| Owner | Filings | Most Recent |
|---|---|---|
| CUNY | 26 | 09/25/2026 |
| DASNY | 82 | 08/13/2026 |
| DORMITORY AUTHORITY OF THE STATE OF NEW YORK | 7 | 03/22/2026 |
| TDX CONSTRUCTION CORPORAT | 1 | 03/22/2026 |
| MINELLI CONSTRUCTION CO | 18 | 03/22/2026 |
| MINWLLI CONSTRUCTION CO | 1 | 03/22/2026 |
| CUNY 042 | 2 | 03/22/2026 |
| LAGUARDIA COLLEGE 042 | 2 | 03/22/2026 |
| NEWMARK | 1 | 03/22/2026 |
| THOM-ROCK REALTY | 5 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ADROIT ENGINEERING PLLC | 1 | 09/01/2026 |
| LORING CONSULTING ENGINEERS, INC. | 21 | 06/25/2026 |
| LERA CONSULTING STRUCTURAL ENGINEER | 4 | 06/15/2026 |
| RAMBOLL | 1 | 04/15/2026 |
| YSRAEL A. SEINUK, P.C. | 8 | 03/24/2026 |
| THE SWITZER GROUP | 4 | 03/10/2026 |
| MITCHELL / GIURGOLA ARCHITECTS | 4 | 02/13/2026 |
| YU & ASSOCIATES | 1 | 12/02/2025 |
| SETTY | 3 | 07/08/2025 |
| PERKINS EASTMAN | 1 | 06/17/2025 |
| YORKOS ENGINEERING DESIGN CONSULT | 1 | 05/07/2025 |
| BITOPI CONSULTANTS LLC | 2 | 06/07/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| J. CALLAHAN CONSULTING, INC. | 28 | 03/21/2026 |
| JMV ARCHITECT | 20 | 03/21/2026 |
| CONVERSANO ASSOCIATES, INC. | 10 | 03/21/2026 |
| J CALLAHAN CONSULTING | 8 | 03/21/2026 |
| AK CONSULTING SERVICES | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| HOLT CONSTRUCTION CORP | General Contractor | 14 | 07/08/2026 |
| P B CONTRACTING CORP | General Contractor | 8 | 07/08/2026 |
| AKS INTERNATIONAL INC | General Contractor | 4 | 08/13/2026 |
| W5 GROUP LLC | General Contractor | 3 | 07/28/2026 |
| NYC FIRE SPRINKLER CORP | Fire Protection | 2 | 07/08/2026 |
| AM RESTORATION INC | General Contractor | 2 | 07/02/2026 |
| M&T PLBG AND HTG CO., INC | Plumbing | 2 | 06/28/2026 |
| MARIC PLBG & HTG INC | Fire Protection | 2 | 06/28/2026 |
| AIR STREAM AIR CONDITIONING | General Contractor | 1 | 04/09/2026 |
| INTERBORO SIGN & MAINTENANCE | General Contractor | 1 | 07/08/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 1 | 09/25/2026 |
| EASTERN PLBG & MECH CONTR | Plumbing | 1 | 08/05/2026 |
| EVERGREEN MECHANICAL CORP | Plumbing | 1 | 07/08/2026 |
| CORPORATE ELEC. GROUP INC | Electrical | 1 | 03/22/2026 |
| INTERBORO SIGN ELECL MAI | Scaffold | 1 | 07/08/2026 |
| DIDONATO, EDWARD | Electrical | 1 | 03/21/2026 |
| IRVING BAPTISTE | Electrical | 1 | 03/21/2026 |
| LEONE, PETER | Electrical | 1 | 03/21/2026 |
| ROOPCHAN, BICKRAM | Electrical | 1 | 03/21/2026 |
| SPEICHER, RONALD | Electrical | 1 | 03/21/2026 |
| VAN VASSELL | Electrical | 1 | 03/21/2026 |
| EVERGREEN MECHANICAL CORP | Fire Protection | 1 | 07/02/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| TECTONIC ENGINEERING CONS | 106 | 34 | 06/25/2026 |
| ETI CONSULTANTS LLC | 7694 | 5 | 04/07/2026 |
| YORKOS ENGINEERING, DESIG | 6991 | 1 | 05/07/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | JRM CONSTRUCTION MGMT LLC | 09/24/2026 |
| DOB NOW | Structural | Permit Issued | AKS INTERNATIONAL INC | 08/12/2026 |
| DOB NOW | General Construction | Permit Issued | AKS INTERNATIONAL INC | 08/07/2026 |
| DOB NOW | Plumbing | Permit Issued | EASTERN PLBG & MECH CONTR | 08/04/2026 |
| DOB NOW | General Construction | Signed-off | W5 GROUP LLC | 07/27/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | AM RESTORATION INC | 06/30/2026 |
| DOB NOW | Sprinklers | Permit Issued | MARIC PLBG & HTG INC | 06/26/2026 |
| DOB NOW | Standpipe | Permit Issued | MARIC PLBG & HTG INC | 06/26/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | AM RESTORATION INC | 05/06/2026 |
| DOB NOW | General Construction | Permit Issued | HOLT CONSTRUCTION CORP | 04/03/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | HOLT CONSTRUCTION CORP | 04/02/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | P B CONTRACTING CORP | 03/11/2026 |
| DOB NOW | General Construction | Signed-off | W5 GROUP LLC | 02/25/2026 |
| DOB NOW | Earth Work | Permit Issued | AKS INTERNATIONAL INC | 02/19/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | AKS INTERNATIONAL INC | 01/06/2026 |
| DOB NOW | Plumbing | Signed-off | M&T PLBG AND HTG CO., INC | 12/01/2025 |
| DOB NOW | Sprinklers | Signed-off | NYC FIRE SPRINKLER CORP | 09/30/2025 |
| DOB NOW | Sprinklers | Signed-off | EVERGREEN MECHANICAL CORP | 08/04/2025 |
| DOB NOW | Mechanical Systems | Signed-off | AIR STREAM AIR CONDITIONI | 07/10/2025 |
| DOB NOW | General Construction | Signed-off | W5 GROUP LLC | 07/09/2025 |
| DOB NOW | Plumbing | Signed-off | EVERGREEN MECHANICAL CORP | 07/08/2025 |
| DOB NOW | Structural | Permit Issued | HOLT CONSTRUCTION CORP | 04/03/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | HOLT CONSTRUCTION CORP | 04/03/2025 |
| DOB NOW | General Construction | Permit Issued | HOLT CONSTRUCTION CORP | 04/03/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | P B CONTRACTING CORP | 03/04/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | HOLT CONSTRUCTION CORP | 01/30/2025 |
| DOB NOW | General Construction | Permit Issued | HOLT CONSTRUCTION CORP | 01/30/2025 |
| DOB NOW | Structural | Permit Issued | HOLT CONSTRUCTION CORP | 01/30/2025 |
| DOB NOW | Sprinklers | Signed-off | NYC FIRE SPRINKLER CORP | 09/30/2024 |
| DOB NOW | Plumbing | Signed-off | M&T PLBG AND HTG CO., INC | 09/19/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | HOLT CONSTRUCTION CORP | 09/18/2024 |
| DOB NOW | General Construction | Permit Issued | HOLT CONSTRUCTION CORP | 09/10/2024 |
| DOB NOW | Structural | Permit Issued | HOLT CONSTRUCTION CORP | 08/13/2024 |
| DOB NOW | Sidewalk Shed | Permit Issued | P B CONTRACTING CORP | 04/19/2024 |
| DOB NOW | Structural | Signed-off | INTERBORO SIGN & MAINTENA | 06/01/2023 |
| DOB NOW | Sidewalk Shed | Permit Issued | P B CONTRACTING CORP | 03/22/2023 |
| DOB NOW | Sign | Signed-off | INTERBORO SIGN &ELECL MAI | 06/28/2021 |
| BIS | PL | ISSUED | EASTERN PLBG & MECH CONTR | 11/08/2022 |
| BIS | OT | ISSUED | MINELLI CONSTRUCTION CO | 01/10/2022 |
| BIS | PL | ISSUED | EASTERN PLBG & MECH CONTR | 11/10/2021 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 04/07/2026 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling International Environmental HPY14 1,207 CFM · Fan Coil Indoor ×6 Heating Trane UHSB036 700 CFM · Electric Heater ×5 UHSB072 950 CFM · Electric Heater ×3 UHSB060 700 CFM · Electric Heater ×2 Ventilation Trane ×13 Greenheck BSQ-300 45,000 CFM · Exhaust Fan ×6 BSQ-240 17,000 CFM · Exhaust Fan ×2 BSQ-360 15,000 CFM · Exhaust Fan ×2 CUE-240-VG 5,450 CFM · Exhaust Fan ×1 FJC-306 180 CFM · Exhaust Fan ×1 Captiveaire CAS-HVAC4-30 8,145 CFM · Doas ×2 USBI36DD-RM 7,758 CFM · Exhaust Fan ×2 USBI11DD-RM 675 CFM · Exhaust Fan ×1 Airius S-10-SP-SH-120-B 40 CFM ×1 __Junk__ ×1 |
| 07/08/2025 | — | — | Heating and Air Conditioning Systems | Heat / Cool Daikin CAH028GDCM 4,600 CFM · Fan Coil Indoor ×6 |
| 10/04/2022 | Permit Issued | HOLT CONSTRUCTION CORP | Air Conditioning Systems | Cooling Aaon CF-003-3-A-GA0C-00-21-000-A
CF-003-3-A-GA0C-00-21-000-A 1,800 CFM · Condensing Unit ×2 SB-018-2-0-L80A-E2J 5,000 CFM · Condensing Unit ×2 SB-014-2-0L80S-E2J 4,000 CFM · Condensing Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/25/2026 | Permit Issued | MARIC PLBG & HTG INC | 396 heads |
| 06/15/2026 | — | — | Sprinkler System |
| 04/07/2026 | — | — | Sprinkler System |
| 07/08/2025 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/15/2026 | Signed-off | EVERGREEN MECHANICAL CORP | Water/Sanitary |
| 05/26/2026 | Permit Issued | EASTERN PLBG & MECH CONTR | Water/Sanitary |
| 04/07/2026 | — | — | Gas, Water/Sanitary |
| 07/08/2025 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/29/2026 | Permit Issued | ARK SYSTEMS ELEC. CORP | General Wiring, Lighting |
| 07/15/2026 | Permit Issued | PREMIER ELECTRIC, INC | — |
| 05/13/2026 | Permit Issued | TRANSEL ELEV. & ELEC. INC | General Wiring |
| 03/09/2026 | Permit Issued | ARK SYSTEMS ELEC. CORP | — |
| 03/03/2026 | Permit Issued | HIGH QUALITY ELEC.OF NYC | — |
| 07/09/2025 | Complete | PREMIER ELECTRIC, INC | General Wiring |
| 07/02/2025 | Permit Issued | WILLDAN ELECTRICAL OF NY | General Wiring |
| 09/17/2024 | Complete | KND LICENSED ELEC'L CONT' | General Wiring, Lighting |
| 01/24/2023 | Permit Issued | JOSEPH WEINSTEIN ELECTRIC | General Wiring |
| 07/27/2022 | Complete | CORPORATE ELEC. GROUP INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/01/2026 | Permit Issued | AKS INTERNATIONAL INC | 1 scope_items |
| 06/15/2026 | Signed-off | W5 GROUP LLC | Steel, Concrete |
| 04/07/2026 | Permit Issued | JRM CONSTRUCTION MGMT LLC | Steel, Concrete |
| 03/24/2026 | Permit Issued | AKS INTERNATIONAL INC | Concrete |
| 07/08/2025 | — | — | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/07/2023 | Permit Issued | P B CONTRACTING CORP | Sidewalk Shed |
| Date | Type | Result | Report |
|---|---|---|---|
| 05/20/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/12/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/16/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/26/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 11/18/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/20/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/28/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/23/2023 | Pass-Final Sign Permit Inspection | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/31/2026 | Post-installed Anchors | GEORGE GHEBRYAL | special |
| 07/31/2026 | Final | GEORGE GHEBRYAL | progress |
| 07/31/2026 | Structural Steel - High Strength Bolting | GEORGE GHEBRYAL | special |
| 07/31/2026 | Structural Steel - Details | GEORGE GHEBRYAL | special |
| 07/31/2026 | Structural Steel - Welding | GEORGE GHEBRYAL | special |
| 07/31/2026 | Structural Stability – Alterations of existing buildings | GEORGE GHEBRYAL | special |
| 07/31/2026 | Concrete - Cast-In-Place | GEORGE GHEBRYAL | special |
| 07/17/2026 | Standpipe Systems | GEORGE GHEBRYAL | special |
| 07/17/2026 | Fire-Resistant Penetrations and Joints | GEORGE GHEBRYAL | special |
| 06/17/2026 | Final | — | progress |
| 06/11/2026 | Final | GEORGE GHEBRYAL | progress |
| 06/11/2026 | Post-installed Anchors | GEORGE GHEBRYAL | special |
| 06/11/2026 | Concrete - Cast-In-Place | GEORGE GHEBRYAL | special |
| 06/11/2026 | Structural Stability – Alterations of existing buildings | GEORGE GHEBRYAL | special |
| 06/11/2026 | Structural Steel - Welding | GEORGE GHEBRYAL | special |
| 06/11/2026 | Structural Steel - High Strength Bolting | GEORGE GHEBRYAL | special |
| 06/11/2026 | Structural Steel - Details | GEORGE GHEBRYAL | special |
| 06/02/2026 | Standpipe Systems | GEORGE GHEBRYAL | special |
| 06/02/2026 | Sprinkler Systems | GEORGE GHEBRYAL | special |
| 06/02/2026 | Post-installed Anchors | GEORGE GHEBRYAL | special |
| 06/02/2026 | Fire-Resistant Penetrations and Joints | GEORGE GHEBRYAL | special |
| 05/26/2026 | Post-installed Anchors | GEORGE GHEBRYAL | special |
| 04/15/2026 | HVAC-R and service water piping design and insulation | ANTHONY MUSUMECI | energy_progress |
| 04/15/2026 | Sprinkler Systems | ANTHONY MUSUMECI | special |
| 04/15/2026 | Fire-Resistant Penetrations and Joints | ANTHONY MUSUMECI | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Laguardia College Community | Education | — | Project Q01315913 |