← Back
BuildNYC
Elevator apt, fireproof with stores
275 PARK AVENUE
BROOKLYN · Fort Greene · BIN 3054140
💬 Discuss this project
1920Year Built
7Stories
D6Building Class
M1-2Zoning
184,411 sfGross Floor Area
80Units
LL97 CoveredRent Stabilized24 Active Violations 18 unresolved · 6 paperwork only 3 old, status unconfirmed ▸FDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: Thor Chocolate Factory · 41,196 sf lot · 4.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofGfb Management32p · 4 filings · 20 docs
Floor 7Unit 7B, Unit 7Q, Unit 7V +1118p · 11 filings · 20 docs
Floor 6Unit 6S, Unit 6U113p · 11 filings · 20 docs
Floor 5Unit 5B, Unit 5G121p · 11 filings · 20 docs
Floor 4Unit 4A, Unit 4B, Unit 4D +9134p · 13 filings · 20 docs
Floor 3Unit 3D, Unit 3E, Unit 3F +8130p · 11 filings · 20 docs
Floor 2Unit 2A, Unit 2B, Unit 2C +11129p · 11 filings · 20 docs
Floor 1Brooklyn Creative LeagueUnder Construction65p · 17 filings · 20 docs
CellarThor Equities, LLCUnder Construction36p · 6 filings · 20 docs
Basement275 Park Performance Venue, LLC3p · 2 filings · 20 docs
Site & exterior275 Park Owner LLC40p · 4 filings · 20 docs
Filed — no permit issuedBrooklyn Creative League1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
275 Park Associates5203/21/2026
Chocolate Factory3303/22/2026
275 Park Owner2807/08/2026
Thor Equities2410/01/2026
275 Park Performance Venue1907/08/2026
Brooklyn Creative League1107/08/2026
Fairstead1103/21/2026
Martino103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/08/2024$58.5M—275 PARK OWNER LLC → THOR CHOCOLATE FACTORY LLC$317/sf building
08/12/2014$68.0M—— → —$369/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York & Company304/29/2026
Brian McDonough, PE102/04/2026
Bromley Caldari Architects1211/18/2025
WRG Engineering206/23/2025
Levin Engineering103/28/2025
Surface Design205/24/2024
Mohammad Ahead, PE405/31/2023
Paul Perdek, Prof. Engineering103/22/2023
James A Bowles PE111/16/2022
Belal Salim108/02/2022
Madsen Consulting Engineering307/28/2022
BFS Architect206/02/2022
CES Engineering2905/02/2022
Ksid101/13/2022
Gasbarro Structural Engineering109/10/2021
Eric Safyan Architect104/13/2021
Syed Engineering108/24/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Kna Consulting9603/21/2026
Arsenal Building Consultants403/21/2026
New York & Company403/21/2026
Levin Engineering203/21/2026
Metropolis Group203/21/2026
EA Design Group803/21/2026
AE Design Solution203/21/2026
WRG Engineering P C403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kings Group NYScaffold2207/08/2026
Glenns Plumbing ServicesPlumbing2007/08/2026
Progeny ConstructionGeneral Contractor1707/08/2026
Bek Plumbing & HeatingPlumbing1107/08/2026
Skyline Builders GroupGeneral Contractor510/01/2026
Black Hammer ConstructionGeneral Contractor507/08/2026
Cypress Green Construction CoGeneral Contractor407/08/2026
Ebro Dique GroupGeneral Contractor303/21/2026
Pro Builders R ConstructionGeneral Contractor303/21/2026
Neptune MechanicalPlumbing207/08/2026
Superior HVACspecialty_contractor203/21/2026
Franklylofty ConstructionGeneral Contractor107/08/2026
Air Depot Commercial RefrigerationGeneral Contractor107/08/2026
Word of Light ElectricElectrical103/22/2026
Ebro Dique GroupScaffold107/08/2026
AP Plumbing & HVACPlumbing107/08/2026
Crossfield Plumbing & HeatingFire Protection107/08/2026
Fibertek Data & ElectricElectrical103/22/2026
Lloyd G Drummond Plumbing & GenFire Protection107/08/2026
Lloyd G Drummond Plumbing & GenPlumbing107/08/2026
Luma ConstructionGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851304/29/2026
McDonough Engineering Pra9377102/04/2026
WRG Engineering4403206/23/2025
Bromley Caldari Architect1534103/28/2025
Surface Design Profession3968205/24/2024
BFS Architect74771401/26/2023
Cole Technologies/Control1290707/28/2022
CES Engineering1277809/14/2021
Gasbarro Structural Engineering5919109/10/2021
Eric Safyan Architectpc3248104/13/2021
Building Lifecycle
All (300)Filed (64)Permit Issued (57)Signed Off (6)Violation (60)Inspection (27)Objection (56)Special Inspection (30)
09/30/2026
Permit issued — Structural
B01172063-I1-ST
09/09/2026
Permit issued — Structural
B01210303-I1-ST
07/28/2026
Permit issued — Structural
B01210303-I1-ST
05/22/2026
Violation issued (HPD, open)
C
05/11/2026
Objection resolved — Addressed
05/04/2026
Objection raised — Scope
05/04/2026
Objection raised — Cost
05/04/2026
Objection raised — Scope
04/29/2026
Filed — Alteration
INSTALL NEW GAS METER AND PIPING TO NEW BOILER AND KITCHEN APPLIANCES.
B01258836-P1
03/23/2026
Violation issued (ECB, closed)
Unknown
03/16/2026
Violation issued (HPD, open)
A
03/16/2026
Violation issued (HPD, open)
B
03/11/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/05/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/04/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/26/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/13/2026
Permit issued — Plumbing
B00756881-S1-PL
02/04/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION TO APARTMENTS 2B, 2D, 3E, 3O, 3Q, 5D, 5L, 5M, 7Q. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00756881-S1
02/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Brian McDonough
02/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brian McDonough
02/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Brian McDonough
01/30/2026
Violation issued (HPD, closed)
A
01/26/2026
Permit issued — Plumbing
B01258836-S1-PL
01/26/2026
Permit issued — Boiler Equipment
B01258836-I1-BE
12/19/2025
Permit issued — Structural
B01172063-I1-ST
12/10/2025
Objection resolved — Addressed
11/19/2025
Objection resolved — Addressed
11/19/2025
Special inspection requirement — Final
Jerry Caldari
11/18/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION TO APARTMENTS 2B, 2D, 3E, 3O, 3Q, 5D, 5L, 5M, 7Q. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00756881-P4
11/18/2025
Objection resolved — Addressed
11/07/2025
Objection resolved — Addressed
11/07/2025
Objection resolved — Addressed
11/07/2025
Objection resolved — Addressed
11/06/2025
Objection raised — Plumbing
11/06/2025
Objection raised — Other
11/06/2025
Objection raised — Plumbing
11/06/2025
Objection raised — Plumbing
11/06/2025
Objection raised — Plumbing
11/05/2025
Special inspection requirement — Final
Jerry Caldari
11/03/2025
Violation issued (HPD, closed)
C
10/29/2025
Objection resolved — Addressed
10/29/2025
Objection resolved — Addressed
10/29/2025
Objection resolved — Addressed
10/28/2025
Objection raised — Plumbing
10/28/2025
Objection raised — Plumbing
10/21/2025
Objection resolved — Addressed
10/07/2025
Violation issued (FDNY_NOV, closed)
10/07/2025
Violation issued (FDNY_NOV, closed)
09/29/2025
Objection raised — Scope
09/26/2025
Objection raised — Mechanical
09/26/2025
Objection raised — Plumbing
09/16/2025
Filed — Alteration
INSTALL NEW GAS METER AND PIPING TO NEW BOILER AND KITCHEN APPLIANCES.
B01258836-S1
09/16/2025
Filed — Alteration
INSTALL NEW GAS METER AND PIPING TO NEW BOILER AND KITCHEN APPLIANCES.
B01258836-I1
09/02/2025
Filed — Alteration
PROPOSED INTERIOR RENOVATION TO APARTMENTS 2B, 2D, 3E, 3O, 3Q, 5D, 5L, 5M, 7Q. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00756881-P3
08/01/2025
Violation issued (HPD, closed)
A
07/28/2025
Permit issued — Structural
B01210303-I1-ST
07/21/2025
Special inspection requirement — Heating Systems
LOUIS ARENA
07/21/2025
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
07/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
07/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedSkyline Builders Group09/30/2026
DOB NOWStructuralPermit IssuedSkyline Builders Group09/09/2026
DOB NOWStructuralPermit IssuedSkyline Builders Group07/28/2026
DOB NOWPlumbingSigned-offBek Plumbing & Heating02/13/2026
DOB NOWPlumbingPermit IssuedNeptune Mechanical01/26/2026
DOB NOWBoiler EquipmentPermit IssuedNeptune Mechanical01/26/2026
DOB NOWStructuralPermit IssuedSkyline Builders Group12/19/2025
DOB NOWStructuralPermit IssuedSkyline Builders Group07/28/2025
DOB NOWGeneral ConstructionPermit IssuedLuma Construction05/08/2025
DOB NOWSidewalk ShedSigned-offKings Group NY05/02/2024
DOB NOWSupported ScaffoldSigned-offKings Group NY01/19/2024
DOB NOWSidewalk ShedSigned-offKings Group NY05/04/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedEbro Dique Group03/23/2023
DOB NOWGeneral ConstructionSigned-offEbro Dique Group03/17/2023
DOB NOWSupported ScaffoldSigned-offKings Group NY02/09/2023
DOB NOWGeneral ConstructionPermit IssuedBlack Hammer Construction11/16/2022
DOB NOWSidewalk ShedSigned-offKings Group NY08/23/2022
DOB NOWGeneral ConstructionPermit IssuedProgeny Construction08/17/2022
DOB NOWSprinklersPermit IssuedLloyd G. Drummond07/27/2022
DOB NOWPlumbingPermit IssuedLloyd G Drummond Plumbing & Gen07/11/2022
DOB NOWMechanical SystemsPermit IssuedSuperior HVAC06/27/2022
DOB NOWGeneral ConstructionPermit IssuedPro Builders R Construction06/10/2022
DOB NOWSidewalk ShedSigned-offKings Group NY05/17/2022
DOB NOWGeneral ConstructionPermit IssuedBlack Hammer Construction03/11/2022
DOB NOWGeneral ConstructionPermit IssuedBlack Hammer Construction03/10/2022
DOB NOWGeneral ConstructionPermit IssuedCypress Green Construction Co02/28/2022
DOB NOWMechanical SystemsSigned-offAir Depot Commercial Refrigeration12/09/2021
DOB NOWPlumbingPermit IssuedGlenns Plumbing Services11/13/2021
DOB NOWStructuralPermit IssuedFranklylofty Construction11/05/2021
DOB NOWGeneral ConstructionSigned-offProgeny Construction11/03/2021
DOB NOWGeneral ConstructionPermit IssuedProgeny Construction10/07/2021
DOB NOWPlumbingSigned-offGlenns Plumbing Services09/30/2021
DOB NOWSprinklersSigned-offCrossfield Plumbing & Heating09/29/2021
DOB NOWPlumbingSigned-offCrossfield Plumbing & Heating09/29/2021
DOB NOWGeneral ConstructionPermit IssuedProgeny Construction09/15/2021
DOB NOWSidewalk ShedSigned-offKings Group NY08/25/2021
DOB NOWPlumbingPermit IssuedGlenns Plumbing Services08/03/2021
DOB NOWGeneral ConstructionPermit IssuedProgeny Construction07/23/2021
DOB NOWGeneral ConstructionPermit IssuedCypress Green Construction Co07/19/2021
DOB NOWPlumbingPermit IssuedGlenns Plumbing Services07/13/2021
+ 60 more permits on file
3 projects · most recent 03/28/2025
Ventilation Systems Associated Ducts and Piping Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/28/2025——Ventilation Systems
Ventilation
Captiveaire SIF9DD 50 CFM · Makeup Air ×1
05/02/2022Permit IssuedSuperior HVACAssociated Ducts and Piping, Heating and Air Conditioning Systems
Heat / Cool
Daikin RXYQ120XATJA 120,000 BTU · Vrf Outdoor ×2
RXYQ192XATJA 192,000 BTU · Vrf Outdoor ×2
Ducts & Piping
Daikin FXSQ54TAVJU 54,000 BTU · Vrf Indoor ×8
FXAQ07PVJU 7,500 BTU · Vrf Indoor ×2
FXFQ24TVJU 23,000 BTU · Vrf Indoor ×2
FXTQ24TAVJUA 24,000 BTU · Vrf Indoor ×2
10/23/2020——Ventilation Systems—
1 project · most recent 06/02/2022
FiledStatusContractorScope
06/02/2022Permit IssuedLloyd G Drummond Plumbing & Gen—
8 projects · most recent 04/29/2026
Gas Water/Sanitary
FiledStatusContractorScope
04/29/2026Permit IssuedNeptune MechanicalGas
06/02/2022Permit IssuedLloyd G Drummond Plumbing & GenGas, Water/Sanitary
09/22/2021Signed-offI & I PlumbingGas, Water/Sanitary
03/25/2021Permit IssuedI & I PlumbingGas, Water/Sanitary
03/25/2021Permit IssuedI & I PlumbingGas, Water/Sanitary
03/25/2021Permit IssuedI & I PlumbingGas, Water/Sanitary
02/18/2021Permit IssuedI & I PlumbingGas, Water/Sanitary
10/29/2020Permit IssuedI & I PlumbingWater/Sanitary
25 projects · most recent 11/24/2025
General Wiring
FiledStatusContractorScope
11/24/2025Permit IssuedRobert ChimentiGeneral Wiring
06/13/2025CompleteRobert ChimentiGeneral Wiring
06/13/2025CompleteRobert ChimentiGeneral Wiring
06/13/2025CompleteRobert ChimentiGeneral Wiring
06/13/2025CompleteRobert ChimentiGeneral Wiring
06/13/2025CompleteRobert ChimentiGeneral Wiring
06/13/2025CompleteRobert ChimentiGeneral Wiring
06/12/2025CompleteRobert ChimentiGeneral Wiring
12/19/2024Permit IssuedMaximum ElectricGeneral Wiring
12/13/2024Permit IssuedMaximum ElectricGeneral Wiring
05/10/2022CompleteWord of Light ElectricGeneral Wiring
02/10/2022Permit IssuedTrincity ElectricGeneral Wiring
11/11/2021CompleteWord of Light ElectricGeneral Wiring
09/20/2021Permit IssuedWord of Light ElectricGeneral Wiring
07/26/2021CompleteEcny Electrical Contractors—
2 projects · most recent 02/06/2025
Steel
FiledStatusContractorScope
02/06/2025Permit IssuedSkyline Builders Group1 scope_items
09/10/2021——Steel
1 project · most recent 04/29/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
04/29/2026Permit IssuedNeptune MechanicalTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 27
DateTypeResultReport
03/11/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/05/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/04/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/26/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/08/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/06/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/16/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/15/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/09/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/15/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/15/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/10/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/10/2022Certified Sprinkler - SP - RoughingCertifiedView ↗
05/05/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/02/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/02/2022Certified Sprinkler - SP - RoughingCertifiedView ↗
05/02/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/09/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
01/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/22/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/29/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/29/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/11/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
Latest 25 of 27.
▾Special Inspection Requirements (DOB NOW) — 121
DateRequirementInspectorRole
02/04/2026Energy Code Compliance InspectionsBrian McDonoughprogress
02/04/2026Fire-Resistant Penetrations and JointsBrian McDonoughspecial
02/04/2026HVAC-R and service water piping design and insulationBrian McDonoughenergy_progress
11/19/2025FinalJerry Caldariprogress
11/05/2025FinalJerry Caldariprogress
07/21/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
07/21/2025Energy Code Compliance InspectionsLOUIS ARENAprogress
07/21/2025HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
07/21/2025HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
07/21/2025HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
07/21/2025Maintenance informationLOUIS ARENAenergy_progress
07/21/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
07/21/2025Heating SystemsLOUIS ARENAspecial
04/14/2025MasonryWinston Garciaspecial
04/14/2025FinalWinston Garciaprogress
04/14/2025Sprayed fire-resistant materialsWinston Garciaspecial
04/14/2025Structural Cold-Formed SteelWinston Garciaspecial
04/14/2025Tenant Protection Plan ComplianceWinston Garciaspecial
04/14/2025Structural Steel - WeldingWinston Garciaspecial
04/14/2025Structural Steel - High Strength BoltingWinston Garciaspecial
04/14/2025Post-installed AnchorsWinston Garciaspecial
04/14/2025Fire-Resistant Penetrations and JointsWinston Garciaspecial
04/14/2025Structural Steel - DetailsWinston Garciaspecial
03/19/2025Tenant Protection Plan ComplianceAshley Rauenzahnspecial
03/13/2025Shutoff dampers—energy_progress
Latest 25 of 121.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Brooklyn Creative LeagueOfficeFloor 1
Project B00498827 Alteration · Permit Entire · 04/13/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 907 on file (BIS + DOB NOW)
▸Plans & Drawings68
▸DOB NOWPlans/Sketch43
09/01/2026B00498827-P1Request digital key ↗
09/01/2026B00543800-I1Request digital key ↗
09/01/2026B00590186-I1Request digital key ↗
Showing 3 of 43 on file for this type
▸DOB NOWPlans/Sketch - Plumbing16
09/02/2026B00421341-I1Request digital key ↗
09/01/2026B00453799-I1Request digital key ↗
09/01/2026B00418021-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems6
09/02/2026B00417323-I1Request digital key ↗
09/02/2026B00417884-I1Request digital key ↗
09/02/2026B00417976-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly1
08/28/2026B00780644-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00384160-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/01/2026B00448936-I1Request digital key ↗
▸Applications & Permits127
▸BISPLAN / WORK APPROVAL APPLICATION69
08/06/2025322068098Open ↗
06/06/2024340765014Open ↗
01/24/2022321479985Open ↗
Showing 3 of 69 on file for this type
▸BISWORK PERMIT APPLICATION50
11/19/2020340780177Open ↗
11/17/2020340779438Open ↗
11/17/2020340779401Open ↗
Showing 3 of 50 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications275
▸DOB NOWDPL-1: Design Professional Seal & Signature68
09/02/2026B00417323-I1Open ↗
09/02/2026B00417884-I1Open ↗
09/02/2026B00417976-I1Open ↗
Showing 3 of 68 on file for this type
▸DOB NOWProgress Inspector Seal & Signature54
10/14/2026B00756881-I1Open ↗
10/05/2026B00590186-I1Open ↗
09/30/2026B00493268-P1Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature49
10/05/2026B00590186-I1Open ↗
10/05/2026B00590186-I1Open ↗
09/30/2026B00493268-P1Open ↗
Showing 3 of 49 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT24
01/19/2021340799568Open ↗
10/28/2020340780177Open ↗
10/23/2020340779321Open ↗
Showing 3 of 24 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION20
01/19/2021340799568Open ↗
10/28/2020340780177Open ↗
10/23/2020340779321Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY11
10/28/2020340780177Open ↗
10/01/2020340765014Open ↗
08/14/2020340755310Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/01/2020340765014Open ↗
▸Trade Schedules & Equipment28
▸BISSCHEDULE B - PLUMBING19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSELF-CERT PLUMBING NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection54
▸BISTENANT PROTECTION PLAN AND NOTES27
04/27/2021340726593Open ↗
04/27/2021322020852Open ↗
03/09/2021322085550Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWTenant Protection Plan22
09/02/2026B00417323-I1Open ↗
09/02/2026B00417884-I1Open ↗
09/02/2026B00417976-I1Open ↗
Showing 3 of 22 on file for this type
▸BISSTREET TREE CHECKLIST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Environmental & Asbestos85
▸DOB NOWDEP ACP-5: Asbestos Assessment Report59
09/02/2026B00417323-I1Open ↗
09/02/2026B00417884-I1Open ↗
09/02/2026B00417976-I1Open ↗
Showing 3 of 59 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)15
10/28/2020340780177Open ↗
10/01/2020340765014Open ↗
08/14/2020340755310Open ↗
Showing 3 of 15 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/27/2026B00817800-I1Open ↗
▸Energy Compliance45
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY18
11/19/2020340780177Open ↗
10/28/2020340780177Open ↗
10/27/2020340765014Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS10
10/28/2020340780177Open ↗
10/01/2020340765014Open ↗
08/14/2020340755310Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
09/01/2026B00606006-I1Open ↗
Showing 1 of 2 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
06/24/2024340765014Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/24/2024340765014Open ↗
▸Inspections & Test Reports43
▸BISTECHNICAL REPORT: RESPONSIBILITY32
03/29/2021340726593Open ↗
03/29/2021340726593Open ↗
03/11/2021340726593Open ↗
Showing 3 of 32 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)9
11/17/2020340779438Open ↗
11/17/2020340779401Open ↗
11/17/2020340779394Open ↗
Showing 3 of 9 on file for this type
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISMASONRY1
06/24/2024340765014Open ↗
▸Approvals, Objections & Sign-offs48
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST20
06/25/2024340765014Open ↗
Showing 1 of 20 on file for this type
▸BISFINAL10
06/24/2024340765014Open ↗
11/17/2020340779438Open ↗
11/17/2020340779401Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership57
▸BISCOST AFFIDAVIT56
01/19/2021340799568Open ↗
10/28/2020340780177Open ↗
10/23/2020340779321Open ↗
Showing 3 of 56 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/24/2024340765014Open ↗
▸Filing & Intake Forms74
▸BISADDITIONAL INFORMATION23
06/21/2024340765014Open ↗
02/01/2022320009959Open ↗
03/31/2021340726593Open ↗
Showing 3 of 23 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET21
01/19/2021340799568Open ↗
10/28/2020340780177Open ↗
10/23/2020340779321Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING COVER SHEET16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISBOROUGH INTAKE FORM14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸Other Documents3
▸BISDHCR DOCUMENT1
02/15/2022320009959Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type