← Back
BuildNYC
Elevator apt, semi-fireproof without stores
2790 BRAGG STREET
BROOKLYN · BIN 3247900
💬 Discuss this project
1961Year Built
6Stories
D1Building Class
R5Zoning
73,000 sfGross Floor Area
76Units
LL97 CoveredRent Stabilized88 Active Violations 87 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 2790 Bragg Street · 29,700 sf lot · 2.46 FAR built · Flood zone X500
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 4 docs
Floor 1Nautilus sidewalk and curb cut1 filing · 3 docs
Sub-Basement2790 Bragg Street LLC4p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Nautilus Realty1603/21/2026
2790 Bragg Street904/09/2026
Lefrak103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/07/2022$16.5M—— → —$226/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Gregory Perotto202/26/2026
K & M Associates101/07/2021
Bauer Dermel Architect109/09/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GC1 Expediting203/21/2026
Metropolis Group203/21/2026
Perotto Group403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L.e.c.incGeneral Contractor203/21/2026
Bell Fuel OilPlumbing106/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Gregory V. Perotto, P.E947202/26/2026
KM Consulting NY5305101/07/2021
Building Lifecycle
All (73)Filed (4)Permit Issued (3)Signed Off (3)Violation (60)Inspection (1)Special Inspection (2)
08/31/2026
Signed off — Alteration
Reconnect existing gas line to replacement burner. Replacement burner filed under DOB NOW BUILD# B01363127. No change in use, egress or occupancy.
B01363129-I1
07/28/2026
Signed off — Alteration
B01363127-I1
04/22/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/01/2026
Violation issued (ECB, open)
Boilers
03/12/2026
Permit issued — Boiler Equipment
B01363127-I1-BE
03/10/2026
Permit issued — Plumbing
B01363129-I1-PL
02/26/2026
Filed — Alteration
Reconnect existing gas line to replacement burner. Replacement burner filed under DOB NOW BUILD# B01363127. No change in use, egress or occupancy.
B01363129-I1
02/26/2026
Filed — Alteration
B01363127-I1
02/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
02/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
Gregory Perotto
02/16/2026
Violation issued (HPD, closed)
B
02/16/2026
Violation issued (HPD, closed)
B
02/09/2026
Violation issued (HPD, closed)
B
02/09/2026
Violation issued (HPD, closed)
C
02/09/2026
Violation issued (HPD, closed)
C
02/09/2026
Violation issued (HPD, closed)
B
02/03/2026
Violation issued (HPD, closed)
B
02/03/2026
Violation issued (HPD, closed)
C
02/03/2026
Violation issued (HPD, open)
C
02/03/2026
Violation issued (HPD, closed)
C
02/03/2026
Violation issued (HPD, closed)
B
02/03/2026
Violation issued (HPD, closed)
C
01/14/2026
Violation issued (HPD, open)
B
01/14/2026
Violation issued (HPD, open)
B
01/14/2026
Violation issued (HPD, open)
C
01/14/2026
Violation issued (HPD, open)
C
01/14/2026
Violation issued (HPD, open)
B
12/18/2025
Violation issued (HPD, open)
B
12/18/2025
Violation issued (HPD, open)
B
12/18/2025
Violation issued (HPD, open)
C
12/18/2025
Violation issued (HPD, open)
B
12/18/2025
Violation issued (HPD, open)
B
12/18/2025
Violation issued (HPD, open)
B
12/18/2025
Violation issued (HPD, open)
B
12/18/2025
Violation issued (HPD, open)
B
12/16/2025
Violation issued (HPD, open)
B
11/08/2025
Violation issued (HPD, closed)
B
10/11/2025
Violation issued (HPD, closed)
B
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
A
08/30/2025
Violation issued (HPD, closed)
C
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
A
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, closed)
C
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
B
08/30/2025
Violation issued (HPD, open)
B
07/24/2025
Violation issued (FDNY_NOV, closed)
07/01/2025
Violation issued (HPD, open)
B
07/01/2025
Violation issued (HPD, open)
B
07/01/2025
Violation issued (HPD, open)
B
05/21/2025
Violation issued (HPD, closed)
B
03/13/2025
Violation issued (HPD, open)
B
03/13/2025
Violation issued (HPD, open)
B
03/13/2025
Violation issued (HPD, open)
B
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offApproved Oil Co. of Brook03/12/2026
DOB NOWPlumbingSigned-offApproved Energy03/10/2026
DOB NOWAntennaSigned-offL.e.c.inc02/05/2021
BISPLISSUEDCommerical Plumbing Svces10/17/2024
BISOTISSUEDDNA Contracting03/18/2019
BISEQISSUEDSpring Scaffolding03/04/2019
BISEQISSUEDSpring Scaffolding03/28/2018
BISOTISSUEDDNA Contracting02/26/2018
BISOTISSUEDDNA Contracting02/07/2018
BISOTISSUEDDNA Contracting05/02/2017
BISEQISSUEDSpring Scaffolding04/25/2017
BISOTISSUEDDavrial Enterprises09/28/2016
BISOTISSUEDGeneral Restoration Group09/30/2015
BISPLISSUEDGenesis Plumbing and Heating06/16/2015
BIS—ISSUEDCanfield Construction06/11/2015
BISOTISSUEDKing Rose of NY11/22/2013
BISMHISSUEDKing Rose of NY11/22/2013
BISOTISSUEDKing Rose of NY08/21/2013
BISOTISSUEDKing Rose of NY08/21/2013
BISMHISSUEDKing Rose of NY08/21/2013
BISOTISSUEDPantheon Construction02/08/2013
BISOTISSUEDRiconda Maintenance01/28/2013
BISEQISSUEDEverest Scaffolding06/12/2012
BISOTISSUEDRiconda Maintenance01/31/2012
BISEQISSUEDEverest Scaffolding09/02/2011
BISOTISSUEDRiconda Maintenance01/12/2011
BISOTISSUEDRiconda Maintenance06/28/2010
BISOTISSUEDTelcom Engineering GP01/22/2010
BIS—ISSUEDCanfield Construction12/11/2007
BIS—ISSUEDCanfield Construction04/15/2005
BISPLISSUEDBell Fuel Oil12/04/2003
BISFBISSUEDAbilene12/04/2003
BIS—ISSUEDCanfield Construction03/25/2003
BISOTISSUEDApplied Electric08/23/2001
BISOTISSUEDApplied Electric03/19/1997
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
04/22/2026Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
02/22/2026Fire-Resistant Penetrations and JointsGregory Perottospecial
02/22/2026Tenant Protection Plan ComplianceGregory Perottospecial
▾Documents — 220 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch2
08/18/2026B01363129-I1Request digital key ↗
08/18/2026B01363127-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/02/2026B00374105-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
09/02/2026B00439371-I1Request digital key ↗
▸Applications & Permits54
▸BISPLAN / WORK APPROVAL APPLICATION33
04/07/2025301149950Open ↗
10/24/2024301149950Open ↗
11/16/2023301149950Open ↗
Showing 3 of 33 on file for this type
▸BISWORK PERMIT APPLICATION20
08/23/2024301149950Open ↗
03/29/2018321562386Open ↗
03/08/2018340472287Open ↗
Showing 3 of 20 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
11/09/2023301149950Open ↗
▸Seals & Professional Certifications52
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
09/25/2019321562386Open ↗
09/14/2019340472287Open ↗
09/14/2019340472287Open ↗
Showing 3 of 29 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
05/03/2017321562386Open ↗
09/01/2015321228578Open ↗
04/30/2013320736101Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
04/30/2013320736101Open ↗
04/30/2013320736101Open ↗
04/30/2013320736101Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/02/2026B00439371-I1Open ↗
08/18/2026B01363127-I1Open ↗
08/13/2026B01363129-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/03/2017321562386Open ↗
03/02/2017340472287Open ↗
09/01/2015321228578Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026B01363129-I1Open ↗
09/02/2026B01363129-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/02/2017340472287Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/02/2017340472287Open ↗
▸Trade Schedules & Equipment8
▸BISSELF-CERT PLUMBING NOTICE4
07/25/2014320736101Open ↗
07/25/2014320736101Open ↗
06/09/2014320736101Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
04/27/2018301149950Open ↗
05/03/2017301149950Open ↗
12/01/2015301149950Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
04/30/2013320736101Open ↗
▸Safety & Tenant Protection6
▸BISTENANT PROTECTION PLAN AND NOTES3
01/23/2024301149950Open ↗
03/02/2017340472287Open ↗
05/03/2017321562386Open ↗
▸DOB NOWTenant Protection Plan2
08/13/2026B00439371-I1Open ↗
08/13/2026B00374105-I1Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
06/14/2012320492622Open ↗
▸Environmental & Asbestos11
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/02/2017340472287Open ↗
04/30/2013320736101Open ↗
01/14/2013320701282Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
06/29/2010320179203Open ↗
02/09/2009310297540Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/02/2026B00439371-I1Open ↗
08/18/2026B01363127-I1Open ↗
08/13/2026B01363129-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/05/2010320154168Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
10/06/2015321228578Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
09/14/2019340472287Open ↗
03/09/2018321114076Open ↗
02/17/2016321228578Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
09/14/2019340472287Open ↗
03/09/2018321114076Open ↗
02/17/2016321228578Open ↗
Showing 3 of 4 on file for this type
▸BISNYCECC ANALYSIS1
03/02/2017340472287Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/02/2017340472287Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
10/18/2021301149950Open ↗
12/15/2020301149950Open ↗
08/30/2019340472287Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs21
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
09/25/2019321562386Open ↗
09/14/2019340472287Open ↗
03/09/2018321114076Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
09/01/2015321228578Open ↗
04/27/2015321114076Open ↗
04/30/2013320736101Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
04/07/2025301149950Open ↗
▸BISSUPERSEDING LETTER1
03/08/2018340472287Open ↗
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT20
12/14/2023301149950Open ↗
09/14/2019340472287Open ↗
08/30/2019340472287Open ↗
Showing 3 of 20 on file for this type
▸Filing & Intake Forms23
▸BISEFILING COVER SHEET10
05/02/2017321562386Open ↗
09/01/2015321228578Open ↗
04/27/2015321114076Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION8
01/23/2024301149950Open ↗
07/22/2021301149950Open ↗
08/30/2019340472287Open ↗
Showing 3 of 8 on file for this type
▸BISBOROUGH INTAKE FORM4
12/08/2020301149950Open ↗
09/25/2019321562386Open ↗
09/14/2019340472287Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
03/02/2017340472287Open ↗
▸Other Documents1
▸BISSupporting Document: Fee Deferment1
03/14/2019340472287Open ↗