Three families
246 MONTROSE AVENUE
BROOKLYN · BIN 3071261
💬 Discuss this project
1930Year Built
3Stories
C0Building Class
M1-1Zoning
3,132 sfGross Floor Area
3Units
Rent Stabilized23 Open Violations ▸FDNY Report ↗
Three families · 1,950 sf lot · 1.61 FAR built · Flood zone X
Locations of Work
StructuralPlumbing
Roof2p · 2 filings · 20 docs
Cellar1p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DONALD RUBIN, ARCHITECT LLC505/02/2022
THORNTON TOMASETTI104/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DOMINION EXPEDITING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OZ CONTRACTING LLCGeneral Contractor407/08/2026
CJ HEATING & MECHANICAL CPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHOI ENGINEERING PLLC2264205/02/2022
DNA CONTROLLED INSPECTION554104/06/2021
THORNTON TOMASETTI, INC.1740104/06/2021
Building Lifecycle
All (77)Filed (6)Permit Issued (4)Signed Off (3)Violation (30)Inspection (4)Special Inspection (30)
05/05/2026
Violation issued (HPD, open)
A
11/18/2025
Violation issued (HPD, open)
I
06/10/2025
Violation issued (HPD, open)
A
11/25/2024
Violation issued (HPD, open)
I
04/11/2024
Violation issued (HPD, open)
A
11/17/2023
Violation issued (HPD, open)
I
03/24/2023
Violation issued (HPD, open)
A
11/07/2022
Violation issued (HPD, open)
I
09/14/2022
Signed off — Alteration
B00542580-S1
09/13/2022
Signed off — Alteration
B00542580-I1
08/29/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/02/2022
Filed — Alteration
B00542580-P9
05/02/2022
Special inspection requirement — Insulation placement and R values
Eugene Choi
05/02/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eugene Choi
05/02/2022
Special inspection requirement — Energy Code Compliance Inspections
Eugene Choi
05/02/2022
Special inspection requirement — Final
Eugene Choi
05/02/2022
Special inspection requirement — Fire-Resistance Rated Construction
Eugene Choi
05/02/2022
Special inspection requirement — Structural Wood Frame
Eugene Choi
05/02/2022
Special inspection requirement — Fenestration air leakage
Eugene Choi
05/02/2022
Special inspection requirement — Air barrier - visual inspection
Eugene Choi
05/02/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Eugene Choi
05/02/2022
Special inspection requirement — Lighting controls
Eugene Choi
05/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eugene Choi
05/02/2022
Special inspection requirement — Exterior lighting power
Eugene Choi
05/02/2022
Special inspection requirement — Lighting in dwelling units
Eugene Choi
05/02/2022
Special inspection requirement — Fenestration areas
Eugene Choi
05/02/2022
Special inspection requirement — Interior lighting power
Eugene Choi
05/02/2022
Special inspection requirement — Metering
Eugene Choi
05/02/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Eugene Choi
05/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eugene Choi
05/02/2022
Special inspection requirement — Energy Code Compliance Inspections
Eugene Choi
05/02/2022
Special inspection requirement — Fire-Resistance Rated Construction
Eugene Choi
05/02/2022
Special inspection requirement — Final
Eugene Choi
05/02/2022
Special inspection requirement — Structural Wood Frame
Eugene Choi
05/02/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Eugene Choi
05/02/2022
Special inspection requirement — Lighting controls
Eugene Choi
05/02/2022
Special inspection requirement — Exterior lighting power
Eugene Choi
05/02/2022
Special inspection requirement — Lighting in dwelling units
Eugene Choi
05/02/2022
Special inspection requirement — Fenestration air leakage
Eugene Choi
05/02/2022
Special inspection requirement — Interior lighting power
Eugene Choi
05/02/2022
Special inspection requirement — Air barrier - visual inspection
Eugene Choi
05/02/2022
Special inspection requirement — Insulation placement and R values
Eugene Choi
04/28/2022
Filed — Alteration
B00542580-P2
04/14/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/28/2022
Filed — Alteration
B00542580-P1
03/01/2022
Violation issued (HPD, open)
A
03/01/2022
Violation issued (HPD, open)
I
12/03/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/03/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/22/2021
Permit issued — Plumbing
B00542580-S1-PL
10/26/2021
Permit issued — Plumbing
B00542580-S1-PL
10/21/2021
Signed off — Alteration
B00498368-I1
10/05/2021
Filed — Alteration
B00542580-S1
07/09/2021
Permit issued — Structural
B00542580-I1-GC-CX
06/24/2021
Filed — Alteration
B00542580-I1
04/20/2021
Permit issued — Structural
B00498368-I1-ST
04/12/2021
Violation issued (HPD, open)
A
04/12/2021
Violation issued (HPD, open)
I
04/06/2021
Filed — Alteration
B00498368-I1
02/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCJ HEATING & MECHANICAL C11/22/2021
DOB NOWPlumbingSigned-offCJ HEATING & MECHANICAL C10/26/2021
DOB NOWStructuralSigned-offOZ CONTRACTING LLC07/09/2021
DOB NOWStructuralSigned-offOZ CONTRACTING LLC04/20/2021
1 project · most recent 04/18/2022
General Wiring
FiledStatusContractorScope
04/18/2022CompletePOWER ON ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
08/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/03/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/03/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
05/02/2022Insulation placement and R valuesEugene Choienergy_progress
05/02/2022Structural Stability – Alterations of existing buildingsEugene Choispecial
05/02/2022Energy Code Compliance InspectionsEugene Choiprogress
05/02/2022FinalEugene Choiprogress
05/02/2022Fire-Resistance Rated ConstructionEugene Choiprogress
05/02/2022Structural Wood FrameEugene Choiprogress
05/02/2022Fenestration air leakageEugene Choienergy_progress
05/02/2022Air barrier - visual inspectionEugene Choienergy_progress
05/02/2022Fenestration and door U-factor and product ratingsEugene Choienergy_progress
05/02/2022Lighting controlsEugene Choienergy_progress
05/02/2022Fire-Resistant Penetrations and JointsEugene Choispecial
05/02/2022Exterior lighting powerEugene Choienergy_progress
05/02/2022Lighting in dwelling unitsEugene Choienergy_progress
05/02/2022Fenestration areasEugene Choienergy_progress
05/02/2022Interior lighting powerEugene Choienergy_progress
05/02/2022MeteringEugene Choienergy_progress
05/02/2022Structural Stability – Alterations of existing buildingsEugene Choispecial
05/02/2022Fire-Resistant Penetrations and JointsEugene Choispecial
05/02/2022Energy Code Compliance InspectionsEugene Choiprogress
05/02/2022Fire-Resistance Rated ConstructionEugene Choiprogress
05/02/2022FinalEugene Choiprogress
05/02/2022Structural Wood FrameEugene Choiprogress
05/02/2022Fenestration and door U-factor and product ratingsEugene Choienergy_progress
05/02/2022Lighting controlsEugene Choienergy_progress
05/02/2022Exterior lighting powerEugene Choienergy_progress
Latest 25 of 42.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
09/01/2026B00498368-I1Request digital key ↗
09/01/2026B00542580-I1Request digital key ↗
09/01/2026B00542580-S1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature26
09/01/2026B00542580-P9Open ↗
08/31/2026B00542580-P2Open ↗
08/31/2026B00542580-P2Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00498368-I1Open ↗
09/01/2026B00542580-S1Open ↗
09/01/2026B00542580-P9Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B00542580-P9Open ↗
08/29/2026B00542580-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00542580-P9Open ↗
09/01/2026B00542580-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/01/2026B00498368-I1Open ↗
09/01/2026B00542580-S1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00542580-I1Open ↗
08/13/2026B00542580-S1Open ↗