1900Year Built
5Stories
W5Building Class
R6Zoning
1,073,920 sfGross Floor Area
3Units
LL97 Covered0 Active Violations 3 likely answered 2 old, status unconfirmed ▸FDNY Report ↗
City university · 720,000 sf lot · 1.49 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBrooklyn College2 filings · 11 docs
PenthouseBrooklyn College1 filing · 11 docs
Floor 6Brooklyn College2 filings · 3 docs
Floor 5Brooklyn CollegeUnder Construction4 filings · 17 docs
Floor 4Brooklyn College2 filings · 11 docs
Floor 3Brooklyn College2 filings · 11 docs
Floor 2Brooklyn College2 filings · 11 docs
Floor 1Brooklyn CollegeUnder Construction11p · 5 filings · 17 docs
CellarBrooklyn College1 filing · 11 docs
Sub-BasementBrooklyn CollegeUnder Construction20p · 7 filings · 18 docs
Site & exteriorBrooklyn CollegeUnder Construction26p · 5 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Dasny4009/19/2026
Dormitory Authority of the State1903/21/2026
CUNY810/20/2026
CCNY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J Callahan Consulting1003/21/2026
Nyccode203/21/2026
Conapac Services Dba103/21/2026
Socotec403/21/2026
AK Consulting Services203/21/2026
Metropolis Group203/21/2026
Conapac Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Dynamic USGeneral Contractor1107/08/2026
Carlitos ContractingScaffold607/08/2026
Steven Dubner Landscapingspecialty_contractor409/19/2026
Richards P and H CoPlumbing407/08/2026
Utb-United TechnologyScaffold207/08/2026
Richards Plum & Heating CoGeneral Contractor104/09/2026
Inter Connection ElectricElectrical103/21/2026
Skowronski JeffElectrical103/21/2026
Up Town ElectricElectrical103/22/2026
Mac Fhionnghaile & SonsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates423310/19/2026
Socotec Engineering4983212/17/2025
Future Tech Consultants O589307/14/2025
Tectonic Engineering Cons106102/01/2022
Building Lifecycle
All (169)Filed (24)Permit Issued (18)Signed Off (7)Violation (60)Inspection (4)Objection (26)Special Inspection (30)
10/19/2026
Filed — Alteration
Application filed for mechanical modificatins as per plans. No change to use, egress or occupancy.
B01435354-S1
10/19/2026
Filed — Alteration
Application filed for mechanical modificatins as per plans. No change to use, egress or occupancy.
B01435354-S2
10/15/2026
Filed — Alteration
Application filed for mechanical modificatins as per plans. No change to use, egress or occupancy.
B01435354-I1
10/15/2026
Special inspection requirement — Sprayed fire-resistant materials
Young Suh
09/18/2026
Permit issued — General Construction
B01248867-I1-GC
09/18/2026
Objection raised — Scope
09/14/2026
Permit issued — General Construction
B01248738-I1-GC
09/11/2026
Objection resolved — Open
09/11/2026
Objection resolved — Addressed
09/11/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Young Suh
09/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
09/09/2026
Filed — Alteration
B01428407-S4
09/09/2026
Objection resolved — Resolved
09/09/2026
Objection resolved — Resolved
09/09/2026
Objection resolved — Addressed
09/09/2026
Objection resolved — Open
09/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
Young Suh
09/09/2026
Special inspection requirement — Duct leakage testing, insulation and design
Young Suh
09/09/2026
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
09/09/2026
Special inspection requirement — Shutoff dampers
Young Suh
09/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Young Suh
09/09/2026
Special inspection requirement — Maintenance information
Young Suh
09/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
09/09/2026
Special inspection requirement — High-Pressure Steam Piping (Welding)
Young Suh
09/09/2026
Special inspection requirement — Heating Systems
Young Suh
09/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
09/08/2026
Objection raised — Scope
09/08/2026
Objection raised — Scope
09/08/2026
Objection raised — Scope
09/04/2026
Objection raised — Scope
09/04/2026
Objection raised — Scope
09/04/2026
Objection raised — Other
09/04/2026
Objection raised — Inspections
09/03/2026
Special inspection requirement — Lighting controls
Young Suh
09/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
09/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
09/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
Young Suh
09/03/2026
Special inspection requirement — Interior lighting power
Young Suh
08/31/2026
Filed — Alteration
B01428407-S3
08/31/2026
Filed — Alteration
B01428407-S2
08/27/2026
Filed — Alteration
B01428407-S1
08/27/2026
Special inspection requirement — Post-installed Anchors
08/26/2026
Filed — Alteration
B01428407-I1
08/26/2026
Special inspection requirement — Concrete - Cast-In-Place
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/19/2026
Special inspection requirement — Post-installed Anchors
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/19/2026
Special inspection requirement — Sprayed fire-resistant materials
08/19/2026
Special inspection requirement — Post-installed Anchors
08/19/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
07/23/2026
Special inspection requirement — Mechanical Systems
Young Suh
07/23/2026
Special inspection requirement — Final
Young Suh
07/23/2026
Special inspection requirement — Final
Young Suh
07/09/2026
Special inspection requirement — Final
03/04/2026
Signed off — Alteration
MINOR STRUCTURAL WORK AS PER PLANS. NO CHANGE OF USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01017446-I1
02/20/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/20/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/17/2025
Filed — Alteration
EXTENSION OF EXISTING STANDPIPE RISERS AND PROVISION OF NEW FHV STATIONS AND 3-WAY MANIFOLDS AS SHOW ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B01271809-I1
10/21/2025
Permit issued — General Construction
B01017446-I1-GC
10/17/2025
Permit issued — General Construction
B01248867-I1-GC
Latest 60 of 169 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSteven Dubner Landscaping09/18/2026
DOB NOWGeneral ConstructionPermit IssuedSteven Dubner Landscaping09/14/2026
DOB NOWGeneral ConstructionSigned-offRichards Plum & Heating Co10/21/2025
DOB NOWGeneral ConstructionPermit IssuedSteven Dubner Landscaping10/17/2025
DOB NOWGeneral ConstructionPermit IssuedSteven Dubner Landscaping10/14/2025
DOB NOWPlumbingSigned-offRichards P and H Co06/12/2025
DOB NOWGeneral ConstructionSigned-offDynamic US06/26/2024
DOB NOWGeneral ConstructionSigned-offDynamic US06/26/2024
DOB NOWGeneral ConstructionSigned-offDynamic US07/25/2023
DOB NOWMechanical SystemsSigned-offDynamic US07/25/2023
DOB NOWMechanical SystemsSigned-offDynamic US08/24/2022
DOB NOWGeneral ConstructionSigned-offDynamic US08/24/2022
DOB NOWSidewalk ShedSigned-offCarlitos Contracting07/29/2020
DOB NOWSupported ScaffoldSigned-offCarlitos Contracting07/17/2020
DOB NOWSidewalk ShedSigned-offCarlitos Contracting07/17/2020
DOB NOWSupported ScaffoldSigned-offCarlitos Contracting07/13/2020
DOB NOWConstruction FenceSigned-offUtb-United Technology07/09/2020
DOB NOWConstruction FenceSigned-offUtb-United Technology07/02/2020
BISOTISSUEDC & L Contracting12/18/2023
BISOTISSUEDC & L Contracting12/18/2023
BISPLISSUEDLeviathan Mechanical09/22/2023
BISOTISSUEDC & L Contracting01/04/2023
BISOTISSUEDC & L Contracting12/30/2022
BISMHISSUEDC & L Contracting12/30/2022
BISOTISSUEDSKY Heights Construction02/10/2022
BISPLISSUEDOlympic Plumbing & Heating Service01/31/2022
BISOTISSUEDC & L Contracting12/22/2021
BISOTISSUEDC & L Contracting12/22/2021
BISMHISSUEDC & L Contracting12/22/2021
BISPLISSUEDOlympic Plumbing & Heating Service02/02/2021
BISOTISSUEDC & L Contracting12/23/2020
BISMHISSUEDC & L Contracting12/23/2020
BISOTISSUEDC & L Contracting12/23/2020
BISMHISSUEDInfinity Contracting Service11/07/2020
BISOTISSUEDUtb-United Technology07/07/2020
BISPLISSUEDOlympic Plumbing & Heating Service02/11/2020
BISMHISSUEDC & L Contracting12/26/2019
BISMHISSUEDInfinity Contracting Service11/19/2019
BISPLISSUEDLeviathan Mechanical09/26/2019
BISOTISSUEDLO Sardo General Contractors09/17/2019
+ 28 more permits on file
1 project · most recent 10/19/2026
Heating and Air Conditioning Systems Others Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/19/2026——Heating and Air Conditioning Systems, Others, Ventilation Systems
Heat / Cool
Daikin RXTA36AAVJU 3 tons · Vrf Outdoor ×27
FXFA09AAVJU 441 CFM · Vrf Indoor ×1
FXFA24AAVJU 777 CFM · Vrf Indoor ×1
FXSA24AAVJU 742 CFM · Vrf Indoor ×1
FXSA36AAVJU 1,130 CFM · Vrf Indoor ×1
Ventilation
Greenheck SQ-15-M2 800 CFM · Exhaust Fan ×1
USF-10-B6 300 CFM · Exhaust Fan ×1
USF-13-B7 3,556 CFM · Exhaust Fan ×1
Other
Titus 300RL 610 CFM · Ductwork ×5
355RL 4,728 CFM · Exhaust Fan ×5
OWNI 314 CFM ×2
355FL 528 CFM · Exhaust Fan ×1
1 project · most recent 12/17/2025
FiledStatusContractorScope
12/17/2025——6 outlets
3 projects · most recent 10/19/2026
Water/Sanitary
FiledStatusContractorScope
10/19/2026——Water/Sanitary
12/17/2025———
06/02/2025Signed-offRichards P and H CoWater/Sanitary
6 projects · most recent 08/27/2026
General Wiring
FiledStatusContractorScope
08/27/2026Permit IssuedRaiden ElectricGeneral Wiring
07/24/2025CompleteMac Fhionnghaile & SonsGeneral Wiring
08/11/2020CompleteStar-Delta Electric—
07/20/2020CompleteStar-Delta Electric—
02/11/2020CompleteUp Town ElectricGeneral Wiring
02/12/2018Permit IssuedJ.H. Electric of New YorkGeneral Wiring
2 projects · most recent 10/19/2026
Concrete Steel
FiledStatusContractorScope
10/19/2026——Steel, Concrete
06/02/2025Signed-offRichards Plum & Heating CoConcrete
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
02/20/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/20/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/25/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
10/15/2026Sprayed fire-resistant materialsYoung Suhspecial
09/11/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYoung Suhspecial
09/11/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
09/09/2026HVAC-R and service water heating equipmentYoung Suhenergy_progress
09/09/2026Duct leakage testing, insulation and designYoung Suhenergy_progress
09/09/2026Energy Code Compliance InspectionsYoung Suhprogress
09/09/2026Shutoff dampersYoung Suhenergy_progress
09/09/2026HVAC-R and service water piping design and insulationYoung Suhenergy_progress
09/09/2026Maintenance informationYoung Suhenergy_progress
09/09/2026HVAC-R and service water heating system controlsYoung Suhenergy_progress
09/09/2026High-Pressure Steam Piping (Welding)Young Suhspecial
09/09/2026Heating SystemsYoung Suhspecial
09/09/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
09/03/2026Lighting controlsYoung Suhenergy_progress
09/03/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
09/03/2026Energy Code Compliance InspectionsYoung Suhprogress
09/03/2026Fire-Resistance Rated ConstructionYoung Suhprogress
09/03/2026Interior lighting powerYoung Suhenergy_progress
08/27/2026Post-installed Anchors—special
08/26/2026Concrete - Cast-In-Place—special
08/19/2026Fire-Resistant Penetrations and Joints—special
08/19/2026Post-installed Anchors—special
08/19/2026Fire-Resistant Penetrations and Joints—special
08/19/2026Sprayed fire-resistant materials—special
08/19/2026Post-installed Anchors—special
Latest 25 of 47.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Brooklyn CollegeEducationEntire building
Project B01428407 Alteration · Plan Examiner Review · 08/26/2026
Project B01271809 Alteration · Approved · 12/17/2025
Project B01248738 Alteration · Permit Entire · 07/14/2025
Project B01248867 Alteration · Permit Entire · 07/14/2025
Project B01017446 Alteration · LOC Issued · 04/26/2024
Project B00619384 Alteration · Permit Entire · 04/05/2024
Project B00641349 Alteration · LOC Issued · 02/01/2022
Project B00362981 Alteration · LOC Issued · 07/28/2020
Project B00364896 Alteration · LOC Issued · 07/10/2020
Project B00363436 Alteration · LOC Issued · 07/09/2020
Project B00360979 Alteration · LOC Issued · 06/30/2020
Project B01435354 Alteration · Plan Examiner Review · 10/15/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 693 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch20
10/20/2026B01435354-S2Request digital key ↗
10/20/2026B01435354-S1Request digital key ↗
10/16/2026B01435354-S3Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold4
09/02/2026B00364896-I1Request digital key ↗
09/02/2026B00364896-S1Request digital key ↗
08/15/2026B00364896-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/02/2026B00363436-I1Request digital key ↗
09/02/2026B00362981-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/02/2026B00360979-I1Request digital key ↗
▸Applications & Permits173
▸BISWORK PERMIT APPLICATION84
09/27/2023321079177Open ↗
07/10/2023321079177Open ↗
06/05/2023321079177Open ↗
Showing 3 of 84 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION67
06/23/2025321666915Open ↗
02/12/2025320987884Open ↗
09/22/2023321079177Open ↗
Showing 3 of 67 on file for this type
▸BISPLACE OF ASSEMBLY14
11/08/2019321096540Open ↗
10/24/2019321096540Open ↗
10/24/2019321096540Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION7
06/23/2025321666915Open ↗
07/03/2019320987893Open ↗
03/05/2019320987893Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/08/2019321096540Open ↗
▸Seals & Professional Certifications128
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION64
10/22/2019321096540Open ↗
10/22/2019321096540Open ↗
04/03/2019321847944Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature25
10/20/2026B01435354-S2Open ↗
10/20/2026B01435354-S1Open ↗
10/16/2026B01435354-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
10/17/2026B01435354-S1Open ↗
10/17/2026B01435354-I1Open ↗
10/17/2026B01435354-S2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
10/17/2026B01435354-I1Open ↗
10/17/2026B01435354-S1Open ↗
10/17/2026B01435354-S1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
06/25/2020340732363Open ↗
02/20/2019340662241Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
06/25/2020340732363Open ↗
02/20/2019340662241Open ↗
Showing 2 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
06/25/2020340732363Open ↗
02/20/2019340662241Open ↗
Showing 2 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment48
▸BISSCHEDULE B - PLUMBING13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE9
07/29/2019320987893Open ↗
Showing 1 of 9 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
10/22/2020321824166Open ↗
05/26/2020321824166Open ↗
Showing 2 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS5
10/22/2020321824166Open ↗
10/22/2020321824166Open ↗
09/10/2020321824166Open ↗
Showing 3 of 5 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION4
07/03/2019320987893Open ↗
03/05/2019320987893Open ↗
Showing 2 of 4 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS2
08/19/2024320987893Open ↗
02/08/2023321079177Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA2
08/21/2024321666915Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection2
▸BISTENANT PROTECTION PLAN AND NOTES1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
08/19/2024320987893Open ↗
▸Environmental & Asbestos23
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/25/2026B00619384-P1Open ↗
08/25/2026B00619384-I1Open ↗
08/23/2026B01017446-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
06/23/2025321666915Open ↗
02/10/2022340732363Open ↗
07/07/2020340705437Open ↗
▸BISASBESTOS INSPECTION REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
01/28/2021340705437Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAPPLICANT SHALL PROVIDE 4 ACP-21 FORMSPRIOR TO SIGN OFF: TRU0728BK201
01/28/2021340705437Open ↗
▸Energy Compliance42
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY9
12/11/2024320987893Open ↗
03/03/2022340732363Open ↗
02/10/2022340732363Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
03/03/2022340732363Open ↗
01/28/2021340705437Open ↗
03/28/2019321824166Open ↗
Showing 3 of 5 on file for this type
▸BISLIGHTING CONTROLS2
08/19/2024320987893Open ↗
02/08/2023321079177Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
12/09/2024320987893Open ↗
02/08/2023321079177Open ↗
▸BIS* HVAC INSULATION AND SEALING2
08/19/2024320987893Open ↗
02/08/2023321079177Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
06/25/2020340732363Open ↗
Showing 1 of 2 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
08/19/2024320987893Open ↗
02/08/2023321079177Open ↗
▸BISINTERIOR LIGHTING POWER2
08/19/2024320987893Open ↗
02/08/2023321079177Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
08/19/2024320987893Open ↗
▸Inspections & Test Reports28
▸BISTECHNICAL REPORT: RESPONSIBILITY18
12/09/2024320987893Open ↗
03/03/2022340732363Open ↗
02/10/2022340732363Open ↗
Showing 3 of 18 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
01/23/2025320987893Open ↗
Showing 1 of 3 on file for this type
▸BISCONCRETE - CAST-IN-PLACE2
08/19/2024320987893Open ↗
02/08/2023321079177Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISMECHANICAL SYSTEMS2
08/19/2024320987893Open ↗
02/08/2023321079177Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
10/24/2019321096540Open ↗
▸Approvals, Objections & Sign-offs80
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter30
10/20/2026B01435354-S1Open ↗
10/20/2026B01435354-S2Open ↗
10/16/2026B01435354-I1Open ↗
Showing 3 of 30 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST23
08/11/2025320987893Open ↗
06/23/2025321666915Open ↗
06/20/2025321666915Open ↗
Showing 3 of 23 on file for this type
▸BISADMINISTRATIVE OBJECTIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
10/24/2019321096540Open ↗
10/24/2019321096540Open ↗
10/24/2019321096540Open ↗
Showing 3 of 8 on file for this type
▸BISFINAL3
07/28/2025320987893Open ↗
06/22/2023320987900Open ↗
02/08/2023321079177Open ↗
▸BISSUPERSEDING LETTER1
03/08/2019320987893Open ↗
▸Cost, Insurance & Ownership48
▸BISCOST AFFIDAVIT39
03/03/2022340732363Open ↗
01/28/2021340705437Open ↗
06/25/2020340732363Open ↗
Showing 3 of 39 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
08/08/2025320987893Open ↗
02/06/2025321666915Open ↗
06/22/2023320987900Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms54
▸BISEFILING COVER SHEET31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISADDITIONAL INFORMATION10
08/27/2024320987893Open ↗
01/06/2020340705437Open ↗
07/29/2019320987893Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM8
07/10/2023321079177Open ↗
01/17/2020321824166Open ↗
11/23/2019321824166Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
06/25/2020340732363Open ↗
11/25/2019340705437Open ↗
02/20/2019340662241Open ↗
Showing 3 of 5 on file for this type
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
02/20/2019340662241Open ↗
02/20/2019340662241Open ↗
Showing 2 of 4 on file for this type
▸BISSupporting Document: Fee Exempt2
06/20/2025321666915Open ↗
04/11/2022321079177Open ↗
▸BISEMERGENCY & STANDBY POWER SYSTEMS (GENERATORS)1
06/22/2023320987900Open ↗
▸BISALTERNATIVE MATERIALS - OTCR BUILDINGS BULLETIN1
08/19/2024320987893Open ↗
▸BISSHUTOFF DAMPERS1
08/19/2024320987893Open ↗