← Back
Old law tenement
246 WEST 108 STREET
MANHATTAN · Upper West Side-Manhattan Valley · BIN 1056669
💬 Discuss this project
1910Year Built
5Stories
C4Building Class
R8BZoning
9,485 sfGross Floor Area
10Units
Rent Stabilized0 Open Violations
Old law tenement · Owner of record: 246 WEST 108TH ST L.P. · 2,523 sf lot · 3.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Roof5p · 1 filing · 8 docs
Floor 550p · 4 filings · 20 docs
Floor 448p · 4 filings · 20 docs
Floor 347p · 4 filings · 20 docs
Floor 246p · 4 filings · 20 docs
Floor 148p · 5 filings · 20 docs
Cellar58p · 6 filings · 20 docs
Filed — no permit issued29p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RM-SM PROPERTIES UWS L P2807/08/2026
246 WEST 108TH STREET903/22/2026
FLUSHING 1224803/21/2026
246 W 108 ST203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/23/2022$5.8M—246 WEST 108TH, LLC → 246 WEST 108TH ST L.P.$611/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
R.J. MCGEE ENGINEERING, PLLC511/13/2024
SA-DA ARCHITECTURE310/20/2023
MARTOS ENGINEERING204/12/2023
CHRISTOPHER TEETER408/28/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS903/21/2026
SKY MANAGEMENT GROUP803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HAIAN HONEST RENOVATIONGeneral Contractor607/08/2026
PROCORE MECHANICAL CORPPlumbing107/08/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SA-DA ARCHITECTURE2640411/13/2024
CHRISTIAN L. MARTOS ENGIN5965304/12/2023
R.J. MCGEE ENGINEERING, P7878101/20/2023
Building Lifecycle
All (196)Filed (14)Permit Issued (6)Signed Off (6)Violation (60)Inspection (4)Objection (76)Special Inspection (30)
08/11/2025
Signed off — Alteration
REMOVAL OF AN EXISTING GAS METER, BOILER, AND ASSOCIATED PIPING AS PER THE SUBMITTED PLANS. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01032995-I1
04/18/2025
Violation issued (ECB, closed)
Quality of Life
04/18/2025
Violation issued (ECB, closed)
Construction
04/18/2025
Violation issued (ECB, closed)
Construction
04/18/2025
Violation issued (ECB, closed)
Quality of Life
04/18/2025
Violation issued (ECB, closed)
Quality of Life
04/18/2025
Violation issued (ECB, closed)
Quality of Life
04/18/2025
Violation issued (ECB, closed)
Quality of Life
04/18/2025
Violation issued (ECB, closed)
Construction
02/11/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/22/2025
Permit issued — Plumbing
M01032995-I1-PL
01/02/2025
Violation issued (HPD, closed)
C
01/02/2025
Violation issued (HPD, closed)
C
01/02/2025
Violation issued (HPD, closed)
C
11/13/2024
Filed — Alteration
REMOVAL OF AN EXISTING GAS METER, BOILER, AND ASSOCIATED PIPING AS PER THE SUBMITTED PLANS. NO CHANGE TO ZONING, USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01032995-I1
10/22/2024
Violation issued (HPD, closed)
A
10/22/2024
Violation issued (HPD, closed)
A
10/22/2024
Violation issued (HPD, closed)
A
10/22/2024
Violation issued (HPD, closed)
A
10/22/2024
Violation issued (HPD, closed)
A
10/22/2024
Violation issued (HPD, closed)
A
10/22/2024
Violation issued (HPD, closed)
A
10/22/2024
Violation issued (HPD, closed)
A
07/31/2024
Violation issued (HPD, closed)
A
07/31/2024
Violation issued (HPD, closed)
A
07/31/2024
Violation issued (HPD, closed)
A
07/31/2024
Violation issued (HPD, closed)
C
07/31/2024
Violation issued (HPD, closed)
A
07/31/2024
Violation issued (HPD, closed)
A
07/31/2024
Violation issued (HPD, closed)
A
07/31/2024
Violation issued (HPD, closed)
A
04/01/2024
Violation issued (HPD, closed)
A
01/29/2024
Signed off — Alteration
Respectfully filing for mechanical work as per proposed plans. No change to use egress or occupancy.
M00800617-I1
01/18/2024
Signed off — Alteration
RESPECTFULLY FILING FOR PROPOSED PLUMBING WORK TO A 5 STORY, 5 FAMILY MIXED USE BUILDING. ALTERATION TO CONSIST OF INTERIOR PLUMBING WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00800624-I1
01/16/2024
Signed off — Alteration
Structural renovations include reconfiguration of public stair core on all levels,construction of new bulkhead,modification/reinforcement of floor framing at each level to accommodate new stairs and apartment layouts. no change to use egress or occupancy.
M08055595-I1
12/23/2023
Filed — Alteration
RESPECTFULLY FILING FOR PROPOSED PLUMBING WORK TO A 5 STORY, 5 FAMILY MIXED USE BUILDING. ALTERATION TO CONSIST OF INTERIOR PLUMBING WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00800624-P2
12/19/2023
Signed off — Alteration
Foundation work related to Proposed work to a 5-story multifamily mixed-use building.
M08045900-I1
11/22/2023
Filed — Alteration
RESPECTFULLY FILING FOR PROPOSED PLUMBING WORK TO A 5 STORY, 5 FAMILY MIXED USE BUILDING. ALTERATION TO CONSIST OF INTERIOR PLUMBING WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00800624-P1
11/17/2023
Permit issued — Mechanical Systems
M00800617-I1-MS
11/15/2023
Signed off — Alteration
SCOPE OF WORK: PROPOSED WORK TO A 5 STORY PLUS CELLAR, 10 FAMILY BUILDING. ALTERATIONS TO CONSIST OF INTERIOR PARTITIONS, RELOCATED AND ENLARGED STAIR WITH NEW ROOFTOP MECHANICAL UNITS. NO CHANGE IN USE, EGRESS, OCCUPANCY AND ZONING IN THIS APPLICATION.
M08055480-I1
11/15/2023
Violation issued (HPD, closed)
I
10/31/2023
Permit issued — Foundation
M08045900-I1-FO
10/26/2023
Special inspection requirement — Lighting in dwelling units
Alexander Stoltz
10/26/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Alexander Stoltz
10/26/2023
Special inspection requirement — Interior lighting power
Alexander Stoltz
10/26/2023
Special inspection requirement — Fenestration areas
Alexander Stoltz
10/26/2023
Special inspection requirement — Exterior lighting power
Alexander Stoltz
10/26/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Alexander Stoltz
10/26/2023
Special inspection requirement — Insulation placement and R values
Alexander Stoltz
10/26/2023
Special inspection requirement — Fenestration air leakage
Alexander Stoltz
10/26/2023
Special inspection requirement — Lighting controls
Alexander Stoltz
10/26/2023
Special inspection requirement — Insulation placement and R values
Alexander Stoltz
10/26/2023
Special inspection requirement — Interior lighting power
Alexander Stoltz
10/26/2023
Special inspection requirement — Lighting controls
Alexander Stoltz
10/26/2023
Special inspection requirement — Fenestration air leakage
Alexander Stoltz
10/26/2023
Special inspection requirement — Lighting in dwelling units
Alexander Stoltz
10/26/2023
Special inspection requirement — Energy Code Compliance Inspections
Alexander Stoltz
10/26/2023
Special inspection requirement — Fenestration areas
Alexander Stoltz
10/26/2023
Special inspection requirement — Fire-Resistance Rated Construction
Alexander Stoltz
10/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Stoltz
Latest 60 of 196 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPROCORE MECHANICAL CORP01/22/2025
DOB NOWMechanical SystemsSigned-offHAIAN HONEST RENOVATION11/17/2023
DOB NOWFoundationSigned-offHAIAN HONEST RENOVATION10/31/2023
DOB NOWStructuralSigned-offHAIAN HONEST RENOVATION05/01/2023
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC04/12/2023
DOB NOWGeneral ConstructionSigned-offHAIAN HONEST RENOVATION04/07/2023
BISPLISSUEDMEGA PLBG CORP09/15/2016
BISOTISSUEDOMNIVOROUS INC08/01/2016
BISPLISSUEDMEGA PLBG CORP09/24/2014
BISPLISSUEDMEGA PLBG CORP06/18/2013
BISFBISSUEDMICHAEL S. KAPLAN09/11/2012
BISPLISSUEDMEGA PLBG CORP04/27/2010
BISPLISSUEDMEGA PLBG CORP12/10/2008
BISFBISSUEDSTEPHEN BRAUN12/10/2008
BISOTISSUEDFEDERAL CONSTRUCTION CO INC02/28/2008
BISOTISSUEDCHAN MEI CONTRACTING03/08/2006
BISBLISSUEDLEARDON BOILER WORKS.INC09/21/2004
BISFBISSUEDNEAL M. RUDIKOFF07/25/1996
1 project · most recent 08/25/2021
Water/Sanitary
FiledStatusContractorScope
08/25/2021——Water/Sanitary
1 project · most recent 10/23/2023
General Wiring
FiledStatusContractorScope
10/23/2023CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/12/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/28/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
10/26/2023Fenestration and door U-factor and product ratingsAlexander Stoltzenergy_progress
10/26/2023Lighting controlsAlexander Stoltzenergy_progress
10/26/2023Fenestration air leakageAlexander Stoltzenergy_progress
10/26/2023Insulation placement and R valuesAlexander Stoltzenergy_progress
10/26/2023Interior lighting powerAlexander Stoltzenergy_progress
10/26/2023Lighting in dwelling unitsAlexander Stoltzenergy_progress
10/26/2023Fenestration areasAlexander Stoltzenergy_progress
10/26/2023Exterior lighting powerAlexander Stoltzenergy_progress
10/26/2023Fenestration and door U-factor and product ratingsAlexander Stoltzenergy_progress
10/26/2023FinalAlexander Stoltzprogress
10/26/2023Energy Code Compliance InspectionsAlexander Stoltzprogress
10/26/2023Fire-Resistance Rated ConstructionAlexander Stoltzprogress
10/26/2023Fire-Resistant Penetrations and JointsAlexander Stoltzspecial
10/26/2023Fenestration air leakageAlexander Stoltzenergy_progress
10/26/2023Interior lighting powerAlexander Stoltzenergy_progress
10/26/2023Lighting controlsAlexander Stoltzenergy_progress
10/26/2023Insulation placement and R valuesAlexander Stoltzenergy_progress
10/26/2023Fenestration areasAlexander Stoltzenergy_progress
10/26/2023Lighting in dwelling unitsAlexander Stoltzenergy_progress
10/26/2023Exterior lighting powerAlexander Stoltzenergy_progress
10/19/2023Lighting in dwelling unitsAlexander Stoltzenergy_progress
10/19/2023Lighting controlsAlexander Stoltzenergy_progress
10/19/2023Insulation placement and R valuesAlexander Stoltzenergy_progress
10/19/2023Exterior lighting powerAlexander Stoltzenergy_progress
10/19/2023Lighting in dwelling unitsAlexander Stoltzenergy_progress
Latest 25 of 70.
▾Documents — 144 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/03/2026M00585043-I1Request digital key ↗
09/01/2026M08055480-I1Request digital key ↗
09/01/2026M08055480-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION8
09/27/2016122842120Open ↗
08/05/2016122842120Open ↗
06/27/2013110374425Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
07/28/2016122842120Open ↗
01/04/2012110374425Open ↗
12/28/2011110374425Open ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026M08026244-I1Open ↗
▸Seals & Professional Certifications67
▸DOB NOWProgress Inspector Seal & Signature36
09/20/2026M08045900-I1Open ↗
09/02/2026M00800617-I1Open ↗
08/30/2026M08055480-I1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/03/2026M00585017-I1Open ↗
09/01/2026M08055480-P1Open ↗
09/01/2026M08055480-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/20/2026M08045900-I1Open ↗
09/02/2026M00800617-I1Open ↗
08/30/2026M08055480-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
10/11/2017122842120Open ↗
07/28/2016122842120Open ↗
02/12/2015110374425Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/28/2016122842120Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
07/28/2016122842120Open ↗
▸Trade Schedules & Equipment8
▸BISSELF-CERT PLUMBING NOTICE3
12/09/2014110374425Open ↗
12/09/2014110374425Open ↗
02/24/2014110374425Open ↗
▸BISSCHEDULE B - PLUMBING3
01/04/2012110374425Open ↗
11/05/2008110374425Open ↗
02/06/2008110086031Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/05/2008110374425Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/28/2016122842120Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
07/28/2016122842120Open ↗
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/01/2026M08055480-I1Open ↗
09/01/2026M08055480-P1Open ↗
08/31/2026M08055595-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
11/05/2008110374425Open ↗
02/06/2008110086031Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/28/2016122842120Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M08045900-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/11/2017122842120Open ↗
07/28/2016122842120Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/11/2017122842120Open ↗
▸Approvals, Objections & Sign-offs5
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/11/2017122842120Open ↗
10/11/2017122842120Open ↗
02/12/2015110374425Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
11/05/2008110374425Open ↗
02/06/2008110086031Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT5
10/11/2017122842120Open ↗
07/28/2016122842120Open ↗
02/12/2015110374425Open ↗
Showing 3 of 5 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
08/05/2016122842120Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
07/28/2016122842120Open ↗
▸Other Documents10
▸DOB NOWDHCR Document9
09/01/2026M08055480-P1Open ↗
08/13/2026M00800617-I1Open ↗
08/13/2026M01032995-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSite Survey: Initial1
08/13/2026M08026244-I1Open ↗