The Stanton
250 WEST 94TH STREET · BIN 1033653
💬 Discuss this project
1925Year Built
15Stories
D4Building Class
R8Zoning
280,809 sfGross Floor Area
150Units
LL97 CoveredRent Stabilized3 Active Violations 2 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 250 Tenants · 22,660 sf lot · 12.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsInstall chimney support1 filing
RoofPeggy Kriegel Penthouse mechanical system2 filings · 14 docs
Floor 16Peggy Kriegel Penthouse mechanical system1 filing · 11 docs
Floor 15Unit PH1, Unit PH41 filing · 11 docs
Floor 14Minor plumbing work1 filing · 14 docs
Floor 13Unit 13E, Unit 13G3 filings · 20 docs
Floor 12
Floor 11Unit 11H1p · 2 filings · 3 docs
Floor 10Unit 10D, Unit 10E, Unit 10F +21p · 7 filings · 20 docs
Floor 9
Floor 8
Floor 7Unit 7A2 filings · 9 docs
Floor 6Unit 6G, Unit 6JUnder Construction2 filings · 20 docs
Floor 5Unit 5D, Unit 5GUnder Construction5p · 3 filings · 20 docs
Floor 4Unit 4A3 filings · 19 docs
Floor 3Unit 3B1 filing · 17 docs
Floor 2
Floor 1Plumbing system installation and access5p · 4 filings · 20 docs
CellarRetail interior fit-out and finishes5p · 3 filings · 20 docs
Sub-Cellar1p · 1 filing · 10 docs
Site & exteriorOrsid Realty CORP8 filings · 20 docs
Filed — no permit issuedErect illuminated sign1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
250 Tenants14203/22/2026
2nd Street707/08/2026
Capital One403/21/2026
Sandra Na203/22/2026
Amsterdam Rest & Construction Co203/21/2026
Pomander Walk Housing203/21/2026
25 Tenants Corp % Cooper Square103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Studio Huashi803/21/2026
Rigid Structural Design703/21/2026
Archiel403/21/2026
Maryclare Nepogoda303/21/2026
Burnham Nationwide403/21/2026
MK Associates403/21/2026
Aht Engineering203/21/2026
Stecc603/21/2026
Enigma Expediting603/21/2026
EC Building Consultants403/21/2026
Christopher Teeter RA1003/21/2026
Azar Associates303/21/2026
Louis Striar603/21/2026
Big Orange Expediting203/21/2026
JM Zoning203/21/2026
Ndkazalas Architecture203/21/2026
Maryclare Nepogoda Expediter203/21/2026
Nexus Consulting NYC403/21/2026
Richard Lewis Architect103/21/2026
Noel Building Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
New Amsterdam RestorationScaffold1107/08/2026
RD-WrightGeneral Contractor603/21/2026
Eljin Construc of New YorkGeneral Contractor507/08/2026
Amsterdam RestorationScaffold407/08/2026
Cauldwell Wingate CoGeneral Contractor407/08/2026
Stanley Ruth CoGeneral Contractor407/08/2026
Signstar NYCSign hanger307/08/2026
Taurus Construction GroupGeneral Contractor303/21/2026
Prestige Renovation GroupGeneral Contractor303/21/2026
Perfect Square ConstructionGeneral Contractor303/21/2026
Apollo Plumbing & HeatingPlumbing207/08/2026
Aura PlumbingPlumbing207/08/2026
Albstars ContractorsGeneral Contractor203/21/2026
K & G Electric CoElectrical203/21/2026
Donald R Borg ConstructionGeneral Contractor207/08/2026
RomanovGeneral Contractor207/08/2026
E.L. ContractingGeneral Contractor107/08/2026
Minos ConstructionGeneral Contractor107/08/2026
RenovytGeneral Contractor104/09/2026
V & Roger ConstructionGeneral Contractor107/08/2026
Amn PlumbingPlumbing107/03/2026
Aranda Plumbing & HeatingPlumbing106/28/2026
Arcon Plumbing SolutionsPlumbing107/08/2026
Delta-Sigma MechanicalPlumbing107/08/2026
Ferko Plumbing & HeatingPlumbing107/08/2026
Fulton Plumbing & HeatingPlumbing107/08/2026
LG Elite PlumbingPlumbing107/08/2026
New York Park Plumbing & Heating CoPlumbing107/08/2026
PipestylistsPlumbing107/08/2026
R.J.C. MechanicalPlumbing107/08/2026
Simple Choice Plumbing and HTPlumbing107/08/2026
Aero ElectricElectrical103/21/2026
Zone Plumbing & HeatingPlumbing107/08/2026
Antonio Ceriello ElectricElectrical103/21/2026
BNH ElectricalElectrical103/22/2026
Ceriello AntonioElectrical103/21/2026
Harry Dorowsky, Lic. ElectricElectrical103/21/2026
Einstein ElectricalElectrical103/22/2026
Eos ElectricalElectrical103/22/2026
QNCC Electrical ContractingElectrical103/21/2026
Matsikas VasiliosElectrical103/21/2026
Tri-ElectricElectrical103/21/2026
The Metro Group ElectricElectrical103/21/2026
Stan ElectricElectrical103/22/2026
Tower ElectricElectrical103/21/2026
Graham Plumbing CoFire Protection103/21/2026
Aruum InteriorGeneral Contractor104/09/2026
Ashtons Remodeling and CoGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Youn Design9534108/30/2026
Michael House Architect7910308/10/2026
Aht Engineering8836212/29/2025
Edra Engineering & Inspec2820112/29/2025
MK Architecture476210/22/2025
Zaskorski & Associates AR6121110/07/2025
Ryan Special Engineering2018405/28/2025
Allen Shinfeld, P.E1305212/02/2024
Outsource Special Inspection2827107/17/2024
Socotec Engineering4983405/28/2024
Kimberly Peck Architect6812310/17/2023
Chang Park Arch663309/06/2022
Lawrence V McDonald Architects6039404/11/2022
Adal Engineering4205101/05/2022
Concrete Solutions Lab Co5344110/20/2021
Mirella Boselli R.A6330108/05/2020
Geodesign627101/10/2020
Domani Inspection Service843101/10/2020
Building Lifecycle
All (265)Filed (61)Permit Issued (56)Signed Off (29)Facade (FISP) (33)Violation (60)Inspection (26)
10/20/2026
Filed — Alteration
PROPOSED INTERIOR ALTERATION AT APARTNENT 11 H TO INCLUDE NEW PARTITIONS,CABINETRY, FINISHES, HUNG CEILING AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. PLUMBING FILED SUBSEQUENTLY.
M01473643-I1
08/30/2026
Filed — Alteration
INSTALLATION OF A NEW ILLUMINATED ACCESSORY BUSINESS SIGN. NO CHANGE IN USE, EGRESS, OCCUPANCY, OR BUILDING ENVELOPE.
M01436106-I1
08/10/2026
Filed — Alteration
Proposed plumbing work in existing unit #3 on the 3rd floor. Initial general construction application to be filed. As per the submitted plans. There is no change to use, egress, or occupancy under this application.
M01099931-P1
08/10/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/29/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/11/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/29/2026
Violation issued (HPD, closed)
A
04/22/2026
Signed off — Alteration
New openings in exterior wall for installation of sleeves for PTHP units. No change in use, occupancy or egress under this application.
M01256691-I1
02/19/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/13/2026
Permit issued — Plumbing
M01300884-S1-PL
02/05/2026
Permit issued — Mechanical Systems
M01300884-I1-GC-CX
12/29/2025
Filed — Alteration
INTERIOR RENOVATION OF UNIT 5D WITHIN EXISTING MULTI-FAMILY BUILDING. NO INCREASE IN THE BULK . NO IMPACT ON ZONING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01300884-S1
12/29/2025
Filed — Alteration
INTERIOR RENOVATION OF UNIT 5D WITHIN EXISTING MULTI-FAMILY BUILDING. NO INCREASE IN THE BULK . NO IMPACT ON ZONING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01300884-I1
12/12/2025
Permit issued — Plumbing
M01289608-S1-PL
12/10/2025
Permit issued — Mechanical Systems
M01256691-I1-GC-CX
12/08/2025
Permit issued — General Construction
M01289608-I1-GC
10/22/2025
Filed — Alteration
Interior Renovations of Unit 6G as per plans. Limited demolition of non-structural partitions, doors & finishes. Installation of new non-structural partitions doors and finishes. No change to Use, Egress or Occupancy under this application.
M01289608-I1
10/22/2025
Filed — Alteration
Interior Renovations of Unit 6G as per plans. Limited demolition of non-structural partitions, doors & finishes. Installation of new non-structural partitions doors and finishes. No change to Use, Egress or Occupancy under this application.
M01289608-S1
10/16/2025
Cycle 9 facade report signed — SAFE
10/07/2025
Filed — Alteration
New openings in exterior wall for installation of sleeves for PTHP units. No change in use, occupancy or egress under this application.
M01256691-I1
09/29/2025
Permit issued — Plumbing
M01099931-S1-PL
09/26/2025
Cycle 9 facade report submitted
09/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/23/2025
Permit issued — General Construction
M01099931-I1-GC
08/15/2025
Cycle 9 facade inspection completed
08/14/2025
Cycle 9 facade inspection completed
07/29/2025
Signed off — Alteration
M01114398-I1
07/29/2025
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - 2ND STREET. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01114397-I1
07/29/2025
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - 2ND STREET. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01114395-I1
07/15/2025
Signed off — Alteration
Removal of existing partitions, FF&E, lights, ceiling. Installation of new partitions, retail fixtures, floor/wall/ceiling finishes, lighting, electrical. Storefront to remain. Signage filed under separate permit. No change in use, egress, or occupancy.
M01116696-I1
06/20/2025
Signed off — Alteration
M01116740-I1
06/20/2025
Signed off — Alteration
Mechanical modifications as per plans submitted herewith. Addition of a new air conditioning system to replace the existing, including new distribution and controls. No Change to Use, Occupancy Group, or Egress.
M01116746-I1
06/18/2025
Signed off — Alteration
M01072649-I1
06/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/05/2025
Cycle 9 facade report submitted
05/30/2025
Cycle 9 facade report signed — UNSAFE
05/28/2025
Filed — Alteration
Removal of existing partitions, FF&E, lights, ceiling. Installation of new partitions, retail fixtures, floor/wall/ceiling finishes, lighting, electrical. Storefront to remain. Signage filed under separate permit. No change in use, egress, or occupancy.
M01116696-P1
05/28/2025
Cycle 9 facade inspection completed
05/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/09/2025
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapte r 33. No change in use, egress and/or occupancy with this application.
M00887597-I1
05/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/06/2025
Permit issued — Plumbing
M01116740-I1-PL
05/01/2025
Cycle 9 facade report submitted
03/25/2025
Violation issued (ECB, open)
Unknown
03/25/2025
Violation issued (ECB, closed)
Construction
03/21/2025
Permit issued — General Construction
M01116696-I1-GC
03/21/2025
Permit issued — Mechanical Systems
M01116746-I1-MS
03/14/2025
Permit issued — Plumbing
M01132433-S1-PL
02/28/2025
Signed off — Alteration
plumbing work in apt 13G
M01082691-I1
02/28/2025
Signed off — Alteration
INSTALLATION OF A SUSPENDED SCAFFOLD FOR FACADE INSPECTION AND REPAIR AS PER THE PLANS SUBMITTED. NO CHANGE TO EGRESS OR OCCUPANCY.
M01017929-I1
02/18/2025
Signed off — Alteration
interior renovation of apt 13G
M01072368-I1
02/07/2025
Filed — Alteration
Proposed plumbing work in existing unit #3 on the 3rd floor. Initial general construction application to be filed. As per the submitted plans. There is no change to use, egress, or occupancy under this application.
M01099931-I1
02/07/2025
Filed — Alteration
Proposed plumbing work in existing unit #3 on the 3rd floor. Initial general construction application to be filed. As per the submitted plans. There is no change to use, egress, or occupancy under this application.
M01099931-S1
01/23/2025
Cycle 9 facade report submitted
01/23/2025
Cycle 9 facade report signed — UNSAFE
01/21/2025
Cycle 9 facade inspection completed
12/26/2024
Permit issued — Mechanical Systems
M01132433-I1-GC-CX
12/24/2024
Permit issued — Sign
M01114395-I1-SG
12/24/2024
Permit issued — Sign
M01114398-I1-SG
12/23/2024
Permit issued — Sign
M01114397-I1-SG
Latest 60 of 265 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedAranda Plumbing & Heating02/13/2026
DOB NOWMechanical SystemsPermit IssuedV & Roger Construction02/05/2026
DOB NOWPlumbingPermit IssuedZone Plumbing & Heating12/12/2025
DOB NOWMechanical SystemsSigned-offStanley Ruth Co12/10/2025
DOB NOWGeneral ConstructionPermit IssuedAshtons Remodeling and12/08/2025
DOB NOWPlumbingPermit IssuedAmn Plumbing09/29/2025
DOB NOWGeneral ConstructionPermit IssuedRenovyt09/23/2025
DOB NOWPlumbingSigned-offFulton Plumbing & Heating05/06/2025
DOB NOWGeneral ConstructionSigned-offDonald R Borg Construction03/21/2025
DOB NOWMechanical SystemsSigned-offDonald R Borg Construction03/21/2025
DOB NOWPlumbingSigned-offLG Elite Plumbing03/14/2025
DOB NOWMechanical SystemsPermit IssuedAruum Interior12/26/2024
DOB NOWSignSigned-offSignstar NYC12/24/2024
DOB NOWSignSigned-offSignstar NYC12/24/2024
DOB NOWSignSigned-offSignstar NYC12/23/2024
DOB NOWPlumbingSigned-offSimple Choice Plumbing and HT08/08/2024
DOB NOWGeneral ConstructionSigned-offPrestige Renovation Group08/02/2024
DOB NOWGeneral ConstructionSigned-offRomanov08/02/2024
DOB NOWMechanical SystemsSigned-offStanley Ruth Co07/03/2024
DOB NOWMechanical SystemsSigned-offStanley Ruth Co06/18/2024
DOB NOWSidewalk ShedPermit IssuedNew Amsterdam Restoration06/06/2024
DOB NOWSupported ScaffoldSigned-offNew Amsterdam Restoration06/06/2024
DOB NOWGeneral ConstructionSigned-offRomanov05/02/2024
DOB NOWSuspended ScaffoldSigned-offNew Amsterdam Restoration03/12/2024
DOB NOWPlumbingSigned-offT & T Plumbing01/19/2024
DOB NOWGeneral ConstructionSigned-offAlbstars Contractors01/09/2024
DOB NOWGeneral ConstructionSigned-offEljin Construc of New Yor12/11/2023
DOB NOWMechanical SystemsSigned-offEljin Construc of New Yor09/29/2023
DOB NOWSupported ScaffoldSigned-offNew Amsterdam Restoration06/13/2023
DOB NOWSidewalk ShedPermit IssuedNew Amsterdam Restoration06/13/2023
DOB NOWProtection and Mechanical MethodsSigned-offNew Amsterdam Restoration06/12/2023
DOB NOWPlumbingSigned-offArcon Plumbing Solutions05/10/2023
DOB NOWGeneral ConstructionSigned-offEL Contracting04/25/2023
DOB NOWPlumbingSigned-offDelta-Sigma Mechanical03/20/2023
DOB NOWGeneral ConstructionSigned-offEljin Construc of New Yor03/07/2023
DOB NOWGeneral ConstructionSigned-offPerfect Square Construction01/31/2023
DOB NOWPlumbingSigned-offR.J.C. Mechanical01/04/2023
DOB NOWGeneral ConstructionSigned-offEljin Construc of New Yor09/27/2022
DOB NOWPlumbingPermit IssuedNew York Park Plumbing & Heating Co06/17/2022
DOB NOWMechanical SystemsSigned-offRD-Wright05/11/2022
+ 60 more permits on file
3 projects · most recent 12/29/2025
Air Conditioning Systems Heating Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/29/2025Permit IssuedV & Roger ConstructionAir Conditioning Systems, Heating Systems
Cooling
Friedrich WCVT12B10A 13,500 BTU · Ptac ×3
Heating
12/02/2024Permit IssuedAruum InteriorHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
York SDSH096C 96,000 BTU · Heat Pump Outdoor ×1
Ventilation
Fantech FKD 10XL 1,266 CFM · Exhaust Fan ×2
01/05/2022Signed-offRD-WrightAir Conditioning Systems
Cooling
Daikin RXYQ96XATJA 96,000 BTU · Vrf Outdoor ×1
5 projects · most recent 10/20/2026
Water/Sanitary Gas
FiledStatusContractorScope
10/20/2026——Gas, Water/Sanitary
08/10/2026Permit IssuedAmn PlumbingGas, Water/Sanitary
12/29/2025Permit IssuedAranda Plumbing & HeatingGas, Water/Sanitary
04/11/2022Permit IssuedNew York Park Plumbing & Heating CoWater/Sanitary
10/15/2020Signed-offFerko Plumbing & HeatingWater/Sanitary
25 projects · most recent 04/28/2026
General Wiring
FiledStatusContractorScope
04/28/2026CompleteNew York City ElectricGeneral Wiring
04/24/2026Permit IssuedKet ElectricGeneral Wiring
02/18/2026Permit IssuedJoseph Weinstein ElectricGeneral Wiring
12/05/2025Permit IssuedThe Metro Group ElectricGeneral Wiring
09/29/2025Permit IssuedGlendale Electl ContngGeneral Wiring
08/26/2025CompleteK & G Electric CoGeneral Wiring
07/02/2025CompleteLebo ElectricGeneral Wiring
07/02/2025CompleteSolas Electrical ContractingGeneral Wiring
04/15/2025Permit IssuedAsko Electric Construction & MaintenanceGeneral Wiring
03/27/2025Permit IssuedAsko Electric Construction & Maintenance—
01/24/2025CompleteTM Select ElectricGeneral Wiring
01/06/2025CompleteProff Electrical—
01/06/2025CompleteProff Electrical—
09/20/2024CompleteGRX Euro ElectricGeneral Wiring
08/09/2024CompleteGRX Euro ElectricGeneral Wiring
1 project · most recent 01/10/2020
FiledStatusContractorScope
01/10/2020Permit IssuedCauldwell Wingate Co1 scope_items
2 projects · most recent 12/29/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
12/29/2025Permit IssuedAranda Plumbing & HeatingTenant Protection Plan 72 Hour
10/22/2025Permit IssuedZone Plumbing & HeatingTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 26
DateTypeResultReport
08/10/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/11/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/19/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/10/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/29/2024Pass-Final General Construction Non-Directive 14PassView ↗
10/04/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/30/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/17/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/17/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/17/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 26.
▾Special Inspection Requirements (DOB NOW) — 106
DateRequirementInspectorRole
10/13/2026Fire-Resistant Penetrations and Joints—special
10/13/2026Lighting in dwelling units—energy_progress
10/13/2026Post-installed Anchors—special
10/13/2026Lighting controls—energy_progress
10/13/2026Interior lighting power—energy_progress
10/13/2026Energy Code Compliance Inspections—progress
08/29/2026Structural Stability – Alterations of existing buildingsJIN HWAN CHOspecial
08/29/2026Post-installed AnchorsJIN HWAN CHOspecial
08/29/2026FinalJIN HWAN CHOprogress
08/28/2026Fire-Resistant Penetrations and JointsMICHAEL HOUSEspecial
07/27/2026Fire-Resistant Penetrations and JointsMICHAEL HOUSEspecial
05/28/2026Post-installed AnchorsEDWARD RACZKOWSKIspecial
12/23/2025Fenestration air leakageABRAHAM TAWILenergy_progress
12/23/2025Energy Code Compliance InspectionsABRAHAM TAWILprogress
12/23/2025Fire-Resistant Penetrations and JointsABRAHAM TAWILspecial
12/23/2025Fenestration and door U-factor and product ratingsABRAHAM TAWILenergy_progress
12/23/2025Energy Code Compliance InspectionsABRAHAM TAWILprogress
12/23/2025HVAC-R and service water piping design and insulationABRAHAM TAWILenergy_progress
10/15/2025Tenant Protection Plan CompliancePeter Rissettospecial
10/13/2025HVAC-R and service water heating system controlsABRAHAM TAWILenergy_progress
10/13/2025HVAC-R and service water heating equipmentABRAHAM TAWILenergy_progress
10/13/2025HVAC-R and service water piping design and insulationABRAHAM TAWILenergy_progress
10/13/2025Maintenance informationABRAHAM TAWILenergy_progress
10/10/2025Lighting in dwelling unitsPeter Rissettoenergy_progress
10/10/2025FinalABRAHAM TAWILprogress
Latest 25 of 106.
▾Documents — 1,317 on file (BIS + DOB NOW)
▸Plans & Drawings60
▸DOB NOWPlans/Sketch49
09/22/2026M01436106-I1Request digital key ↗
09/03/2026M00480400-I1Request digital key ↗
09/03/2026M00612516-I1Request digital key ↗
Showing 3 of 49 on file for this type
▸DOB NOWPlans/Sketch - Plumbing8
09/04/2026M00284614-I1Request digital key ↗
09/04/2026M00284614-P1Request digital key ↗
09/04/2026M00284614-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00247568-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00290544-I1Request digital key ↗
▸Applications & Permits222
▸BISPLAN / WORK APPROVAL APPLICATION123
05/15/2024123801216Open ↗
05/03/2024123801216Open ↗
05/03/2024123801216Open ↗
Showing 3 of 123 on file for this type
▸BISWORK PERMIT APPLICATION99
06/12/2023123799121Open ↗
06/09/2023123799121Open ↗
08/04/2022123707596Open ↗
Showing 3 of 99 on file for this type
▸Seals & Professional Certifications333
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION127
12/26/2019123726370Open ↗
11/22/2019123379496Open ↗
08/21/2019123799121Open ↗
Showing 3 of 127 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature59
09/22/2026M01436106-I1Open ↗
09/05/2026M00247568-I1Open ↗
09/05/2026M00247568-P1Open ↗
Showing 3 of 59 on file for this type
▸DOB NOWProgress Inspector Seal & Signature55
09/23/2026M01300884-I1Open ↗
09/23/2026M01300884-I1Open ↗
09/01/2026M00290544-I1Open ↗
Showing 3 of 55 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
10/01/2026M08054641-P1Open ↗
09/23/2026M01300884-I1Open ↗
09/23/2026M01300884-I1Open ↗
Showing 3 of 30 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST27
10/31/2019123801216Open ↗
Showing 1 of 27 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT17
07/23/2020140928236Open ↗
10/31/2019123801216Open ↗
Showing 2 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
12/14/2021141006569Open ↗
07/22/2020140920957Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/14/2021141006569Open ↗
07/23/2020140928236Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/23/2020140928236Open ↗
▸Trade Schedules & Equipment85
▸BISSELF-CERT PLUMBING NOTICE32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISSCHEDULE B - PLUMBING25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE19
12/03/2019123810983Open ↗
06/26/2019123810983Open ↗
06/14/2019123707596Open ↗
Showing 3 of 19 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
12/09/2020123253291Open ↗
12/07/2020123253291Open ↗
Showing 2 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS3
12/09/2020123253291Open ↗
12/07/2020123253291Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSIGN HANGER CERTIFICATE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection31
▸BISTenant Protection Plan and Notes15
07/22/2020140920957Open ↗
11/22/2019123379496Open ↗
10/31/2019123801216Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWTenant Protection Plan10
09/04/2026M00284614-I1Open ↗
09/04/2026M00284614-P2Open ↗
09/04/2026M00284614-P1Open ↗
Showing 3 of 10 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM5
11/14/2019123799121Open ↗
07/29/2019123707596Open ↗
Showing 2 of 5 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
12/14/2021141006569Open ↗
▸Environmental & Asbestos104
▸DOB NOWDEP ACP-5: Asbestos Assessment Report48
09/05/2026M00290544-I1Open ↗
09/04/2026M00284614-P1Open ↗
09/04/2026M00284614-I1Open ↗
Showing 3 of 48 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)34
12/14/2021141006569Open ↗
07/23/2020140928236Open ↗
07/22/2020140920957Open ↗
Showing 3 of 34 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
07/23/2019123810983Open ↗
Showing 1 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance102
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS49
12/26/2019123726370Open ↗
11/22/2019123379496Open ↗
07/19/2019123707596Open ↗
Showing 3 of 49 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS25
05/03/2021123379496Open ↗
12/11/2020123726370Open ↗
12/07/2020123253291Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
12/24/2021141006569Open ↗
12/14/2021141006569Open ↗
05/03/2021123379496Open ↗
Showing 3 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWEN2: As Built Energy Analysis4
09/03/2026M00633181-I1Open ↗
09/03/2026M00612516-I1Open ↗
Showing 2 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/10/2025123799121Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
04/15/2025123799121Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/14/2021141006569Open ↗
▸BISNYCECC EXEMPTION1
07/23/2020140928236Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
09/03/2026M00633181-I1Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY18
07/28/2023121629210Open ↗
05/20/2022122054463Open ↗
05/20/2022122054463Open ↗
Showing 3 of 18 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
04/15/2025123799121Open ↗
▸BISMASONRY1
04/15/2025123799121Open ↗
▸Approvals, Objections & Sign-offs117
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST49
04/17/2025123799121Open ↗
08/15/2023121629210Open ↗
06/06/2022122054463Open ↗
Showing 3 of 49 on file for this type
▸BISADMINISTRATIVE OBJECTIONS23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION18
08/04/2022123707596Open ↗
08/04/2022123707596Open ↗
Showing 2 of 18 on file for this type
▸BISLANDMARKS APPROVAL17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISCCD1-Construction Code Determination3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSUPERSEDING LETTER2
06/12/2023123799121Open ↗
Showing 1 of 2 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership109
▸BISCOST AFFIDAVIT101
08/15/2023121629210Open ↗
07/28/2023121629210Open ↗
05/20/2022122054463Open ↗
Showing 3 of 101 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT8
12/23/2019123379496Open ↗
Showing 1 of 8 on file for this type
▸Filing & Intake Forms108
▸BISEFILING COVER SHEET51
12/26/2019123726370Open ↗
11/22/2019123379496Open ↗
10/31/2019123801216Open ↗
Showing 3 of 51 on file for this type
▸BISADDITIONAL INFORMATION41
05/15/2024123801216Open ↗
05/03/2024123801216Open ↗
08/07/2023121629210Open ↗
Showing 3 of 41 on file for this type
▸BISBOROUGH INTAKE FORM12
06/12/2023123799121Open ↗
06/09/2023123799121Open ↗
08/04/2022123707596Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
12/14/2021141006569Open ↗
07/23/2020140928236Open ↗
07/22/2020140920957Open ↗
Showing 3 of 4 on file for this type
▸Other Documents15
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION9
06/06/2022122054463Open ↗
06/06/2022122054463Open ↗
11/14/2019123799121Open ↗
Showing 3 of 9 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type