| Owner | Filings | Most Recent |
|---|---|---|
| Lic Site B1 Owner | 234 | 03/22/2026 |
| Tishman Speyer Properties - Jacx | 136 | 09/18/2026 |
| 300 Park Avenue | 20 | 07/08/2026 |
| 520 Madison Avenue | 9 | 07/08/2026 |
| Lic Development Owner | 6 | 03/21/2026 |
| Jacx | 5 | 03/21/2026 |
| NYC Economic Development | 3 | 03/21/2026 |
| Allstate State Group | 1 | 03/22/2026 |
| Nycedc | 1 | 03/21/2026 |
| NYC Department of Housing Preservation and Development | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 06/30/2016 | $10.7M | — | NEW YORK CITY ECONOMIC DEVELOPMENT CORPORATION → LIC SITE B-1 OWNER, L.L.C. | — not available |
| Representative | Filings | Most Recent |
|---|---|---|
| Codegreen | 3 | 03/21/2026 |
| Custodio Consulting | 8 | 03/21/2026 |
| Gillman Consulting | 58 | 03/21/2026 |
| Sol Building Consulting Services | 11 | 03/21/2026 |
| Municipal Expediting | 42 | 03/21/2026 |
| Empire City Consultants | 10 | 03/21/2026 |
| City Building NY Architect P | 8 | 03/21/2026 |
| Building Brothers | 6 | 03/21/2026 |
| Joanna Karagiannis | 6 | 03/21/2026 |
| Integrated C O Milrose Consultants | 2 | 03/21/2026 |
| JP Expedite | 2 | 03/21/2026 |
| A1 Expediting Service | 2 | 03/21/2026 |
| Spring Scaffolding | 2 | 03/21/2026 |
| Valjato Engineering P | 2 | 03/21/2026 |
| Louis Striar | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Turner Construction Company | General Contractor | 10 | 07/08/2026 |
| Structure Tone | General Contractor | 9 | 07/08/2026 |
| Premier Fire Sprinkler Co | Fire Protection | 9 | 07/08/2026 |
| Ridge Construction | General Contractor | 8 | 03/21/2026 |
| Mac Felder | Plumbing | 6 | 07/08/2026 |
| John Gallin & Son | General Contractor | 4 | 03/21/2026 |
| Build NYC Group | General Contractor | 4 | 07/28/2026 |
| NY Building Associates | General Contractor | 4 | 03/21/2026 |
| Imperium Construction SE* | General Contractor | 4 | 04/09/2026 |
| S&E Bridge & Scaffold | Scaffold | 4 | 07/08/2026 |
| Wesbuilt Construction Man | General Contractor | 3 | 07/08/2026 |
| Signs Cad | Sign hanger | 3 | 07/08/2026 |
| Spring Scaffolding | Scaffold | 3 | 03/21/2026 |
| American Standard P&H Cororp | Plumbing | 2 | 07/08/2026 |
| Vanguard Construction and | General Contractor | 2 | 07/08/2026 |
| PSI Partners | Fire Protection | 2 | 08/26/2026 |
| Long Shot Crane | Sign hanger | 2 | 09/18/2026 |
| Universal Fire Sprinkler | Fire Protection | 2 | 07/08/2026 |
| Schimenti Construction Co | General Contractor | 2 | 07/08/2026 |
| High Quality Construction | General Contractor | 2 | 03/21/2026 |
| Enobrac Plumbing | Plumbing | 2 | 07/08/2026 |
| Omara Organization | General Contractor | 2 | 03/21/2026 |
| Active Signs | Sign hanger | 2 | 08/11/2026 |
| RRP Plumbing | Plumbing | 1 | 07/08/2026 |
| Watson's Plumbing, Heating, & Building | Plumbing | 1 | 07/08/2026 |
| Allstate Sales Group | Electrical | 1 | 03/22/2026 |
| William C. Gerakaris P&H | Plumbing | 1 | 07/08/2026 |
| Control Electrical Cont'g | Electrical | 1 | 03/22/2026 |
| Freedom Electl & Data | Electrical | 1 | 03/22/2026 |
| Intelogic Electric | Electrical | 1 | 03/22/2026 |
| Knight Electrical Service | Electrical | 1 | 03/22/2026 |
| Tuxedo Electrical Contracting | Electrical | 1 | 03/22/2026 |
| Fabbrica | General Contractor | 1 | 07/08/2026 |
| Mass Contracting | General Contractor | 1 | 07/08/2026 |
| SCG America Construction | General Contractor | 1 | 04/10/2026 |
| The Sci Construction | General Contractor | 1 | 07/22/2026 |
| L.S. Sign Co | Sign hanger | 1 | 07/08/2026 |
| A&A Plumbing | Plumbing | 1 | 07/30/2026 |
| American Standard Plumbing | Fire Protection | 1 | 07/08/2026 |
| A & M Warshaw Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| A Plus Plumbing | Plumbing | 1 | 07/08/2026 |
| Bedrock Mechanical | Fire Protection | 1 | 07/08/2026 |
| Bedrock Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Full Capacity Fire | Fire Protection | 1 | 07/08/2026 |
| Mackler Master Fire | Fire Protection | 1 | 07/08/2026 |
| Mackler Master Fire | Plumbing | 1 | 07/08/2026 |
| Metrotech Mechanical | Plumbing | 1 | 07/08/2026 |
| Rael Automatic Sprinkler Co | Fire Protection | 1 | 07/08/2026 |
| RRP Plumbing | Fire Protection | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Walter T. Gorman, P.E., P | 268 | 4 | 07/14/2026 |
| Custodio Consulting | 1835 | 5 | 04/23/2026 |
| Welldone Inspection | 8628 | 2 | 04/03/2026 |
| Stracar Special Inspectio | 229 | 2 | 04/01/2026 |
| Architectural Engineering | 6111 | 7 | 07/01/2024 |
| Richmond Testing Lab | 263 | 9 | 10/09/2023 |
| Huan Design | 7669 | 2 | 09/13/2023 |
| Valjato Engineering | 2486 | 1 | 09/22/2022 |
| J&R Design and Inspection | 6637 | 3 | 08/21/2022 |
| NKM Engineering | 6244 | 1 | 08/21/2022 |
| Alan Margolin & Associates | 423 | 31 | 05/27/2022 |
| DNA Controlled Inspection | 554 | 8 | 05/09/2022 |
| Crosscheck Inspection Services | 544 | 6 | 02/04/2021 |
| Project Tactical Solution | 5859 | 6 | 01/20/2021 |
| Milrose Consultants | 2003 | 3 | 09/29/2020 |
| MT Group | 798 | 2 | 02/13/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sign | Permit Issued | Long Shot Crane | 09/17/2026 |
| DOB NOW | Sign | Permit Issued | Bori Construction | 09/14/2026 |
| DOB NOW | Sign | Permit Issued | Active Signs | 08/10/2026 |
| DOB NOW | Sprinklers | Permit Issued | PSI Partners | 08/04/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A Plumbing | 07/29/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Build NYC Group | 07/27/2026 |
| DOB NOW | General Construction | Permit Issued | Build NYC Group | 07/27/2026 |
| DOB NOW | General Construction | Permit Issued | The Sci Construction | 07/20/2026 |
| DOB NOW | Plumbing | Permit Issued | Watson's Plumbing, Heating, & Building | 04/21/2026 |
| DOB NOW | General Construction | Permit Issued | SCG America Construction | 04/08/2026 |
| DOB NOW | Sprinklers | Signed-off | Mackler Master Fire | 08/01/2025 |
| DOB NOW | Plumbing | Signed-off | Mackler Master Fire | 08/01/2025 |
| DOB NOW | General Construction | Signed-off | Imperium Construction SE* | 07/09/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Imperium Construction SE* | 07/09/2025 |
| DOB NOW | Sprinklers | Signed-off | Bedrock Mechanical | 03/21/2024 |
| DOB NOW | Sprinklers | Signed-off | Bedrock Plumbing & Heating | 03/20/2024 |
| DOB NOW | Plumbing | Signed-off | A & M Warshaw Plumbing & Heating | 02/22/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Structure Tone | 02/21/2024 |
| DOB NOW | General Construction | Signed-off | Structure Tone | 02/21/2024 |
| DOB NOW | Plumbing | Signed-off | A Plus Plumbing | 10/11/2023 |
| DOB NOW | Plumbing | Permit Issued | American Standard P&H Cororp | 09/20/2023 |
| DOB NOW | General Construction | Signed-off | NY Building Associates | 08/02/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | Ridge Construction | 05/02/2023 |
| DOB NOW | Structural | Permit Issued | Ridge Construction | 03/29/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | NY Building Associates | 01/19/2023 |
| DOB NOW | Sprinklers | Permit Issued | American Standard Plumbing | 11/03/2022 |
| DOB NOW | Sign | Permit Issued | Active Signs | 10/31/2022 |
| DOB NOW | Plumbing | Signed-off | Enobrac Plumbing | 10/28/2022 |
| DOB NOW | Sidewalk Shed | Signed-off | Spring Scaffolding | 10/28/2022 |
| DOB NOW | Sign | Signed-off | Weinfeld, Elliot | 10/07/2022 |
| DOB NOW | Mechanical Systems | Permit Issued | Ridge Construction | 09/29/2022 |
| DOB NOW | General Construction | Signed-off | Fabbrica | 09/27/2022 |
| DOB NOW | Plumbing | Signed-off | American Standard P&H Cororp | 08/25/2022 |
| DOB NOW | General Construction | Signed-off | High Quality Construction | 08/03/2022 |
| DOB NOW | Sprinklers | Signed-off | Premier Fire Sprinkler Co | 02/10/2022 |
| DOB NOW | Sign | Signed-off | Signs Cad | 01/18/2022 |
| DOB NOW | Mechanical Systems | Signed-off | Turner Construction Company | 12/20/2021 |
| DOB NOW | General Construction | Signed-off | Turner Construction Company | 12/02/2021 |
| DOB NOW | General Construction | Signed-off | John Gallin Son | 11/30/2021 |
| DOB NOW | Plumbing | Signed-off | Enobrac Plumbing | 11/27/2021 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 04/02/2026 | Signed-off | Imperium Construction SE* | Heating and Air Conditioning Systems | Heat / Cool Trane GEVK03642A2KB0TRH 29,600 BTU · Wshp ×9 GEVK12042A4CB0TFF 126,500 BTU · Wshp ×6 GEVK06042A4CB0TFF 60,100 BTU ×3 |
| 07/01/2024 | Signed-off | Structure Tone | Heating and Air Conditioning Systems | Heat / Cool |
| 10/09/2023 | Permit Issued | Ridge Construction | Refrigeration Systems | Refrigeration Bohn BNL-S01-A008 8,000 CFM · Condensing Unit ×6 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/01/2026 | Signed-off | Mackler Master Fire | 88 heads |
| 07/01/2024 | Signed-off | Bedrock Mechanical | Sprinkler System |
| 08/21/2022 | Permit Issued | American Standard Plumbing | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/03/2026 | Permit Issued | Watson's Plumbing, Heating, & Building | Gas, Water/Sanitary |
| 04/01/2026 | — | — | — |
| 07/01/2024 | Signed-off | Bedrock Plumbing & Heating | Water/Sanitary |
| 08/16/2022 | Signed-off | American Standard P&H | Water/Sanitary |
| 01/20/2021 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/29/2026 | Permit Issued | Allstate Electric | General Wiring |
| 04/14/2026 | Permit Issued | First Star Electric | General Wiring |
| 04/10/2026 | Complete | V Electric NY | General Wiring |
| 12/30/2024 | Complete | Freedom Electric & Data | General Wiring |
| 02/22/2024 | Complete | Amr Electrical Contracting | General Wiring, Lighting |
| 11/21/2023 | Complete | Allstate Sales Group | General Wiring |
| 10/25/2023 | Complete | Allstate Sales Group | General Wiring |
| 09/25/2023 | Complete | Electriccity | General Wiring |
| 05/22/2023 | Complete | Intelogic Electric | General Wiring |
| 10/28/2022 | Complete | Top Shelf Electric | — |
| 10/06/2022 | Permit Issued | AUR0RA Electrical Contg | — |
| 09/28/2022 | Permit Issued | Knight Electrical Service | General Wiring |
| 11/23/2021 | Permit Issued | Jay United Electrical Contng | General Wiring |
| 08/04/2021 | Complete | S & D Electric NY | General Wiring |
| 02/17/2021 | Complete | E-J Electric Installation Co | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/09/2023 | Permit Issued | Ridge Construction | Concrete |
| Date | Type | Result | Report |
|---|---|---|---|
| 04/14/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/19/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/17/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/17/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/11/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 08/29/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/12/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/01/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/26/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/05/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/24/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/04/2023 | Certified Storm Drainage-ST-Fixtures-Finish | Certified | View ↗ |
| 11/02/2023 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 10/06/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/06/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/28/2023 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 06/02/2023 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 05/31/2023 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 02/08/2023 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 12/30/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/07/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/04/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/09/2022 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/23/2022 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/12/2026 | Final | LEON SKVIRSKY | progress |
| 08/10/2026 | Final | LEON SKVIRSKY | progress |
| 08/07/2026 | Final | LEON SKVIRSKY | progress |
| 07/02/2026 | Final | Susana Su-Tom | progress |
| 06/29/2026 | Electrical motors and elevators | Walter Gorman | energy_progress |
| 06/29/2026 | Post-installed Anchors | Walter Gorman | special |
| 06/29/2026 | Lighting controls | Walter Gorman | energy_progress |
| 06/29/2026 | Interior lighting power | Walter Gorman | energy_progress |
| 06/29/2026 | Duct leakage testing, insulation and design | Walter Gorman | energy_progress |
| 06/29/2026 | HVAC-R and service water piping design and insulation | Walter Gorman | energy_progress |
| 06/29/2026 | Energy Code Compliance Inspections | Walter Gorman | progress |
| 06/29/2026 | Metering | Walter Gorman | energy_progress |
| 06/29/2026 | Maintenance information | Walter Gorman | energy_progress |
| 06/26/2026 | Post-installed Anchors | Walter Gorman | special |
| 06/26/2026 | HVAC-R and service water piping design and insulation | Walter Gorman | energy_progress |
| 06/26/2026 | Fire-Resistant Penetrations and Joints | Walter Gorman | special |
| 06/26/2026 | HVAC-R and service water heating equipment | Walter Gorman | energy_progress |
| 06/26/2026 | Maintenance information | Walter Gorman | energy_progress |
| 06/26/2026 | HVAC-R and service water heating system controls | Walter Gorman | energy_progress |
| 06/26/2026 | Energy Code Compliance Inspections | Walter Gorman | progress |
| 06/17/2026 | Final | Walter Gorman | progress |
| 06/17/2026 | Mechanical Systems | Walter Gorman | special |
| 04/23/2026 | Interior lighting power | Anthony Caserma | energy_progress |
| 04/23/2026 | Energy Code Compliance Inspections | Anthony Caserma | progress |
| 04/23/2026 | Fire-Resistant Penetrations and Joints | Anthony Caserma | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Barry's | Fitness / Recreation | Cellar, Floor 1 | Project Q01187279 Project Q01187308 Project Q01187316 Project Q01197062 |
| Rolex | Retail | Floors 25, 26 | Project Q00978039 |
| Compass | Office | Cellar | Project Q00924058 |
| City Acres | Retail | Roof | Project Q00822046 |
| City Acres Market | Restaurant / Food Service | Cellar, Floor 1, Roof | Project Q00787681 Project Q00422028 Project Q00297230 |
| NewYork-Presbyterian | Medical / Healthcare | Cellar, Floors 1, 2 | Project Q00625160 Project Q00597530 Project Q00597573 Project Q00537040 Project Q00326029 Project Q00326039 Project Q00326037 Project Q00339627 |
| Bloomingdale's | Retail | Floors 16, 26 | Project Q00463678 Project Q00255959 Project Q00259839 |
| Jacx & Co | Restaurant / Food Service | Floor 1 | Project Q00372510 Project Q00372546 |
| WeWork | Office | — | Project Q00383792 |
| Kluger Restaurant | Restaurant / Food Service | Floor 1, Mezzanine | Project Q00259312 |
| Macy's & Bloomingdale's | Retail | Floors 4, 5, 15, 16, 20, 26 | Project Q00263124 |