← Back
BuildNYC
Public elementary, junior or senior high
P.S. 90
2840 WEST 12TH STREET · BIN 3196558
💬 Discuss this project
1964Year Built
3Stories
W1Building Class
R6Zoning
64,600 sfGross Floor Area
1Units
LL97 Covered2 Active Violations 0 unresolved · 2 paperwork only 4 likely answered ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Parks and Recreation · 116,400 sf lot · 0.55 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofP.S. 90 Edna Cohen SchoolUnder Construction83p · 3 filings · 20 docs
BulkheadP.S. 90 Edna Cohen SchoolUnder Construction1p · 1 filing · 20 docs
Floor 3P.S. 90 Edna Cohen SchoolUnder Construction29p · 2 filings · 20 docs
Floor 2P.S. 90 Edna Cohen SchoolUnder Construction23p · 1 filing · 20 docs
Floor 1P.S. 90 Edna Cohen SchoolUnder Construction38p · 3 filings · 20 docs
CellarP.S. 90 Edna Cohen SchoolUnder Construction27p · 2 filings · 20 docs
Site & exteriorP.S. 90 Edna Cohen SchoolUnder Construction9p · 3 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority8810/13/2026
NYC Department of Education303/22/2026
Department of School Construction Aut203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC School Construction Authority103/21/2026
Superstructures Engineering + Architects1003/21/2026
Ame Services603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Arora ConstructionGeneral Contractor607/08/2026
Army ConstructionScaffold609/19/2026
Army ConstructionGeneral Contractor507/08/2026
Varsity Plumbing and HeatingPlumbing207/08/2026
A & S ElectricElectrical203/21/2026
Eon Mechanicalspecialty_contractor207/08/2026
Forsythe Plumbing & HeatingPlumbing207/08/2026
A.T.J. Electrical CoElectrical103/21/2026
Christ Gatzonis Electric ConElectrical103/21/2026
I.S.M. ElectricElectrical103/21/2026
Stanco System Electrical ContElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Twin Peaks3171108/27/2026
Future Tech Consultants O589609/05/2023
Building Lifecycle
All (166)Filed (22)Permit Issued (21)Signed Off (2)Violation (60)Inspection (3)Objection (28)Special Inspection (30)
09/18/2026
Permit issued — Sidewalk Shed
B01275944-I1-SH
08/31/2026
Objection raised — Other
08/27/2026
Filed — Alteration
work includes remove/relocate existing roof mounted exhaust fans.
B00916346-P1
08/26/2026
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
08/11/2026
Special inspection requirement — Sprinkler Systems
Maxim Korngold
08/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Maxim Korngold
08/11/2026
Special inspection requirement — Post-installed Anchors
Maxim Korngold
06/24/2026
Permit issued — Sprinklers
B00916346-S6-PL
06/23/2026
Permit issued — Sidewalk Shed
B01275944-I1-SH
05/20/2026
Permit issued — Mechanical Systems
B00916716-S2-MS
05/20/2026
Permit issued — Mechanical Systems
B00916346-S3-MS
05/18/2026
Permit issued — Plumbing
B00916716-S3-PL
05/14/2026
Permit issued — General Construction
B00916716-I1-GC
04/16/2026
Permit issued — Structural
B00916346-S1-ST
04/16/2026
Permit issued — Structural
B00916716-S1-ST
04/16/2026
Permit issued — General Construction
B00916346-I1-GC
04/16/2026
Permit issued — General Construction
B00916716-S4-GC
03/25/2026
Permit issued — Sidewalk Shed
B01275944-I1-SH
11/25/2025
Permit issued — Supported Scaffold
B01275943-I1-SF
11/25/2025
Permit issued — Construction Fence
B01275945-I1-FN
11/25/2025
Permit issued — Sidewalk Shed
B01275944-I1-SH
11/07/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/22/2025
Objection resolved — Addressed
10/22/2025
Objection resolved — Addressed
10/16/2025
Objection resolved — Addressed
09/29/2025
Objection raised — Other
09/29/2025
Objection raised — Other
09/29/2025
Objection raised — Other
09/24/2025
Filed — Alteration
Temporary Construction Fence Installation in conjunction with B00916346 and B00916716. No change in use, egress, or occupancy under this filing
B01275945-I1
09/23/2025
Filed — Alteration
Sidewalk Shed Installation in conjunction with B00916346 and B00916716. No change in use, egress, or occupancy under this filing
B01275944-I1
09/23/2025
Filed — Alteration
Pipe Scaffold Installation in conjunction with B00916346 and B00916716. No change in use, egress, or occupancy under this filing
B01275943-I1
08/22/2025
Special inspection requirement — Post-installed Anchors
MAXIM KORNGOLD
05/23/2025
Violation issued (FDNY_ORDER, closed)
05/23/2025
Violation issued (FDNY_ORDER, closed)
05/23/2025
Violation issued (FDNY_ORDER, closed)
02/26/2025
Objection resolved — Addressed
02/26/2025
Objection resolved — Addressed
02/25/2025
Objection resolved — Addressed
02/25/2025
Objection resolved — Addressed
02/25/2025
Objection resolved — Addressed
02/25/2025
Objection resolved — Addressed
01/28/2025
Violation issued (FDNY_ORDER, closed)
01/28/2025
Violation issued (FDNY_NOV, closed)
01/28/2025
Violation issued (FDNY_ORDER, closed)
01/28/2025
Violation issued (FDNY_ORDER, closed)
01/27/2025
Objection resolved — Addressed
01/27/2025
Objection resolved — Addressed
01/27/2025
Objection resolved — Addressed
10/29/2024
Signed off — Alteration
B00538643-S1
10/29/2024
Signed off — Alteration
B00538643-I1
10/25/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/19/2024
Violation issued (ECB, closed)
Construction
06/05/2024
Special inspection requirement — Energy Code Compliance Inspections
MAXIM KORNGOLD
04/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Michael Marchese
04/17/2024
Special inspection requirement — Post-installed Anchors
Michael Marchese
04/09/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
12/27/2023
Permit issued — General Construction
B00538643-I1-GC
11/22/2023
Permit issued — Plumbing
B00538643-S1-PL
11/14/2023
Objection raised — Other
11/07/2023
Filed — Alteration
work includes remove/relocate existing roof mounted exhaust fans.
B00916346-S6
Latest 60 of 166 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedArmy Construction09/18/2026
DOB NOWPlumbingPermit IssuedForsythe Plumbing & Heating06/24/2026
DOB NOWSidewalk ShedPermit IssuedArmy Construction06/23/2026
DOB NOWMechanical SystemsPermit IssuedEon Mechanical05/20/2026
DOB NOWMechanical SystemsPermit IssuedEon Mechanical05/20/2026
DOB NOWPlumbingPermit IssuedForsythe Plumbing & Heating05/18/2026
DOB NOWGeneral ConstructionPermit IssuedArmy Construction05/14/2026
DOB NOWStructuralPermit IssuedArmy Construction04/16/2026
DOB NOWStructuralPermit IssuedArmy Construction04/16/2026
DOB NOWGeneral ConstructionPermit IssuedArmy Construction04/16/2026
DOB NOWGeneral ConstructionPermit IssuedArmy Construction04/16/2026
DOB NOWSidewalk ShedPermit IssuedArmy Construction03/25/2026
DOB NOWSupported ScaffoldPermit IssuedArmy Construction11/25/2025
DOB NOWConstruction FencePermit IssuedArmy Construction11/25/2025
DOB NOWSidewalk ShedPermit IssuedArmy Construction11/25/2025
DOB NOWGeneral ConstructionSigned-offArora Construction12/27/2023
DOB NOWPlumbingSigned-offVarsity Plumbing and Heating11/22/2023
DOB NOWGeneral ConstructionSigned-offArora Construction05/10/2023
DOB NOWGeneral ConstructionSigned-offArora Construction11/30/2022
DOB NOWPlumbingSigned-offVarsity Plumbing and Heating11/22/2022
DOB NOWGeneral ConstructionSigned-offArora Construction09/20/2022
BISMHISSUEDACS System Associates05/02/2019
BISOTISSUEDAmcc01/31/2019
BISOTISSUEDAmcc01/31/2019
BISPLISSUEDEagle 1 Mechanical11/08/2018
BISEQISSUEDCreamer Environmental07/20/2018
BISMHISSUEDACS System Associates03/21/2018
BISOTISSUEDAmcc01/03/2018
BISOTISSUEDAmcc01/03/2018
BISPLISSUEDEagle 1 Mechanical11/14/2017
BISOTISSUEDNYC School Construction Authority05/16/2017
BISMHISSUEDACS System Associates03/11/2017
BISOTISSUEDAmcc01/23/2017
BISOTISSUEDAmcc01/23/2017
BISPLISSUEDEagle 1 Mechanical11/17/2016
BISMHISSUEDACS System Associates03/10/2016
BISBLISSUEDEagle 1 Mechanical02/23/2016
BISEQISSUEDAmcc12/29/2015
BISMHISSUEDAmcc12/21/2015
BISOTISSUEDAmcc12/18/2015
+ 31 more permits on file
2 projects · most recent 08/27/2026
Heating and Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/27/2026Permit IssuedEon MechanicalHeating and Air Conditioning Systems
Heat / Cool
Lg LSU363HLV / LSN363HLV 33,000 BTU · Heat Pump Outdoor ×1
08/28/2023Permit IssuedEon MechanicalHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Trane OADG015C1-DAB50JD00-G3AEA3AE3-11B40B03B-A01CA0A00-AA1A01000-00AE00000 15 tons · Heat Pump Outdoor ×1
Heating
Qmark CDF558 5 kW · Electric Heater ×3
MUH0381 3 kW · Electric Heater ×2
Ventilation
Loren Cook ACEB 90C 90 CFM · Exhaust Fan ×1
1 project · most recent 08/27/2026
FiledStatusContractorScope
08/27/2026——1 heads
2 projects · most recent 08/27/2026
Storm Water/Sanitary Gas
FiledStatusContractorScope
08/27/2026Permit IssuedForsythe Plumbing & HeatingGas, Storm, Water/Sanitary
08/28/2023Permit IssuedForsythe Plumbing & HeatingStorm, Water/Sanitary
16 projects · most recent 10/20/2026
General Wiring
FiledStatusContractorScope
10/20/2026CompleteA & S Electric—
06/23/2026Permit IssuedStanco System Electrical ContGeneral Wiring
04/08/2026Permit IssuedStanco System Electrical Cont—
11/18/2025CompleteCharan Electrical Enterp's—
10/27/2025Permit IssuedStanco System Electrical Cont—
07/02/2025CompleteAbm ElectricGeneral Wiring
12/13/2024Permit IssuedWilldan Electrical of NYGeneral Wiring
06/26/2023CompleteAujla ElectricGeneral Wiring
03/31/2023CompleteGemini Electric Co—
11/07/2022CompleteCharan Electrical Enterp's—
06/24/2021CompleteAbm Electric—
05/28/2021CompleteAbm Electric—
11/12/2020CompleteUrban ElectricalGeneral Wiring
11/27/2019CompleteCharan Electrical Enterp's—
06/18/2019CompleteAnco Electl ContctngGeneral Wiring
2 projects · most recent 08/27/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/27/2026Permit IssuedForsythe Plumbing & HeatingSteel, Concrete
08/28/2023Permit IssuedEon MechanicalSteel, Concrete, Masonry
3 projects · most recent 09/24/2025
Fence Sidewalk Shed Scaffold
FiledStatusContractorScope
09/24/2025Permit IssuedArmy ConstructionFence
09/23/2025Permit IssuedArmy ConstructionSidewalk Shed
09/23/2025Permit IssuedArmy ConstructionScaffold
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/07/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/25/2024Pass-Final General Construction Non-Directive 14PassView ↗
04/09/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
08/26/2026High-Pressure Fuel-Gas Piping (Welding)—special
08/11/2026Sprinkler SystemsMaxim Korngoldspecial
08/11/2026Fire-Resistant Penetrations and JointsMaxim Korngoldspecial
08/11/2026Post-installed AnchorsMaxim Korngoldspecial
08/22/2025Post-installed AnchorsMAXIM KORNGOLDspecial
06/05/2024Energy Code Compliance InspectionsMAXIM KORNGOLDprogress
04/17/2024Fire-Resistant Penetrations and JointsMichael Marchesespecial
04/17/2024Post-installed AnchorsMichael Marchesespecial
11/07/2023Post-installed AnchorsMaxim Korngoldspecial
11/07/2023Fire-Resistant Penetrations and JointsMaxim Korngoldspecial
11/06/2023Sprinkler SystemsMaxim Korngoldspecial
08/23/2023Maintenance informationMAXIM KORNGOLDenergy_progress
08/23/2023HVAC-R and service water heating system controlsMAXIM KORNGOLDenergy_progress
08/23/2023HVAC-R and service water piping design and insulationMAXIM KORNGOLDenergy_progress
08/23/2023Maintenance informationMAXIM KORNGOLDenergy_progress
08/23/2023Interior lighting powerMAXIM KORNGOLDenergy_progress
08/23/2023Lighting controlsMAXIM KORNGOLDenergy_progress
08/22/2023Shutoff dampersMAXIM KORNGOLDenergy_progress
08/22/2023Fire-Resistant Penetrations and JointsMAXIM KORNGOLDspecial
08/22/2023Post-installed AnchorsMAXIM KORNGOLDspecial
08/22/2023Energy Code Compliance InspectionsMAXIM KORNGOLDprogress
08/22/2023HVAC-R and service water piping design and insulationMAXIM KORNGOLDenergy_progress
08/22/2023Maintenance informationMAXIM KORNGOLDenergy_progress
08/22/2023HVAC-R and service water heating equipmentMAXIM KORNGOLDenergy_progress
08/22/2023HVAC-R and service water heating system controlsMAXIM KORNGOLDenergy_progress
Latest 25 of 49.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 90 Edna Cohen SchoolEducationEntire building
Project B01275945 Alteration · Permit Entire · 09/24/2025
Project B01275943 Alteration · Permit Entire · 09/23/2025
Project B01275944 Alteration · Permit Entire · 09/23/2025
Project B00916346 Alteration · Permit Issued · 08/11/2023
Project B00916716 Alteration · Permit Entire · 08/11/2023
Project B00703953 Alteration · Approved · 03/23/2022
Project B00538643 Alteration · LOC Issued · 06/14/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 215 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
09/01/2026B00538643-P1Request digital key ↗
09/01/2026B00538643-P2Request digital key ↗
09/01/2026B00538643-P5Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits9
▸BISWORK PERMIT APPLICATION5
09/16/2014320539850Open ↗
07/28/2014321215412Open ↗
12/16/2013320539850Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
07/10/2014320722107Open ↗
02/28/2013320539574Open ↗
02/28/2013320539574Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B00916716-I1Open ↗
▸Seals & Professional Certifications76
▸DOB NOWSpecial Inspector Seal & Signature25
10/14/2026B00916346-P1Open ↗
10/14/2026B00916346-P1Open ↗
10/14/2026B00916346-P1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/01/2026B00538643-P2Open ↗
09/01/2026B00538643-P4Open ↗
09/01/2026B00538643-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
08/29/2026B00916716-S3Open ↗
08/29/2026B00916716-S3Open ↗
08/29/2026B00916716-S3Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM8
07/10/2014320722107Open ↗
07/10/2014320722107Open ↗
07/10/2014320722107Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/10/2014320722107Open ↗
02/28/2013320539574Open ↗
02/28/2013320539850Open ↗
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/13/2026B01275945-I1Open ↗
08/13/2026B01275944-I1Open ↗
08/13/2026B01275943-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/01/2026B00538643-S1Open ↗
09/01/2026B00538643-I1Open ↗
▸Inspections & Test Reports1
▸BISWall Panels, Curtain Walls, and Veneers - 2008 CODE1
06/07/2014320722107Open ↗
▸Approvals, Objections & Sign-offs69
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)22
08/27/2026B00916346-P1Open ↗
08/14/2026B00703953-I1Open ↗
08/13/2026B00538643-P2Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter22
09/01/2026B00538643-P2Open ↗
09/01/2026B00538643-P5Open ↗
09/01/2026B00538643-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDEP Variance (V5) letter11
09/01/2026B00538643-S1Open ↗
09/01/2026B00538643-I1Open ↗
08/27/2026B00916346-S3Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)11
08/13/2026B00538643-I1Open ↗
08/13/2026B00916716-S3Open ↗
08/13/2026B00916346-S1Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
07/10/2014320722107Open ↗
02/28/2013320539574Open ↗
02/28/2013320539850Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET4
07/24/2014321215412Open ↗
04/15/2013320722107Open ↗
03/05/2013320539850Open ↗
Showing 3 of 4 on file for this type
▸Other Documents28
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal22
08/27/2026B00916346-P1Open ↗
08/14/2026B00703953-I1Open ↗
08/13/2026B00916346-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWNYCSCA Exhibit 22
08/13/2026B00538643-S1Open ↗
08/13/2026B00538643-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B00916716-I1Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026B00916346-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B00916716-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B00916716-I1Open ↗