← Back
Legitimate theatre, sole use
Imperial Theatre
249 WEST 45 STREET · Midtown-Times Square · BIN 1024725
💬 Discuss this project
1923Year Built
3Stories
J4Building Class
C6-5Zoning
40,110 sfGross Floor Area
1Units
LL97 Covered0 Open Violations
Legitimate theatre, sole use · Owner of record: IMPERIAL THEATRE, LLC · 18,036 sf lot · 2.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 4 filings · 20 docs
Floor 12p · 1 filing · 4 docs
Mezzanine1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
IMPERIAL THEATRE, LLC103/22/2026
PLAZA CONSTRUCTION203/22/2026
COLGATE ENTERPRISES203/21/2026
SHUBER303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYCCODE2003/21/2026
EUROCELT EXPEDITING, INC203/21/2026
PATRICIA L. GASS203/21/2026
VINCENT J. LIOTTA P.E.203/21/2026
VINCENT J. LIOTTA P. E.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
THE SHUBERT ORGANIZATIONGeneral Contractor707/08/2026
GOOD SENSE & CO.PRODUCT SGeneral Contractor303/21/2026
LANE REFRIGERATION CO.,INGeneral Contractor307/08/2026
UNIVERSAL BUILD SUPP LLCGeneral Contractor206/28/2026
AIR STREAM AIR CONDITIONINGGeneral Contractor203/21/2026
JADS PRODUCTIONS, INCGeneral Contractor203/21/2026
HYDRONIC CONCEPTS NY P&HPlumbing107/08/2026
ERBACH ELEC'L CONTRG LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VINCENT J. LIOTTA P. E.1974302/06/2026
SAG ENGINEERING & CONSULT608606/28/2024
Building Lifecycle
All (80)Filed (17)Permit Issued (14)Signed Off (7)Violation (10)Inspection (2)Special Inspection (30)
06/23/2026
Permit issued — Protection and Mechanical Methods
M01242472-I1-PMM
02/18/2026
Signed off — Alteration
M01348402-I1
02/11/2026
Permit issued — Mechanical Systems
M01348402-I1-MS
02/06/2026
Filed — Alteration
M01348402-I1
01/19/2026
Special inspection requirement — Mechanical Systems
Vincent Liotta
01/19/2026
Special inspection requirement — Final
Vincent Liotta
06/27/2025
Filed — Alteration
M01242472-I1
06/27/2025
Permit issued — Protection and Mechanical Methods
M01242472-I1-PMM
04/24/2025
Permit issued — General Construction
M01201133-I1-GC
04/22/2025
Filed — Alteration
M01201133-I1
06/28/2024
Filed — Alteration
Architectural scope associated with the installation of the temporary restrooms at the Imperial Theater. No change of use, egress or occupancy.
M00939114-P1
06/04/2024
Special inspection requirement — Mechanical Systems
Chester Kowalski
06/04/2024
Special inspection requirement — Final
Chester Kowalski
05/08/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/23/2024
Signed off — Alteration
Structural scope associated with the new convenience door opening and the exterior stoop at the Imperial Theater adjacent open space. No change of use, egress or occupancy.
M00939144-S1
04/22/2024
Signed off — Alteration
Structural scope associated with the new convenience door opening and the exterior stoop at the Imperial Theater adjacent open space. No change of use, egress or occupancy.
M00939144-I1
04/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/01/2024
Permit issued — Mechanical Systems
M00939114-S2-MS
02/27/2024
Permit issued — General Construction
M00939114-I1-GC
02/27/2024
Permit issued — Structural
M00939114-S1-ST
01/24/2024
Permit issued — Plumbing
M00939114-S3-PL
01/19/2024
Filed — Alteration
Architectural scope associated with the installation of the temporary restrooms at the Imperial Theater. No change of use, egress or occupancy.
M00939114-S2
01/19/2024
Filed — Alteration
Architectural scope associated with the installation of the temporary restrooms at the Imperial Theater. No change of use, egress or occupancy.
M00939114-S3
01/04/2024
Filed — Alteration
Architectural scope associated with the installation of the temporary restrooms at the Imperial Theater. No change of use, egress or occupancy.
M00939114-S1
01/03/2024
Filed — Alteration
Architectural scope associated with the installation of the temporary restrooms at the Imperial Theater. No change of use, egress or occupancy.
M00939114-I1
12/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Chester Kowalski
12/12/2023
Special inspection requirement — Structural Steel - Details
Chester Kowalski
12/12/2023
Special inspection requirement — Post-installed Anchors
Chester Kowalski
12/12/2023
Special inspection requirement — Structural Steel - Welding
Chester Kowalski
12/11/2023
Special inspection requirement — Final
William Gorlin
12/06/2023
Permit issued — Structural
M00939144-S1-ST
12/06/2023
Permit issued — General Construction
M00939144-I1-GC
12/04/2023
Filed — Alteration
Structural scope associated with the new convenience door opening and the exterior stoop at the Imperial Theater adjacent open space. No change of use, egress or occupancy.
M00939144-S1
12/04/2023
Filed — Alteration
Structural scope associated with the new convenience door opening and the exterior stoop at the Imperial Theater adjacent open space. No change of use, egress or occupancy.
M00939144-I1
11/15/2023
Special inspection requirement — Final
William Gorlin
11/15/2023
Special inspection requirement — Structural Steel - Details
Chester Kowalski
11/15/2023
Special inspection requirement — Structural Steel - Welding
Chester Kowalski
11/15/2023
Special inspection requirement — Post-installed Anchors
Chester Kowalski
11/15/2023
Special inspection requirement — Concrete - Cast-In-Place
Chester Kowalski
09/25/2023
Special inspection requirement — Final
Michael Kostow
09/25/2023
Special inspection requirement — Final
Michael Kostow
06/07/2022
Signed off — Alteration
PAA BEING FILED TO ADD 3 UNITS ON THE ROOF TO THE SCOPE OF WORK. INSTALLATION OF 2 PACKAGED ROOFTOP UNITS WITH A TOTAL CAPACITY OF 11 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M00605378-I1
06/02/2022
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
06/02/2022
Special inspection requirement — Mechanical Systems
Vincent Liotta
06/02/2022
Special inspection requirement — Final
Vincent Liotta
06/02/2022
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
06/02/2022
Special inspection requirement — Maintenance information
Vincent Liotta
06/02/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
06/01/2022
Filed — Alteration
PAA BEING FILED TO ADD 3 UNITS ON THE ROOF TO THE SCOPE OF WORK. INSTALLATION OF 2 PACKAGED ROOFTOP UNITS WITH A TOTAL CAPACITY OF 11 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M00605378-P1
05/31/2022
Signed off — Alteration
Temporary installation of the freestanding lighting support frames in mezzanine, and stage thrust structures & steps unit associated with a one-day event "Brandcast" as shown on plans filed herewith. No change to use, egress, or occupancy.
M00728540-I1
05/20/2022
Special inspection requirement — Mechanical Systems
Vincent Liotta
05/20/2022
Special inspection requirement — HVAC-R and service water heating equipment
Vincent Liotta
05/20/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Vincent Liotta
05/20/2022
Special inspection requirement — HVAC-R and service water heating system controls
Vincent Liotta
05/20/2022
Special inspection requirement — Maintenance information
Vincent Liotta
05/20/2022
Special inspection requirement — Final
Vincent Liotta
05/06/2022
Permit issued — General Construction
M00728540-I1-GC
05/04/2022
Filed — Alteration
Temporary installation of the freestanding lighting support frames in mezzanine, and stage thrust structures & steps unit associated with a one-day event "Brandcast" as shown on plans filed herewith. No change to use, egress, or occupancy.
M00728540-I1
04/29/2022
Special inspection requirement — Final
William Gorlin
11/18/2021
Signed off — Alteration
Installation of temporary tents for a reception for the red carpet arrivals for the premier screening of "Tick, Tick...Boom!" in parking lot at 251 West 45th St adjacent to Imperial Theater located at 249 West 45th Street scheduled on 11-15-21. TPA req'd.
M00620846-I1
Latest 60 of 80 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedUNIVERSAL BUILD SUPP LLC06/23/2026
DOB NOWMechanical SystemsSigned-offLANE REFRIGERATION CO.,IN02/11/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedUNIVERSAL BUILD SUPP LLC06/27/2025
DOB NOWGeneral ConstructionPermit IssuedTHE SHUBERT ORGANIZATION04/24/2025
DOB NOWMechanical SystemsSigned-offAIR STREAM AIR CONDITIONI03/01/2024
DOB NOWGeneral ConstructionPermit IssuedTHE SHUBERT ORGANIZATION02/27/2024
DOB NOWStructuralSigned-offTHE SHUBERT ORGANIZATION02/27/2024
DOB NOWPlumbingSigned-offHYDRONIC CONCEPTS NY P&H01/24/2024
DOB NOWStructuralSigned-offTHE SHUBERT ORGANIZATION12/06/2023
DOB NOWGeneral ConstructionSigned-offTHE SHUBERT ORGANIZATION12/06/2023
DOB NOWGeneral ConstructionSigned-offGOOD SENSE & CO.PRODUCT S05/06/2022
DOB NOWMechanical SystemsSigned-offLANE REFRIGERATION CO.,IN11/09/2021
DOB NOWGeneral ConstructionSigned-offJADS PRODUCTIONS11/05/2021
DOB NOWMechanical SystemsSigned-offLANE REFRIGERATION CO.,IN02/10/2020
BIS—ISSUEDNORTH SHORE NEON SIGN CO05/08/2017
BISOTISSUEDNORTH SHORE NEON SIGN LLC05/08/2017
BISOTISSUEDNORTH SHORE NEON SIGN LLC05/08/2017
BIS—ISSUEDNORTH SHORE NEON SIGN CO05/08/2017
BIS—ISSUEDINTERBORO SIGN &ELECL MAI01/10/2017
BISOTISSUEDINTERBORO SIGN & MAINTENANCE01/10/2017
BISOTISSUEDINTERBORO SIGN & MAINTENANCE01/10/2017
BIS—ISSUEDINTERBORO SIGN &ELECL MAI01/10/2017
BISOTISSUEDINTERBORO SIGN & MAINTENANCE01/10/2017
BIS—ISSUEDINTERBORO SIGN &ELECL MAI01/10/2017
BISOTISSUEDHUDSON SCENIC STUDIO INC10/24/2016
BISOTISSUEDHUDSON SCENIC STUDIO INC10/21/2016
BISOTISSUEDTHE SHUBERT ORGANIZATION09/09/2016
BISOTISSUEDLES MISERABLES BROADWAY 202/20/2014
BISOTISSUEDTHE SHUBERT ORGANIZATION01/09/2014
BIS—ISSUEDSIGNS CAD CORP11/13/2013
BISOTISSUEDTHE SHUBERT ORGANIZATION11/12/2013
BISEQISSUEDCOLGATE ENTERPRISE CORP08/21/2013
BISOTISSUEDJRM CONSTRUCTION MGMT LLC01/30/2012
BISOTISSUEDJRM CONSTRUCTION MGMT LLC01/17/2012
BISOTISSUEDJRM CONSTRUCTION MGMT LLC05/08/2008
BISEQISSUEDCOLGATE SCAFF.11/05/2004
BISEQISSUEDTHE SHUBERT ORGANIZATION11/19/2003
BISOTISSUEDTHE SHUBERT ORGANIZATION11/19/2003
BIS—ISSUEDSIGNS CAD CORP11/18/2003
BISPLISSUEDLAB PLBG & HTG CO INC08/01/2003
+ 12 more permits on file
1 project · most recent 06/28/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/28/2024Signed-offAIR STREAM AIR CONDITIONIHeating and Air Conditioning Systems
Heat / Cool
Fujitsu ASUA14TLAV2 17,000 BTU · Fan Coil Indoor ×4
AOU60RLAVM4 66,000 BTU · Condensing Unit ×2
ASUA30TLAV2 21,000 BTU · Fan Coil Indoor ×2
Bard W36AY-B15M 3 tons · Packaged Unit ×2
1 project · most recent 06/28/2024
Water/Sanitary
FiledStatusContractorScope
06/28/2024Signed-offHYDRONIC CONCEPTS NY P&HWater/Sanitary
10 projects · most recent 09/24/2026
General Wiring
FiledStatusContractorScope
09/24/2026Permit IssuedLINEAR ELECTRIC, INC.—
10/07/2025CompleteLINEAR ELECTRIC, INC.—
03/06/2025CompleteLINEAR ELECTRIC, INC.—
03/01/2024CompleteH. & L. ELECTRIC INCGeneral Wiring
02/17/2024CompleteLINEAR ELECTRIC, INC.—
02/13/2023CompleteLINEAR ELECTRIC, INC.—
05/16/2022CompleteLINEAR ELECTRIC, INC.—
02/22/2019CompleteERBACH ELEC'L CONTRG LLC—
12/05/2018CompleteERBACH ELEC'L CONTRG LLC—
02/22/2018CompleteERBACH ELEC'L CONTRG LLC—
1 project · most recent 06/28/2024
Steel
FiledStatusContractorScope
06/28/2024Signed-offAIR STREAM AIR CONDITIONISteel
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
05/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
01/19/2026Mechanical SystemsVincent Liottaspecial
01/19/2026FinalVincent Liottaprogress
06/04/2024Mechanical SystemsChester Kowalskispecial
06/04/2024FinalChester Kowalskiprogress
12/20/2023Fire-Resistant Penetrations and JointsChester Kowalskispecial
12/12/2023Structural Steel - DetailsChester Kowalskispecial
12/12/2023Post-installed AnchorsChester Kowalskispecial
12/12/2023Structural Steel - WeldingChester Kowalskispecial
12/11/2023FinalWilliam Gorlinprogress
11/15/2023FinalWilliam Gorlinprogress
11/15/2023Structural Steel - DetailsChester Kowalskispecial
11/15/2023Structural Steel - WeldingChester Kowalskispecial
11/15/2023Post-installed AnchorsChester Kowalskispecial
11/15/2023Concrete - Cast-In-PlaceChester Kowalskispecial
09/25/2023FinalMichael Kostowprogress
09/25/2023FinalMichael Kostowprogress
06/02/2022HVAC-R and service water heating equipmentVincent Liottaenergy_progress
06/02/2022Mechanical SystemsVincent Liottaspecial
06/02/2022FinalVincent Liottaprogress
06/02/2022HVAC-R and service water heating system controlsVincent Liottaenergy_progress
06/02/2022Maintenance informationVincent Liottaenergy_progress
06/02/2022HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
05/20/2022Mechanical SystemsVincent Liottaspecial
05/20/2022HVAC-R and service water heating equipmentVincent Liottaenergy_progress
05/20/2022HVAC-R and service water piping design and insulationVincent Liottaenergy_progress
Latest 25 of 31.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
YouTube BrandcastOtherMezzanine
Project M00728540 Alteration · LOC Issued · 05/04/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 302 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch15
09/03/2026M00620846-I1Request digital key ↗
09/03/2026M00620846-P1Request digital key ↗
09/02/2026M00728540-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00235203-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
09/03/2026M00626210-I1Request digital key ↗
▸Applications & Permits58
▸BISPLAN / WORK APPROVAL APPLICATION25
04/27/2017122939570Open ↗
04/27/2017122954534Open ↗
02/08/2017122954534Open ↗
Showing 3 of 25 on file for this type
▸BISWORK PERMIT APPLICATION21
05/26/2017122954534Open ↗
05/26/2017122939570Open ↗
05/26/2017122928001Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWLPC Approval/Permit12
09/02/2026M00605378-I1Open ↗
08/13/2026M00939114-I1Open ↗
08/13/2026M00939114-S2Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications111
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION37
09/13/2017121910548Open ↗
09/13/2017121910548Open ↗
09/13/2017122901556Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/02/2026M00605378-I1Open ↗
08/28/2026M00939144-I1Open ↗
08/28/2026M00939144-S1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST15
12/29/2016122928001Open ↗
12/29/2016122939543Open ↗
12/29/2016122939561Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/27/2026M00939114-S1Open ↗
09/02/2026M01348402-I1Open ↗
09/01/2026M00939114-P1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT12
12/29/2016122928001Open ↗
12/29/2016122939543Open ↗
12/29/2016122939561Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/27/2026M00939114-S1Open ↗
09/27/2026M00939114-S1Open ↗
09/27/2026M00939114-S1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
01/10/2014121891989Open ↗
01/10/2014121891989Open ↗
08/23/2013121755350Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos22
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
12/27/2016122954534Open ↗
12/27/2016122939552Open ↗
12/27/2016122939570Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/28/2026M00939144-I1Open ↗
08/28/2026M00939144-S1Open ↗
08/13/2026M00235203-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
01/27/2012120950293Open ↗
01/19/2012120938986Open ↗
Showing 2 of 4 on file for this type
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
02/01/2014121910548Open ↗
11/18/2013121839476Open ↗
11/13/2013121839458Open ↗
▸BISTECHNICAL REPORT: ENERGY1
01/27/2012120950293Open ↗
▸BISTR8: Energy Code Progress Inspections1
01/10/2014121891989Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00605378-I1Open ↗
▸Approvals, Objections & Sign-offs40
▸BISLANDMARKS APPROVAL21
09/13/2017121910548Open ↗
09/13/2017122901556Open ↗
12/29/2016122928001Open ↗
Showing 3 of 21 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
09/13/2017121910548Open ↗
09/13/2017122901556Open ↗
05/23/2017120950293Open ↗
Showing 3 of 11 on file for this type
▸BISSUPERSEDING LETTER4
05/26/2017122954534Open ↗
05/26/2017122939570Open ↗
05/26/2017122928001Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
01/27/2012120950293Open ↗
01/19/2012120938986Open ↗
Showing 2 of 3 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership25
▸BISCOST AFFIDAVIT25
09/13/2017121910548Open ↗
09/13/2017122901556Open ↗
05/23/2017120950293Open ↗
Showing 3 of 25 on file for this type
▸Filing & Intake Forms20
▸BISEFILING COVER SHEET17
12/29/2016122928001Open ↗
12/29/2016122939543Open ↗
12/29/2016122939561Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM2
09/13/2017121910548Open ↗
09/13/2017122901556Open ↗
▸BISADDITIONAL INFORMATION1
01/07/2014121839458Open ↗
▸Other Documents3
▸DOB NOWProof of Historic Building3
08/13/2026M00939144-I1Open ↗
08/13/2026M01201133-I1Open ↗
08/13/2026M00728540-I1Open ↗