RoofUnder Construction3p · 4 filings · 20 docs
ArchitectureElectricalStructural
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
On file for this project
2 documents · 1 drawing sheet
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
On file for this project
2 documents · 1 drawing sheet
INSTALLATION OF A PINNACLE SCAFFOLD AT WEST & EAST TOWERS AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD SHALL COMPLY WITH NYC BUILDING CODE, CHAPTER 33.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
BulkheadUnder Construction1p · 1 filing · 20 docs
Structural
Facade Restoration & inspection - Added Scaffolds at New Locations
On file for this project
30 documents · 1 drawing sheet
Penthouse2p · 1 filing · 7 docs
ArchitectureGeneral
No filed description on record for this project.
On file for this project
7 documents · 2 drawing sheets
Floor 45Under Construction3p · 2 filings · 14 docs
Fire ProtectionGeneralStructural
INSTALLATION OF SPRINKLER PRE-ACTION SYSTEMS AS SHOWN ON DRAWINGS FILED HEREWITH
On file for this project
4 documents · 1 drawing sheet
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 2 drawing sheets
Floor 44Under Construction3p · 2 filings · 14 docs
ArchitectureGeneralStructural
INSTALLATION OF SPRINKLER PRE-ACTION SYSTEMS AS SHOWN ON DRAWINGS FILED HEREWITH
On file for this project
4 documents · 1 drawing sheet
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 2 drawing sheets
Floor 43Under Construction206p · 3 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 5 drawing sheets
INSTALLATION OF SYSTEM SCAFFOLD STAIR TOWER AS PER DRAWINGS. SYSTEM SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents · 1 drawing sheet
Floor 42Under Construction206p · 2 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 6 drawing sheets
Floor 41Under Construction207p · 2 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents · 1 drawing sheet
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 6 drawing sheets
Floor 40Under Construction206p · 2 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 6 drawing sheets
Floor 39Under Construction207p · 3 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 6 drawing sheets
INSTALLATION OF SYSTEM SCAFFOLD STAIR TOWER AS PER DRAWINGS. SYSTEM SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents · 1 drawing sheet
Floor 38Under Construction206p · 2 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 6 drawing sheets
Floor 37Under Construction203p · 2 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 3 drawing sheets
Floor 36Under Construction205p · 2 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents · 2 drawing sheets
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 3 drawing sheets
Floor 35Under Construction203p · 2 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 3 drawing sheets
Floor 34Under Construction203p · 2 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 3 drawing sheets
Floor 33Under Construction203p · 2 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 3 drawing sheets
Floor 32Under Construction203p · 2 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 3 drawing sheets
Floor 31Under Construction203p · 2 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 3 drawing sheets
Floor 30Under Construction205p · 3 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing
HEREBY FILINGN FOR REMOVAL/INSTALLATION OF PARTITIONS IN UNIT 3006. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 3 drawing sheets
Floor 29Under Construction203p · 2 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 3 drawing sheets
Floor 28Under Construction203p · 2 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 3 drawing sheets
Floor 27Under Construction208p · 4 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY NEEDLE BEAM PLATFORM AS PER DRAWINGS. NEEDLE BEAM PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 26Under Construction204p · 2 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 4 drawing sheets
Floor 25Under Construction204p · 2 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 4 drawing sheets
Floor 24Under Construction204p · 2 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 4 drawing sheets
Floor 23Under Construction204p · 2 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 4 drawing sheets
Floor 22Under Construction204p · 2 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 4 drawing sheets
Floor 21Under Construction221p · 3 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing
INTERIOR RENOVATION OF UNITS 2805 & 2803 AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCPANCY.
On file for this project
14 documents · 5 drawing sheets
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 5 drawing sheets
Floor 20Under Construction207p · 4 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 5 drawing sheets
INSTALLATION OF SYSTEM SCAFFOLD STAIR TOWER AS PER DRAWINGS. SYSTEM SCAFFOLD STAIR TOWER SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 19Under Construction204p · 3 filings · 20 docs
ArchitectureGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
FILING PARTITION MODIFICATIONS FOR TEMPORARY STAIR ENCLOSURES AND HORIZONTAL EGRESS TRANSFERS. EGRESS APPROVED UNDER CCD1 CONTROL #68062. STAIR TOWER FILED AND APPROVED UNDER DOBNOW #M00042210.
On file for this project
6 documents · 1 drawing sheet
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 1 drawing sheet
Floor 18Under Construction201p · 2 filings · 20 docs
GeneralPlumbing
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 1 drawing sheet
Floor 17Under Construction201p · 2 filings · 20 docs
GeneralPlumbing
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 1 drawing sheet
Floor 16Under Construction201p · 2 filings · 20 docs
GeneralPlumbing
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
10 documents · 1 drawing sheet
Floor 15Under Construction200p · 1 filing · 20 docs
Plumbing
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
Floor 14Under Construction200p · 1 filing · 20 docs
Plumbing
Issued Permit Scope
Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
Floor 13Under Construction204p · 2 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
This application if filed for a Temporary Use Permit for a sales office including model apartments pursuant to section AC-28-111 and Buildings Bulletin 2010-002 option B.
On file for this project
3 documents · 2 drawing sheets
Floor 12Under Construction267p · 2 filings · 20 docs
MechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF MECHANICAL DUCT WORK, RELATED PIPING, CEILING DIFFUSERS, FAN COIL UNITS ANDBASEBOARD HEATING. FILED IN CONJUNCTION WITH ALT 1 #121191245. NO CHANGE TO USE, EGRESS OROCCUPANCY.
On file for this project
23 documents
Floor 11Under Construction267p · 2 filings · 20 docs
MechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF MECHANICAL DUCT WORK, RELATED PIPING, CEILING DIFFUSERS, FAN COIL UNITS ANDBASEBOARD HEATING. FILED IN CONJUNCTION WITH ALT 1 #121191245. NO CHANGE TO USE, EGRESS OROCCUPANCY.
On file for this project
23 documents
Floor 10Under Construction267p · 2 filings · 20 docs
MechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF MECHANICAL DUCT WORK, RELATED PIPING, CEILING DIFFUSERS, FAN COIL UNITS ANDBASEBOARD HEATING. FILED IN CONJUNCTION WITH ALT 1 #121191245. NO CHANGE TO USE, EGRESS OROCCUPANCY.
On file for this project
23 documents
Floor 9Under Construction267p · 2 filings · 20 docs
MechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF MECHANICAL DUCT WORK, RELATED PIPING, CEILING DIFFUSERS, FAN COIL UNITS ANDBASEBOARD HEATING. FILED IN CONJUNCTION WITH ALT 1 #121191245. NO CHANGE TO USE, EGRESS OROCCUPANCY.
On file for this project
23 documents
Floor 8Under Construction270p · 6 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF EIGHT (8) BOILERS ON THE 7TH FLOOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
26 documents · 1 drawing sheet
INSTALLATION OF MECHANICAL DUCT WORK, RELATED PIPING, CEILING DIFFUSERS, FAN COIL UNITS ANDBASEBOARD HEATING. FILED IN CONJUNCTION WITH ALT 1 #121191245. NO CHANGE TO USE, EGRESS OROCCUPANCY.
On file for this project
23 documents
Latest 3 of 6 filings on this floor.
Floor 7Under Construction269p · 5 filings · 20 docs
ArchitectureElectricalMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF CHP UNITS AND VENTILATION SYSTEMS IN THE CHP ROOM ON THE 6TH FLOOR AND ASSOCIATED ELECTRICAL DISTRIBUTION PANEL ON 7TH FLOOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
23 documents · 1 drawing sheet
INSTALLATION OF MECHANICAL DUCT WORK, RELATED PIPING, CEILING DIFFUSERS, FAN COIL UNITS ANDBASEBOARD HEATING. FILED IN CONJUNCTION WITH ALT 1 #121191245. NO CHANGE TO USE, EGRESS OROCCUPANCY.
On file for this project
23 documents
Latest 3 of 5 filings on this floor.
Floor 6Under Construction272p · 5 filings · 20 docs
ElectricalMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
INSTALLATION OF PLUMBING FIXTURES IN THE CHP ROOM ON THE 6TH FLOOR , AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
On file for this project
4 documents · 1 drawing sheet
INSTALLATION OF CHP UNITS AND VENTILATION SYSTEMS IN THE CHP ROOM ON THE 6TH FLOOR AND ASSOCIATED ELECTRICAL DISTRIBUTION PANEL ON 7TH FLOOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
23 documents · 4 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 5Under Construction270p · 3 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
FILING PARTITION MODIFICATIONS FOR TEMPORARY STAIR ENCLOSURES AND HORIZONTAL EGRESS TRANSFERS. EGRESS APPROVED UNDER CCD1 CONTROL #68062. STAIR TOWER FILED AND APPROVED UNDER DOBNOW #M00042210.
On file for this project
6 documents · 1 drawing sheet
INSTALLATION OF MECHANICAL DUCT WORK, RELATED PIPING, CEILING DIFFUSERS, FAN COIL UNITS ANDBASEBOARD HEATING. FILED IN CONJUNCTION WITH ALT 1 #121191245. NO CHANGE TO USE, EGRESS OROCCUPANCY.
On file for this project
23 documents
Floor 413p · 2 filings · 18 docs
MechanicalStructural
Issued Permit Scope
Mechanical Systems
TEMPORARY WORK PLATFORM AT 4TH FLOOR FROM HOIST COMMON PLATFORM AS PER DWGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Extended Air Distribution from air handling unit provided in Alt 1 Filing Job #121191245 to 3-Meal Restaurant seating space. Added 4-Pipe supplemental fan coils for spot heating and cooling. No change to use, egress or occupancy.
On file for this project
16 documents
Floor 3Under Construction3p · 1 filing · 6 docs
Architecture
Issued Permit Scope
General Construction
FILING PARTITION MODIFICATIONS FOR TEMPORARY STAIR ENCLOSURES AND HORIZONTAL EGRESS TRANSFERS. EGRESS APPROVED UNDER CCD1 CONTROL #68062. STAIR TOWER FILED AND APPROVED UNDER DOBNOW #M00042210.
On file for this project
6 documents · 1 drawing sheet
Floor 2
Floor 1Under Construction13p · 14 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING. FILED IN CONJUNCTION WITH ALT 1#121191245. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
18 documents · 2 drawing sheets
INSTALLATION OF SPRINKLER PRE-ACTION SYSTEMS AS SHOWN ON DRAWINGS FILED HEREWITH
On file for this project
4 documents · 1 drawing sheet
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Mezzanine2p · 2 filings · 11 docs
Architecture
No filed description on record for this project.
On file for this project
7 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
4 documents · 1 drawing sheet
CellarUnder Construction10p · 3 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers
Installation of smoke curtain shutter at elevators as shown on plans per approved OTCR #85-20. No change to use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
INSTALLATION OF SPRINKLER PRE-ACTION SYSTEMS AS SHOWN ON DRAWINGS FILED HEREWITH
On file for this project
4 documents
INSTALLATION OF FUEL OIL PIPING FOR EMERGENCY GENERATOR IN CONJUNCTION WITH ALT-I #121191245, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
25 documents · 5 drawing sheets
Sub-Cellar16p · 5 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Installation of smoke curtain shutter at elevators as shown on plans per approved OTCR #85-20. No change to use, egress or occupancy.
On file for this project
7 documents · 2 drawing sheets
MODIFICATION OF EXISTING SPRINKLER SYSTEM AS PER PLANS (NEW SPRINKLER BOOSTER PUMP). NO CHANGE TO USE, EGRESS OR OCCUPANCY
On file for this project
6 documents · 1 drawing sheet
INSTALLATION OF EIGHT (8) BOILERS ON THE 7TH FLOOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
26 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
BasementUnder Construction27p · 10 filings · 20 docs
ArchitectureCivilElectricalGeneralMechanicalPlumbingStructural
INSTALLATION OF SPRINKLER PRE-ACTION SYSTEMS AS SHOWN ON DRAWINGS FILED HEREWITH
On file for this project
4 documents · 1 drawing sheet
Construction of Temporary Contractors field office in basement only. Filed in conjunction to Alt 1 #121191245. No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
INSTALLATION OF FUEL OIL PIPING FOR EMERGENCY GENERATOR IN CONJUNCTION WITH ALT-I #121191245, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
25 documents · 6 drawing sheets
Latest 3 of 8 filings on this floor.
Sub-BasementUnder Construction13p · 5 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Herewith filing for construction of temporary field shanties located in the basement as indicated on plans. No change in use, occupancy, or egress.
On file for this project
7 documents
INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING. FILED IN CONJUNCTION WITH ALT 1#121191245. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
18 documents
Provide water & sanitary & gas risers throughout building to support build outs under separate applications. No change to use, egress or occupancy. Filed in conjunction with alt 1 #121191245.
On file for this project
31 documents
Latest 3 of 5 filings on this floor.