| Owner | Filings | Most Recent |
|---|---|---|
| COLUMBIA PROPERTY TRUST | 108 | 07/08/2026 |
| ALBA SERVICES | 16 | 07/08/2026 |
| L AND Z CONSULTING | 8 | 07/08/2026 |
| STRUCTURETECH NEW YORK INC | 9 | 03/22/2026 |
| SKYLINE SCAFFOLDING GROUP | 5 | 03/22/2026 |
| COLGATE ENTERPRISES | 10 | 03/22/2026 |
| NOVA CONSTRUCTION SERVICE | 1 | 03/22/2026 |
| WARREN ELEVATOR SERVICE C | 1 | 03/22/2026 |
| PHOENIX SUTTON STRI INC | 1 | 03/22/2026 |
| WFN I LLC | 2 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 10/23/2018 | $880.0M | — | — → — | $757/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| 5TH FLOOR DESIGN | 7 | 08/26/2026 |
| STUDIO HUJI | 2 | 08/12/2026 |
| DESIGN REPUBLIC | 12 | 07/28/2026 |
| HIGHLAND ASSOCIATES | 14 | 07/08/2026 |
| JAMES HARB ARCHITECTS | 7 | 07/07/2026 |
| ADAL ENGINEERING PLLC | 1 | 06/26/2026 |
| GILSANZ MURRAY STEFICEK LLP | 2 | 05/19/2026 |
| MURDOCH ENGINEERING | 2 | 04/22/2026 |
| PLAN B ENGINEERING | 33 | 03/18/2026 |
| TED MOUDIS ASSOCIATES | 1 | 03/02/2026 |
| SYNC ARCHITECTURE P.C | 4 | 02/20/2026 |
| KEVIN DENLINGER | 1 | 02/17/2026 |
| DESIMONE CONSULTING ENGINEERS | 3 | 01/28/2026 |
| DERIVE ENGINEERS | 4 | 11/03/2025 |
| COOKFOX ARCHITECTS | 3 | 10/16/2025 |
| THETA CONSULTING LLC | 1 | 08/27/2025 |
| JENSEN HUGHES ENGINEERING P.C. | 11 | 07/24/2025 |
| PAUL PERDEK, PROF. ENG. PLLC | 18 | 10/22/2024 |
| G. BLINN CONSULTING, LLC | 11 | 08/02/2024 |
| MG ENGINEERING D.P.C. | 4 | 06/18/2024 |
| LOFFREDO BROOKS ARCHITECTS P.C. | 1 | 06/14/2024 |
| ROBERT GERMAIN JR. PE | 10 | 06/13/2024 |
| LOMBARDO PROFESSIONAL ENGINEERING | 7 | 08/23/2023 |
| PAUL G. JONES, P.E. | 2 | 04/17/2023 |
| LANGAN ENGINEERING | 4 | 03/22/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| RIZZO GROUP | 73 | 03/21/2026 |
| AE DESIGN SOLUTION | 32 | 03/21/2026 |
| NEW YORK ENGINEERING | 3 | 03/21/2026 |
| GC1 EXPEDITING | 2 | 03/21/2026 |
| HOWARD I SHAPIRO ASSOCIATES | 6 | 03/21/2026 |
| RELATED COMPANIES | 1 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 26 | 03/21/2026 |
| EUROCELT EXPEDITING, INC | 46 | 03/21/2026 |
| LOMBARDO PROFESSIONAL ENGINEERING | 6 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| PLATFORM SOLUTIONS, INC | General Contractor | 46 | 07/08/2026 |
| ALBA SERVICES INC | General Contractor | 20 | 07/08/2026 |
| NOVA CONSTRUCTION SERVICE | General Contractor | 17 | 07/08/2026 |
| S&E BRIDGE & SCAFFOLD LLC. | General Contractor | 15 | 07/08/2026 |
| KG SPRINKLER CORP | Fire Protection | 15 | 07/08/2026 |
| NEW LINE STRUCTURES & DEV | General Contractor | 12 | 07/08/2026 |
| FABBRICA LLC | General Contractor | 10 | 07/08/2026 |
| C C CONTROLLED COMBUSTION | General Contractor | 9 | 07/08/2026 |
| ARCH MW LLC | General Contractor | 8 | 07/08/2026 |
| STRUCTURE TONE, LLC | General Contractor | 8 | 07/08/2026 |
| L & Z CONSULTING CORP | General Contractor | 7 | 07/08/2026 |
| DESIMONE BUILDERS LLC | General Contractor | 7 | 09/03/2026 |
| SKYLINE SCAFFOLDING GROUP | General Contractor | 6 | 03/21/2026 |
| CONSOLIDATED SCAFFOLDING | General Contractor | 6 | 03/21/2026 |
| TEAM ELECTRIC, INC | Electrical | 6 | 03/22/2026 |
| RIP OUT KINGS & RESTORATION | General Contractor | 6 | 03/21/2026 |
| PHOENIX SUTTON STR INC | General Contractor | 5 | 07/08/2026 |
| STRUCTURETECH NEW YORK IN | General Contractor | 4 | 03/21/2026 |
| WINICK PRODUCTIONS, LLC | General Contractor | 3 | 07/08/2026 |
| ADVANCED PLBG, MECH & SPR | Fire Protection | 3 | 06/28/2026 |
| BEDROCK MECHANICAL INC | Fire Protection | 3 | 07/08/2026 |
| JURGEN WRIEDT | Electrical | 3 | 03/21/2026 |
| SCHONDORF MICHAEL | Electrical | 3 | 03/21/2026 |
| ARENA EVENT SERVICES INC | General Contractor | 3 | 03/21/2026 |
| SIGNS CAD | Scaffold | 2 | 08/13/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AK ENGINEERING PC | 678 | 17 | 07/08/2026 |
| CODEGREEN | 510 | 29 | 07/07/2026 |
| ADAL ENGINEERING PLLC | 4205 | 1 | 06/26/2026 |
| ATLANTIC ENGINEERINGLABOR | 1381 | 16 | 06/18/2024 |
| ROBERT F. GERMAIN JR. PE | 5100 | 9 | 06/13/2024 |
| LEO Y LEE ASSOCIATES | 2481 | 3 | 10/11/2022 |
| DESIMONE CONSULTING ENGIN | 5942 | 5 | 07/27/2022 |
| JEREMY K MCKEON, P.E. | 7263 | 1 | 04/20/2021 |
| ATLAS ATC ENGINEERING INC | 8011 | 1 | 04/23/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | DESIMONE BUILDERS LLC | 09/02/2026 |
| DOB NOW | General Construction | Permit Issued | DESIMONE BUILDERS LLC | 09/02/2026 |
| DOB NOW | Structural | Permit Issued | DESIMONE BUILDERS LLC | 09/02/2026 |
| DOB NOW | Sign | Permit Issued | SIGNS CAD CORP | 08/12/2026 |
| DOB NOW | Sign | Permit Issued | SIGNS CAD CORP | 08/12/2026 |
| DOB NOW | General Construction | Permit Issued | DESIMONE BUILDERS LLC | 08/10/2026 |
| DOB NOW | Sprinklers | Permit Issued | ADVANCED PLBG, MECH & SPR | 06/26/2026 |
| DOB NOW | Sprinklers | Permit Issued | ADVANCED PLBG, MECH & SPR | 06/22/2026 |
| DOB NOW | General Construction | Permit Issued | WINICK PRODUCTIONS, LLC | 06/12/2026 |
| DOB NOW | Plumbing | Permit Issued | ADVANCED PLUMBING MECH | 05/11/2026 |
| DOB NOW | Sprinklers | Permit Issued | ADVANCED PLBG, MECH & SPR | 05/07/2026 |
| DOB NOW | Sign | Signed-off | A.M.A HOLDINGS INC | 05/05/2026 |
| DOB NOW | Sign | Signed-off | A.M.A HOLDINGS INC | 05/05/2026 |
| DOB NOW | General Construction | Permit Issued | BLACK BULL BULDERS LLC | 04/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | BLACK BULL BULDERS LLC | 04/23/2026 |
| DOB NOW | Structural | Permit Issued | DESIMONE BUILDERS | 04/08/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | DESIMONE BUILDERS | 04/08/2026 |
| DOB NOW | General Construction | Permit Issued | DESIMONE BUILDERS | 04/07/2026 |
| DOB NOW | Structural | Permit Issued | ALBA SERVICES INC | 03/23/2026 |
| DOB NOW | General Construction | Permit Issued | C C CONTROLLED COMBUSTION | 03/19/2026 |
| DOB NOW | General Construction | Signed-off | WINICK PRODUCTIONS, LLC | 02/25/2026 |
| DOB NOW | Plumbing | Signed-off | A&A PLUMBING CORP | 02/06/2026 |
| DOB NOW | Sprinklers | Permit Issued | BEDROCK MECHANICAL INC | 02/04/2026 |
| DOB NOW | Structural | Signed-off | STRUCTURE TONE, LLC | 02/03/2026 |
| DOB NOW | Standpipe | Permit Issued | BEDROCK MECHANICAL INC | 02/02/2026 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 01/30/2026 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 01/30/2026 |
| DOB NOW | Sprinklers | Permit Issued | BEDROCK MECHANICAL INC | 01/07/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 01/07/2026 |
| DOB NOW | Structural | Signed-off | STRUCTURE TONE, LLC | 12/15/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 12/12/2025 |
| DOB NOW | General Construction | Permit Issued | STRUCTURE TONE, LLC | 12/12/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 12/12/2025 |
| DOB NOW | Structural | Permit Issued | ALBA SERVICES INC | 11/13/2025 |
| DOB NOW | Sprinklers | Permit Issued | CMA PLUMBING & HEATING IN | 10/27/2025 |
| DOB NOW | Mechanical Systems | Signed-off | SHAWMUT WOODWORKING & SUPPLY | 09/11/2025 |
| DOB NOW | General Construction | Signed-off | ARENA EVENT SERVICES INC | 09/09/2025 |
| DOB NOW | Plumbing | Signed-off | JADA PLUMBING & HTG LLC | 09/08/2025 |
| DOB NOW | General Construction | Signed-off | SHAWMUT WOODWORKING & SUPPLY | 08/29/2025 |
| DOB NOW | Plumbing | Signed-off | DONATO PLUMBING GROUP INC | 06/18/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/08/2026 | Signed-off | STRUCTURE TONE, LLC | Heating and Air Conditioning Systems | Heat / Cool Lg ZRNU543B8AA (ZRUM264DTE6) 66,000 BTU · Vrf Indoor ×5 ZRNU363M2AA (ZRUM264DTE6) 32,000 BTU · Vrf Indoor ×2 ZRNU963B8AA (ZRUM264DTE6) 863,000 BTU · Vrf Indoor ×2 ZRNU073MAAA (ZRUM264DTE6) 5,500 BTU · Vrf Indoor ×1 ZRNU543B8AA 66,000 BTU · Vrf Outdoor ×5 — ZRNU363M2AA 32,000 BTU · Vrf Indoor ×2 ZRNU963B8AA 863,000 BTU · Vrf Indoor ×2 ZRNU073MAAA 5,500 BTU · Vrf Indoor ×1 |
| 07/08/2026 | Signed-off | STRUCTURE TONE, LLC | Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems | Cooling Bosch EC 300 7,000 CFM · Wshp ×2 MC 720 22,000 CFM · Wshp ×2 EC300-4VTC-FBTBUC 7,000 CFM ×1 MC720-4VLC-SBFIUC 22,000 CFM ×1 Heat / Cool — ZRNU363SRAA 31,400 BTU · Fan Coil Indoor ×6 ZRNU123MAAA 11,600 BTU · Fan Coil Indoor ×4 ZRNU243MAAA 23,100 BTU · Fan Coil Indoor ×4 ZRNU073MAAA 2,300 BTU · Fan Coil Indoor ×2 ZRNU153MAAA 13,100 BTU · Fan Coil Indoor ×2 ZRNU243SKSA 18,800 BTU · Fan Coil Indoor ×2 ZRUM264BTE6 264,000 BTU · Condensing Unit ×1 ZRUM264BTE6 (HRU-8 PRHR033C / HRU-9 PRHR043C) 264,000 BTU · Vrf Outdoor ×1 ZRUM264DTE6 (HRU-1 PRHR033C / HRU-2 PRHR033C / HRU-4 PRHR023C / HRU-3 PRHR043C) 264,000 BTU · Vrf Outdoor ×1 ZRUM264DTE6 (HRU-5 PRHR043C / HRU-6 PRHR023C / HRU-7 PRHR023C) 264,000 BTU · Vrf Outdoor ×1 Lg ZRNU423TAAA 38,500 BTU · Vrf Outdoor ×7 ZRUM264DTE6 264,000 BTU · Vrf Outdoor ×2 ZRNU423M2AA 38,500 BTU · Vrf Indoor ×2 ZRNU423TAAA (ZRUM264DTE6) 38,500 BTU · Vrf Indoor ×4 ZRNU123MAAA (ZRUM264DTE6) 11,600 BTU · Vrf Indoor ×2 ZRNU243MAAA (ZRUM264DTE6) 23,100 BTU · Vrf Indoor ×2 ZRNU363SRAA (ZRUM264DTE6) 31,400 BTU · Vrf Indoor ×2 ZRNU073MAAA (ZRUM264DTE6) 2,300 BTU · Vrf Indoor ×1 ZRNU153MAAA (ZRUM264DTE6) 13,100 BTU · Vrf Indoor ×1 ZRNU243SKSA (ZRUM264DTE6) 18,800 BTU · Vrf Indoor ×1 ZRNU363SRAA (ZRUM264DTE6 31,400 BTU · Vrf Indoor ×1 ZRNU423M2AA (ZRUM264DTE6) 38,500 BTU · Vrf Indoor ×1 ZRUM264BTE6 (HRU-8 PRHR033C / HRU-9 PRHR043C) 264,000 BTU · Vrf Outdoor ×1 ZRUM264DTE6 (HRU-1 PRHR033C / HRU-2 PRHR033C / HRU-4 PRHR023C / HRU-3 PRHR043C) 264,000 BTU · Vrf Outdoor ×1 ZRUM264DTE6 (HRU-5 PRHR043C / HRU-6 PRHR023C / HRU-7 PRHR023C) 264,000 BTU · Vrf Outdoor ×1 Ventilation Greenheck SQ-16-M2-VG 6,000 CFM · Makeup Air ×1 SQ-18 6,378 CFM · Makeup Air ×1 SQ-7-M1-VG 400 CFM · Makeup Air ×1 AX-103-275-0630-A400 45,000 CFM · Makeup Air ×1 GVS-1X4DP / QEI-16-300-75-6 / GVMAX-21423 5,000 CFM · Exhaust Fan ×1 SQ-16-M2-VG-X 6,000 CFM · Makeup Air ×1 SQ-18-H2-X 6,378 CFM · Makeup Air ×1 — AX-103-275-0630-A400 45,000 CFM · Makeup Air ×1 GVS-1X4DP / QEI-16-300-75-6 / GVMAX-21423 5,000 CFM · Exhaust Fan ×1 N/A NA 400 CFM · Makeup Air ×1 |
| 03/08/2024 | Permit Issued | C C CONTROLLED COMBUSTION | Generators | Generators Mtu MTU 12V2000DS750 750 kW · Generator ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/08/2026 | Permit Issued | BEDROCK MECHANICAL INC | 612 heads |
| 07/08/2026 | Permit Issued | BEDROCK MECHANICAL INC | 528 heads, 4 outlets |
| 07/07/2026 | Permit Issued | ADVANCED PLBG, MECH & SPR | 744 heads |
| 07/24/2025 | Permit Issued | CMA PLUMBING & HEATING IN | 71 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/08/2026 | — | — | — |
| 07/07/2026 | Permit Issued | ADVANCED PLUMBING MECH | Gas, Water/Sanitary |
| 01/26/2026 | Signed-off | A&A PLUMBING CORP | Water/Sanitary |
| 11/21/2025 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 07/24/2025 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | Permit Issued | SIGNS CAD CORP | — |
| 08/25/2026 | Permit Issued | SIGNS CAD CORP | — |
| 08/07/2026 | Complete | MER ELECTRIC, INC | General Wiring |
| 06/05/2026 | Permit Issued | TEAM ELECTRIC, INC | General Wiring |
| 06/03/2026 | Permit Issued | SHELBY ELECTRICAL CORP | — |
| 05/17/2026 | Permit Issued | PATRIOT ELECTRIC CORP | General Wiring |
| 05/01/2026 | Permit Issued | PATRIOT ELECTRIC CORP | — |
| 03/06/2026 | Permit Issued | ENNELL GRP ELECTRIC CORP | General Wiring |
| 01/28/2026 | Permit Issued | DELTA ELEC'L CONTR'G CORP | General Wiring |
| 01/13/2026 | Cancelled | METROPOLIS ELECTRIC CORP | General Wiring |
| 01/03/2026 | Complete | JAM ELECTRICAL CORP | — |
| 01/03/2026 | Complete | JAM ELECTRICAL CORP | — |
| 12/22/2025 | Permit Issued | ENNELL GRP ELECTRIC CORP | General Wiring |
| 11/11/2025 | Complete | JAM ELECTRICAL CORP | — |
| 09/03/2025 | Complete | TEAM ELECTRIC, INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/07/2026 | Permit Issued | DESIMONE BUILDERS LLC | Steel, Concrete |
| 03/18/2026 | Permit Issued | ALBA SERVICES INC | Steel |
| 11/24/2025 | Signed-off | STRUCTURE TONE, LLC | Steel, Concrete |
| 10/15/2025 | Permit Issued | ALBA SERVICES INC | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/17/2023 | Permit Issued | CONSOLIDATED SCAFFOLDING | Scaffold |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/19/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/24/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/24/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 07/21/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 07/16/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/16/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/13/2026 | Pass-Final SP - Up to 9 Requested Floors | Pass | View ↗ |
| 07/08/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/01/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/23/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/17/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/15/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/09/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/31/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/27/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/09/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/15/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/12/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/24/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/21/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/21/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/19/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 10/02/2025 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/07/2026 | Final | Ryan Hung | progress |
| 08/07/2026 | Final | Ryan Hung | progress |
| 07/28/2026 | Public Assembly Emergency Lighting | Ari Kamo | progress |
| 07/09/2026 | Mechanical Systems | Ari Kamo | special |
| 07/09/2026 | Sprinkler Systems | Ari Kamo | special |
| 07/09/2026 | Post-installed Anchors | James Sullivan Jr | special |
| 07/09/2026 | Fire-Resistant Penetrations and Joints | James Sullivan Jr | special |
| 07/09/2026 | Sprinkler Systems | James Sullivan Jr | special |
| 07/09/2026 | Final | Ari Kamo | progress |
| 07/08/2026 | Final | Ari Kamo | progress |
| 07/08/2026 | Mechanical Systems | Ari Kamo | special |
| 07/06/2026 | Final | Ari Kamo | progress |
| 07/06/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 07/06/2026 | Fire-Resistance Rated Construction | Ari Kamo | progress |
| 07/01/2026 | Sprayed fire-resistant materials | Ari Kamo | special |
| 07/01/2026 | Final | Ari Kamo | progress |
| 07/01/2026 | Fire-Resistance Rated Construction | Ari Kamo | progress |
| 07/01/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 06/30/2026 | Final | Ari Kamo | progress |
| 06/30/2026 | Fire-Resistance Rated Construction | Ari Kamo | progress |
| 06/30/2026 | Final | Ari Kamo | progress |
| 06/30/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| 06/30/2026 | Mechanical Systems | Ari Kamo | special |
| 06/01/2026 | Final | Ari Kamo | progress |
| 06/01/2026 | Fire-Resistant Penetrations and Joints | Ari Kamo | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Equinox | Fitness / Recreation | Floor 1 | Project M01404701 Project M01300538 |
| Kennedy | Office | — | Project M01311194 |
| Terminal Warehouse Cafe | Restaurant / Food Service | Cellar | Project M01338911 |
| Terminal Building Cafe | Restaurant / Food Service | — | Project M01338945 |
| TWC Terminal Warehouse Cafe | Restaurant / Food Service | — | Project M01338952 |
| Convene | Office | Floors 1–3 | Project M01273488 Project M01226815 |
| Michael Kors | Other | Floor 1 | Project M01276228 |
| Miu Miu | Retail | Floor 1 | Project M01212381 |