← Back
BuildNYC
Three families
260 CLINTON AVENUE
BROOKLYN · Clinton Hill · BIN 3055021
💬 Discuss this project
1878Year Built
4Stories
C0Building Class
R6BZoning
5,400 sfGross Floor Area
3Units
Three families · 1,808 sf lot · 2.99 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof17p · 1 filing · 20 docs
Attic45p · 2 filings · 20 docs
Floor 347p · 2 filings · 20 docs
Floor 250p · 2 filings · 20 docs
Floor 1Stoop and door opening alterations57p · 3 filings · 20 docs
Cellar53p · 2 filings · 20 docs
BasementStoop and door opening alterations51p · 2 filings · 20 docs
Sub-BasementStoop and door opening alterations7p · 2 filings · 12 docs
Site & exteriorStoop and door opening alterations12p · 3 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/24/2024$3.7M—Private party → Private party$684/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Jonar Madriaga408/28/2026
SA-DA Architecture402/13/2026
Sung Ho Shin Architect106/04/2025
Glen Langer111/19/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Big Orange Expediting603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Northbridge ContractingGeneral Contractor1107/08/2026
Northbridge Contractingspecialty_contractor107/08/2026
Expert Fire SprinklerFire Protection107/08/2026
HP ServicesPlumbing107/08/2026
Reliable GeneralGeneral Contractor112/23/2016
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jian Engineering7397708/28/2026
SA-DA Architecture2640202/13/2026
Building Lifecycle
10/16/2026
Signed off — Alteration CO
New Mechanical system as per plans
B01069892-S2
10/15/2026
Permit expired, never signed off — Sprinklers
The city's record still shows this permit as issued, with no sign-off on its filing
B01069892-S3-EW-SP
08/28/2026
Filed — Alteration CO
New Mechanical system as per plans
B01069892-P3
07/13/2026
Signed off — Alteration
Installation of new stoop as per plans. No change in use, occupancy or egress is involved under this application.
B01222152-I1
06/23/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
96 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNorthbridge Contracting04/09/2026
DOB NOWSprinklersPermit IssuedExpert Fire Sprinkler10/15/2025
DOB NOWStructuralSigned-offNorthbridge Contracting08/25/2025
DOB NOWPlumbingPermit IssuedHP Services01/14/2025
DOB NOWMechanical SystemsSigned-offNorthbridge Contracting01/07/2025
DOB NOWStructuralPermit IssuedNorthbridge Contracting12/12/2024
DOB NOWGeneral ConstructionPermit IssuedNorthbridge Contracting11/13/2024
DOB NOWGeneral ConstructionPermit IssuedNorthbridge Contracting10/10/2024
BISOTISSUEDReliable General12/23/2016
1 project · most recent 08/28/2026
Air Conditioning Systems Heating Systems Others Ventilation Systems
FiledStatusContractorScope
08/28/2026Signed-offNorthbridge ContractingAir Conditioning Systems, Heating Systems, Others, Ventilation Systems
1 project · most recent 12/24/2025
General Wiring
FiledStatusContractorScope
12/24/2025CompleteNelson & Tom Maintenance Inc DBGeneral Wiring
1 project · most recent 06/04/2025
Steel Concrete Masonry
FiledStatusContractorScope
06/04/2025Signed-offNorthbridge ContractingSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
06/23/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/15/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/15/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/01/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/29/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/15/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/21/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
06/15/2026FinalJIAN DENGprogress
06/15/2026Fire-Resistant Penetrations and JointsJIAN DENGspecial
06/15/2026Mechanical SystemsJIAN DENGspecial
06/15/2026Energy Code Compliance InspectionsJIAN DENGprogress
02/19/2026Fire-Resistant Penetrations and JointsAlexander Stoltzspecial
02/19/2026Fire-Resistance Rated ConstructionAlexander Stoltzprogress
02/06/2026Fire-Resistant Penetrations and JointsAlexander Stoltzspecial
02/06/2026Fire-Resistance Rated ConstructionAlexander Stoltzprogress
06/12/2025Structural Stability – Alterations of existing buildingsJIAN DENGspecial
05/28/2025Structural Steel - DetailsJIAN DENGspecial
05/07/2025Footing and FoundationJIAN DENGprogress
05/07/2025Concrete - Cast-In-PlaceJIAN DENGspecial
05/07/2025Excavations - Sheeting, Shoring, and BracingJIAN DENGspecial
05/07/2025MasonryJIAN DENGspecial
05/07/2025Structural Stability – Alterations of existing buildingsJIAN DENGspecial
05/07/2025Structural Steel - High Strength BoltingJIAN DENGspecial
05/07/2025Structural Steel - WeldingJIAN DENGspecial
05/07/2025Subgrade InspectionsJIAN DENGspecial
05/07/2025FinalJIAN DENGprogress
05/05/2025FinalAlexander Stoltzprogress
12/03/2024Duct leakage testing, insulation and designJIAN DENGenergy_progress
11/07/2024HVAC-R and service water heating system controlsJIAN DENGenergy_progress
11/07/2024Shutoff dampersJIAN DENGenergy_progress
11/07/2024Fire-Resistant Penetrations and JointsJIAN DENGspecial
11/07/2024HVAC-R and service water heating equipmentJIAN DENGenergy_progress
Latest 25 of 39.
103 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account