RoofUnder Construction3p · 5 filings · 20 docs
ArchitectureElectricalEquipmentLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Supported Scaffold
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
On file for this project
2 documents · 1 drawing sheet
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
On file for this project
2 documents · 1 drawing sheet
Facade repair of pinnacles including full recladding and copper repair. No change in egress, use or occupancy.
On file for this project
5 documents
Latest 3 of 5 filings on this floor.
BulkheadUnder Construction1p · 1 filing · 20 docs
Structural
Facade Restoration & inspection - Added Scaffolds at New Locations
On file for this project
30 documents · 1 drawing sheet
Penthouse2 filings · 13 docs
Plumbing
Issued Permit Scope
Plumbing
Installation of plumbing fixtures and related piping on the 43rd and 44th floor, apt. 4301. No change to use, egress or occupancy. Related applications: GC #M00575887-I1, MH #M00597490-I1.
On file for this project
5 documents
Installation of plumbing fixtures and related piping. No change to use, egress or occupancy.
On file for this project
8 documents
Floor 45Under Construction1p · 1 filing · 4 docs
Fire ProtectionGeneralStructural
INSTALLATION OF SPRINKLER PRE-ACTION SYSTEMS AS SHOWN ON DRAWINGS FILED HEREWITH
On file for this project
4 documents · 1 drawing sheet
Floor 44Under Construction1p · 4 filings · 20 docs
ArchitectureElectricalEquipmentGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
Supported Scaffold
INSTALLATION OF A TEMPORARY SCAFFOLD RIGGING SYSTEM AS PER PLANS DURING BUILDING RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents
INSTALLATION OF SPRINKLER PRE-ACTION SYSTEMS AS SHOWN ON DRAWINGS FILED HEREWITH
On file for this project
4 documents · 1 drawing sheet
INSTALLATION OF A PINNACLE SCAFFOLD AT WEST & EAST TOWERS AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD SHALL COMPLY WITH NYC BUILDING CODE, CHAPTER 33.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 433 filings
ArchitectureElectricalEquipmentGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF A TEMPORARY SCAFFOLD RIGGING SYSTEM AS PER PLANS DURING BUILDING RENOVATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents
INSTALLATION OF A PINNACLE SCAFFOLD AT WEST & EAST TOWERS AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. SCAFFOLD SHALL COMPLY WITH NYC BUILDING CODE, CHAPTER 33.
On file for this project
4 documents
INSTALLATION OF A TEMPORARY SCAFFOLD AT WEST & EAST TOWERS AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
On file for this project
20 documents
Floor 42
Floor 41
Floor 40
Floor 39
Floor 381 filing
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF A TEMPORARY PROTECTION DECKS @ DIFFERENT LEVELS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PROTECTION DECKS TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30Under Construction2 filings · 6 docs
ArchitectureElectricalGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Supported Scaffold
HEREBY FILINGN FOR REMOVAL/INSTALLATION OF PARTITIONS IN UNIT 3006. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents
INSTALLATION OF A TEMPORARY PROTECTION DECKS @ DIFFERENT LEVELS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PROTECTION DECKS TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents
Floor 29
Floor 281 filing
ArchitectureElectricalGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF A TEMPORARY PROTECTION DECKS @ DIFFERENT LEVELS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PROTECTION DECKS TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents
Floor 271p · 1 filing
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF TEMPORARY NEEDLE BEAM PLATFORM AS PER DRAWINGS. NEEDLE BEAM PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21Under Construction5p · 1 filing · 14 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Supported Scaffold
INTERIOR RENOVATION OF UNITS 2805 & 2803 AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCPANCY.
On file for this project
14 documents · 5 drawing sheets
Floor 201p · 2 filings
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Supported Scaffold
Installation of Mini crane for glass installation. no change in use, egress or occupancy.
On file for this project
2 documents
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Floor 19Under Construction1p · 1 filing
ArchitectureGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Supported Scaffold
FILING PARTITION MODIFICATIONS FOR TEMPORARY STAIR ENCLOSURES AND HORIZONTAL EGRESS TRANSFERS. EGRESS APPROVED UNDER CCD1 CONTROL #68062. STAIR TOWER FILED AND APPROVED UNDER DOBNOW #M00042210.
On file for this project
6 documents · 1 drawing sheet
Floor 181 filing
ArchitectureFire ProtectionGeneralPlumbing
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Supported Scaffold
No filed description on record for this project.
On file for this project
6 documents
Floor 171 filing
ArchitectureElectricalGeneralPlumbing
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF MATERIAL HOIST ONLY AS PLANS DURING MAJOR ALTERATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. MATERIAL HOIST TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents
Floor 161 filing
ArchitectureElectricalGeneralPlumbing
Issued Permit Scope
Plumbing · Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF MATERIAL HOIST ONLY AS PLANS DURING MAJOR ALTERATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. MATERIAL HOIST TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents
Floor 15
Floor 14
Floor 132p · 3 filings
ArchitectureElectricalGeneralPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Protection and Mechanical Methods · Supported Scaffold
This application if filed for a Temporary Use Permit for a sales office including model apartments pursuant to section AC-28-111 and Buildings Bulletin 2010-002 option B.
On file for this project
3 documents · 2 drawing sheets
INSTALLATION OF A TEMPORARY PROTECTION DECKS @ DIFFERENT LEVELS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PROTECTION DECKS TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
On file for this project
2 documents
Use of temporary construction shanty as per plans filed herewith.
On file for this project
2 documents
Floor 12Under Construction1 filing
ArchitectureGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF MECHANICAL DUCT WORK, RELATED PIPING, CEILING DIFFUSERS, FAN COIL UNITS ANDBASEBOARD HEATING. FILED IN CONJUNCTION WITH ALT 1 #121191245. NO CHANGE TO USE, EGRESS OROCCUPANCY.
On file for this project
23 documents
Floor 11Under Construction1 filing
ArchitectureGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF MECHANICAL DUCT WORK, RELATED PIPING, CEILING DIFFUSERS, FAN COIL UNITS ANDBASEBOARD HEATING. FILED IN CONJUNCTION WITH ALT 1 #121191245. NO CHANGE TO USE, EGRESS OROCCUPANCY.
On file for this project
23 documents
Floor 10Under Construction1 filing
ArchitectureGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF MECHANICAL DUCT WORK, RELATED PIPING, CEILING DIFFUSERS, FAN COIL UNITS ANDBASEBOARD HEATING. FILED IN CONJUNCTION WITH ALT 1 #121191245. NO CHANGE TO USE, EGRESS OROCCUPANCY.
On file for this project
23 documents
Floor 9Under Construction1 filing
ArchitectureGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF MECHANICAL DUCT WORK, RELATED PIPING, CEILING DIFFUSERS, FAN COIL UNITS ANDBASEBOARD HEATING. FILED IN CONJUNCTION WITH ALT 1 #121191245. NO CHANGE TO USE, EGRESS OROCCUPANCY.
On file for this project
23 documents
Floor 8Under Construction2p · 4 filings
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF EIGHT (8) BOILERS ON THE 7TH FLOOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
26 documents · 1 drawing sheet
INSTALLATION OF MECHANICAL DUCT WORK, RELATED PIPING, CEILING DIFFUSERS, FAN COIL UNITS ANDBASEBOARD HEATING. FILED IN CONJUNCTION WITH ALT 1 #121191245. NO CHANGE TO USE, EGRESS OROCCUPANCY.
On file for this project
23 documents
BOILERS FILED UNDER SEPARATE APPLICATION. BOILERS ARE CONDENSING TYPE. THIS APPLICATION COVERS HW PIPING, FLUES, VENTILATION AND COMBUSTION AIR TO BOILERS. APPLICATION FILED IN CONJUNCTION WITH ALT 1 #121191245. WORK INCLUDES FLUES AT 8TH FL TERRACE.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 7Under Construction1p · 6 filings
ArchitectureElectricalGeneralMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF PLUMBING FIXTURES IN THE BOILER ROOM ON THE 7TH FLOOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
On file for this project
4 documents
INSTALLATION OF EIGHT (8) BOILERS ON THE 7TH FLOOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
26 documents
INSTALLATION OF CHP UNITS AND VENTILATION SYSTEMS IN THE CHP ROOM ON THE 6TH FLOOR AND ASSOCIATED ELECTRICAL DISTRIBUTION PANEL ON 7TH FLOOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
23 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 6Under Construction4p · 4 filings
ArchitectureElectricalGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF PLUMBING FIXTURES IN THE CHP ROOM ON THE 6TH FLOOR , AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
On file for this project
4 documents · 1 drawing sheet
INSTALLATION OF CHP UNITS AND VENTILATION SYSTEMS IN THE CHP ROOM ON THE 6TH FLOOR AND ASSOCIATED ELECTRICAL DISTRIBUTION PANEL ON 7TH FLOOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
23 documents · 4 drawing sheets
INSTALLATION OF MECHANICAL DUCT WORK, RELATED PIPING, CEILING DIFFUSERS, FAN COIL UNITS ANDBASEBOARD HEATING. FILED IN CONJUNCTION WITH ALT 1 #121191245. NO CHANGE TO USE, EGRESS OROCCUPANCY.
On file for this project
23 documents
Latest 3 of 4 filings on this floor.
Floor 5Under Construction1p · 5 filings
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Supported Scaffold
TEMPORARY WORK PLATFORM AT 4TH FLOOR FROM HOIST COMMON PLATFORM AS PER DWGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
GRAND BALLROOM (ROOM 03-100) INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
FILING PARTITION MODIFICATIONS FOR TEMPORARY STAIR ENCLOSURES AND HORIZONTAL EGRESS TRANSFERS. EGRESS APPROVED UNDER CCD1 CONTROL #68062. STAIR TOWER FILED AND APPROVED UNDER DOBNOW #M00042210.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 41p · 4 filings · 13 docs
ArchitectureFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Protection and Mechanical Methods · Supported Scaffold
TEMPORARY WORK PLATFORM AT 4TH FLOOR FROM HOIST COMMON PLATFORM AS PER DWGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 1 drawing sheet
Extended Air Distribution from air handling unit provided in Alt 1 Filing Job #121191245 to 3-Meal Restaurant seating space. Added 4-Pipe supplemental fan coils for spot heating and cooling. No change to use, egress or occupancy.
On file for this project
16 documents
GRAND BALLROOM (ROOM 03-100) INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Floor 3Under Construction1p · 6 filings · 16 docs
ArchitectureGeneralStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Supported Scaffold
GRAND BALLROOM (ROOM 03-100) INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
BASILDON ROOM: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
SILVER CORRIDOR: INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Latest 3 of 6 filings on this floor.
Floor 22 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanical
Issued Permit Scope
Boiler Equipment · Protection and Mechanical Methods
INSTALLATION OF FUEL OIL PIPING FOR EMERGENCY GENERATOR IN CONJUNCTION WITH ALT-I #121191245, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
25 documents
No filed description on record for this project.
On file for this project
6 documents
Floor 1Under Construction17p · 24 filings · 20 docs
ArchitectureCivilFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Construction Fence · Curb Cut · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Supported Scaffold
INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING. FILED IN CONJUNCTION WITH ALT 1#121191245. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
18 documents · 2 drawing sheets
REMOVAL AND INSTALLATION OF DUCTWORK, DIFFUSERS, FAN COIL UNIT, AND ASSOCIATEDMECHANICAL PIPING.THERE IS NO CHANGE IN OCCUPANCY, USE, OR EGRESS
On file for this project
39 documents · 2 drawing sheets
FILING FOR TEMP USE PERMIT PURSUANT TO SECTION AC-28-111 FOR FIRST FLOOR EVENT SPACE WITH FEWER THAN 74 PEOPLE OCCUPYING THE SPACE AT A TIME
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 24 filings on this floor.
CellarUnder Construction6p · 6 filings · 13 docs
ArchitectureCivilFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Plumbing · Protection and Mechanical Methods · Sprinklers
INSTALLATION OF SPRINKLER PRE-ACTION SYSTEMS AS SHOWN ON DRAWINGS FILED HEREWITH
On file for this project
4 documents
MODIFICATION OF EXISTING SPRINKLER SYSTEM AS PER PLANS (NEW SPRINKLER BOOSTER PUMP). NO CHANGE TO USE, EGRESS OR OCCUPANCY
On file for this project
6 documents
INSTALLATION OF FUEL OIL PIPING FOR EMERGENCY GENERATOR IN CONJUNCTION WITH ALT-I #121191245, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
25 documents · 6 drawing sheets
Latest 3 of 6 filings on this floor.
Sub-Cellar15p · 4 filings · 13 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Plumbing · Sprinklers
MODIFICATION OF EXISTING SPRINKLER SYSTEM AS PER PLANS (NEW SPRINKLER BOOSTER PUMP). NO CHANGE TO USE, EGRESS OR OCCUPANCY
On file for this project
6 documents · 1 drawing sheet
INSTALLATION OF EIGHT (8) BOILERS ON THE 7TH FLOOR, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
26 documents · 2 drawing sheets
INSTALLATION OF FUEL OIL PIPING FOR EMERGENCY GENERATOR IN CONJUNCTION WITH ALT-I #121191245, AS SHOWN ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
25 documents · 10 drawing sheets
Latest 3 of 4 filings on this floor.
BasementUnder Construction6p · 4 filings · 20 docs
ArchitectureGeneral
Herewith filing for construction of temporary field shanties located in the basement as indicated on plans. No change in use, occupancy, or egress.
On file for this project
7 documents · 2 drawing sheets
INSTALLATION OF SPRINKLER PRE-ACTION SYSTEMS AS SHOWN ON DRAWINGS FILED HEREWITH
On file for this project
4 documents · 1 drawing sheet
Construction of Temporary Contractors field office in basement only. Filed in conjunction to Alt 1 #121191245. No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Sub-BasementUnder Construction5 filings · 7 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing
Herewith filing for construction of temporary field shanties located in the basement as indicated on plans. No change in use, occupancy, or egress.
On file for this project
7 documents
INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING. FILED IN CONJUNCTION WITH ALT 1#121191245. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
18 documents
Extended Air Distribution from air handling unit provided in Alt 1 Filing Job #121191245 to 3-Meal Restaurant seating space. Added 4-Pipe supplemental fan coils for spot heating and cooling. No change to use, egress or occupancy.
On file for this project
16 documents
Latest 3 of 5 filings on this floor.
Site & exterior17 filings · 20 docs
ArchitectureCivilElectricalEquipmentGeneralLandscapeMechanicalPlumbingStructuralOther
Issued Permit Scope
Construction Fence · General Construction · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
HEAVY DUTY SIDEWALK SHED DURING BLDG ALTERATION, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY.
On file for this project
2 documents · 2 drawing sheets
CONSTRUCTION FENCE AS PER DRAWINGS. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE INSTALLED ON SIDEWALK/ROADWAY.
On file for this project
2 documents · 2 drawing sheets
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.
On file for this project
3 documents · 3 drawing sheets
Latest 3 of 17 filings on this floor.
Filed — no permit issued24 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
INSTALLATION OF 2 NEW INTERIOR DOORS & ASSOCIATED MINOR PARTITION/FINISH WORK AT THE 15TH-FLOOR HOTEL CORRIDOR/SERVICE VESTIBULE AREA. NO CHANGE IN USE, OCCUPANCY, EGRESS, CAPACITY, FLOOR AREA, PLUMBING, MECH SYSTEMS, STRUCTURAL SYSTEMS/MEMBERS OR C OF O
On file for this project
3 documents · 5 drawing sheets
No filed description on record for this project.
On file for this project
5 documents · 10 drawing sheets
No filed description on record for this project.
On file for this project
6 documents · 6 drawing sheets
Latest 3 of 24 filings on this floor.