Elevator cooperative
26 EAST 93RD STREET
MANHATTAN · BIN 1078500
💬 Discuss this project
1925Year Built
10Stories
D4Building Class
R10Zoning
49,520 sfGross Floor Area
50Units
Rent Stabilized1 Active Violation ▸FISP: SWARMP
Elevator cooperative · Owner of record: 24 26 E 93 Apt · 6,267 sf lot · 7.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsRudd Realty Mgmt CORP.1 filing
RoofRudd Realty Mgmt CORP.1p · 3 filings · 20 docs
Floor 9Unit 8B, Unit 9A, Unit 9B +110p · 9 filings · 20 docs
Floor 8Unit 8A, Unit 8B, Unit 8AB6p · 7 filings · 20 docs
Floor 7
Floor 6
Floor 5
Floor 4Unit 4C, Unit 4D2 filings · 15 docs
Floor 3Unit 3CD2p · 3 filings · 19 docs
Floor 2Unit 2A, Unit 2CD2 filings · 20 docs
Floor 1Commercial kitchen equipment and fire suppression valve inst4 filings · 10 docs
CellarRudd Realty Mgmt CORP.3 filings · 20 docs
BasementExterior exhaust duct replacement at restaurant2p · 1 filing · 16 docs
Site & exteriorRudd Realty Mgmt CORP.4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
24 26 E 93 Apt8003/21/2026
John J Grogan & Associate103/21/2026
Valleville Ltd Dba Burio Du Noro103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Errol McIntosh, R.A209/21/2026
KDV Designs Architects106/06/2025
Ashraf104/03/2025
Jarek Tresko Architect310/25/2024
NA210/06/2024
Mohammad Ahead, PE205/09/2024
KMB Design Group204/25/2024
Rosenthal104/25/2024
Joseph K. Blum Co103/11/2024
Richard Truemner Architect503/28/2023
Teresasequeira Architect402/28/2023
Anz Consulting Engineering202/03/2023
Pop Architecture102/01/2023
Anthony Cucich Architect108/26/2022
Moore205/09/2022
Swa Architecture202/05/2021
Winton Group Architecture205/01/2020
Jack Green Associates101/27/2020
AK Engineering112/02/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Boutiqkey603/21/2026
Dezignplus403/21/2026
Build Team403/21/2026
Construction Permit Services203/21/2026
Anthony Cucich Architect103/21/2026
Clarke Construction Consultants703/21/2026
Swa Architecture603/21/2026
Synergy Building Consultants203/21/2026
TBC & Associates203/21/2026
Mary Mays103/21/2026
Municipal Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Diker A & V ContractingGeneral Contractor807/08/2026
WTC Plumbing & HeatingPlumbing707/08/2026
Leone Construction Manag*General Contractor707/08/2026
AM Building Restoration*General Contractor504/09/2026
BuildopsGeneral Contractor407/08/2026
Marciano DiazElectrical303/21/2026
Dynamix Scaffold GroupScaffold304/09/2026
Five Star P and H CoPlumbing307/08/2026
Recine & Sons P&HPlumbing207/08/2026
HP ServicesPlumbing203/22/2026
Agl DevelopmentGeneral Contractor107/08/2026
Hydrokinetic Plumbing & Heating IPlumbing107/08/2026
Nice PlumbingPlumbing107/08/2026
Aprea AirGeneral Contractor107/08/2026
M.B.S. ElectricElectrical103/21/2026
Daven ElectricElectrical103/22/2026
Master Fire MechanicalGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
City Safety Compliance Co8919209/21/2026
NS Engineering & Consulting3652106/06/2025
Edra Engineering & Inspec2820110/25/2024
KZ Engineering4665310/25/2024
Jarek Tresko Architect1086204/25/2024
KMB Design Group513204/25/2024
BHK Engineering9589103/11/2024
Skyline Engineering267203/28/2023
Butterfield & O'Connor4189303/28/2023
AA Building & Inspection1519202/03/2023
Anthony J Farina5788302/03/2023
Met Inspections7385202/03/2023
Moore Associates3408205/09/2022
Jack Green Associates422101/27/2020
AK Engineering678112/02/2019
Ryan Special Engineering2018110/03/2019
Building Lifecycle
All (275)Filed (38)Permit Issued (38)Signed Off (18)Facade (FISP) (16)Violation (60)Inspection (7)Objection (68)Special Inspection (30)
09/24/2026
Signed off — Alteration
HEREWITH FILING FOR THE INSTALLATION OF HVAC UNITS @ SECOND FLOOR APARTMENT 2CD.
M01233590-I1
09/21/2026
Filed — Alteration
HEREWITH FILING FOR THE INSTALLATION OF HVAC UNITS @ SECOND FLOOR APARTMENT 2CD.
M01233590-P1
09/21/2026
Special inspection requirement — Mechanical Systems
EUGENIA MASUCCI
09/21/2026
Special inspection requirement — Final
EUGENIA MASUCCI
09/18/2026
Special inspection requirement — Final
EUGENIA MASUCCI
09/18/2026
Special inspection requirement — Mechanical Systems
EUGENIA MASUCCI
08/12/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/29/2026
Violation issued (HPD, closed)
A
03/02/2026
Permit issued — Mechanical Systems
M01233590-I1-MS
02/26/2026
Signed off — Alteration
Install of pipe scaffold as per plans in compliance with chapter 33 of NYCBC. No change in use, egress, or occupancy under this application
M00995605-I1
02/26/2026
Signed off — Alteration
Install of pipe scaffold as per plans in compliance with chapter 33 of NYCBC. No change in use, egress, or occupancy under this application
M00995605-S1
02/18/2026
Cycle 10 facade report signed — SAFE
01/14/2026
Cycle 10 facade report submitted
01/05/2026
Cycle 10 facade inspection completed
11/24/2025
Signed off — Alteration
REPLACING OLD/EXISTING EXTERIOR EXHAUST DUCT WITH NEW AT EXISTING RESTAURANT. WORK AT BUILDING EXTERIOR ONLY. NO OTHER WORK PROPOSED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00266191-S1
11/17/2025
Violation issued (HPD, closed)
I
11/03/2025
Signed off — Alteration
M00963129-I1
08/06/2025
Filed — Alteration
HEREWITH FILING FOR THE INSTALLATION OF HVAC UNITS @ SECOND FLOOR APARTMENT 2CD.
M01233590-I1
08/06/2025
Signed off — Alteration
M01008969-I1
07/17/2025
Signed off — Alteration
in conjunction with Renovation of existing duplex apartment on the 8 and 9th floor. apartment 8/9AB . plumbing work only.
M01002809-I1
07/15/2025
Signed off — Alteration
Interior renovation of existing duplex apartment on the 8th and 9th floor. apartment 8/9AB . Architectural/ Construction work only.
M01002797-I1
06/13/2025
Permit issued — Mechanical Systems
M00266191-S1-MS
06/06/2025
Filed — Alteration
REPLACING OLD/EXISTING EXTERIOR EXHAUST DUCT WITH NEW AT EXISTING RESTAURANT. WORK AT BUILDING EXTERIOR ONLY. NO OTHER WORK PROPOSED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00266191-S1
04/29/2025
Permit issued — General Construction
M00963129-I1-GC
04/29/2025
Permit issued — Suspended Scaffold
M00982335-I1-SC
04/04/2025
Permit issued — Supported Scaffold
M00995605-S1-SF
04/03/2025
Filed — Alteration
Install of pipe scaffold as per plans in compliance with chapter 33 of NYCBC. No change in use, egress, or occupancy under this application
M00995605-S1
04/01/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/31/2025
Permit issued — General Construction
M00963129-I1-GC
03/31/2025
Permit issued — Suspended Scaffold
M00982335-I1-SC
03/18/2025
Signed off — Alteration
M01129334-I1
02/10/2025
Special inspection requirement — Mechanical Systems
NARI MOTWANI
02/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
NARI MOTWANI
02/10/2025
Special inspection requirement — Final
DAVIDSON CHRISTMAS
02/06/2025
Permit issued — Sidewalk Shed
M00995605-I1-SH
12/20/2024
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH BIS APPLICATION . NO CHANGE IN USE OCCUPANCY OR EGRESS
M00199375-I1
12/11/2024
Permit issued — Structural
M01129334-I1-ST
12/10/2024
Permit issued — General Construction
M01002797-I1-GC
12/03/2024
Objection resolved — Addressed
11/25/2024
Objection resolved — Addressed
11/25/2024
Objection resolved — Addressed
11/25/2024
Objection resolved — Addressed
11/25/2024
Objection resolved — Addressed
11/25/2024
Objection resolved — Addressed
11/25/2024
Objection resolved — Addressed
11/25/2024
Objection resolved — Addressed
11/22/2024
Permit issued — Mechanical Systems
M01008969-I1-MS
11/07/2024
Objection raised — Other
10/28/2024
Objection resolved — Addressed
10/28/2024
Objection resolved — Addressed
10/25/2024
Filed — Alteration
M01129334-I1
10/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Withdrawn
10/08/2024
Objection raised — Other
10/08/2024
Objection raised — Other
10/08/2024
Objection raised — Other
10/08/2024
Objection raised — Other
10/07/2024
Objection raised — Other
10/07/2024
Objection raised — Other
10/07/2024
Objection raised — Other
10/07/2024
Objection raised — Other
Latest 60 of 275 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offDiker A & V Contracting03/02/2026
DOB NOWMechanical SystemsSigned-offMaster Fire Mechanical06/13/2025
DOB NOWGeneral ConstructionSigned-offAM Building Restoration*04/29/2025
DOB NOWSuspended ScaffoldPermit IssuedAM Building Restoration I04/29/2025
DOB NOWSupported ScaffoldSigned-offDynamix Scaffold Group04/04/2025
DOB NOWGeneral ConstructionSigned-offAM Building Restoration*03/31/2025
DOB NOWSuspended ScaffoldPermit IssuedAM Building Restoration I03/31/2025
DOB NOWSidewalk ShedSigned-offDynamix Scaffold Group02/06/2025
DOB NOWStructuralSigned-offLeone Construction Manag*12/11/2024
DOB NOWGeneral ConstructionSigned-offLeone Construction Manag*12/10/2024
DOB NOWMechanical SystemsSigned-offLeone Construction Manag*11/22/2024
DOB NOWSuspended ScaffoldPermit IssuedAM Building Restoration I07/30/2024
DOB NOWMechanical SystemsSigned-offLeone Construction Manag*06/05/2024
DOB NOWPlumbingSigned-offHydrokinetic Plumbing & Heating I05/28/2024
DOB NOWGeneral ConstructionSigned-offLeone Construction Manag*05/28/2024
DOB NOWSuspended ScaffoldPermit IssuedAM Building Restoration I04/04/2024
DOB NOWGeneral ConstructionSigned-offAM Building Restoration*04/02/2024
DOB NOWSidewalk ShedSigned-offDynamix Scaffold Group02/05/2024
DOB NOWSuspended ScaffoldPermit IssuedAM Building Restoration I01/11/2024
DOB NOWAntennaPermit IssuedAgl Development10/13/2023
DOB NOWGeneral ConstructionSigned-offBuildops04/17/2023
DOB NOWMechanical SystemsSigned-offBuildops04/12/2023
DOB NOWPlumbingSigned-offNice Plumbing04/12/2023
DOB NOWPlumbingSigned-offFive Star P and H Co03/21/2023
DOB NOWGeneral ConstructionSigned-offDiker A & V Contracting03/10/2023
DOB NOWStructuralSigned-offDiker A & V Contracting05/11/2022
DOB NOWGeneral ConstructionSigned-offDiker A & V Contracting04/06/2022
DOB NOWGeneral ConstructionSigned-offDiker A & V Contracting04/05/2022
DOB NOWPlumbingPermit IssuedWTC Plumbing & Heating09/15/2021
DOB NOWPlumbingPermit IssuedWTC Plumbing & Heating09/15/2021
DOB NOWPlumbingPermit IssuedWTC Plumbing & Heating09/08/2021
DOB NOWPlumbingSigned-offRecine & Sons P&H07/17/2020
DOB NOWPlumbingPermit IssuedWTC Plumbing & Heating07/14/2020
DOB NOWPlumbingPermit IssuedWTC Plumbing & Heating03/25/2020
DOB NOWMechanical SystemsSigned-offAprea Air03/03/2020
DOB NOWPlumbingSigned-offWTC Plumbing & Heating12/05/2019
DOB NOWPlumbingPermit IssuedWTC Plumbing & Heating12/05/2019
DOB NOWPlumbingSigned-offRecine & Sons P&H11/18/2019
BISOTISSUEDL.e.c.inc02/26/2021
BISOTISSUEDSupersonic Group01/20/2021
+ 48 more permits on file
1 project · most recent 06/06/2025
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/06/2025Signed-offMaster Fire MechanicalVentilation Systems
Ventilation
Rapid MODEL # BC12 2,800 CFM · Ductwork ×1
4 projects · most recent 10/06/2024
Water/Sanitary Gas
FiledStatusContractorScope
10/06/2024——Water/Sanitary
02/05/2021Permit IssuedWTC Plumbing & HeatingGas
05/01/2020——Water/Sanitary
05/01/2020——Gas, Water/Sanitary
16 projects · most recent 09/23/2025
General Wiring
FiledStatusContractorScope
09/23/2025CompletePrecision Electrical ContGeneral Wiring
12/31/2024CompleteAll Ways Electric Corp.w—
03/22/2024CompleteDaven ElectricGeneral Wiring
02/13/2024CompleteHigh Quality Electric of—
10/16/2023CompleteTristrux24 meters, 1 new_meters
09/28/2023CompleteCMY ElectricalGeneral Wiring
03/31/2023CompleteA & R Electrical ContractingGeneral Wiring
10/29/2020CompleteLeone Electric CoGeneral Wiring
02/10/2020Permit IssuedLeader Electric CoGeneral Wiring
10/14/2019Permit IssuedElpo Electrical ContgGeneral Wiring
10/07/2019CompleteKobryn Electrical ServicesGeneral Wiring
09/11/2019Permit IssuedElpo Electrical ContgGeneral Wiring
08/26/2019Permit IssuedLCJ Electrical ContractorsGeneral Wiring
03/07/2019CompleteT. McCaffrey-T. McGovernGeneral Wiring
11/05/2018CompleteLeader Electric CoGeneral Wiring
1 project · most recent 07/22/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
07/22/2024Permit IssuedAM Building Restoration ISuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/27/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/06/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/22/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 60
DateRequirementInspectorRole
09/21/2026Mechanical SystemsEUGENIA MASUCCIspecial
09/21/2026FinalEUGENIA MASUCCIprogress
09/18/2026FinalEUGENIA MASUCCIprogress
09/18/2026Mechanical SystemsEUGENIA MASUCCIspecial
02/10/2025Mechanical SystemsNARI MOTWANIspecial
02/10/2025Tenant Protection Plan ComplianceNARI MOTWANIspecial
02/10/2025FinalDAVIDSON CHRISTMASprogress
10/09/2024Fire-Resistant Penetrations and JointsWithdrawnspecial
10/06/2024Tenant Protection Plan ComplianceWithdrawnspecial
08/19/2024Fire-Resistant Penetrations and JointsWithdrawnspecial
07/30/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
07/30/2024Post-installed AnchorsKarol Zdancewiczspecial
07/22/2024Post-installed AnchorsKarol Zdancewiczspecial
07/22/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
02/21/2024FinalJarek Treskoprogress
02/21/2024Post-installed AnchorsJarek Treskospecial
02/21/2024Fire-Resistant Penetrations and JointsJarek Treskospecial
02/21/2024Interior lighting powerJarek Treskoenergy_progress
02/21/2024Lighting in dwelling unitsJarek Treskoenergy_progress
04/04/2023Energy Code Compliance InspectionsRICHARD TRUEMNERprogress
04/04/2023Fire-Resistant Penetrations and JointsBRIAN T. O'CONNORspecial
04/04/2023Mastic and Intumescent Fire-resistant CoatingsMatthew Wavrospecial
04/04/2023FinalRICHARD TRUEMNERprogress
04/04/2023Fire-Resistance Rated ConstructionRICHARD TRUEMNERprogress
03/27/2023Mastic and Intumescent Fire-resistant CoatingsMatthew Wavrospecial
Latest 25 of 60.
▾Documents — 708 on file (BIS + DOB NOW)
▸Plans & Drawings37
▸DOB NOWPlans/Sketch27
09/05/2026M00266191-S1Request digital key ↗
09/02/2026M00613294-I1Request digital key ↗
09/02/2026M00720042-P1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00199375-I1Request digital key ↗
09/05/2026M00284096-I1Request digital key ↗
09/04/2026M00355537-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing Legalization3
09/05/2026M00266191-I1Request digital key ↗
09/05/2026M00239284-I1Request digital key ↗
09/05/2026M00275755-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00199966-I1Request digital key ↗
▸Applications & Permits135
▸BISWORK PERMIT APPLICATION59
02/26/2021123727529Open ↗
01/21/2021123700165Open ↗
09/11/2020123841968Open ↗
Showing 3 of 59 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION42
02/02/2026123727529Open ↗
02/16/2023123815540Open ↗
05/26/2020123700165Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWLPC Approval/Permit32
10/04/2026M01233590-P1Open ↗
09/05/2026M00199375-I1Open ↗
09/05/2026M00199375-P1Open ↗
Showing 3 of 32 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications165
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION53
03/17/2020123841968Open ↗
03/16/2020123701930Open ↗
03/10/2020140698966Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature37
10/04/2026M01233590-P1Open ↗
10/04/2026M01233590-I1Open ↗
09/05/2026M00199375-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWProgress Inspector Seal & Signature33
10/04/2026M01233590-P1Open ↗
10/04/2026M01233590-I1Open ↗
09/02/2026M00199966-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature26
10/04/2026M01233590-I1Open ↗
10/04/2026M01233590-P1Open ↗
09/02/2026M00199966-I1Open ↗
Showing 3 of 26 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
01/30/2020123742138Open ↗
Showing 1 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/04/2017140698966Open ↗
▸Trade Schedules & Equipment37
▸BISSCHEDULE B - PLUMBING16
10/19/2018140698966Open ↗
07/10/2018140698966Open ↗
11/21/2017140698966Open ↗
Showing 3 of 16 on file for this type
▸BISSELF-CERT PLUMBING NOTICE16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
06/05/2019123142152Open ↗
05/10/2018140698966Open ↗
09/13/2017123142152Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection19
▸BISTenant Protection Plan and Notes8
06/04/2020123701930Open ↗
03/17/2020123841968Open ↗
01/30/2020123700165Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan8
09/05/2026M00199375-P1Open ↗
09/05/2026M00199375-I1Open ↗
08/13/2026M00284096-I1Open ↗
Showing 3 of 8 on file for this type
▸BISSTREET TREE CHECKLIST3
05/26/2020123700165Open ↗
01/30/2020123742138Open ↗
Showing 2 of 3 on file for this type
▸Environmental & Asbestos45
▸DOB NOWDEP ACP-5: Asbestos Assessment Report29
10/04/2026M01233590-P1Open ↗
09/05/2026M00199375-P1Open ↗
09/05/2026M00199375-I1Open ↗
Showing 3 of 29 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
05/26/2020123700165Open ↗
03/17/2020123841968Open ↗
03/16/2020123701930Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
03/16/2020123701930Open ↗
▸Energy Compliance62
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS25
03/17/2020123841968Open ↗
03/16/2020123701930Open ↗
03/10/2020140698966Open ↗
Showing 3 of 25 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS13
06/30/2022123815540Open ↗
12/18/2020123701930Open ↗
12/18/2020123841968Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
03/16/2023123815540Open ↗
03/16/2023123815540Open ↗
06/30/2022123815540Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M01008969-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY9
03/16/2023123815540Open ↗
03/16/2023123815540Open ↗
06/30/2022123815540Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs78
▸BISLANDMARKS APPROVAL28
07/17/2020123700165Open ↗
06/04/2020123701930Open ↗
03/23/2020123841968Open ↗
Showing 3 of 28 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST27
03/29/2023123815540Open ↗
02/10/2021123700165Open ↗
12/18/2020123701930Open ↗
Showing 3 of 27 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
02/15/2017120672995Open ↗
01/10/2017122647617Open ↗
01/10/2017122647617Open ↗
Showing 3 of 4 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUPERSEDING LETTER1
02/26/2021123727529Open ↗
▸BISLANDMARKS SIGNOFF1
02/17/2023123815540Open ↗
▸Cost, Insurance & Ownership51
▸BISCOST AFFIDAVIT51
03/16/2023123815540Open ↗
06/30/2022123815540Open ↗
02/10/2021123700165Open ↗
Showing 3 of 51 on file for this type
▸Filing & Intake Forms51
▸BISEFILING COVER SHEET26
03/17/2020123841968Open ↗
03/16/2020123701930Open ↗
01/30/2020123700165Open ↗
Showing 3 of 26 on file for this type
▸BISADDITIONAL INFORMATION17
06/04/2020123701930Open ↗
05/26/2020123700165Open ↗
01/30/2020123700165Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM5
02/26/2021123727529Open ↗
03/10/2020140698966Open ↗
12/17/2019140698966Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
10/04/2017140698966Open ↗
Showing 1 of 3 on file for this type
▸Other Documents19
▸DOB NOWProof of Historic Building6
10/04/2026M01233590-P1Open ↗
08/13/2026M00963129-I1Open ↗
08/13/2026M08014755-I1Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
07/30/2018140698966Open ↗
07/30/2018140698966Open ↗
07/23/2018140698966Open ↗
Showing 3 of 4 on file for this type
▸BISPlot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
08/13/2026M00982335-P1Open ↗
08/13/2026M00982335-I1Open ↗
▸DOB NOWWaiver Document2
10/04/2026M01233590-P1Open ↗
10/04/2026M01233590-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M00982335-I1Open ↗
08/13/2026M00982335-P1Open ↗
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type