
| ASHLAND PLUMBING CORP | Plumbing | 27 | 07/23/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 23 | 09/18/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 15 | 07/08/2026 |
| CONCEPT CONSTRUCTION SERV | General Contractor | 13 | 07/08/2026 |
| STRUCTURE TONE, LLC | General Contractor | 12 | 07/23/2026 |
| PREFERRED SPKLR AND MECH | Fire Protection | 11 | 09/26/2026 |
| FINALY GENL CONTR CORP | General Contractor | 11 | 07/08/2026 |
| ACC CONSTRUCTION CORP | General Contractor | 10 | 07/08/2026 |
| BUILDERGURU CONTRACTING* | General Contractor | 6 | 07/08/2026 |
| LOGISTIC SVCS A DIV OF EM | General Contractor | 6 | 03/21/2026 |
| BEDROCK MECHANICAL INC | Fire Protection | 6 | 07/08/2026 |
| N Y SIGN ART | Scaffold | 5 | 07/08/2026 |
| COLGATE RESTORATION CORP | General Contractor | 5 | 07/08/2026 |
| VULPIS & VULPIS PLBG INC | Fire Protection | 5 | 07/08/2026 |
| ICON INTERIORS INC | General Contractor | 5 | 07/08/2026 |
| DK CONSTRUCTION ONE, CORP | General Contractor | 5 | 07/08/2026 |
| PAR PLUMBING CO., INC | Plumbing | 5 | 07/08/2026 |
| SCULLY CONSTRUCTION LLC | General Contractor | 4 | 07/08/2026 |
| BEDROCK PLBG. & HTG., INC | Plumbing | 4 | 07/08/2026 |
| ASHLAR MECHANICAL CORP | Fire Protection | 4 | 07/08/2026 |
| BROADWAY CONSTRUCTION GRO | General Contractor | 3 | 07/08/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 3 | 07/08/2026 |
| BENCHMARK BUILDERS LLC | General Contractor | 3 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| ALAN MARGOLIN & ASSOC | 423 | 132 | 08/11/2026 |
| AK ENGINEERING PC | 678 | 68 | 08/03/2026 |
| MILROSE CONSULTANTS LLC | 2003 | 29 | 06/29/2026 |
| FENAGH, INC | 6942 | 5 | 05/20/2026 |
| SOCOTEC ENGINEERING | 4983 | 6 | 04/28/2026 |
| GILSANZ MURRAY STEFICEK | 240 | 7 | 03/25/2026 |
| CFS ENGINEERING, PC | 615 | 10 | 03/25/2026 |
| G. BLINN CONSULTING, LLC | 2894 | 5 | 07/14/2025 |
| SOCOTEC, INC. | 301 | 1 | 06/06/2025 |
| SE INSPECTIONS | 7486 | 4 | 09/06/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | JT MAGEN & COMPANY INC | 09/29/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT MAGEN & COMPANY INC | 09/25/2026 |
| DOB NOW | Sprinklers | Permit Issued | PREFERRED SPKLR AND MECH | 09/25/2026 |
| DOB NOW | Plumbing | Permit Issued | PREFERRED MECHANICAL INC | 09/25/2026 |
| DOB NOW | General Construction | Permit Issued | JT MAGEN & COMPANY INC | 09/24/2026 |
| DOB NOW | General Construction | Permit Issued | JT MAGEN & COMPANY INC | 09/24/2026 |
| DOB NOW | General Construction | Permit Issued | JT MAGEN & COMPANY INC | 09/24/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT MAGEN & COMPANY INC | 09/23/2026 |
| DOB NOW | General Construction | Permit Issued | JT MAGEN & COMPANY INC | 09/23/2026 |
| DOB NOW | Structural | Permit Issued | JT MAGEN & COMPANY INC | 09/23/2026 |
| DOB NOW | General Construction | Permit Issued | JT MAGEN & COMPANY INC | 09/23/2026 |
| DOB NOW | Structural | Permit Issued | JT MAGEN & COMPANY INC | 09/23/2026 |
| DOB NOW | General Construction | Permit Issued | JT MAGEN & COMPANY INC | 09/23/2026 |
| DOB NOW | Mechanical Systems | Signed-off | JT MAGEN & COMPANY INC | 09/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT MAGEN & COMPANY INC | 09/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT MAGEN & COMPANY INC | 09/23/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | SAFWAY ATLANTIC, LLC | 09/17/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SAFWAY ATLANTIC, LLC | 09/17/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SAFWAY ATLANTIC, LLC | 09/17/2026 |
| DOB NOW | Construction Fence | Permit Issued | SAFWAY ATLANTIC, LLC | 09/17/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SAFWAY ATLANTIC, LLC | 09/17/2026 |
| DOB NOW | Sprinklers | Signed-off | ASHLAND PLUMBING CORP | 07/22/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 07/22/2026 |
| DOB NOW | Plumbing | Permit Issued | ASHLAND PLUMBING CORP | 07/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 07/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 07/22/2026 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 07/21/2026 |
| DOB NOW | Plumbing | Permit Issued | ASHLAND PLUMBING CORP | 07/13/2026 |
| DOB NOW | General Construction | Permit Issued | JT MAGEN & COMPANY INC | 07/07/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT MAGEN & COMPANY INC | 07/06/2026 |
| DOB NOW | Standpipe | Permit Issued | PREFERRED SPKLR AND MECH | 07/02/2026 |
| DOB NOW | Plumbing | Permit Issued | ASHLAND PLUMBING CORP | 07/02/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | STRUCTUAL PRESV SYSTEM | 07/02/2026 |
| DOB NOW | Sprinklers | Permit Issued | PREFERRED SPKLR AND MECH | 07/02/2026 |
| DOB NOW | General Construction | Permit Issued | JT MAGEN & COMPANY INC | 07/02/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | STRUCTUAL PRESV SYSTEM | 07/01/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | STRUCTUAL PRESV SYSTEM | 07/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT MAGEN & COMPANY INC | 06/30/2026 |
| DOB NOW | Plumbing | Permit Issued | ASHLAND PLUMBING CORP | 06/24/2026 |
| DOB NOW | Sprinklers | Permit Issued | PAR FIRE PROTECTION LLC | 06/15/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/20/2026 | Permit Issued | JAMES E FITZGERALD INC | Heating and Air Conditioning Systems | Heat / Cool Florida Heat Pump CL012 - FLORIDA HEAT PUMPS 400 CFM · Wshp ×3 CL030 - Florida Heat Pump 950 CFM · Wshp ×2 Model CL024 - Florida Heat Pump 800 CFM · Wshp ×2 CL018 - FLORIDA HEAT PUMP 600 CFM · Wshp ×1 Above Air MCW-009B-4-0000 - Above Air 1,250 CFM · Crac Unit ×1 |
| 05/12/2026 | Permit Issued | JT MAGEN & COMPANY INC | Air Conditioning Systems | Cooling Florida Heat Pump Florida Heat Pump - CL018 570 CFM · Wshp ×2 Florida Heat Pump - CL024 750 CFM · Wshp ×2 Florida Heat Pump - CL012 375 CFM · Wshp ×1 Florida Heat Pump - CL036 3 tons · Wshp ×1 Liebert Liebert - DME020E 825 CFM · Crac Unit ×2 |
| 03/30/2026 | Permit Issued | JT MAGEN & COMPANY INC | Air Conditioning Systems | Cooling Florida Heat Pump Florida Heat Pump - CL012 1 tons · Wshp ×4 Florida Heat Pump - CL024 2 tons · Wshp ×4 Florida Heat Pump - CL036 3 tons · Wshp ×4 FLORIDA HEAT PUMPS - CL012 1 tons · Wshp ×3 Florida Heat Pump - CL018 570 CFM · Wshp ×2 Florida Heat Pump - CL048 4 tons · Wshp ×2 Liebert LIEBERT - DME020E 825 CFM · Crac Unit ×2 LIEBERT - DME027E 1,125 CFM · Crac Unit ×1 LIEBERT - PX011UW 3 tons · Crac Unit ×1 Mammoth Mammoth - A-1-0.5I 10 tons ×1 |
| 03/25/2026 | Permit Issued | HUNTER ROBERTS CONSTRUCTI | Air Conditioning Systems | |
| 03/16/2026 | Permit Issued | JT MAGEN & COMPANY INC | Air Conditioning Systems | Cooling Above Air ×1 |
| 07/08/2025 | Permit Issued | STRUCTURE TONE, LLC | Air Conditioning Systems | Cooling Vertiv DME044C 1,200 CFM · Ahu ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/29/2026 | Permit Issued | PREFERRED SPKLR AND MECH | 8 heads |
| 06/29/2026 | Permit Issued | PAR FIRE PROTECTION LLC | 1,056 heads |
| 06/04/2026 | Permit Issued | PREFERRED SPKLR AND MECH | — |
| 05/20/2026 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | — |
| 05/12/2026 | Permit Issued | PREFERRED SPKLR AND MECH | 1 outlets |
| 05/12/2026 | Permit Issued | PREFERRED SPKLR AND MECH | — |
| 03/28/2026 | Permit Issued | PREFERRED SPKLR AND MECH | 2 outlets |
| 03/28/2026 | Permit Issued | PREFERRED SPKLR AND MECH | — |
| 03/25/2026 | Permit Issued | ARCHER CONSULTANTS GROUP | 279 heads |
| 03/13/2026 | Permit Issued | SIRINA FIRE PROT CORP | — |
| 03/10/2026 | Signed-off | SIRINA FIRE PROT CORP | 50 heads |
| 03/04/2026 | Permit Issued | SIRINA FIRE PROT CORP | 42 heads, 4 outlets |
| 01/15/2026 | Permit Issued | SOH PAR SPRINKLER LLC | 294 heads |
| 10/24/2025 | Permit Issued | PREFERRED SPKLR AND MECH | 2 outlets |
| 10/24/2025 | Permit Issued | PREFERRED SPKLR AND MECH | 1,345 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/03/2026 | Permit Issued | ASHLAND PLUMBING CORP | Water/Sanitary |
| 06/29/2026 | Signed-off | ASHLAND PLUMBING CORP | Water/Sanitary |
| 06/10/2026 | Signed-off | ASHLAND PLUMBING CORP | Water/Sanitary |
| 06/04/2026 | Permit Issued | ASHLAND PLUMBING CORP | Water/Sanitary |
| 06/01/2026 | Permit Issued | ASHLAND PLUMBING CORP | Gas, Storm, Water/Sanitary |
| 05/20/2026 | Permit Issued | LAB PLBG & HTG CO INC | Water/Sanitary |
| 04/17/2026 | Permit Issued | ASHLAND PLUMBING CORP | Gas |
| 03/30/2026 | Permit Issued | ASHLAND PLUMBING CORP | Water/Sanitary |
| 03/28/2026 | — | — | — |
| 03/25/2026 | — | — | — |
| 03/25/2026 | Permit Issued | PAR PLUMBING CO., INC | Water/Sanitary |
| 03/13/2026 | Permit Issued | ASHLAND PLUMBING CORP | Water/Sanitary |
| 03/10/2026 | — | — | — |
| 03/04/2026 | Permit Issued | ASHLAND PLUMBING CORP | Storm, Water/Sanitary |
| 03/04/2026 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/19/2026 | Permit Issued | H. & L. ELECTRIC INC | General Wiring |
| 06/10/2026 | Permit Issued | POWER-TECH INSTALL. ELEC' | General Wiring |
| 05/14/2026 | Permit Issued | H. & L. ELECTRIC INC | General Wiring |
| 05/06/2026 | Permit Issued | P.E. STONE INC | General Wiring |
| 04/29/2026 | Permit Issued | FOREST ELECTRIC CORP. | General Wiring |
| 03/31/2026 | Permit Issued | POLARIS ELEC'L CONST CORP | General Wiring |
| 03/27/2026 | Permit Issued | ROBERT B SAMUELS, INC | General Wiring |
| 01/23/2026 | Complete | ROBERT B SAMUELS, INC | General Wiring |
| 01/21/2026 | Complete | H. & L. ELECTRIC INC | General Wiring |
| 01/21/2026 | Complete | H. & L. ELECTRIC INC | General Wiring |
| 11/03/2025 | Permit Issued | TUXEDO ELEC'L CONTR'G INC | — |
| 10/29/2025 | Permit Issued | H. & L. ELECTRIC INC | General Wiring |
| 10/07/2025 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 08/13/2025 | Permit Issued | TUXEDO ELEC'L CONTR'G INC | — |
| 07/14/2025 | Permit Issued | POWER-TECH INSTALL. ELEC' | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/26/2026 | Permit Issued | JT MAGEN & COMPANY INC | 1 scope_items |
| 05/12/2026 | Permit Issued | JT MAGEN & COMPANY INC | Concrete |
| 03/24/2026 | Permit Issued | HUNTER ROBERTS CONSTRUCTI | Steel |
| 03/19/2026 | Signed-off | JT MAGEN & COMPANY INC | Steel, Concrete |
| 03/17/2026 | Permit Issued | JT MAGEN & COMPANY INC | Steel, Concrete |
| 03/04/2026 | Permit Issued | ASHLAND PLUMBING CORP | 1 scope_items |
| 11/12/2025 | Signed-off | ICON INTERIORS INC | Steel |
| 08/07/2025 | Permit Issued | JT MAGEN & COMPANY INC | Steel, Concrete |
| 05/29/2025 | Signed-off | JT MAGEN & COMPANY INC | Steel |
| 02/05/2025 | Signed-off | JT MAGEN & COMPANY INC | Steel, Concrete |
| 04/11/2024 | Signed-off | JT MAGEN & COMPANY INC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/19/2026 | Permit Issued | SAFWAY ATLANTIC, LLC | Fence |
| 03/19/2026 | Permit Issued | SAFWAY ATLANTIC, LLC | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/28/2026 | Permit Issued | STRUCTUAL PRESV SYSTEM | Suspended Scaffold (SC) |
| 04/06/2026 | Permit Issued | STRUCTUAL PRESV SYSTEM | Suspended Scaffold (SC) |
| 05/12/2025 | Permit Issued | STRUCTUAL PRESV SYSTEM | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/03/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 08/19/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 08/19/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 08/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/13/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/12/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 08/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 08/11/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/11/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 08/11/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/10/2026 | Pass-Final SP - Up to 9 Requested Floors | Pass | View ↗ |
| 08/07/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/07/2026 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 08/05/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 08/05/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/05/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 08/04/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/31/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/30/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/30/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/24/2026 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 07/17/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/09/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/06/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/14/2026 | Final | Omer Fenik | progress |
| 08/14/2026 | Mastic and Intumescent Fire-resistant Coatings | Young Suh | special |
| 08/14/2026 | Fire-Resistance Rated Construction | Young Suh | progress |
| 08/14/2026 | Post-installed Anchors | Young Suh | special |
| 08/14/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 08/06/2026 | Post-installed Anchors | Ari Kamo | special |
| 08/06/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 07/30/2026 | Public Assembly Emergency Lighting | Young Suh | progress |
| 07/13/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 07/13/2026 | Post-installed Anchors | Ari Kamo | special |
| 07/07/2026 | Post-installed Anchors | Christopher Drutjons | special |
| 07/07/2026 | Fire-Resistant Penetrations and Joints | Christopher Drutjons | special |
| 07/07/2026 | Energy Code Compliance Inspections | Christopher Drutjons | progress |
| 07/07/2026 | HVAC-R and service water heating system controls | Christopher Drutjons | energy_progress |
| 07/07/2026 | HVAC-R and service water heating equipment | Christopher Drutjons | energy_progress |
| 07/07/2026 | HVAC-R and service water piping design and insulation | Christopher Drutjons | energy_progress |
| 07/07/2026 | Sprinkler Systems | Christopher Drutjons | special |
| 06/25/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 06/25/2026 | Post-installed Anchors | Ari Kamo | special |
| 06/25/2026 | Post-installed Anchors | Ari Kamo | special |
| 06/25/2026 | Post-installed Anchors | Ari Kamo | special |
| 06/25/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 06/25/2026 | Duct leakage testing, insulation and design | Ari Kamo | energy_progress |
| 06/24/2026 | Interior lighting power | Ari Kamo | energy_progress |
| 06/24/2026 | Energy Code Compliance Inspections | Ari Kamo | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Cliffwater | Office | Floor 27 | Project M01384427 Project M01385155 Project M01385282 Project M01385290 Project M01384363 |
| Ares Management | Office | Floors 31, 36–44 | Project M01389256 Project M01389301 Project M01389349 Project M01389354 Project M01389358 Project M01389363 Project M01371017 Project M01371041 Project M01371060 Project M01373576 Project M01371003 Project M01293102 |
| EQT Partners | Office | Floor 32 | Project M01360768 |
| Houlihan Lokey | Office | Floors 1–3, 5, 16–20, 22, 29, Mezzanine | Project M01359205 Project M01359233 Project M01359183 Project M00954636 Project M00814002 Project M00817551 Project M08023636 Project M08031540 Project M08023957 Project M08023993 Project M08043269 Project M00765690 |
| Scarpetta | Restaurant / Food Service | Floor 1 | Project M01345468 |
| Cala Scarpetta | Restaurant / Food Service | Floor 1 | Project M01323083 |
| Cala Scarpetta | Restaurant / Food Service | Floor 1 | Project M01323058 |
| Tradeweb | Office | Floors 29, 30 | Project M01274592 Project M01159692 Project M01146573 |
| Societe Generale | Office | Floor 2 | Project M01243202 Project M01243190 Project M01243216 Project M01143941 Project M01010249 Project M01010196 Project M00983173 |
| Verition Fund | Office | Floors 14, 15 | Project M01221748 Project M01221759 Project M01221688 Project M01223751 |
| Junto Capital Management | Office | Floors 33, 34 | Project M01084581 |
| Angelo Gordon | Office | Floor 23 | Project M00962334 Project M00329536 |
| Dos Caminos | Restaurant / Food Service | — | Project M00768672 Project M00742913 |
| Landry's | Restaurant / Food Service | Floors 1, 2, Mezzanine | Project M00641582 Project M00641856 Project M00641874 Project M00641884 |
| PKF O'Connor Davies | Office | Floor 12 | Project M00506121 Project M00506145 Project M00510532 |
| ARES Capital | Office | Floors 42–44 | Project M00356717 |