← Back
BuildNYC
Elevator co-op, conversion from loft/warehouse
L'elysee Condominium
28 EAST 22ND STREET · BIN 1016258
💬 Discuss this project
1903Year Built
9Stories
D0Building Class
M1-5MZoning
19,226 sfGross Floor Area
10Units
Rent Stabilized0 Active Violations 2 old, status unconfirmed ▸FISP: UNSAFE
Elevator co-op, conversion from loft/warehouse · Owner of record: Asa Lofts · 2,300 sf lot · 8.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHoffman Management4p · 2 filings · 10 docs
Floor 99p · 1 filing · 6 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 34p · 1 filing · 8 docs
Floor 2Plumbing bathroom fixture modification, 2nd floor office1p · 1 filing · 3 docs
Floor 1
Site & exteriorHoffman Management10p · 2 filings · 15 docs
Filed — no permit issuedAsa Lofts, INC.7p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Asalofts1903/22/2026
28 East 22203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kohn Architecture101/12/2026
Tohfaz Uddin PE409/10/2025
FL&M Engineering Design & Inspection109/18/2023
Pamela Glazer Architect202/01/2023
Thomas Salazar308/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
W J Professional Expediting Company203/21/2026
Spring Scaffolding803/21/2026
Nexus Consulting NYC403/21/2026
Metropolis Group603/21/2026
Outsource Consultants203/21/2026
PS Engineers203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold908/14/2026
Conte BuildersGeneral Contractor203/21/2026
Tribute Restorationspecialty_contractor207/03/2026
Nophier Plumbing & HeatingPlumbing207/08/2026
Ostrava ElectricElectrical103/21/2026
Practical Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Geiger Engineering689109/18/2023
Metrospec Sia6420102/01/2023
Building Lifecycle
All (130)Filed (12)Permit Issued (17)Signed Off (6)Facade (FISP) (33)Violation (33)Inspection (3)Objection (20)Special Inspection (6)
10/07/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS , OR OCCUPANCY. THE PIPE SCAFFOLD ON THE FRONT ELEVATION OF THE BUILDING FROM THE TOP OF THE SIDEWALK BRIDGE.
M00824829-S1
10/06/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS , OR OCCUPANCY. THE PIPE SCAFFOLD ON THE FRONT ELEVATION OF THE BUILDING FROM THE TOP OF THE SIDEWALK BRIDGE.
M00824829-I1
08/27/2026
Signed off — Alteration
LOCALIZED FACADE REPAIRS FOR LL-11 . WORK INCLUDES BRICK REPLACEMENT/ POINTING; COPING STONE & WINDOWSILL REPLACEMENT; WINDOW LINTEL RESTORATION, ETC. WORK ALSO INCLUDES FIRE ESCAPE RESTORATION. NO CHANGE OF EGRESS, USE, OCCUPANCY, BULK OR HEIGHT
M00916397-I1
08/13/2026
Permit issued — Sidewalk Shed
M00824829-I1-SH
07/21/2026
Signed off — Alteration
M01229882-I1
07/01/2026
Permit issued — General Construction
M00916397-I1-GC
06/12/2026
Permit issued — Supported Scaffold
M00824829-S1-SF
05/27/2026
Permit issued — Sidewalk Shed
M00824829-I1-SH
04/14/2026
Objection resolved — Resolved
04/14/2026
Objection resolved — Resolved
04/14/2026
Objection resolved — Resolved
04/08/2026
Objection resolved — Resolved
03/23/2026
Objection resolved — Addressed
03/19/2026
Objection resolved — Addressed
03/19/2026
Objection resolved — Addressed
03/19/2026
Objection resolved — Addressed
03/19/2026
Objection resolved — Addressed
03/19/2026
Objection resolved — Addressed
03/02/2026
Permit issued — Sidewalk Shed
M00824829-I1-SH
02/05/2026
Objection raised — Other
02/05/2026
Objection raised — Zoning
02/05/2026
Objection raised — Structural
02/05/2026
Objection raised — Mechanical
02/05/2026
Objection raised — Scope
02/05/2026
Objection raised — Admin
02/05/2026
Objection raised — Zoning
02/05/2026
Objection raised — Plumbing
02/05/2026
Objection raised — Fire_Protection
02/05/2026
Objection raised — Cost
01/12/2026
Filed — Alteration CO
Project has been accepted into the HUB via consultation meeting on 07/28/2025 with Damian Titus. Herewith filing for a change of use on the full 2nd floor from non-residential to a partial dwelling unit. Please see comments for additional project info.
M01300983-I1
01/05/2026
Cycle 9 facade report signed — UNSAFE
12/22/2025
Cycle 9 facade report submitted
12/15/2025
Cycle 9 facade inspection completed
10/02/2025
Permit issued — Suspended Scaffold
M01229882-I1-SC
09/10/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS , OR OCCUPANCY. THE PIPE SCAFFOLD ON THE FRONT ELEVATION OF THE BUILDING FROM THE TOP OF THE SIDEWALK BRIDGE.
M00824829-P3
07/25/2025
Permit issued — General Construction
M00916397-I1-GC
06/09/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS , OR OCCUPANCY. THE PIPE SCAFFOLD ON THE FRONT ELEVATION OF THE BUILDING FROM THE TOP OF THE SIDEWALK BRIDGE.
M00824829-S1
06/09/2025
Permit issued — Supported Scaffold
M00824829-S1-SF
05/28/2025
Permit issued — Suspended Scaffold
M01229882-I1-SC
05/27/2025
Filed — Alteration
M01229882-I1
02/27/2025
Permit issued — Sidewalk Shed
M00824829-I1-SH
02/06/2025
Permit issued — Sidewalk Shed
M00824829-I1-SH
01/29/2025
Cycle 9 facade report signed — UNSAFE
12/26/2024
Cycle 9 facade report submitted
12/11/2024
Cycle 9 facade inspection completed
07/08/2024
Cycle 9 facade inspection completed
07/08/2024
Cycle 9 facade report signed — UNSAFE
04/23/2024
Cycle 9 facade report submitted
02/07/2024
Permit issued — Sidewalk Shed
M00824829-I1-SH
01/24/2024
Cycle 9 facade report submitted
01/24/2024
Cycle 9 facade report signed — UNSAFE
01/23/2024
Cycle 9 facade inspection completed
10/31/2023
Cycle 9 facade report submitted
10/30/2023
Cycle 9 facade report signed — UNSAFE
10/27/2023
Cycle 9 facade inspection completed
09/18/2023
Filed — Alteration
LOCALIZED FACADE REPAIRS FOR LL-11 . WORK INCLUDES BRICK REPLACEMENT/ POINTING; COPING STONE & WINDOWSILL REPLACEMENT; WINDOW LINTEL RESTORATION, ETC. WORK ALSO INCLUDES FIRE ESCAPE RESTORATION. NO CHANGE OF EGRESS, USE, OCCUPANCY, BULK OR HEIGHT
M00916397-I1
08/08/2023
Special inspection requirement — Masonry
FADY HABEEL
08/08/2023
Special inspection requirement — Post-installed Anchors
FADY HABEEL
08/08/2023
Special inspection requirement — Tenant Protection Plan Compliance
ELISHA GEIGER
08/08/2023
Special inspection requirement — Final
FADY HABEEL
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offSpring Scaffolding08/13/2026
DOB NOWGeneral ConstructionSigned-offTribute Restoration07/01/2026
DOB NOWSupported ScaffoldSigned-offSpring Scaffolding06/12/2026
DOB NOWSidewalk ShedSigned-offSpring Scaffolding05/27/2026
DOB NOWSidewalk ShedSigned-offSpring Scaffolding03/02/2026
DOB NOWSuspended ScaffoldSigned-offTribute Restoration10/02/2025
DOB NOWGeneral ConstructionSigned-offTribute Restoration07/25/2025
DOB NOWSupported ScaffoldPermit IssuedSpring Scaffolding06/09/2025
DOB NOWSuspended ScaffoldSigned-offTribute Restoration05/28/2025
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/27/2025
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/06/2025
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/07/2024
DOB NOWPlumbingSigned-offPractical Plumbing & Heating02/21/2023
DOB NOWSidewalk ShedSigned-offSpring Scaffolding02/07/2023
DOB NOWGeneral ConstructionSigned-offConte Builders02/02/2023
DOB NOWPlumbingPermit IssuedNophier Plumbing & Heating04/23/2021
DOB NOWPlumbingPermit IssuedNophier Plumbing & Heating04/02/2021
BISOTISSUEDEuro T.I11/19/2020
BISOTISSUEDEuro T.I11/19/2020
BISOTISSUEDJerrick Associates11/12/2014
BISEQISSUEDJerrick Associates09/15/2014
BISEQISSUEDXinos Construction03/27/2007
BISOTISSUEDXinos Construction03/27/2007
BISBLISSUEDApproved Oil of Brooklyn03/02/2007
BISPLISSUEDThej Plumbing Co02/09/2005
BISOTISSUEDSpindle L C01/10/2005
BISOTISSUEDPlan Construction Group06/21/2000
BISOTISSUEDPlan Construction Group02/18/2000
BISEQISSUEDColgate Scaffolding05/08/1997
BISPLISSUEDDual Fuel Plumbing & Heating07/29/1993
BISOTISSUEDJin Han Construction10/17/1990
1 project · most recent 04/08/2021
Water/Sanitary
FiledStatusContractorScope
04/08/2021Permit IssuedNophier Plumbing & HeatingWater/Sanitary
4 projects · most recent 12/17/2023
General Wiring
FiledStatusContractorScope
12/17/2023CompleteOstrava ElectricGeneral Wiring
02/20/2023CompleteGoldman ElectricGeneral Wiring
02/09/2023Permit IssuedTop Shelf Electric—
08/12/2020Permit IssuedKJK ElectricGeneral Wiring
1 project · most recent 09/10/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
09/10/2025Signed-offSpring ScaffoldingScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/15/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/08/2023MasonryFADY HABEELspecial
08/08/2023Post-installed AnchorsFADY HABEELspecial
08/08/2023Tenant Protection Plan ComplianceELISHA GEIGERspecial
08/08/2023FinalFADY HABEELprogress
08/06/2021Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
06/24/2021Fire-Resistance Rated ConstructionEUGENE BIFULCOprogress
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch10
09/03/2026M00499090-I1Request digital key ↗
08/31/2026M00818275-S1Request digital key ↗
08/31/2026M00818275-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/03/2026M00438111-I1Request digital key ↗
08/15/2026M00438111-P1Request digital key ↗
▸Applications & Permits11
▸BISWORK PERMIT APPLICATION6
12/20/2019123769243Open ↗
12/20/2019123709479Open ↗
08/01/2019123769243Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
07/30/2019123769243Open ↗
07/30/2019123709479Open ↗
09/12/2014140252465Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/03/2026M00438111-P1Open ↗
09/03/2026M00438111-I1Open ↗
08/31/2026M00824829-S1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
07/30/2019123769243Open ↗
07/30/2019123709479Open ↗
11/20/2015140170829Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
07/30/2019123769243Open ↗
07/30/2019123709479Open ↗
09/12/2014140252465Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/01/2026M00916397-I1Open ↗
09/01/2026M00916397-I1Open ↗
09/01/2026M00916397-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026M00916397-I1Open ↗
08/25/2026M00438111-P1Open ↗
08/23/2026M00438111-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/30/2019123769243Open ↗
07/30/2019123709479Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
09/12/2014140252465Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/12/2014140252465Open ↗
▸BISApplicant / Owner Signature1
04/01/2014140170829Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes2
07/30/2019123769243Open ↗
07/30/2019123709479Open ↗
▸BISDS1-Demolition Submittal Certification Form1
04/01/2014140170829Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026M01300983-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/03/2026M00438111-P1Open ↗
09/03/2026M00438111-I1Open ↗
08/20/2026M01300983-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/30/2019123769243Open ↗
07/30/2019123709479Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
11/12/2014140170829Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
08/01/2019123769243Open ↗
07/30/2019123769243Open ↗
07/30/2019123709479Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/12/2014140252465Open ↗
▸BISTR8: Energy Code Progress Inspections1
04/01/2014140170829Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/20/2015140170829Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/12/2014140252465Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/20/2015140170829Open ↗
10/05/2015140252465Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/31/2014140170829Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
07/30/2019123769243Open ↗
07/30/2019123709479Open ↗
11/20/2015140170829Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET2
09/12/2014140252465Open ↗
04/01/2014140170829Open ↗
▸BISEFILING COVER SHEET2
07/30/2019123769243Open ↗
07/30/2019123709479Open ↗
▸Other Documents3
▸DOB NOWManufacturer's Specifications1
08/13/2026M01229882-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01229882-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/20/2026M01300983-I1Open ↗