← Back
BuildNYC
Elevator cooperative
290 WEST END AVENUE
MANHATTAN · BIN 1030542
💬 Discuss this project
1925Year Built
16Stories
D4Building Class
R10AZoning
148,845 sfGross Floor Area
63Units
LL97 CoveredRent Stabilized5 Active Violations 3 unresolved · 2 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 288/298 West End Tenants · 11,950 sf lot · 12.46 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsOpenings in block walls of concrete residential building1 filing
Floor 16Unit 16A, Unit 16B5p · 4 filings · 16 docs
Floor 15Unit 15D1p · 1 filing · 14 docs
Floor 14Unit 14D2 filings · 11 docs
Floor 13Unit 14D1 filing · 15 docs
Floor 12
Floor 11
Floor 10Unit 10B8p · 4 filings · 16 docs
Floor 9
Floor 8
Floor 7
Floor 6Unit 6A, Unit 6D2p · 3 filings · 16 docs
Floor 5Isolated facade repairs1 filing · 6 docs
Floor 4Unit 4A6p · 1 filing · 16 docs
Floor 3Unit 3DUnder Construction1p · 1 filing · 20 docs
Floor 2
Floor 1
CellarUnder Construction1 filing · 20 docs
Site & exteriorInstallation of sidewalk shed1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
288 98 West End Tenants7503/22/2026
Ben Dan203/21/2026
Quantum Design103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Code803/21/2026
Boutiqkey3203/21/2026
J.A.M. Associates603/21/2026
EA Design Group2003/21/2026
Municipal Building Consultants203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JJ Universal Constructionspecialty_contractor903/21/2026
JJ Universal ConstructionGeneral Contractor707/08/2026
Kings Group NYScaffold707/08/2026
A. Tobin InteriorsGeneral Contractor507/08/2026
GP Concepts ConstructionGeneral Contractor403/21/2026
FanukaGeneral Contractor403/21/2026
S M Godwinspecialty_contractor407/08/2026
RP Builders GroupGeneral Contractor407/08/2026
RP Builders Groupspecialty_contractor307/08/2026
CMY ElectricalElectrical303/21/2026
Erbi ContractorGeneral Contractor203/21/2026
BuildopsGeneral Contractor207/08/2026
Hydronic Concepts NY P&HPlumbing207/08/2026
Nice PlumbingPlumbing207/08/2026
Premier Flow Plumbing and HeatingPlumbing207/08/2026
William PasterGeneral Contractor203/21/2026
Air Depot Commercial Refrigerationspecialty_contractor203/21/2026
Rova Kitchen BathGeneral Contractor103/21/2026
Two-Tone ContractingGeneral Contractor103/21/2026
United Elite GroupGeneral Contractor103/21/2026
CC Controlled PlumbingPlumbing103/21/2026
Demar PlumbingPlumbing103/21/2026
Doval Plumbing & HeatingPlumbing103/21/2026
Forte Express P HPlumbing103/21/2026
Galicja Plumbing & HeatingPlumbing103/21/2026
Ihope Plumbing & HeatingPlumbing103/21/2026
J Vuplis SonsPlumbing103/21/2026
Macreddin Plumbing & HeatingPlumbing103/21/2026
Orbit Plumbing & HeatingPlumbing103/21/2026
Practical Plumbing & HeatingPlumbing103/21/2026
V J KearneyPlumbing103/21/2026
Walter J Grande PLG HeatingPlumbing103/21/2026
Z W Plumbing & HeatingPlumbing103/21/2026
Atlantida HVACspecialty_contractor104/09/2026
A Tobin Interiorsspecialty_contractor107/08/2026
Aqueduct MechanicalPlumbing106/28/2026
Catman PlumbingPlumbing107/08/2026
Everyday MechanicalPlumbing107/08/2026
G.M.A. Plumbing & HeatingPlumbing107/08/2026
Creggan ElectrialElectrical103/22/2026
P.S.I. MechanicalPlumbing107/08/2026
C C Controlled CombustionGeneral Contractor103/21/2026
Hamilton Air CompanyGeneral Contractor103/21/2026
Jepol ConstructionGeneral Contractor103/21/2026
MZMGeneral Contractor103/21/2026
PL-Euro ConstructionGeneral Contractor103/21/2026
Polteam RenovationGeneral Contractor103/21/2026
RenovytGeneral Contractor104/09/2026
Alpine Construction ServicesGeneral Contractor212/23/2011
Anchor PlumbingPlumbing110/16/2017
A.W.P.General Contractor206/30/2020
Bellet ConstructionGeneral Contractor107/18/2000
Capital Improvement ServicesGeneral Contractor211/18/2011
DBC InteriorGeneral Contractor105/14/2013
DelucGeneral Contractor109/09/2005
DI Benedetto Plumbing ContractorsPlumbing103/19/1992
Doval Plumbing HeatPlumbing106/07/2004
Everest ScaffoldingGeneral Contractor106/23/2016
Fordham MehcniaclPlumbing105/16/1995
Forte MechnlPlumbing105/04/1993
G.P. MechanicalPlumbing111/19/2012
Held BrothersPlumbing111/03/2000
Henry's Custom CabinetsGeneral Contractor112/19/2005
Hub HoldingsPlumbing207/14/2020
J.K. Constructing Services Inc71General Contractor104/15/2004
JK Constructing ServicesGeneral Contractor112/24/2009
Lando & AssociatesPlumbing110/07/2013
Linden-Marshall ContractingGeneral Contractor112/14/1998
New Century ConstructionGeneral Contractor208/04/2000
NTS ContractingGeneral Contractor209/29/2017
NTS ContractorsGeneral Contractor205/23/2018
Outdoor InstallationGeneral Contractor107/07/2005
Retcon MechanicalPlumbing107/11/2012
Rockledge ScaffoldGeneral Contractor211/23/2011
S.M. GodwinGeneral Contractor205/22/2020
Teamwork ContractingGeneral Contractor106/16/2004
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Midtown Preservation2634108/31/2026
Anthony J Farina57881808/10/2026
Anz Consulting Engineering3946404/30/2025
Jack Green Associates422903/21/2025
AG Engineering8899202/25/2025
Met Inspections7385112/15/2022
Cthree Architecture + Des1124212/15/2022
Eric Sheffield Architect2195112/22/2021
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
08/31/2026
Filed — Alteration
Isolated Facade Repairs at Northwest Corner. S
M01441729-I1
08/31/2026
Special inspection requirement — Masonry
Dennis Mele
08/26/2026
Signed off — Alteration
PLUMBING WITH THE RENOVATION OF APARTMENT 16B ON THE 16TH FLOOR. AS PER PLANS FILED HEREWITH. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
M01311671-S1
08/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedAwr Group06/05/2026
DOB NOWPlumbingSigned-offG.M.A. Plumbing & Heating05/12/2026
DOB NOWPlumbingPermit IssuedAqueduct Mechanical04/23/2026
DOB NOWGeneral ConstructionPermit IssuedRenovyt04/02/2026
DOB NOWPlumbingSigned-offNice Plumbing01/23/2026
DOB NOWGeneral ConstructionSigned-offBuildops01/05/2026
DOB NOWPlumbingSigned-offNice Plumbing03/26/2025
DOB NOWMechanical SystemsSigned-offAtlantida HVAC03/25/2025
DOB NOWGeneral ConstructionSigned-offBuildops03/19/2025
DOB NOWPlumbingSigned-offHydronic Concepts NY P&H01/15/2025
DOB NOWMechanical SystemsSigned-offRP Builders Group03/13/2024
DOB NOWGeneral ConstructionSigned-offRP Builders Group03/13/2024
DOB NOWMechanical SystemsSigned-offRP Builders Group12/21/2023
DOB NOWGeneral ConstructionSigned-offRP Builders Group12/20/2023
DOB NOWPlumbingSigned-offHydronic Concepts NY P&H11/09/2023
DOB NOWMechanical SystemsSigned-offRP Builders Group10/25/2023
DOB NOWGeneral ConstructionSigned-offRP Builders Group10/25/2023
DOB NOWGeneral ConstructionSigned-offA. Tobin Interiors02/07/2023
DOB NOWMechanical SystemsSigned-offA. Tobin Interiors01/27/2023
DOB NOWMechanical SystemsSigned-offJJ Universal Construction12/20/2022
DOB NOWMechanical SystemsSigned-offJJ Universal Construction12/20/2022
DOB NOWGeneral ConstructionSigned-offA. Tobin Interiors11/16/2022
DOB NOWPlumbingSigned-offP.S.I. Mechanical11/02/2022
DOB NOWGeneral ConstructionSigned-offA. Tobin Interiors10/25/2022
DOB NOWSidewalk ShedSigned-offKings Group NY08/29/2022
DOB NOWGeneral ConstructionSigned-offJJ Universal Construction06/09/2022
DOB NOWGeneral ConstructionSigned-offJJ Universal Construction06/08/2022
DOB NOWPlumbingSigned-offCatman Plumbing05/11/2022
DOB NOWMechanical SystemsSigned-offJJ Universal Construction05/06/2022
DOB NOWMechanical SystemsSigned-offJJ Universal Construction05/06/2022
DOB NOWSidewalk ShedSigned-offKings Group NY08/27/2021
DOB NOWPlumbingSigned-offGalicja Plumbing and Heating04/06/2021
DOB NOWSidewalk ShedSigned-offKings Group NY08/27/2020
DOB NOWMechanical SystemsSigned-offAir Depot Commercial Refrigeration08/25/2020
DOB NOWMechanical SystemsSigned-offS.M. Godwin07/30/2020
DOB NOWPlumbingSigned-offEveryday Mechanical07/23/2020
DOB NOWMechanical SystemsSigned-offS.M. Godwin06/19/2020
DOB NOWPlumbingSigned-offGalicja Plumbing and Heating06/17/2020
DOB NOWMechanical SystemsSigned-offS.M. Godwin01/29/2020
DOB NOWPlumbingSigned-offGalicja Plumbing and Heating01/07/2020
+ 50 more permits on file
3 projects · most recent 08/10/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/10/2026Permit IssuedPegasus P&HGas, Water/Sanitary
07/28/2026Signed-offG.M.A. Plumbing & HeatingGas
11/16/2025Signed-offNice PlumbingWater/Sanitary
25 projects · most recent 03/27/2026
General Wiring
FiledStatusContractorScope
03/27/2026Permit IssuedGlendale Electl ContngGeneral Wiring
03/24/2026Permit IssuedThe Metro Group ElectricGeneral Wiring
03/23/2026Permit IssuedThe Metro Group ElectricGeneral Wiring
03/23/2026Permit IssuedThe Metro Group ElectricGeneral Wiring
03/23/2026Permit IssuedThe Metro Group ElectricGeneral Wiring
03/20/2026Permit IssuedThe Metro Group ElectricGeneral Wiring
03/20/2026CompleteThe Metro Group ElectricGeneral Wiring
03/20/2026Permit IssuedThe Metro Group ElectricGeneral Wiring
03/20/2026Permit IssuedThe Metro Group ElectricGeneral Wiring
02/05/2026CompleteEnterprise Electrical SystemsGeneral Wiring
09/24/2025CompleteShuir Electrical ContractorsGeneral Wiring
05/05/2025Permit IssuedGS Electric—
03/26/2025CompleteVertex ElectricGeneral Wiring
03/25/2025CompleteCMY ElectricalGeneral Wiring
05/15/2024Permit IssuedCentennial Elevator IndustriesGeneral Wiring
1 project · most recent 05/26/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
05/26/2026Permit IssuedAwr GroupSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
08/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/25/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/20/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/18/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/05/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/30/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/30/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/01/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/18/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
09/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 57
DateRequirementInspectorRole
08/31/2026MasonryDennis Melespecial
08/12/2026Tenant Protection Plan Compliance—special
08/09/2026Fire-Resistant Penetrations and JointsAnthony Farinaspecial
08/05/2026FinalDennis Meleprogress
07/04/2026Fire-Resistant Penetrations and JointsAnthony Farinaspecial
03/02/2026Fire-Resistant Penetrations and JointsAnthony Farinaspecial
02/19/2026Fire-Resistance Rated ConstructionOKAN ONCELprogress
11/11/2025Fire-Resistant Penetrations and JointsAnthony Farinaspecial
11/10/2025FinalOKAN ONCELprogress
11/03/2025Fire-Resistance Rated ConstructionOKAN ONCELprogress
10/30/2025FinalOKAN ONCELprogress
05/09/2025Post-installed AnchorsALBERT ZIRINOspecial
05/09/2025Fire-Resistant Penetrations and JointsAnthony Farinaspecial
05/09/2025Tenant Protection Plan ComplianceARIEL GOLSHANspecial
04/29/2025Tenant Protection Plan Compliance—special
04/29/2025Fire-Resistant Penetrations and JointsAnthony Farinaspecial
04/29/2025Post-installed AnchorsALBERT ZIRINOspecial
03/05/2025Fire-Resistant Penetrations and JointsAnthony Farinaspecial
03/05/2025Post-installed AnchorsALBERT ZIRINOspecial
01/28/2025Fire-Resistance Rated ConstructionOKAN ONCELprogress
01/28/2025Tenant Protection Plan ComplianceARIEL GOLSHANspecial
01/28/2025Fire-Resistant Penetrations and JointsAnthony Farinaspecial
01/22/2025FinalOKAN ONCELprogress
01/22/2025Mechanical SystemsALBERT ZIRINOspecial
01/22/2025FinalALBERT ZIRINOprogress
Latest 25 of 57.
922 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account