Roof11p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 7 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
INSTALLATION OF 300 psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE INUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Bulkhead4p · 3 filings · 20 docs
EquipmentFire ProtectionStructural
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
CONSTRUCCTION OF NEW CAST-IN-PLACE CONTRETE 28-STORY RESIDENTIALTOWER. MAIN STRUCTURAL GRAVITY SYSTEM CONSISTS OF CONCRETE FLAT SLAB SUPPORTED OFF CONCRETE COLUMNS. MAIN STRUCTURAL LATERAL SYSTEM CONSISTS OF CONCRETE SHEAR WALL CORE WITH LINK BEAMS.
On file for this project
3 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
5 documents · 1 drawing sheet
Floor 301p · 1 filing · 3 docs
Structural
CONSTRUCCTION OF NEW CAST-IN-PLACE CONTRETE 28-STORY RESIDENTIALTOWER. MAIN STRUCTURAL GRAVITY SYSTEM CONSISTS OF CONCRETE FLAT SLAB SUPPORTED OFF CONCRETE COLUMNS. MAIN STRUCTURAL LATERAL SYSTEM CONSISTS OF CONCRETE SHEAR WALL CORE WITH LINK BEAMS.
On file for this project
3 documents · 1 drawing sheet
Floor 291p · 1 filing · 3 docs
Structural
CONSTRUCCTION OF NEW CAST-IN-PLACE CONTRETE 28-STORY RESIDENTIALTOWER. MAIN STRUCTURAL GRAVITY SYSTEM CONSISTS OF CONCRETE FLAT SLAB SUPPORTED OFF CONCRETE COLUMNS. MAIN STRUCTURAL LATERAL SYSTEM CONSISTS OF CONCRETE SHEAR WALL CORE WITH LINK BEAMS.
On file for this project
3 documents · 1 drawing sheet
Floor 28
Floor 274p · 4 filings · 20 docs
EquipmentFire ProtectionStructural
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 1 drawing sheet
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
CONSTRUCCTION OF NEW CAST-IN-PLACE CONTRETE 28-STORY RESIDENTIALTOWER. MAIN STRUCTURAL GRAVITY SYSTEM CONSISTS OF CONCRETE FLAT SLAB SUPPORTED OFF CONCRETE COLUMNS. MAIN STRUCTURAL LATERAL SYSTEM CONSISTS OF CONCRETE SHEAR WALL CORE WITH LINK BEAMS.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 265p · 4 filings · 20 docs
ElectricalFire ProtectionStructural
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
CONSTRUCCTION OF NEW CAST-IN-PLACE CONTRETE 28-STORY RESIDENTIALTOWER. MAIN STRUCTURAL GRAVITY SYSTEM CONSISTS OF CONCRETE FLAT SLAB SUPPORTED OFF CONCRETE COLUMNS. MAIN STRUCTURAL LATERAL SYSTEM CONSISTS OF CONCRETE SHEAR WALL CORE WITH LINK BEAMS.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 253p · 2 filings · 20 docs
Fire Protection
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
Floor 242p · 2 filings · 20 docs
Fire Protection
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 1 drawing sheet
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
Floor 233p · 2 filings · 20 docs
Fire Protection
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
Floor 222p · 2 filings · 20 docs
Fire Protection
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 1 drawing sheet
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
Floor 214p · 3 filings · 20 docs
EquipmentFire Protection
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
5 documents · 1 drawing sheet
Floor 204p · 3 filings · 20 docs
Fire ProtectionStructural
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
CONSTRUCCTION OF NEW CAST-IN-PLACE CONTRETE 28-STORY RESIDENTIALTOWER. MAIN STRUCTURAL GRAVITY SYSTEM CONSISTS OF CONCRETE FLAT SLAB SUPPORTED OFF CONCRETE COLUMNS. MAIN STRUCTURAL LATERAL SYSTEM CONSISTS OF CONCRETE SHEAR WALL CORE WITH LINK BEAMS.
On file for this project
3 documents · 1 drawing sheet
Floor 193p · 2 filings · 20 docs
Fire Protection
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
Floor 183p · 2 filings · 20 docs
Fire Protection
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
Floor 173p · 2 filings · 20 docs
Fire Protection
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
Floor 163p · 2 filings · 20 docs
Fire Protection
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
Floor 153p · 2 filings · 20 docs
Fire Protection
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
Floor 143p · 2 filings · 20 docs
Fire Protection
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
Floor 133p · 2 filings · 20 docs
Fire Protection
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
Floor 123p · 2 filings · 20 docs
Fire Protection
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
Floor 113p · 2 filings · 20 docs
Fire Protection
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
Floor 103p · 2 filings · 20 docs
Fire Protection
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
Floor 93p · 2 filings · 20 docs
Fire Protection
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
Floor 83p · 2 filings · 20 docs
Fire Protection
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
Floor 76p · 4 filings · 20 docs
ArchitectureEquipmentFire ProtectionStructural
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 3 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
CONSTRUCCTION OF NEW CAST-IN-PLACE CONTRETE 28-STORY RESIDENTIALTOWER. MAIN STRUCTURAL GRAVITY SYSTEM CONSISTS OF CONCRETE FLAT SLAB SUPPORTED OFF CONCRETE COLUMNS. MAIN STRUCTURAL LATERAL SYSTEM CONSISTS OF CONCRETE SHEAR WALL CORE WITH LINK BEAMS.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 64p · 3 filings · 11 docs
ArchitectureEquipmentStructuralOther
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
CONSTRUCCTION OF NEW CAST-IN-PLACE CONTRETE 28-STORY RESIDENTIALTOWER. MAIN STRUCTURAL GRAVITY SYSTEM CONSISTS OF CONCRETE FLAT SLAB SUPPORTED OFF CONCRETE COLUMNS. MAIN STRUCTURAL LATERAL SYSTEM CONSISTS OF CONCRETE SHEAR WALL CORE WITH LINK BEAMS.
On file for this project
3 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
5 documents · 2 drawing sheets
Floor 55p · 4 filings · 20 docs
ArchitectureFire ProtectionStructural
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
CONSTRUCCTION OF NEW CAST-IN-PLACE CONTRETE 28-STORY RESIDENTIALTOWER. MAIN STRUCTURAL GRAVITY SYSTEM CONSISTS OF CONCRETE FLAT SLAB SUPPORTED OFF CONCRETE COLUMNS. MAIN STRUCTURAL LATERAL SYSTEM CONSISTS OF CONCRETE SHEAR WALL CORE WITH LINK BEAMS.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 46p · 4 filings · 20 docs
Fire ProtectionGeneralMechanicalStructural
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
INSTALL ONE (1) 550 GALLON MAIN FUEL OIL STORAGE TANK IN SUB-CELLAR 2 AND ONE (1) 90 GALLON DAY TANK TO SERVE EMERGENCY DIESEL GENERATOR ON FOURTH FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 34p · 3 filings · 20 docs
Fire ProtectionStructural
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
CONSTRUCCTION OF NEW CAST-IN-PLACE CONTRETE 28-STORY RESIDENTIALTOWER. MAIN STRUCTURAL GRAVITY SYSTEM CONSISTS OF CONCRETE FLAT SLAB SUPPORTED OFF CONCRETE COLUMNS. MAIN STRUCTURAL LATERAL SYSTEM CONSISTS OF CONCRETE SHEAR WALL CORE WITH LINK BEAMS.
On file for this project
3 documents · 1 drawing sheet
Floor 2Under Construction14p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing
Interior renovation / modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
3 documents
Plumbing and sprinkler additions and modifications as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 2 drawing sheets
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 1Under Construction9p · 3 filings · 9 docs
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
General Construction · Plumbing
Interior renovation / modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
3 documents
Plumbing and sprinkler additions and modifications as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
CellarUnder Construction14p · 5 filings · 20 docs
CivilFire ProtectionPlumbing
Issued Permit Scope
Plumbing
Plumbing and sprinkler additions and modifications as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 2 drawing sheets
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 2 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Sub-Cellar8p · 4 filings · 20 docs
CivilFire ProtectionMechanicalPlumbingStructural
Installation of new sprinkler heads, associated piping & standpipe system AS PER PLANS FILED HEREWITH. APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 420665667
On file for this project
18 documents · 3 drawing sheets
New installation of (Temp Standpipe) in conjunction to the new building application filed under #420665667 as per plans filed herewith
On file for this project
3 documents · 2 drawing sheets
INSTALL ONE (1) 550 GALLON MAIN FUEL OIL STORAGE TANK IN SUB-CELLAR 2 AND ONE (1) 90 GALLON DAY TANK TO SERVE EMERGENCY DIESEL GENERATOR ON FOURTH FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.