4 projects with open permitsMANHATTAN · 21BROOKLYN · 2STATEN ISLAND · 2
15 buildings
38
Total Filings
25
Projects on File
15
Buildings Worked
4
Projects w/ Open Permits
Special Inspection Agency
Primary Trade
Activity
Projects by first filing month25 projects all-time
0235Sep '19 · 1Dec '19 · 2Apr '20 · 1Aug '20 · 1Apr '21 · 1Apr '22 · 2Sep '22 · 4Oct '22 · 1Dec '22 · 1Feb '23 · 3Aug '24 · 1Oct '24 · 2Feb '25 · 1May '25 · 1Nov '25 · 1Mar '26 · 1May '26 · 12020202120222023202420252026
bars = month · line = 3-mo average
Portfolio status
Browse projects →
Open permit416%
Signed off2080%
Filed only14%
By project type
Alteration25
Most active buildings
All buildings →
290 WEST END AVENUEMANHATTAN · 1 open · latest 04/23/2026
8 projects
24 EAST 93 STREETMANHATTAN · latest 04/17/2023
3 projects
157 EAST 72 STREETMANHATTAN · 1 open · latest 08/13/2026
2 projects
1 5 AVENUEMANHATTAN · latest 10/06/2022
1 projects
33 5 AVENUEMANHATTAN · latest 09/29/2022
1 projects
815 GREENWICH STREETMANHATTAN · 1 open · latest 07/13/2022
1 projects
Key relationships
Everyone →
Filing representatives
Contractors
Most recent projects
All projects →
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B01217919 ↗1653 79 STREET
BROOKLYN
AlterationPermit Issued05/02/202508/18/2026
Contractor SMBT LLC
TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW JOB # B01217919-I1
M01404507 ↗157 EAST 72 STREET
MANHATTAN
AlterationPermit Issued05/28/202608/13/2026PLUMBING WORK IN APT 6ABC
M01114011 ↗336 WEST END AVENUE
MANHATTAN
AlterationSigned-off10/30/202405/27/2026PLUMBING IN CONJUNCTION WITH THE RENOVATION OF APARTMENT 17AF ON THE 17TH FLOOR. AS PER PLANS FILED. NO CHANGE OF USE, EGRESS, AND OCCUPANCY…
M01316520 ↗290 WEST END AVENUE
MANHATTAN
AlterationPermit Issued03/10/202604/23/2026
Contractor RENOVYT, INC
INTERIOR PLUMBING FOR KITCHEN AND BATHROOMS WITH THE RENOVATION OF APARTMENT 3D ON THE 3RD FLOOR. PAA P2 TO AMEND PLUMBING SCHEDULE TO REFLE…
M01311671 ↗290 WEST END AVENUE
MANHATTAN
AlterationSigned-off11/16/202501/23/2026PLUMBING WITH THE RENOVATION OF APARTMENT 16B ON THE 16TH FLOOR. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
M01170719 ↗290 WEST END AVENUE
MANHATTAN
AlterationSigned-off02/24/202503/26/2025PLUMBING WITH THE RENOVATION OF APARTMENT 4A ON THE 4TH FLOOR AS PER PLANS FILED HEREWITH. PAA FILED TO AMEND SCHEDULE B. NO CHANGE OF USE, …
Counts cover all 25 projects (25 DOB NOW). Dated by first filing; BIS projects by first permit issuance.
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
POP ARCHITECTURE DPC1008/10/2026
ANZ CONSULTING ENGINEERING, PLLC704/30/2025
GUY V. MANGOGNA ARCHITECT204/27/2020
RISE PROJECTS205/28/2026
ARCHETYPE ARCHITECTURE109/01/2021
BERNARD OCASIO ARCHITECT, P.C.109/07/2022
GARFINKEL ARCHITECT, PLLC105/02/2025
LEVEL-UP ENGINEERING, PLLC104/07/2023
VASILIOS ARTEMIOU PE108/06/2020
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
BUILDOPS INC511/16/2025
NICE PLUMBING CORP311/16/2025
RD HOME CONSTRUCTION INC305/28/2026
A. TOBIN INTERIORS INC208/03/2023
ASPECT PLBNG&HTNG CO LLC209/07/2022
PEGASUS P&H CORP208/10/2026
RENOVYT, INC208/10/2026
S.M. GODWIN INC209/01/2021
ATLANTIDA HVAC CORP104/30/2025
COBALT MECHANICAL INC109/18/2023
CORE CONSTRUCTION OF NY 1108/29/2024
FEDERICO PLUMBING LLC104/27/2020
GALICJA PLBG AND HTG.CORP108/30/2021
LOYAL GENERAL CONTRACTING109/29/2022
NAMRON, INC110/30/2024
NEW YORK STANDARD MECH CO109/06/2019
P.S.I. MECHANICAL109/11/2023
PACIFIC ENERGY CORP108/06/2020
PETER MICELI PLUMBING105/28/2026
SMBT LLC105/02/2025
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
AKAM ASSOCIATES, INC.108/29/2024
ALLIED PARTNERS109/07/2022
STATEN ISLAND GRINDING SERVICE104/27/2020
Who this entity's projects were filed with. Top 25 per group by shared jobs.
NameProjects togetherMost recent
BOUTIQKEY LLC1008/10/2026
ADAM MAISER209/29/2022
METROPOLIS GROUP INC109/07/2022
NEXUS CONSULTING NYC, INC109/01/2021
STECC CORP105/28/2026
25 DOB NOW projects, anchored the same way as Buildings Worked. Status is the project's permit state today: open = at least one permit currently issued. BIS projects show their raw permit status and are not counted as open.
All 25Open permit 4Signed off 20Filed only 1
25 projects
ProjectAddressTypeStatusFiledLatest permitOn the projectDescription
B01217919 ↗1653 79 STREET
BROOKLYN
AlterationPermit Issued05/02/202508/18/2026
Contractor SMBT LLC
TEMPORARY CONSTRUCTION FENCE IN CONJUNCTION WITH DOB NOW JOB # B01217919-I1
M01404507 ↗157 EAST 72 STREET
MANHATTAN
AlterationPermit Issued05/28/202608/13/2026PLUMBING WORK IN APT 6ABC
M01114011 ↗336 WEST END AVENUE
MANHATTAN
AlterationSigned-off10/30/202405/27/2026PLUMBING IN CONJUNCTION WITH THE RENOVATION OF APARTMENT 17AF ON THE 17TH FLOOR. AS PER PLANS FILED. NO CHANGE OF USE, EGRESS, AND OCCUPANCY…
M01316520 ↗290 WEST END AVENUE
MANHATTAN
AlterationPermit Issued03/10/202604/23/2026
Contractor RENOVYT, INC
INTERIOR PLUMBING FOR KITCHEN AND BATHROOMS WITH THE RENOVATION OF APARTMENT 3D ON THE 3RD FLOOR. PAA P2 TO AMEND PLUMBING SCHEDULE TO REFLE…
M01311671 ↗290 WEST END AVENUE
MANHATTAN
AlterationSigned-off11/16/202501/23/2026PLUMBING WITH THE RENOVATION OF APARTMENT 16B ON THE 16TH FLOOR. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
M01170719 ↗290 WEST END AVENUE
MANHATTAN
AlterationSigned-off02/24/202503/26/2025PLUMBING WITH THE RENOVATION OF APARTMENT 4A ON THE 4TH FLOOR AS PER PLANS FILED HEREWITH. PAA FILED TO AMEND SCHEDULE B. NO CHANGE OF USE, …
M01056233 ↗702 WASHINGTON STREET
MANHATTAN
AlterationSigned-off08/20/202411/21/2024STRUCTURAL IN CONJUNCTION WITH RENOVATION AT THE REAR OF APARTMENT GA IN THE BASEMENT AND PATIO. AS PER PLANS FILED HEREWITH. NO CHANGE OF U…
M01131312 ↗929 PARK AVENUE
MANHATTAN
AlterationSigned-off10/24/202411/06/2024renovation of apt.12C
M00790607 ↗120 EAST 87 STREET
MANHATTAN
AlterationSigned-off09/29/202201/29/2024Renovation of existing apartment 18C on floor 018. Architectural work. There is to be no change of use, occupancy, and egress.
M08014755 ↗24 EAST 93 STREET
MANHATTAN
AlterationSigned-off02/01/202304/17/2023
Contractor BUILDOPS INC
RENOVATION GENERAL CONSTRUCTION OF APARTMENT #3CD ON THE 3RD FLOOR. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
M08006133 ↗24 EAST 93 STREET
MANHATTAN
AlterationSigned-off02/03/202304/12/2023PLUMBING RENOVATION OF APARTMENT #3CD ON THE 3RD FLOOR. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
M08006147 ↗24 EAST 93 STREET
MANHATTAN
AlterationSigned-off02/03/202304/12/2023
Contractor BUILDOPS INC
MECHANICAL RENOVATION AND INSTALLATION OF NEW EQUIPMENT FOR APARTMENT #3CD ON THE 3RD FLOOR. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, …
M07996764 ↗157 EAST 72 STREET
MANHATTAN
AlterationSigned-off10/04/202203/24/2023RENOVATION AND COMBINATION OF APARTMENTS 6A AND 6B ON THE 6TH FLOOR. GENERAL CONSTRUCTION AS PER PLANS FILED. NO CHANGE OF USE, EGRESS, OR O…
M00785207 ↗290 WEST END AVENUE
MANHATTAN
AlterationSigned-off12/15/202201/27/2023MECHANICAL RENOVATION OF APARTMENT 10B ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
M00785192 ↗290 WEST END AVENUE
MANHATTAN
AlterationSigned-off09/29/202211/16/2022INTERIOR GENERAL CONSTRUCTION ARCHITECTURAL RENOVATION OF APARTMENT 10B ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH. PAA FILED TO AMEND PL…
M00785198 ↗290 WEST END AVENUE
MANHATTAN
AlterationSigned-off09/29/202211/02/2022PLUMBING IN CONJUNCTION WITH THE RENOVATION OF APARTMENT 10B ON THE 10TH FLOOR AS PER PLANS FILED HEREWITH. RELOCATE EXISTING ELECTRIC RANGE…
M00787495 ↗1 5 AVENUE
MANHATTAN
AlterationSigned-off09/07/202210/06/2022REPLACE AND RELOCATE PLUMBING FIXTURES WITHIN EXISTING ROUGHING AS PER PLANS FILED.
M00458190 ↗33 5 AVENUE
MANHATTAN
AlterationSigned-off04/26/202109/29/2022
Contractor S.M. GODWIN INC
Herewith filing new alt2 application for plumbing work to be performed in existing units 14C and 14D on the 14th floor. All in accordance w…
M00581677 ↗815 GREENWICH STREET
MANHATTAN
AlterationPermit Issued04/22/202207/13/2022
Contractor BUILDOPS INC
INTERIOR RENOVATION OF THE APARTMENT 1B AND 2C ON THE SECOND FLOOR OF AN EXISTING RESIDENTIAL BUILDING. NO CHANGE IN USE, OCCUPANCY, OR EGRE…
M00699445 ↗322 CENTRAL PARK WEST
MANHATTAN
AlterationFiled — no permit on record04/04/2022——
S00341930 ↗507 MIDLAND AVENUE
STATEN ISLAND
AlterationSigned-off04/27/202010/25/2021REPLACE EXISTING GAS FIRED EQUIPMENT- INDIRECT HOT WATTER HEATER, GAS FIRED FURNACE, RANGE, FILED IN CONJUCTION WITH APPLICATION #S00269340…
S00191144 ↗190 HALES AVENUE
STATEN ISLAND
AlterationSigned-off09/06/201905/14/2021LEGALIZE GAS FIREPLACE ON FIRST FLOOR- THIS APPLICATION IS FILED IN CONJUNCTION WITH APPLIC#500684100, ALT-1, IS NEEDED FOR FINAL SIGN-OFF
B00371860 ↗192 MIDWOOD STREET
BROOKLYN
AlterationSigned-off08/06/202003/31/2021INSTALL ONE NEW 5-TON CARRIER CONDENSER ON ROOF. NO CHANGE IN ANY DUCT WORK OR EQUIPMENT IN THE BUILDING INTERIOR. ALL DUCT WORK AND EQUIPME…
M00245949 ↗290 WEST END AVENUE
MANHATTAN
AlterationSigned-off12/26/201907/30/2020
Contractor S.M. GODWIN INC
INTERIOR RENOVATION OF APT 6A ON THE 6TH FLOOR. MECHANICAL WORK. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00244654 ↗290 WEST END AVENUE
MANHATTAN
AlterationSigned-off12/26/201906/17/2020INTERIOR RENOVATION OF APT 6A ON THE 6TH FLOOR. PLUMBING WORK. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Click a row for this entity's own projects, plans and documents at that building.
BuildingFilingsMost Recent
290 WEST END AVENUE ↗1808/10/2026
157 EAST 72 STREET ↗305/28/2026
1653 79 STREET ↗105/02/2025
336 WEST END AVENUE ↗110/30/2024
929 PARK AVENUE ↗110/24/2024
702 WASHINGTON STREET ↗108/20/2024
322 CENTRAL PARK WEST ↗204/07/2023
24 EAST 93 STREET ↗302/03/2023
120 EAST 87 STREET ↗109/29/2022
1 5 AVENUE ↗109/07/2022
815 GREENWICH STREET ↗104/22/2022
33 5 AVENUE ↗209/01/2021
192 MIDWOOD STREET ↗108/06/2020
507 MIDLAND AVENUE ↗104/27/2020
190 HALES AVENUE ↗109/06/2019
▾Special Inspection Requirements — 80
DateRequirementBuildingInspectorRole
08/09/2026Fire-Resistant Penetrations and Joints290 WEST END AVENUEAnthony Farinaspecial
07/04/2026Fire-Resistant Penetrations and Joints290 WEST END AVENUEAnthony Farinaspecial
05/26/2026Post-installed Anchors157 EAST 72 STREETGEORGE GEBRAILspecial
05/19/2026Fire-Resistant Penetrations and Joints157 EAST 72 STREETAnthony Farinaspecial
05/19/2026Tenant Protection Plan Compliance157 EAST 72 STREETAnthony Farinaspecial
05/19/2026Final157 EAST 72 STREETkaren fromeprogress
03/02/2026Fire-Resistant Penetrations and Joints290 WEST END AVENUEAnthony Farinaspecial
11/11/2025Fire-Resistant Penetrations and Joints290 WEST END AVENUEAnthony Farinaspecial
05/09/2025Fire-Resistant Penetrations and Joints290 WEST END AVENUEAnthony Farinaspecial
05/09/2025Tenant Protection Plan Compliance290 WEST END AVENUEARIEL GOLSHANspecial
05/09/2025Post-installed Anchors290 WEST END AVENUEALBERT ZIRINOspecial
05/01/2025Tenant Protection Plan Compliance1653 79 STREETAnthony Farinaspecial
04/29/2025Fenestration areas1653 79 STREETStanislav Pilipenkoenergy_progress
04/29/2025Insulation placement and R values1653 79 STREETStanislav Pilipenkoenergy_progress
04/29/2025Permanent certificate1653 79 STREETStanislav Pilipenkoenergy_progress
04/29/2025Fenestration and door U-factor and product ratings1653 79 STREETStanislav Pilipenkoenergy_progress
04/29/2025Fenestration air leakage1653 79 STREETStanislav Pilipenkoenergy_progress
04/29/2025Structural Wood Frame1653 79 STREETStanislav Pilipenkoprogress
04/29/2025Fire-Resistance Rated Construction1653 79 STREETStanislav Pilipenkoprogress
04/29/2025Structural Stability – Alterations of existing buildings1653 79 STREETWILLIAM MONTAGUEspecial
04/29/2025Energy Code Compliance Inspections1653 79 STREETStanislav Pilipenkoprogress
04/29/2025Fire-Resistant Penetrations and Joints1653 79 STREETStanislav Pilipenkospecial
04/29/2025Structural Cold-Formed Steel1653 79 STREETWILLIAM MONTAGUEspecial
04/29/2025Final1653 79 STREETStanislav Pilipenkoprogress
04/29/2025Wood – Seismic Resistance1653 79 STREETStanislav Pilipenkospecial
03/05/2025Fire-Resistant Penetrations and Joints290 WEST END AVENUEAnthony Farinaspecial
03/05/2025Post-installed Anchors290 WEST END AVENUEALBERT ZIRINOspecial
01/28/2025Tenant Protection Plan Compliance290 WEST END AVENUEARIEL GOLSHANspecial
01/28/2025Fire-Resistant Penetrations and Joints290 WEST END AVENUEAnthony Farinaspecial
01/28/2025Fire-Resistance Rated Construction290 WEST END AVENUEOKAN ONCELprogress
01/22/2025Mechanical Systems290 WEST END AVENUEALBERT ZIRINOspecial
01/22/2025Final290 WEST END AVENUEALBERT ZIRINOprogress
01/22/2025Final290 WEST END AVENUEOKAN ONCELprogress
10/23/2024Fire-Resistant Penetrations and Joints336 WEST END AVENUEAnthony Farinaspecial
10/23/2024Fire-Resistance Rated Construction336 WEST END AVENUEOKAN ONCELprogress
09/19/2024Final336 WEST END AVENUEOKAN ONCELprogress
07/15/2024Energy Code Compliance Inspections702 WASHINGTON STREETOKAN ONCELprogress
07/15/2024Air barrier - visual inspection702 WASHINGTON STREETOKAN ONCELenergy_progress
07/15/2024Fenestration areas702 WASHINGTON STREETOKAN ONCELenergy_progress
07/15/2024Insulation placement and R values702 WASHINGTON STREETOKAN ONCELenergy_progress
07/15/2024Fenestration air leakage702 WASHINGTON STREETOKAN ONCELenergy_progress
07/10/2024Fire-Resistance Rated Construction702 WASHINGTON STREETOKAN ONCELprogress
07/10/2024Fire-Resistant Penetrations and Joints702 WASHINGTON STREETAnthony Farinaspecial
05/23/2024Final702 WASHINGTON STREETOKAN ONCELprogress
09/12/2023Fire-Resistant Penetrations and Joints290 WEST END AVENUEAnthony Farinaspecial
09/08/2023Fire-Resistant Penetrations and Joints290 WEST END AVENUEAnthony Farinaspecial
08/03/2023Fire-Resistant Penetrations and Joints290 WEST END AVENUEAnthony Farinaspecial
08/03/2023Final290 WEST END AVENUEOKAN ONCELprogress
08/02/2023Final290 WEST END AVENUEOKAN ONCELprogress
08/02/2023Fire-Resistant Penetrations and Joints290 WEST END AVENUEAnthony Farinaspecial
Latest 50 of 80.
▾Documents — 287 on file (BIS + DOB NOW)
▸Plans & Drawings49
▸DOB NOWPlans/Sketch41
09/03/2026M00458190-S1 · 33 5 AVENUERequest digital key ↗
09/03/2026M00458190-S2 · 33 5 AVENUERequest digital key ↗
09/03/2026M00458190-S3 · 33 5 AVENUERequest digital key ↗
Showing 3 of 41 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
▸DOB NOWPlans/Sketch - General Construction1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWPlans/Sketch - Plumbing Legalization1
08/26/2026S00191144-I1 · 190 HALES AVENUERequest digital key ↗
▸Applications & Permits42
▸DOB NOWLPC Approval/Permit41
09/05/2026M00244654-P1 · 290 WEST END AVENUEOpen ↗
09/05/2026M00244654-I1 · 290 WEST END AVENUEOpen ↗
09/01/2026M07996764-P1 · 157 EAST 72 STREETOpen ↗
Showing 3 of 41 on file for this type
▸DOB NOWState DEC Permit1
08/13/2026S00191144-I1 · 190 HALES AVENUEOpen ↗
▸Seals & Professional Certifications126
▸DOB NOWDPL-1: Design Professional Seal & Signature48
09/05/2026M00244654-P1 · 290 WEST END AVENUEOpen ↗
09/05/2026M00244654-I1 · 290 WEST END AVENUEOpen ↗
09/05/2026M00245949-I1 · 290 WEST END AVENUEOpen ↗
Showing 3 of 48 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature43
09/26/2026M00244654-P1 · 290 WEST END AVENUEOpen ↗
09/02/2026M00458190-S2 · 33 5 AVENUEOpen ↗
09/02/2026M01316520-P1 · 290 WEST END AVENUEOpen ↗
Showing 3 of 43 on file for this type
▸DOB NOWProgress Inspector Seal & Signature35
09/02/2026M00458190-S2 · 33 5 AVENUEOpen ↗
09/02/2026M00458190-S2 · 33 5 AVENUEOpen ↗
09/01/2026M01056233-I1 · 702 WASHINGTON STREETOpen ↗
Showing 3 of 35 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWTenant Protection Plan5
09/05/2026M00244654-P1 · 290 WEST END AVENUEOpen ↗
09/05/2026M00244654-I1 · 290 WEST END AVENUEOpen ↗
08/13/2026M00245949-I1 · 290 WEST END AVENUEOpen ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Checklist1
08/21/2026B01217919-I1 · 1653 79 STREETOpen ↗
▸Environmental & Asbestos46
▸DOB NOWDEP ACP-5: Asbestos Assessment Report43
09/05/2026M00244654-P1 · 290 WEST END AVENUEOpen ↗
09/05/2026M00244654-I1 · 290 WEST END AVENUEOpen ↗
09/05/2026M00245949-I1 · 290 WEST END AVENUEOpen ↗
Showing 3 of 43 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/26/2026M01056233-S2 · 702 WASHINGTON STREETOpen ↗
08/13/2026M00699445-I1 · 322 CENTRAL PARK WESTOpen ↗
Showing 2 of 3 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents16
▸DOB NOWProof of Historic Building16
08/31/2026M00699445-I1 · 322 CENTRAL PARK WESTOpen ↗
08/13/2026M00785198-I1 · 290 WEST END AVENUEOpen ↗
08/13/2026M00785198-P1 · 290 WEST END AVENUEOpen ↗
Showing 3 of 16 on file for this type