Miscellaneous warehouse · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 56,000 sf lot · 0.47 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction256p · 1 filing · 20 docs
Floor 3Under Construction261p · 1 filing · 20 docs
Floor 2Under Construction258p · 1 filing · 20 docs
Floor 1Under Construction261p · 1 filing · 20 docs
CellarUnder Construction30p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC5003/21/2026
HIGH POINT ENGINEERING303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
E.W. HOWELL CO, LLCGeneral Contractor2009/12/2026
ISLAND PUMP AND TANK, LLCGeneral Contractor707/08/2026
ALLIANCE PLUMBING CORPPlumbing607/08/2026
MANENGEERING BUREAU INCFire Protection508/18/2026
KING HOIST & SCAFFOLDINGGeneral Contractor203/21/2026
A + SPRINKLER CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUREAU VERITAS NA69022204/13/2026
HIGH POINT ENGINEERING1151302/19/2025
Building Lifecycle
All (151)Filed (34)Permit Issued (40)Signed Off (1)Inspection (18)Objection (28)Special Inspection (30)
09/10/2026
Permit issued — Mechanical Systems
Q00806670-S2-MS
09/10/2026
Permit issued — General Construction
Q00806670-I1-GC
08/17/2026
Permit issued — Sprinklers
Q00806670-S5-EW-SP
08/17/2026
Permit issued — Standpipe
Q00806670-S5-EW-SD
08/03/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/28/2026
Permit issued — General Construction
Q00806670-I1-GC
07/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/19/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/19/2026
Filed — New Building
INSTALLATION OF CURB CUT ON BEACH 75 STREET.
Q00806670-A4
06/15/2026
Special inspection requirement — Mechanical Systems
IBRAHIM MOURAD
06/15/2026
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
IBRAHIM MOURAD
06/15/2026
Special inspection requirement — Duct leakage testing, insulation and design
IBRAHIM MOURAD
06/15/2026
Special inspection requirement — Final
IBRAHIM MOURAD
06/15/2026
Special inspection requirement — Post-installed Anchors
IBRAHIM MOURAD
06/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
06/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
06/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
06/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
06/15/2026
Special inspection requirement — Shutoff dampers
IBRAHIM MOURAD
06/15/2026
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
06/15/2026
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
04/28/2026
Permit issued — Curb Cut
Q00806670-Z6-CC
04/22/2026
Filed — New Building
INSTALLATION OF CURB CUT ON BEACH 75 STREET.
Q00806670-Z6
04/13/2026
Filed — New Building
INSTALLATION OF CURB CUT ON BEACH 75 STREET.
Q00806670-B1
04/02/2026
Permit issued — Plumbing
Q00806670-S3-PL
03/31/2026
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
03/31/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/31/2026
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
03/31/2026
Special inspection requirement — Duct leakage testing, insulation and design
IBRAHIM MOURAD
03/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
03/31/2026
Special inspection requirement — Mechanical Systems
IBRAHIM MOURAD
03/31/2026
Special inspection requirement — Post-installed Anchors
IBRAHIM MOURAD
03/31/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
03/31/2026
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
IBRAHIM MOURAD
03/31/2026
Special inspection requirement — Shutoff dampers
IBRAHIM MOURAD
03/31/2026
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
03/31/2026
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
03/31/2026
Special inspection requirement — Maintenance information
IBRAHIM MOURAD
03/31/2026
Special inspection requirement — Final
IBRAHIM MOURAD
03/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
03/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
03/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
03/26/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
03/25/2026
Permit issued — Sprinklers
Q00806670-S5-EW-SP
03/16/2026
Filed — New Building
INSTALLATION OF CURB CUT ON BEACH 75 STREET.
Q00806670-A8
03/11/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
02/23/2026
Special inspection requirement — Footing and Foundation
IBRAHIM MOURAD
02/23/2026
Special inspection requirement — Concrete - Cast-In-Place
IBRAHIM MOURAD
02/23/2026
Special inspection requirement — Designated Seismic System
IBRAHIM MOURAD
01/15/2026
Filed — New Building
INSTALLATION OF CURB CUT ON BEACH 75 STREET.
Q00806670-A7
01/07/2026
Permit issued — General Construction
Q00909149-I1-GC
12/31/2025
Filed — New Building
INSTALLATION OF CURB CUT ON BEACH 75 STREET.
Q00806670-A6
12/24/2025
Objection resolved — Addressed
12/18/2025
Filed — New Building
INSTALLATION OF CURB CUT ON BEACH 75 STREET.
Q00806670-P9
12/17/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/15/2025
Objection raised — Scope
12/11/2025
Filed — New Building
INSTALLATION OF CURB CUT ON BEACH 75 STREET.
Q00806670-A5
12/10/2025
Permit issued — Structural
Q00806670-S6-ST
12/10/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/08/2025
Permit issued — General Construction
Q00909149-I1-GC
Latest 60 of 151 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedE.W. HOWELL CO, LLC09/10/2026
DOB NOWGeneral ConstructionPermit IssuedE.W. HOWELL CO, LLC09/10/2026
DOB NOWSprinklersPermit IssuedMANENGEERING BUREAU INC08/17/2026
DOB NOWStandpipePermit IssuedMANENGEERING BUREAU INC08/17/2026
DOB NOWGeneral ConstructionPermit IssuedE.W. HOWELL CO, LLC07/28/2026
DOB NOWCurb CutPermit IssuedE.W. HOWELL CO, LLC04/28/2026
DOB NOWPlumbingPermit IssuedCARDOZA PLUMBING WMBE04/02/2026
DOB NOWSprinklersPermit IssuedMANENGEERING BUREAU INC03/25/2026
DOB NOWGeneral ConstructionSigned-offISLAND PUMP AND TANK, LLC01/07/2026
DOB NOWStructuralPermit IssuedE.W. HOWELL CO, LLC12/10/2025
DOB NOWGeneral ConstructionSigned-offISLAND PUMP AND TANK, LLC12/08/2025
DOB NOWStandpipePermit IssuedMANENGEERING BUREAU INC11/17/2025
DOB NOWGeneral ConstructionPermit IssuedE.W. HOWELL CO, LLC11/13/2025
DOB NOWPlumbingPermit IssuedCARDOZA PLUMBING WMBE10/24/2025
DOB NOWEarth WorkPermit IssuedE.W. HOWELL CO, LLC09/12/2025
DOB NOWGeneral ConstructionPermit IssuedE.W. HOWELL CO, LLC09/09/2025
DOB NOWCurb CutPermit IssuedE.W. HOWELL CO, LLC09/09/2025
DOB NOWMechanical SystemsPermit IssuedE.W. HOWELL CO, LLC09/09/2025
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE05/22/2025
DOB NOWSupport of ExcavationPermit IssuedISLAND PUMP AND TANK, LLC02/26/2025
DOB NOWSprinklersPermit IssuedMANENGEERING BUREAU INC02/11/2025
DOB NOWSupport of ExcavationSigned-offISLAND PUMP AND TANK, LLC01/06/2025
DOB NOWGeneral ConstructionSigned-offISLAND PUMP AND TANK, LLC01/06/2025
DOB NOWGeneral ConstructionPermit IssuedE.W. HOWELL CO, LLC12/02/2024
DOB NOWStructuralPermit IssuedE.W. HOWELL CO, LLC11/29/2024
DOB NOWGeneral ConstructionSigned-offE.W. HOWELL CO, LLC11/29/2024
DOB NOWSupported ScaffoldPermit IssuedKING HOIST & SCAFFOLDING11/06/2024
DOB NOWPlumbingPermit IssuedCARDOZA PLUMBING WMBE10/15/2024
DOB NOWSupport of ExcavationSigned-offISLAND PUMP AND TANK, LLC09/12/2024
DOB NOWGeneral ConstructionPermit IssuedE.W. HOWELL CO, LLC09/12/2024
DOB NOWSprinklersPermit IssuedA + SPRINKLER CORP09/03/2024
DOB NOWGeneral ConstructionSigned-offISLAND PUMP AND TANK, LLC08/09/2024
DOB NOWGeneral ConstructionSigned-offE.W. HOWELL CO, LLC08/05/2024
DOB NOWGeneral ConstructionPermit IssuedE.W. HOWELL CO, LLC05/29/2024
DOB NOWPlumbingPermit IssuedCARDOZA PLUMBING WMBE12/21/2023
DOB NOWStructuralPermit IssuedE.W. HOWELL CO, LLC11/17/2023
DOB NOWPlumbingSigned-offCARDOZA PLUMBING WMBE10/25/2023
DOB NOWFoundationPermit IssuedE.W. HOWELL CO, LLC09/05/2023
DOB NOWGeneral ConstructionSigned-offE.W. HOWELL CO, LLC07/27/2023
DOB NOWFoundationPermit IssuedE.W. HOWELL CO, LLC07/10/2023
1 project · most recent 06/19/2026
Associated Ducts and Piping Generators Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/19/2026Permit IssuedE.W. HOWELL CO, LLCAssociated Ducts and Piping, Generators, Heating and Air Conditioning Systems
Heat / Cool
Carrier MMU-UP0121MH-UL 13 BTU · Vrf Outdoor ×8
38MARBQ18AA3 18 BTU · Heat Pump Outdoor ×2
38MARBQ24AA3 24 BTU · Heat Pump Outdoor ×2
MMD-UP0481HP-UL 54 BTU · Vrf Indoor ×2
MMD-UP0721HP-UL 81 BTU · Vrf Outdoor ×2
MMY-MUP1441HT6P-UL 162 BTU · Vrf Outdoor ×2
Polar Cooling Tech P-RTP.B7.5.AC.HREX.PE.HP 50 BTU · Doas ×3
P-RTP.D20.AC.HREX.PE.HP 278 BTU · Doas ×3
Toshiba MMU-UP0121MH-UL Vrf Outdoor ×4
MMD-UP0481HP-UL Vrf Indoor ×1
MMD-UP0721HP-UL Vrf Indoor ×1
MMY-MUP1441HT6P-UL Vrf Outdoor ×1
Generators
Kohler 400REZXD 400 kW · Generator ×2
Ducts & Piping
Toshiba MMD-UP0481HP-UL Vrf Indoor ×1
1 project · most recent 06/19/2026
Sprinkler System
FiledStatusContractorScope
06/19/2026Permit IssuedMANENGEERING BUREAU INCSprinkler System
1 project · most recent 06/19/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/19/2026Permit IssuedCARDOZA PLUMBING WMBEGas, Storm, Water/Sanitary
3 projects · most recent 07/02/2024
General Wiring Lighting
FiledStatusContractorScope
07/02/2024CompleteJAM ELECTRICAL CORP—
04/29/2024Permit IssuedE-J ELEC. INSTALLATION COGeneral Wiring, Lighting
01/26/2024Permit IssuedE-J ELEC. INSTALLATION CO—
1 project · most recent 06/19/2026
Steel Concrete
FiledStatusContractorScope
06/19/2026Permit IssuedE.W. HOWELL CO, LLCSteel, Concrete
1 project · most recent 12/12/2024
Scaffold
FiledStatusContractorScope
12/12/2024Permit IssuedKING HOIST & SCAFFOLDINGScaffold
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
08/03/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/19/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/31/2026Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
03/31/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/26/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
03/11/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/17/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/18/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/16/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/28/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/23/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/26/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/26/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
06/15/2026Duct leakage testing, insulation and designIBRAHIM MOURADenergy_progress
06/15/2026HVAC-R and service water piping design and insulationIBRAHIM MOURADenergy_progress
06/15/2026Maintenance informationIBRAHIM MOURADenergy_progress
06/15/2026HVAC-R and service water heating equipmentIBRAHIM MOURADenergy_progress
06/15/2026HVAC-R and service water heating system controlsIBRAHIM MOURADenergy_progress
06/15/2026Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
06/15/2026Post-installed AnchorsIBRAHIM MOURADspecial
06/15/2026Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical ComponentsIBRAHIM MOURADspecial
06/15/2026Mechanical SystemsIBRAHIM MOURADspecial
06/15/2026Energy Code Compliance InspectionsIBRAHIM MOURADprogress
06/15/2026FinalIBRAHIM MOURADprogress
06/15/2026Shutoff dampersIBRAHIM MOURADenergy_progress
03/31/2026Shutoff dampersIBRAHIM MOURADenergy_progress
03/31/2026Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
03/31/2026Mechanical SystemsIBRAHIM MOURADspecial
03/31/2026Post-installed AnchorsIBRAHIM MOURADspecial
03/31/2026Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical ComponentsIBRAHIM MOURADspecial
03/31/2026HVAC-R and service water heating equipmentIBRAHIM MOURADenergy_progress
03/31/2026Energy Code Compliance InspectionsIBRAHIM MOURADprogress
03/31/2026FinalIBRAHIM MOURADprogress
03/31/2026Duct leakage testing, insulation and designIBRAHIM MOURADenergy_progress
03/31/2026HVAC-R and service water piping design and insulationIBRAHIM MOURADenergy_progress
03/31/2026HVAC-R and service water heating system controlsIBRAHIM MOURADenergy_progress
03/31/2026Maintenance informationIBRAHIM MOURADenergy_progress
03/27/2026HVAC-R and service water heating system controlsIBRAHIM MOURADenergy_progress
Latest 25 of 150.
▾Documents — 246 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch35
08/24/2026Q00895094-P1Request digital key ↗
08/24/2026Q00895094-I1Request digital key ↗
08/21/2026Q00909149-P3Request digital key ↗
Showing 3 of 35 on file for this type
▸Applications & Permits5
▸DOB NOWDEP Stormwater Construction Permit4
08/20/2026Q00806670-B4Open ↗
08/17/2026Q00806670-I1Open ↗
Showing 2 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION1
10/14/2025440785269Open ↗
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/20/2026Q00806670-B4Open ↗
08/17/2026Q00806670-I1Open ↗
08/13/2026Q00806670-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/20/2026Q00806670-B4Open ↗
08/17/2026Q00806670-I1Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026Q00806670-I1Open ↗
▸Seals & Professional Certifications104
▸DOB NOWSpecial Inspector Seal & Signature37
09/29/2026Q00806670-I1Open ↗
09/29/2026Q00806670-I1Open ↗
09/24/2026Q00806670-P2Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature35
08/21/2026Q00909149-S1Open ↗
08/21/2026Q00909149-P3Open ↗
08/21/2026Q00909149-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature32
09/29/2026Q00806670-I1Open ↗
09/29/2026Q00806670-I1Open ↗
09/29/2026Q00806670-I1Open ↗
Showing 3 of 32 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/17/2026Q00806670-I1Open ↗
Showing 1 of 3 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
08/20/2026Q00806670-B4Open ↗
08/17/2026Q00806670-I1Open ↗
08/15/2026Q00806670-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/17/2026Q00806670-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026Q00806670-I1Open ↗
▸Approvals, Objections & Sign-offs74
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter38
08/21/2026Q00909149-P2Open ↗
08/21/2026Q00909149-I1Open ↗
08/21/2026Q00909149-P3Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)36
08/20/2026Q00806670-B4Open ↗
08/17/2026Q00806670-A9Open ↗
08/17/2026Q00806670-A8Open ↗
Showing 3 of 36 on file for this type
▸Other Documents11
▸DOB NOWSite Survey: Initial4
08/20/2026Q00806670-B4Open ↗
08/17/2026Q00806670-I1Open ↗
08/13/2026Q00806670-A1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/20/2026Q00806670-B4Open ↗
08/17/2026Q00806670-I1Open ↗
Showing 2 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
09/29/2023440785269Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/17/2026Q00806670-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00806670-Z1Open ↗