← Back
Office with commercial, 7-19 stories
Paley Center for Media
25 WEST 52 STREET · Name © OpenStreetMap contributors · Midtown-Times Square · BIN 1076265
💬 Discuss this project
1989Year Built
16Stories
O6Building Class
C5-2.5Zoning
75,806 sfGross Floor Area
5Units
LL97 Covered0 Open ViolationsFISP: SAFE
Office with commercial, 7-19 stories · 5,493 sf lot · 13.8 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Floor 28p · 4 filings · 15 docs
Floor 1
Cellar15p · 4 filings · 15 docs
Sub-Cellar10p · 4 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PALEY CENTER FOR MEDIA6204/09/2026
MARINE CONTRACTOR INC303/22/2026
MANINE CONTRACTOR INC103/22/2026
MARINE CONTRACTING203/22/2026
STONE ERECTORS INC203/22/2026
TURNER CONSTRUCTION CO403/22/2026
TUNRNER CONSTRUCTION CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WELLWORTH CONSULTING LLC106/24/2025
DLR GROUP505/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
UNITED SAFETY CONSULTANTS103/21/2026
METROPOLIS GROUP INC1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BENCHMARK BUILDERS LLCGeneral Contractor504/08/2026
JOSEPH BRAMANElectrical103/21/2026
METRO FIRE PROTECTION INCFire Protection106/28/2026
JAMES STASIElectrical103/21/2026
CAPITAL COOLING SYSTEMSGeneral Contractor104/09/2026
SPRING SCAFFOLDING LLCGeneral Contractor104/09/2026
MAC FELDER INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING4983505/22/2025
Building Lifecycle
All (110)Filed (6)Permit Issued (7)Signed Off (3)Facade (FISP) (15)Violation (60)Inspection (2)Special Inspection (17)
08/19/2026
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING THEATERS, REMOVAL AND INSTALLATION OF SEATING, WALLS, DOORS, CEILINGS AND FLOOR FINISHES AND NEW SLAB OPEININGS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01224056-I1
07/22/2026
Signed off — Alteration
M01224402-I1
06/05/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/04/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/23/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE WORK PLATFORM (DANCE FLOOR) IN THE CELLAR LEVEL AUDITORIUM.
M01245038-I1
10/03/2025
Permit issued — Structural
M01224402-I1-ST
06/26/2025
Permit issued — Sprinklers
M01224368-I1-EW-SP
06/25/2025
Permit issued — Protection and Mechanical Methods
M01245038-I1-PMM
06/24/2025
Filed — Alteration
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE WORK PLATFORM (DANCE FLOOR) IN THE CELLAR LEVEL AUDITORIUM.
M01245038-I1
06/06/2025
Permit issued — Plumbing
M01225834-I1-PL
05/27/2025
Permit issued — Mechanical Systems
M01224141-I1-MS
05/23/2025
Permit issued — Structural
M01224402-I1-ST
05/23/2025
Permit issued — General Construction
M01224056-I1-GC
05/22/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING THEATERS, REMOVAL AND INSTALLATION OF SEATING, WALLS, DOORS, CEILINGS AND FLOOR FINISHES AND NEW SLAB OPEININGS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01224056-I1
05/22/2025
Filed — Alteration
M01224402-I1
05/22/2025
Filed — Alteration
REMOVAL AND REPLACEMENT OF DUCT WORK, FANS, DIFFUSERS AND HEAT PUMPS AS PER DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01224141-I1
05/22/2025
Filed — Alteration
MODIFICATION OF EXISTING SPRINKLER SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01224368-I1
05/22/2025
Filed — Alteration
REMOVAL AND REPLACEMENT OF PLUMIBING FIXURES IN KIND AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01225834-I1
05/19/2025
Special inspection requirement — Lighting controls
ALEXIS SCHLESSINGERMAN
05/19/2025
Special inspection requirement — Concrete - Cast-In-Place
ALEXIS SCHLESSINGERMAN
05/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
05/19/2025
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
05/19/2025
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
05/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
ALEXIS SCHLESSINGERMAN
05/19/2025
Special inspection requirement — Interior lighting power
ALEXIS SCHLESSINGERMAN
05/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
05/19/2025
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
05/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
05/19/2025
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
05/14/2025
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
05/14/2025
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
05/12/2025
Special inspection requirement — Mechanical Systems
ALEXIS SCHLESSINGERMAN
05/12/2025
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
05/12/2025
Special inspection requirement — Sprinkler Systems
ALEXIS SCHLESSINGERMAN
05/12/2025
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
06/30/2022
Cycle 9 facade report submitted
05/10/2022
Cycle 9 facade report signed — SAFE
05/04/2022
Cycle 9 facade inspection completed
11/16/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/16/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/16/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/16/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/03/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/03/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/15/2017
Violation issued (ECB, closed)
Local Law
10/22/2015
Cycle 6 facade report submitted
10/22/2015
Cycle 8 facade report submitted
10/22/2015
Cycle 7 facade report submitted
06/25/2015
Cycle 6 facade report submitted
06/25/2015
Cycle 8 facade report submitted
06/25/2015
Cycle 7 facade report submitted
06/25/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/25/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/25/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/18/2015
Cycle 6 facade report signed — UNSAFE
06/18/2015
Cycle 8 facade report signed — UNSAFE
06/18/2015
Cycle 7 facade report signed — UNSAFE
06/16/2015
Cycle 6 facade inspection completed
06/16/2015
Cycle 8 facade inspection completed
Latest 60 of 110 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offBENCHMARK BUILDERS LLC10/03/2025
DOB NOWSprinklersPermit IssuedMETRO FIRE PROTECTION INC06/26/2025
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC06/25/2025
DOB NOWPlumbingPermit IssuedMAC FELDER INC06/06/2025
DOB NOWMechanical SystemsSigned-offCAPITAL COOLING SYSTEMS05/27/2025
DOB NOWStructuralSigned-offBENCHMARK BUILDERS LLC05/23/2025
DOB NOWGeneral ConstructionSigned-offBENCHMARK BUILDERS LLC05/23/2025
BIS—ISSUEDBIG SHOW CONSTRUCTION MANAGE05/08/2018
BISMHISSUEDBOILERMATIC WELDING INDUS09/06/2016
BISOTISSUEDSATO CONSTRUCTION CO.INC07/08/2015
BISEQISSUEDROCK GROUP NY CORP05/01/2015
BISEQISSUEDUNIVERSAL BUILD SUPP LLC09/03/2014
BISMHISSUEDBP MECHANICAL CORP04/25/2014
BISEQISSUEDUNIVERSAL BUILD SUPP LLC09/18/2013
BISSPISSUEDPREFERRED SPKLR AND MECH08/20/2013
BISSPISSUEDSIRINA FIRE PROT CORP05/07/2013
BISEQISSUEDUNIVERSAL BUILD SUPP LLC12/17/2012
BISPLISSUEDASHLAND PLUMBING CORP08/28/2012
BISMHISSUEDBIG SHOW CONSTRUCTION MANAGE08/22/2012
BISSPISSUEDWHITESTONE PLUMBING CORP09/29/2011
BISPLISSUEDPREFERRED MECHANICAL INC07/12/2011
BISMHISSUEDREIDY CONTRACTING GROUP06/30/2011
BISOTISSUEDREIDY CONTRACTING GROUP06/30/2011
BISOTISSUEDBURA CONSTRUCTION CORP04/28/2011
BIS—ISSUEDGOING SIGN & SVCNG CO,INC11/23/2009
BIS—ISSUEDGOING SIGN & SVCNG CO,INC11/23/2009
BIS—ISSUEDGOING SIGN & SVCNG CO,INC11/23/2009
BISMHISSUEDBIG SHOW CONSTRUCTION MANAGE04/14/2009
BISOTISSUEDBIG SHOW CONSTRUCTION MANAGE04/14/2009
BISPLISSUEDASHLAND PLUMBING CORP12/02/2008
BIS—ISSUEDBIG SHOW CONSTRUCTION MANAGE11/21/2008
BISSPISSUEDVITAL PLUMBING, INC07/22/2003
BISMHISSUEDTURNER CONST CO04/19/1993
BISOTISSUEDTURNER CONST CO04/19/1993
BISSPISSUEDABCO PEERLESS SPRINKLER CORP.02/21/1992
BISPLISSUEDL.S. MILLER PLUMB & HEATING02/20/1992
BISOTISSUEDTURNER CONST.01/22/1992
BISMHISSUEDTURNER CONST.01/22/1992
BISFSISSUEDMANDELL MECH,CORP.12/17/1991
1 project · most recent 05/22/2025
FiledStatusContractorScope
05/22/2025Permit IssuedMETRO FIRE PROTECTION INC50 heads
1 project · most recent 05/22/2025
Water/Sanitary
FiledStatusContractorScope
05/22/2025Permit IssuedMAC FELDER INCWater/Sanitary
1 project · most recent 05/29/2025
General Wiring
FiledStatusContractorScope
05/29/2025CompleteENNELL GRP ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/05/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/04/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
05/19/2025Lighting controlsALEXIS SCHLESSINGERMANenergy_progress
05/19/2025Concrete - Cast-In-PlaceALEXIS SCHLESSINGERMANspecial
05/19/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
05/19/2025Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
05/19/2025Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
05/19/2025Fire-Resistance Rated ConstructionALEXIS SCHLESSINGERMANprogress
05/19/2025Interior lighting powerALEXIS SCHLESSINGERMANenergy_progress
05/19/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
05/19/2025Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
05/19/2025Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
05/19/2025Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
05/14/2025Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
05/14/2025Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
05/12/2025Mechanical SystemsALEXIS SCHLESSINGERMANspecial
05/12/2025FinalALEXIS SCHLESSINGERMANprogress
05/12/2025Sprinkler SystemsALEXIS SCHLESSINGERMANspecial
05/12/2025FinalALEXIS SCHLESSINGERMANprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
The Paley Center for MediaOtherSub-cellar, Cellar, Floor 2
Project M01224056 Alteration · LOC Issued · 05/22/2025
Project M01224402 Alteration · LOC Issued · 05/22/2025
Project M01225834 Alteration · Permit Entire · 05/22/2025
Taco DumboRestaurant / Food Service—
Project M00247663 Alteration · On Hold - Special Inspector Withdrew · 10/30/2019
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 317 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/23/2026M01224402-I1Request digital key ↗
08/23/2026M01224368-I1Request digital key ↗
08/23/2026M01224056-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits67
▸BISPLAN / WORK APPROVAL APPLICATION31
05/02/2025120086192Open ↗
05/02/2025120084336Open ↗
05/02/2025120124631Open ↗
Showing 3 of 31 on file for this type
▸BISWORK PERMIT APPLICATION26
05/11/2018110248232Open ↗
09/13/2016122530449Open ↗
07/16/2015122268544Open ↗
Showing 3 of 26 on file for this type
▸BISPLACE OF ASSEMBLY9
11/07/2018122358304Open ↗
05/24/2017122386729Open ↗
05/24/2017122358304Open ↗
Showing 3 of 9 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
01/29/2018110248232Open ↗
▸Seals & Professional Certifications77
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION42
11/07/2018122358304Open ↗
11/07/2018122358304Open ↗
11/07/2018122358304Open ↗
Showing 3 of 42 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
09/13/2016122530449Open ↗
02/24/2015122268544Open ↗
04/29/2014121678737Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
12/18/2012121464502Open ↗
07/05/2011120741019Open ↗
07/05/2011120741019Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026M01224402-I1Open ↗
08/23/2026M01224056-I1Open ↗
08/13/2026M01224141-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
09/13/2016122530449Open ↗
04/25/2015140336483Open ↗
02/24/2015122268544Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/28/2026M01224056-I1Open ↗
09/01/2026M01225834-I1Open ↗
08/29/2026M01224368-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/28/2026M01224056-I1Open ↗
09/28/2026M01224056-I1Open ↗
08/24/2026M01224141-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/25/2015140336483Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/25/2015140336483Open ↗
▸Trade Schedules & Equipment32
▸BISSELF-CERT PLUMBING NOTICE12
06/30/2014120739638Open ↗
10/16/2013121170142Open ↗
09/20/2013121170142Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING9
08/06/2012121170133Open ↗
08/06/2012121170142Open ↗
07/05/2011120741019Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE PERMITS5
07/22/2014121678737Open ↗
07/22/2014121678737Open ↗
Showing 2 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
06/28/2021110248223Open ↗
10/02/2013121574395Open ↗
06/29/2012120737907Open ↗
▸BISEQUIPMENT USE APPLICATION-PERMIT2
07/22/2014121678737Open ↗
Showing 1 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos20
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER8
04/06/2011120650624Open ↗
Showing 1 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
07/05/2011120741019Open ↗
07/05/2011120739638Open ↗
07/05/2011120737907Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
09/13/2016122530449Open ↗
02/24/2015122268544Open ↗
04/29/2014121678737Open ↗
Showing 3 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
03/26/2013121574395Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
11/07/2018122358304Open ↗
12/14/2016122530449Open ↗
09/13/2016122530449Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
12/14/2016122530449Open ↗
10/20/2015122268544Open ↗
02/13/2012120741019Open ↗
▸BISTECHNICAL REPORT: ENERGY3
02/13/2012120741019Open ↗
07/05/2011120741019Open ↗
07/05/2011120741019Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/25/2015140336483Open ↗
▸Approvals, Objections & Sign-offs31
▸BISADMINISTRATIVE OBJECTIONS15
04/29/2014121678737Open ↗
12/18/2012121464502Open ↗
08/06/2012121170133Open ↗
Showing 3 of 15 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
03/29/2019110248232Open ↗
12/13/2018110248232Open ↗
03/15/2018120739638Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
11/07/2018122358304Open ↗
02/06/2015121464502Open ↗
05/09/2013121170142Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership30
▸BISCOST AFFIDAVIT30
03/15/2018120739638Open ↗
12/14/2016122530449Open ↗
09/13/2016122530449Open ↗
Showing 3 of 30 on file for this type
▸Filing & Intake Forms35
▸BISEFILING COVER SHEET23
09/13/2016122530449Open ↗
02/24/2015122268544Open ↗
04/29/2014121678737Open ↗
Showing 3 of 23 on file for this type
▸BISADDITIONAL INFORMATION6
11/07/2018122358304Open ↗
05/24/2017122386729Open ↗
05/24/2017122358304Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM5
03/29/2019110248232Open ↗
12/13/2018110248232Open ↗
05/31/2018110248232Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
04/25/2015140336483Open ↗
▸Other Documents2
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
04/25/2015140336483Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/07/2018122358304Open ↗