Condo, residential tower (mixed-use, multi-family elevator) [derived]
The 250 E. 65th St Condominium
248 EAST 65 STREET · Upper East Side-Lenox Hill-Roosevelt Island · BIN 1043870
💬 Discuss this project
1963Year Built
14Stories
RMBuilding Class
C2-8Zoning
181,711 sfGross Floor Area
90Units
LL97 CoveredRent Stabilized29 Open Violations ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 250 E 65TH OPERATING INC · 20,100 sf lot · 9.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentLandscapeCivilGeneral
Permit Issued — active, not yet Signed-off
Roof42p · 7 filings · 20 docs
Floor 12Under Construction12p · 3 filings · 19 docs
Floor 119p · 2 filings · 16 docs
Floor 10Under Construction6p · 2 filings · 9 docs
Floor 94p · 2 filings · 9 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 437p · 7 filings · 20 docs
Floor 3
Floor 2
Floor 1Under Construction27p · 3 filings · 20 docs
Cellar29p · 4 filings · 20 docs
Sub-Basement1p · 1 filing · 4 docs
Site & exterior25p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
UNITED MGMT2907/08/2026
PROPERTY FUNDING2303/21/2026
BEAUMONT NY MANAGEMENT807/08/2026
J G CONSTRUCTION SRVCS607/08/2026
250 E 65TH STREET CONDOMINIUM603/21/2026
CVS HEALTH303/22/2026
CVS303/21/2026
RAPID CONTRACTING109/03/2026
1223 MEAT CORP103/22/2026
MONIPA COMPANY, LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ACA ASSOCIATES1403/21/2026
ARINNITY NYC203/21/2026
CCM CONSULTING GROUP, INC.803/21/2026
VINCENT J. LIOTTA P.E.103/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
SOTIR ASSOCIATES103/21/2026
ALL IN PERMIT CONSULTANTS103/21/2026
D R BROWN203/21/2026
BUILDING BROTHERS203/21/2026
HAIDER ENGINEERING, P.E.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UPGRADE 1 CONSTRUCTION COGeneral Contractor907/08/2026
RAPID CONTRACTING INCGeneral Contractor609/03/2026
HAMOUD CONSTRUCTION CORPGeneral Contractor607/08/2026
JACOBS TELECOMMUN. INCGeneral Contractor607/08/2026
GW MECHANICAL CORPPlumbing407/08/2026
J & G CONSTRUCTION SVCSGeneral Contractor407/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor307/08/2026
MAXWELL PLUMB MECH. CORPPlumbing207/08/2026
VILLAGE P & H NY INCPlumbing207/08/2026
AFGO MECHANICAL SVCS INCGeneral Contractor203/21/2026
LUMITECH CONTRACTING CORPGeneral Contractor203/21/2026
DIGITAL CONTR SERVCS INGeneral Contractor207/08/2026
SOTIRIOS STATHOPOULOSElectrical103/21/2026
STEWART RONALDElectrical103/21/2026
STUART MOSKOWITZElectrical103/21/2026
TOP NOTCH ELECTRIC INCElectrical103/22/2026
WCK ELECTRIC CORP.Electrical103/22/2026
DYNAIRE LLCGeneral Contractor107/08/2026
GALLERY RESTORATION LTDGeneral Contractor107/08/2026
HT BUILDS LLCGeneral Contractor104/09/2026
MAXWELL PLUMB MECH CORPGeneral Contractor107/08/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
HUDSON PLMBING & MCH, LLCPlumbing107/08/2026
HYDROKINETIC PLBG & HTG IPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BITOPI CONSULTANTS LLC7036405/15/2026
SOTIR ASSOCIATES7473602/23/2026
IKRA CONSULTING LLC7032410/22/2025
JEREMY K MCKEON, P.E.7263806/17/2025
MJ ENGINEERING & DESIGN5546104/28/2025
BUILDTECH ENGINEERING6369109/03/2024
ADS SPECIAL INSPECTIONS1270104/02/2024
BRAD E. COHEN, PE434402/08/2024
CMSC, INC6098203/22/2021
VINCENT J. LIOTTA P. E.1974112/23/2020
Building Lifecycle
All (298)Filed (48)Permit Issued (48)Signed Off (26)Facade (FISP) (8)Violation (60)Inspection (35)Objection (43)Special Inspection (30)
09/02/2026
Permit issued — Sidewalk Shed
M01453487-I1-SH
08/05/2026
Objection resolved — Addressed
07/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/24/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/22/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/21/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/30/2026
Objection raised — Other
06/09/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/27/2026
Permit issued — Plumbing
M01400925-I1-PL
05/26/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/26/2026
Objection resolved — Addressed
05/20/2026
Permit issued — General Construction
M01400911-I1-GC
05/18/2026
Violation issued (HPD, closed)
C
05/18/2026
Violation issued (HPD, open)
B
05/18/2026
Violation issued (HPD, closed)
A
05/18/2026
Violation issued (HPD, open)
B
05/18/2026
Violation issued (HPD, open)
B
05/18/2026
Violation issued (HPD, open)
B
05/15/2026
Filed — Alteration
PLUMBING WORK IN APR 12F
M01400925-I1
05/15/2026
Filed — Alteration
INTERIOR RENOVATION OF APT 12F
M01400911-I1
05/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
KAMRUL AHSAN
05/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
KAMRUL AHSAN
05/12/2026
Special inspection requirement — Final
Humayun Ahmed
05/07/2026
Permit issued — Plumbing
M01300512-I1-PL
05/04/2026
Signed off — Alteration
Installation of non-emergency gas fired generator with related gas booster pump on roof. No change to occupancy, use, or egress.
M00854227-I1
05/04/2026
Signed off — Alteration
Installation of gas meter and gas piping as per plans. No change to occupancy, use, or egress.
M00854236-I1
04/28/2026
Objection resolved — Resolved
03/31/2026
Violation issued (HPD, closed)
C
03/31/2026
Violation issued (HPD, closed)
C
03/31/2026
Violation issued (HPD, closed)
C
03/31/2026
Violation issued (HPD, closed)
C
03/31/2026
Violation issued (HPD, closed)
C
03/31/2026
Violation issued (HPD, closed)
C
03/31/2026
Violation issued (HPD, closed)
C
03/31/2026
Violation issued (HPD, closed)
C
03/31/2026
Violation issued (HPD, closed)
C
03/31/2026
Violation issued (HPD, closed)
C
03/20/2026
Objection raised — Cost
03/20/2026
Objection raised — Other
03/20/2026
Objection raised — Other
03/20/2026
Objection raised — Other
03/17/2026
Signed off — Alteration
AT&T - Installation of steel platform with related cabinets on roof. Installation of new antenna sectors with related RRH units and GPS on roof. Related service connection. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress.
M00854204-I1
03/12/2026
Objection resolved — Addressed
03/11/2026
Objection raised — Scope
02/23/2026
Filed — Alteration
INTERIOR RENOVATION WORK IN EXISTING COMMERCIAL SPACE ON 1ST FLOOR & CELLAR FOR PROPOSED GROCERY & CONVENIENCE RETAILER WITH COMMERCIAL COOKING. NEW COMMERCIAL KITCHEN PROPOSED. ASSOCIATED MECHANICAL & PLUMBING WORK TO BE FILED SUBSEQUENTLY.
M01168769-P2
02/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Hany Demetry
02/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
Hany Demetry
02/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
Hany Demetry
02/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hany Demetry
02/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Hany Demetry
02/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/10/2026
Objection raised — Admin
02/09/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/09/2026
Objection resolved — Addressed
01/27/2026
Objection raised — Mechanical
01/27/2026
Objection raised — Mechanical
01/27/2026
Objection raised — Cost
01/13/2026
Filed — Alteration
INSTALLING A NEW AIR COOLED CONDENSER ON 1st FLOOR ROOF TO BE UTILIZED BY THE 1ST FLOOR COMMERCIAL SPACE.
M01161982-P1
01/07/2026
Special inspection requirement — Post-installed Anchors
Hany Demetry
01/07/2026
Special inspection requirement — Mechanical Systems
Hany Demetry
Latest 60 of 298 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedRAPID CONTRACTING INC09/02/2026
DOB NOWPlumbingPermit IssuedGW MECHANICAL CORP05/27/2026
DOB NOWGeneral ConstructionPermit IssuedUPGRADE 1 CONSTRUCTION CO05/20/2026
DOB NOWPlumbingPermit IssuedVILLAGE P & H NY INC05/07/2026
DOB NOWGeneral ConstructionPermit IssuedHT BUILDS LLC11/07/2025
DOB NOWPlumbingPermit IssuedVILLAGE P & H NY INC11/07/2025
DOB NOWSignSigned-offDESTHERS, JOSEPH09/16/2025
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG09/04/2025
DOB NOWGeneral ConstructionPermit IssuedHAMOUD CONSTRUCTION CORP08/12/2025
DOB NOWStructuralSigned-offHAMOUD CONSTRUCTION CORP08/12/2025
DOB NOWMechanical SystemsPermit IssuedHAMOUD CONSTRUCTION CORP08/12/2025
DOB NOWPlumbingSigned-offGW MECHANICAL CORP07/24/2025
DOB NOWGeneral ConstructionSigned-offUPGRADE 1 CONSTRUCTION CO07/16/2025
DOB NOWMechanical SystemsPermit IssuedHAMOUD CONSTRUCTION CORP06/10/2025
DOB NOWStructuralSigned-offHAMOUD CONSTRUCTION CORP05/16/2025
DOB NOWPlumbingSigned-offGW MECHANICAL CORP03/31/2025
DOB NOWGeneral ConstructionSigned-offUPGRADE 1 CONSTRUCTION CO03/26/2025
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC03/14/2025
DOB NOWGeneral ConstructionPermit IssuedHAMOUD CONSTRUCTION CORP03/10/2025
DOB NOWPlumbingSigned-offL.L.G. PLBG & HTG INC02/10/2025
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I09/25/2024
DOB NOWGeneral ConstructionPermit IssuedGALLERY RESTORATION LTD09/24/2024
DOB NOWMechanical SystemsSigned-offDIGITAL CONTR SERVCS IN07/18/2024
DOB NOWAntennaSigned-offDIGITAL CONTR SERVCS IN07/18/2024
DOB NOWAntennaSigned-offARMENTUM DIGITAL INFRASTR05/16/2024
DOB NOWMechanical SystemsSigned-offARMENTUM DIGITAL INFRASTR05/15/2024
DOB NOWGeneral ConstructionPermit IssuedLUMITECH CONTRACTING CORP04/12/2024
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP04/10/2024
DOB NOWBoiler EquipmentSigned-offMAXWELL PLUMB MECH. CORP04/03/2024
DOB NOWBoiler EquipmentSigned-offMAXWELL PLUMB MECH. CORP04/02/2024
DOB NOWGeneral ConstructionSigned-offMAXWELL PLUMB MECH CORP02/20/2024
DOB NOWSidewalk ShedSigned-offRAPID CONTRACTING INC01/09/2024
DOB NOWGeneral ConstructionSigned-offUPGRADE 1 CONSTRUCTION CO01/04/2024
DOB NOWPlumbingSigned-offHUDSON PLMBING & MCH, LLC12/06/2023
DOB NOWAntennaSigned-offARMENTUM DIGITAL INFRASTR12/04/2023
DOB NOWMechanical SystemsSigned-offARMENTUM DIGITAL INFRASTR12/04/2023
DOB NOWGeneral ConstructionSigned-offUPGRADE 1 CONSTRUCTION CO09/28/2023
DOB NOWSidewalk ShedSigned-offRAPID CONTRACTING INC05/12/2023
DOB NOWSidewalk ShedSigned-offRAPID CONTRACTING INC06/17/2022
DOB NOWSignSigned-offWEINFELD, ELLIOT02/10/2021
+ 58 more permits on file
1 project · most recent 01/13/2026
Heating Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/13/2026Permit IssuedHAMOUD CONSTRUCTION CORPHeating Systems, Refrigeration Systems, Ventilation Systems
Refrigeration
Russell BNQ-D12-A069 118 CFM ×2
Copeland ZB114K5E-TWC-260 166,000 BTU · Refrigeration Unit ×4
ZB30KCE-TF5-265 43,600 BTU · Refrigeration Unit ×1
ZBD114K5E-TFC-260 166,000 BTU · Refrigeration Unit ×1
ZF28KVE-TFC-292 65,200 BTU · Refrigeration Unit ×1
ZFD41K5E-TFC-260 166,000 BTU · Refrigeration Unit ×1
Heating
Modine PTP200AS0111SBAN 200,000 BTU · Furnace ×2
Ventilation
Air Quality Engineering AUTOCLEAN 4000 4,000 CFM · Kitchen Exhaust ×1
Canarm BI-RM-18 6,000 CFM · Kitchen Exhaust ×1
2 projects · most recent 05/15/2026
Gas Water/Sanitary
FiledStatusContractorScope
05/15/2026Permit IssuedGW MECHANICAL CORPGas, Water/Sanitary
02/23/2026Signed-offJOHN FITZGERALD PLBG &HTGGas, Water/Sanitary
25 projects · most recent 09/25/2026
General Wiring
FiledStatusContractorScope
09/25/2026Permit IssuedJ.H. ELEC. OF NEW YORK INGeneral Wiring
09/02/2026Permit IssuedRICHARD NEU—
05/26/2026Permit IssuedENTERPRISE ELEC'L SYSTEMSGeneral Wiring
03/14/2026CompleteTOP NOTCH ELECTRIC INCGeneral Wiring
12/09/2025CompleteR & T ELECTRICAL CORP—
09/18/2025CompletePROFF ELECTRICAL LLC—
04/08/2025CompleteENTERPRISE ELEC'L SYSTEMSGeneral Wiring
03/07/2025Permit IssuedWCK ELECTRIC CORP.General Wiring
11/14/2024CompleteNION ELECTRIC CORPGeneral Wiring
10/11/2024Permit IssuedOMD ELECTRICAL CORP1 meters, 1 new_meters
09/23/2024CompleteENTERPRISE ELEC'L SYSTEMSGeneral Wiring
07/12/2024Permit IssuedCITI-WIDE ELECTRIC INCGeneral Wiring
05/24/2024CompleteLEGACY ELEC'L CONTR'S COR—
01/30/2024CompleteENTERPRISE ELEC'L SYSTEMSGeneral Wiring
10/17/2023CompleteZIN ELECTRICAL, INC—
▾Field Inspections (DOB CAP) — 35
DateTypeResultReport
07/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/22/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/21/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/09/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/09/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/20/2025Fail-Final General Construction Non-Directive 14FailView ↗
11/13/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/13/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/29/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/06/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/06/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/16/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
Latest 25 of 35.
▾Special Inspection Requirements (DOB NOW) — 86
DateRequirementInspectorRole
05/12/2026Tenant Protection Plan ComplianceKAMRUL AHSANspecial
05/12/2026FinalHumayun Ahmedprogress
05/12/2026Tenant Protection Plan ComplianceKAMRUL AHSANspecial
02/18/2026Energy Code Compliance InspectionsHany Demetryprogress
02/18/2026Fire-Resistance Rated ConstructionHany Demetryprogress
02/18/2026Fire-Resistant Penetrations and JointsHany Demetryspecial
02/18/2026Structural Stability – Alterations of existing buildingsHany Demetryspecial
02/18/2026Tenant Protection Plan ComplianceHany Demetryspecial
01/07/2026Mechanical SystemsHany Demetryspecial
01/07/2026Post-installed AnchorsHany Demetryspecial
01/07/2026Shutoff dampersHany Demetryenergy_progress
01/07/2026HVAC-R and service water heating equipmentHany Demetryenergy_progress
01/07/2026HVAC-R and service water piping design and insulationHany Demetryenergy_progress
01/07/2026HVAC-R and service water heating system controlsHany Demetryenergy_progress
01/07/2026Energy Code Compliance InspectionsHany Demetryprogress
01/07/2026FinalMina Eskarosprogress
10/19/2025Energy Code Compliance InspectionsHumayun Ahmedprogress
10/19/2025Tenant Protection Plan ComplianceMD MOSTAFAspecial
10/09/2025FinalHumayun Ahmedprogress
08/18/2025FinalSALVATOR CARADONNAprogress
07/21/2025Energy Code Compliance InspectionsHany Demetryprogress
07/21/2025Fire-Resistant Penetrations and JointsHany Demetryspecial
07/21/2025HVAC-R and service water heating equipmentHany Demetryenergy_progress
07/09/2025Tenant Protection Plan ComplianceMD MOSTAFAspecial
07/08/2025Fire-Resistant Penetrations and JointsHany Demetryspecial
Latest 25 of 86.
▾Documents — 1,282 on file (BIS + DOB NOW)
▸Plans & Drawings48
▸DOB NOWPlans/Sketch43
09/06/2026M00001115-I1Request digital key ↗
09/06/2026M00022375-I1Request digital key ↗
09/06/2026M00051014-I1Request digital key ↗
Showing 3 of 43 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00291156-P1Request digital key ↗
08/14/2026M00291156-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00326719-I1Request digital key ↗
09/04/2026M00268802-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sign1
09/04/2026M00459842-I1Request digital key ↗
▸Applications & Permits264
▸BISPLAN / WORK APPROVAL APPLICATION147
03/07/2023123482203Open ↗
03/06/2023123482203Open ↗
01/26/2021140768890Open ↗
Showing 3 of 147 on file for this type
▸BISWORK PERMIT APPLICATION115
03/12/2021140924463Open ↗
03/12/2021140924463Open ↗
07/28/2020140929654Open ↗
Showing 3 of 115 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISZONING RESOLUTION DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications367
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION155
03/18/2020121045591Open ↗
03/18/2020121045591Open ↗
03/02/2020121045591Open ↗
Showing 3 of 155 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature48
09/06/2026M00022375-I1Open ↗
09/05/2026M00326719-I1Open ↗
09/04/2026M00268802-I1Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWProgress Inspector Seal & Signature40
09/23/2026M01300273-I1Open ↗
09/23/2026M00326719-I1Open ↗
09/23/2026M00991684-I1Open ↗
Showing 3 of 40 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST38
10/23/2019123694555Open ↗
08/13/2019123693538Open ↗
Showing 2 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature28
09/23/2026M00326719-I1Open ↗
09/23/2026M00991684-I1Open ↗
09/23/2026M00991684-S1Open ↗
Showing 3 of 28 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT25
07/24/2020140929654Open ↗
08/13/2019123693538Open ↗
Showing 2 of 25 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
07/24/2020140929654Open ↗
Showing 1 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
07/24/2020140929654Open ↗
Showing 1 of 5 on file for this type
▸BISProfessional and Owner Certification (POC3)1
10/23/2019123694555Open ↗
▸Trade Schedules & Equipment47
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE19
07/29/2019121567777Open ↗
Showing 1 of 19 on file for this type
▸BISSELF-CERT PLUMBING NOTICE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSIGN HANGER CERTIFICATE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection25
▸BISTenant Protection Plan and Notes17
10/23/2019123694555Open ↗
08/13/2019123693538Open ↗
08/12/2020140924463Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWTenant Protection Plan4
09/05/2026M00326719-I1Open ↗
09/04/2026M00291156-P1Open ↗
08/14/2026M00291156-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos92
▸DOB NOWDEP ACP-5: Asbestos Assessment Report38
09/05/2026M00326719-I1Open ↗
09/04/2026M00268802-I1Open ↗
09/04/2026M00291156-P1Open ↗
Showing 3 of 38 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)29
08/12/2020140924463Open ↗
07/24/2020140929654Open ↗
10/22/2019123694555Open ↗
Showing 3 of 29 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/15/2026M01161982-I1Open ↗
08/13/2026M01204397-I1Open ↗
08/13/2026M01168769-S1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance64
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS40
03/18/2020121045591Open ↗
03/18/2020121045591Open ↗
11/08/2019123694555Open ↗
Showing 3 of 40 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
03/01/2023140924463Open ↗
12/17/2020140929654Open ↗
08/28/2020140924463Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
03/01/2023140924463Open ↗
12/17/2020140929654Open ↗
03/18/2020121045591Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
07/24/2020140929654Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
09/05/2026M00326719-I1Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY10
03/01/2023140924463Open ↗
12/17/2020140929654Open ↗
09/11/2020120046039Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL STEEL - DETAILS1
03/03/2023123482203Open ↗
▸Approvals, Objections & Sign-offs85
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST46
03/07/2023123482203Open ↗
03/06/2023140924463Open ↗
12/17/2020140929654Open ↗
Showing 3 of 46 on file for this type
▸BISADMINISTRATIVE OBJECTIONS20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
04/15/2019122671019Open ↗
Showing 1 of 6 on file for this type
▸BISSUPERSEDING LETTER4
05/06/2019140745264Open ↗
Showing 1 of 4 on file for this type
▸BISFINAL2
09/25/2024123021489Open ↗
03/03/2023123482203Open ↗
▸Cost, Insurance & Ownership105
▸BISCOST AFFIDAVIT97
03/01/2023140924463Open ↗
12/17/2020140929654Open ↗
11/30/2020121045591Open ↗
Showing 3 of 97 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEPT OF FINANCE VERIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
09/25/2024123021489Open ↗
03/03/2023123482203Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms144
▸BISEFILING COVER SHEET57
10/22/2019123694555Open ↗
08/13/2019123693538Open ↗
Showing 2 of 57 on file for this type
▸BISBOROUGH INTAKE FORM46
05/01/2020122671019Open ↗
03/18/2020121045591Open ↗
03/18/2020121045591Open ↗
Showing 3 of 46 on file for this type
▸BISADDITIONAL INFORMATION32
01/26/2021140768890Open ↗
03/18/2020123693538Open ↗
03/02/2020121045591Open ↗
Showing 3 of 32 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
08/12/2020140924463Open ↗
07/24/2020140929654Open ↗
Showing 2 of 9 on file for this type
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
09/06/2026M00022375-I1Open ↗
▸DOB NOWDHCR Document1
08/13/2026M00459842-I1Open ↗