2480 BROADWAY
MANHATTAN · BIN 1033612
💬 Discuss this project
1922Year Built
15Stories
D4Building Class
C4-6AZoning
196,293 sfGross Floor Area
155Units
LL97 CoveredRent Stabilized15 Open Violations 14 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 215 EQUITIES CORP · 17,624 sf lot · 11.14 FAR built · Flood zone X
Locations of Work
MechanicalPlumbingGeneral
Floor 1110p · 2 filings · 20 docs
Floor 10
Floor 9
Floor 81p · 1 filing · 4 docs
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 11p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLUE WOODS MANAGEMENT1107/08/2026
BLUE WOODS MANAGEMENT GROUP2307/08/2026
HH BUILDING CONSULTING407/08/2026
FILLUP COFFEE407/08/2026
RSP COMPANIES503/22/2026
215 EQUITIES4003/22/2026
215 EQUITIES CORP BLUE WO303/22/2026
J.C. KLEIN INC203/22/2026
EXPANSION GROUP203/21/2026
INSIGNIA RESIDENTIAL GROUP103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P1203/21/2026
METROPOLIS GROUP INC1003/21/2026
A+ EXPEDITING403/21/2026
AGOUTI CONSTRUCTION CONSULTING803/21/2026
WM ARCH403/21/2026
SCARANO ARCHITECT203/21/2026
JENNY FLORES EXPEDITING103/21/2026
HH BUILDING CONSULTING & ARCHITECTU203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEEL SYSTEMS LLCGeneral Contractor407/08/2026
K & B HVAC LLCGeneral Contractor303/21/2026
WILLOW BUILDING SERVICESGeneral Contractor303/21/2026
SHALBRO CONSTRUCTION GROUPGeneral Contractor303/21/2026
NEW YORK FLOORMAN, LLCGeneral Contractor303/21/2026
ORBIT PLBG & HTG INCPlumbing207/08/2026
ABILENE INCGeneral Contractor207/08/2026
CAM ENERGY HTG&MECH CORPPlumbing207/08/2026
NY CITY PLUMBER CORPPlumbing207/08/2026
HFM BUILDERS, INCGeneral Contractor107/08/2026
NYC TRANSITElectrical103/21/2026
MP & L METAL INCElectrical103/21/2026
MAYO, EUGENEElectrical103/21/2026
JOHNSON WARRENElectrical103/21/2026
TRISTAR DEVELOPING INCGeneral Contractor107/08/2026
DIMOS PAPADIMASElectrical103/21/2026
ACCURATE MECHANICAL INCPlumbing107/08/2026
BEKKERMAN, MIKHAILElectrical103/21/2026
PARISI, DINOElectrical103/21/2026
VAN VASSELLElectrical103/21/2026
CARRERAS HOME IMPROV INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851610/18/2024
JOCK DEBOER, AIA - SIA7008107/17/2024
LAWRENCE V MCDONALD ARCHI6039310/20/2023
DY SPECIAL INSPECTION LLC7210211/08/2021
JACK GREEN ASSOCIATES422101/15/2020
Building Lifecycle
All (194)Filed (26)Permit Issued (20)Signed Off (15)Facade (FISP) (13)Violation (60)Inspection (19)Objection (11)Special Inspection (30)
04/10/2026
Signed off — Alteration
Proposed minor plumbing alteration to Apt. 3A, as per plans. No change to use, occupancy or egress under this application.
M01176343-I1
03/26/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/20/2025
Violation issued (FDNY_NOV, closed)
10/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/10/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/07/2025
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-S1
09/29/2025
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-S3
09/29/2025
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-I1
09/29/2025
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-S2
09/29/2025
Signed off — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-S4
09/03/2025
Permit issued — Plumbing
M01176343-I1-PL
08/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/05/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/06/2025
Violation issued (FDNY_NOV, closed)
04/29/2025
Signed off — Alteration
Application filed to renovate apt 5F to include modification to non bearing partitions with new finishes as per the plans filed herewith no change to use, egress or occupancy
M01072681-I1
04/23/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/16/2025
Permit issued — General Construction
M01072681-I1-GC
03/20/2025
Permit issued — Plumbing
M00978073-S2-PL
02/10/2025
Filed — Alteration
Proposed minor plumbing alteration to Apt. 3A, as per plans. No change to use, occupancy or egress under this application.
M01176343-I1
10/22/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/21/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/18/2024
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-P1
10/18/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
10/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
10/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
LOUIS ARENA
10/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
09/07/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
M00950799-I1
08/26/2024
Objection raised — Scope
08/14/2024
Filed — Alteration
Application filed to renovate apt 5F to include modification to non bearing partitions with new finishes as per the plans filed herewith no change to use, egress or occupancy
M01072681-S1
08/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/29/2024
Objection resolved — Addressed
07/29/2024
Objection resolved — Addressed
07/25/2024
Objection raised — Scope
07/25/2024
Objection raised — Scope
07/17/2024
Filed — Alteration
Application filed to renovate apt 5F to include modification to non bearing partitions with new finishes as per the plans filed herewith no change to use, egress or occupancy
M01072681-I1
07/15/2024
Special inspection requirement — Insulation placement and R values
Jock deBoer
07/15/2024
Special inspection requirement — Lighting controls
Jock deBoer
07/15/2024
Special inspection requirement — Lighting in dwelling units
Jock deBoer
06/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jock deBoer
06/26/2024
Special inspection requirement — Final
Jock deBoer
06/26/2024
Special inspection requirement — Energy Code Compliance Inspections
Jock deBoer
06/26/2024
Special inspection requirement — Fire-Resistance Rated Construction
Jock deBoer
01/19/2024
Permit issued — Boiler Equipment
M00978073-S1-BE
01/19/2024
Permit issued — General Construction
M00978073-S4-GC
01/19/2024
Permit issued — Boiler Equipment
M00978073-I1-BE
01/19/2024
Permit issued — General Construction
M00978073-S3-GC
01/19/2024
Permit issued — Plumbing
M00978073-S2-PL
01/15/2024
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-S1
01/15/2024
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-S3
01/15/2024
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-I1
01/15/2024
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-S2
01/15/2024
Filed — Alteration
INSTALL NEW GAS SERVICE, METER AND PIPING.
M00978073-S4
12/15/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
LOUIS ARENA
12/15/2023
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
12/15/2023
Special inspection requirement — Maintenance information
LOUIS ARENA
12/15/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
12/15/2023
Special inspection requirement — Heating Systems
LOUIS ARENA
12/15/2023
Special inspection requirement — Final
LOUIS ARENA
12/15/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
Latest 60 of 194 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC09/03/2025
DOB NOWGeneral ConstructionSigned-offNEW YORK FLOORMAN, LLC04/16/2025
DOB NOWPlumbingSigned-offNY CITY PLUMBER CORP03/20/2025
DOB NOWBoiler EquipmentSigned-offABILENE, INC01/19/2024
DOB NOWGeneral ConstructionSigned-offABILENE INC01/19/2024
DOB NOWBoiler EquipmentSigned-offABILENE, INC01/19/2024
DOB NOWGeneral ConstructionSigned-offABILENE INC01/19/2024
DOB NOWPlumbingSigned-offNY CITY PLUMBER CORP01/19/2024
DOB NOWSidewalk ShedSigned-offSHALBRO CONSTRUCTION GROU10/25/2023
DOB NOWGeneral ConstructionSigned-offWILLOW BUILDING SERVICES04/24/2023
DOB NOWPlumbingSigned-offANTHONY DISABATO04/18/2023
DOB NOWMechanical SystemsPermit IssuedK & B HVAC LLC02/21/2022
DOB NOWPlumbingSigned-offCAM ENERGY HTG&MECH CORP01/24/2022
DOB NOWPlumbingSigned-offCAM ENERGY HTG&MECH CORP01/11/2022
DOB NOWGeneral ConstructionSigned-offHFM BUILDERS01/05/2022
DOB NOWGeneral ConstructionSigned-offTRISTAR DEVELOPING INC07/07/2021
DOB NOWPlumbingSigned-offCARRERAS HOME IMPROV INC06/03/2020
DOB NOWSidewalk ShedSigned-offSTEEL SYSTEMS LLC04/02/2020
DOB NOWPlumbingPermit IssuedORBIT PLBG & HTG INC02/05/2020
DOB NOWSidewalk ShedSigned-offSTEEL SYSTEMS LLC09/26/2019
BISOTISSUEDRCD RESTORATIONS INC03/10/2022
BISOTISSUEDRCD RESTORATIONS INC10/25/2021
BISOTISSUEDREAL DEAL DECORATION LLC09/24/2020
BISOTISSUEDRCD RESTORATIONS INC04/14/2020
BISOTISSUEDREAL DEAL DECORATION LLC03/24/2020
BISOTISSUEDADVANCED REMODELING SOLU02/04/2020
BISOTISSUEDRCD RESTORATIONS INC10/09/2019
BISPLISSUEDMACREDDIN PLBG & HTG INC10/10/2017
BISOTISSUEDCOMPLETE RENOVATION & CON10/02/2017
BISOTISSUEDL & Z RESTORATION CORP09/11/2013
BISEQISSUEDL & Z RESTORATION CORP08/27/2013
BISPLISSUEDARIANA CONTRACTING INC07/19/2013
BISOTISSUEDNEZA TEAM LLC06/18/2013
BISEQISSUEDL & Z RESTORATION CORP04/24/2013
BISPLISSUEDATTACK PLUMBING INC04/06/2012
BISOTISSUEDDAVID EVAN INC03/23/2012
BISPLISSUEDFIVE STAR P AND H CO, INC12/19/2011
BISOTISSUEDSJB INTERIORS INC12/12/2011
BISOTISSUEDSJB INTERIORS INC11/30/2011
BISEQISSUEDCEPRINE CONSTRUCTION INC09/27/2011
+ 30 more permits on file
1 project · most recent 01/15/2020
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/15/2020Permit IssuedK & B HVAC LLCVentilation Systems
Ventilation
Above Air VCU-C-030-1-X 28,200 BTU · Condensing Unit ×2
2 projects · most recent 08/14/2024
Gas Water/Sanitary
FiledStatusContractorScope
08/14/2024——Gas, Water/Sanitary
02/22/2021Permit IssuedORBIT PLBG & HTG INCGas, Water/Sanitary
9 projects · most recent 03/26/2026
General Wiring Boiler Controls
FiledStatusContractorScope
03/26/2026Permit IssuedV. VASS ELECTRIC CORPGeneral Wiring
05/07/2025CompleteABILENE ELECTRIC INCBoiler Controls
08/23/2024CompleteVERTEX ELECTRIC CORP.General Wiring
04/23/2024CompleteABILENE ELECTRIC INC—
04/30/2023CompleteV. VASS ELECTRIC CORPGeneral Wiring
02/18/2022CompleteKJK ELECTRIC INCGeneral Wiring
01/15/2021CompletePRESTIGE ELECL CONTG CORPGeneral Wiring
06/04/2020Permit IssuedTOP TIER ELECTRIC INCGeneral Wiring
08/22/2019CompleteTOP SHELF ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
03/26/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/23/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/22/2024Pass-Final Boiler Equipment InspectionPassView ↗
10/21/2024Pass-Final Boiler Equipment InspectionPassView ↗
09/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/22/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/22/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/01/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/31/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/15/2021Pass-Final General Construction Non-Directive 14PassView ↗
11/05/2021Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
10/18/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
10/18/2024Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
10/14/2024Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
10/14/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
08/07/2024Fire-Resistant Penetrations and Joints—special
07/15/2024Insulation placement and R valuesJock deBoerenergy_progress
07/15/2024Lighting controlsJock deBoerenergy_progress
07/15/2024Lighting in dwelling unitsJock deBoerenergy_progress
06/26/2024Fire-Resistant Penetrations and JointsJock deBoerspecial
06/26/2024FinalJock deBoerprogress
06/26/2024Energy Code Compliance InspectionsJock deBoerprogress
06/26/2024Fire-Resistance Rated ConstructionJock deBoerprogress
12/15/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
12/15/2023HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
12/15/2023Maintenance informationLOUIS ARENAenergy_progress
12/15/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
12/15/2023Heating SystemsLOUIS ARENAspecial
12/15/2023FinalLOUIS ARENAprogress
12/15/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
12/15/2023Chimneys and ventsLOUIS ARENAspecial
12/15/2023HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
12/15/2023HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
10/23/2023Fire-Resistant Penetrations and JointsLawrence McDonaldspecial
10/23/2023Energy Code Compliance InspectionsLawrence McDonaldprogress
10/19/2023Energy Code Compliance InspectionsLawrence McDonaldprogress
Latest 25 of 53.
▾Documents — 411 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch20
09/03/2026M00544792-P1Request digital key ↗
09/03/2026M00544792-I1Request digital key ↗
09/03/2026M00627047-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00311436-I1Request digital key ↗
09/04/2026M00270663-I1Request digital key ↗
08/15/2026M00270663-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00231479-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/14/2026M00270569-I1Request digital key ↗
▸Applications & Permits65
▸BISPLAN / WORK APPROVAL APPLICATION35
11/24/2021123710779Open ↗
11/01/2021123710779Open ↗
10/22/2021123710779Open ↗
Showing 3 of 35 on file for this type
▸BISWORK PERMIT APPLICATION30
10/25/2021123710779Open ↗
10/22/2021123710779Open ↗
08/23/2021123710779Open ↗
Showing 3 of 30 on file for this type
▸Seals & Professional Certifications129
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION40
03/26/2020123875208Open ↗
03/23/2020123875208Open ↗
01/21/2020123710779Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
09/05/2026M00270569-I1Open ↗
09/05/2026M00311436-I1Open ↗
09/03/2026M00627047-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWProgress Inspector Seal & Signature25
09/28/2026M00978073-S3Open ↗
09/15/2026M00978073-I1Open ↗
09/15/2026M00978073-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/28/2026M00978073-S3Open ↗
09/28/2026M00978073-S3Open ↗
09/15/2026M00978073-I1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
03/23/2020123875208Open ↗
08/08/2019123710779Open ↗
06/04/2013121637737Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
06/04/2013121637737Open ↗
04/29/2013121598075Open ↗
Showing 2 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/23/2020123875208Open ↗
08/08/2019123710779Open ↗
08/19/2013140107024Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/19/2013140107024Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/19/2013140107024Open ↗
▸Trade Schedules & Equipment23
▸BISSCHEDULE B - PLUMBING13
08/13/2013121637737Open ↗
08/13/2013121637737Open ↗
06/04/2013121637737Open ↗
Showing 3 of 13 on file for this type
▸BISSELF-CERT PLUMBING NOTICE7
10/25/2013121637737Open ↗
10/25/2013121637737Open ↗
04/23/2013121006589Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
04/24/2018123104773Open ↗
02/15/2018123104773Open ↗
08/15/2017123104773Open ↗
▸Safety & Tenant Protection11
▸DOB NOWTenant Protection Plan6
09/05/2026M00311436-I1Open ↗
08/13/2026M00270663-I1Open ↗
08/13/2026M00270663-P1Open ↗
Showing 3 of 6 on file for this type
▸BISTenant Protection Plan and Notes4
03/23/2020123875208Open ↗
12/12/2019123792011Open ↗
08/08/2019123710779Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
06/04/2013121637737Open ↗
▸Environmental & Asbestos42
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
09/05/2026M00311436-I1Open ↗
09/03/2026M00627047-I1Open ↗
09/03/2026M00627031-I1Open ↗
Showing 3 of 24 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
06/04/2013121637737Open ↗
Showing 1 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
03/23/2020123875208Open ↗
12/12/2019123792011Open ↗
08/08/2019123710779Open ↗
Showing 3 of 6 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
03/28/2013121575651Open ↗
03/28/2013121575651Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
12/07/2011120867366Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance21
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
03/23/2020123875208Open ↗
12/12/2019123792011Open ↗
08/08/2019123710779Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
04/02/2021123792011Open ↗
12/01/2020123875208Open ↗
12/01/2020123875208Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
12/01/2020123875208Open ↗
07/17/2018123104773Open ↗
06/19/2014121575651Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
11/16/2022123710779Open ↗
04/02/2021123792011Open ↗
▸BISLIGHTING IN DWELLING UNITS1
04/02/2021123792011Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/16/2022123710779Open ↗
▸BISTECHNICAL REPORT: ENERGY1
10/25/2011120867366Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00978073-S1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00544792-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY6
04/02/2021123792011Open ↗
04/02/2021123792011Open ↗
04/02/2021123792011Open ↗
Showing 3 of 6 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
11/16/2022123710779Open ↗
▸BISMASONRY1
11/16/2022123710779Open ↗
▸BISPOST-INSTALLED ANCHORS1
11/16/2022123710779Open ↗
▸Approvals, Objections & Sign-offs24
▸BISADMINISTRATIVE OBJECTIONS11
06/04/2013121637737Open ↗
04/29/2013121598075Open ↗
03/28/2013121575651Open ↗
Showing 3 of 11 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
11/17/2022123710779Open ↗
04/02/2021123792011Open ↗
12/01/2020123875208Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
08/23/2021123710779Open ↗
08/23/2021123710779Open ↗
08/27/2013140107024Open ↗
▸BISFINAL1
11/16/2022123710779Open ↗
▸Cost, Insurance & Ownership21
▸BISCOST AFFIDAVIT19
12/01/2020123875208Open ↗
03/23/2020123875208Open ↗
12/12/2019123792011Open ↗
Showing 3 of 19 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
11/16/2022123710779Open ↗
03/31/2021123792011Open ↗
▸Filing & Intake Forms35
▸BISEFILING COVER SHEET16
03/23/2020123875208Open ↗
12/12/2019123792011Open ↗
08/08/2019123710779Open ↗
Showing 3 of 16 on file for this type
▸BISADDITIONAL INFORMATION10
11/24/2021123710779Open ↗
08/13/2020123792011Open ↗
05/02/2018123104773Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM8
10/25/2021123710779Open ↗
10/25/2021123710779Open ↗
08/23/2021123710779Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
08/19/2013140107024Open ↗
▸Other Documents5
▸DOB NOWDHCR Document5
09/03/2026M00644283-I1Open ↗
08/15/2026M00644321-I1Open ↗
08/13/2026M00627047-I1Open ↗
Showing 3 of 5 on file for this type