← Back
BuildNYC
Elevator cooperative
305 WEST 72ND STREET
MANHATTAN · BIN 1030986
💬 Discuss this project
1913Year Built
13Stories
D4Building Class
R10AZoning
56,074 sfGross Floor Area
46Units
LL97 CoveredRent Stabilized3 Active Violations 1 unresolved · 2 paperwork only 2 old, status unconfirmed ▸FISP: SWARMP
Elevator cooperative · Owner of record: 72nd Dwellers · 6,130 sf lot · 9.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofAbc Realty5p · 2 filings · 20 docs
BulkheadAbc Management CORP.1p · 1 filing · 18 docs
Floor 9Unit 9C14p · 1 filing · 20 docs
Floor 8Unit 8A, Unit 8BUnder Construction18p · 4 filings · 20 docs
Floor 7Unit 7ABUnder Construction3p · 1 filing · 20 docs
Floor 6
Floor 5
Floor 4Unit 4AD3p · 1 filing · 7 docs
Floor 3Unit 3D6p · 1 filing · 20 docs
Floor 2Unit 2B3p · 1 filing · 10 docs
Floor 1Unit 1B6p · 1 filing · 8 docs
Site & exteriorAbc Realty8p · 3 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
72nd Dwellers5603/22/2026
72nd Dwellers Inc. Building Own2403/21/2026
72nd Dwellers Inc ABC Realty1403/21/2026
155 Perry St Condominium707/08/2026
ABC Realty503/22/2026
ABC Property103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joseph F Sarra JR, Architect409/28/2026
Kay Leong Akerlof Architecture1305/05/2026
MK Associates601/30/2026
B2B Associates104/09/2025
Lpe Engineering104/04/2025
Rimkus111/13/2024
Polym Architects210/13/2023
Yao W Guo Architect208/10/2023
Green Design109/17/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MK Associates1203/21/2026
Ammas403/21/2026
Somma Design Consulting403/21/2026
Framework Consultants203/21/2026
Resolution Expediting1203/21/2026
Kma Designs203/21/2026
Atlantic Building Supply203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Loyola Painting & ConstructionGeneral Contractor507/08/2026
Interior ProfileGeneral Contractor407/08/2026
Joseph Weinstein ElectricElectrical303/22/2026
CH CoGeneral Contractor303/21/2026
Arista Air Conditioningspecialty_contractor203/21/2026
Bent MechanicalPlumbing207/08/2026
Joe Parziale Plumbing CoPlumbing207/08/2026
Approved ElectricElectrical203/21/2026
Gurri InstallationGeneral Contractor107/08/2026
MLS ElectricElectrical103/22/2026
Martyniak, JR, StephenElectrical103/21/2026
Reliant RenovationsGeneral Contractor104/09/2026
JJS BuildersScaffold107/08/2026
Kings Group NYScaffold107/08/2026
AAA Total PlumbingPlumbing107/08/2026
Pipe Solutions AdvisPlumbing107/08/2026
QMB Plumbing & HeatingPlumbing107/08/2026
Banner ConstructionGeneral Contractor104/09/2026
R.J.C. MechanicalPlumbing107/08/2026
Global Design ConceptGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
H. A. Bader Consultants2332209/17/2026
MB Inspections8703305/05/2026
Ace Structural Engineering496106/02/2025
B2 Engineering5433104/09/2025
Lpe Engineering3102104/04/2025
RI Consulting Services8904403/24/2025
Yao W Guo Architect1754108/09/2023
Kay Leong Akerlof Architects1594203/13/2023
Building Lifecycle
All (204)Filed (35)Permit Issued (22)Signed Off (14)Facade (FISP) (16)Violation (60)Inspection (15)Objection (12)Special Inspection (30)
09/28/2026
Filed — Alteration
APPLICATION FILED FOR THE REPAIR/REPLACE OF PARTITIONS, CEILING, & FINISHES IN KITCHEN AND BATHROOM. ALL WORK IS NON-STRUCTURAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01309619-P2
09/17/2026
Filed — Alteration
APPLICATION FILED FOR THE REPAIR/REPLACE OF PARTITIONS, CEILING, & FINISHES IN KITCHEN AND BATHROOM. ALL WORK IS NON-STRUCTURAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01309619-P1
09/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Howard Bader
09/17/2026
Special inspection requirement — Lighting in dwelling units
Howard Bader
09/17/2026
Special inspection requirement — Lighting controls
Howard Bader
09/17/2026
Special inspection requirement — Final
Howard Bader
07/28/2026
Signed off — Alteration
Plumbing work per submitted plans and in connection with the interior renovation of unit 9C. No change in use, occupancy or egress with this filing.
M01280347-I1
06/26/2026
Permit issued — Plumbing
M01353941-S2-PL
06/02/2026
Permit issued — General Construction
M01353941-I1-GC
06/02/2026
Permit issued — Mechanical Systems
M01353941-S1-MS
05/05/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APARTMENT 8B ON THE 008 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01353941-S1
05/05/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APARTMENT 8B ON THE 008 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01353941-S2
05/05/2026
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APARTMENT 8B ON THE 008 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M01353941-I1
04/29/2026
Violation issued (HPD, open)
A
04/08/2026
Special inspection requirement — Maintenance information
BORIS BALKHIYEV
04/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
BORIS BALKHIYEV
04/08/2026
Special inspection requirement — HVAC-R and service water heating equipment
BORIS BALKHIYEV
04/08/2026
Special inspection requirement — Energy Code Compliance Inspections
BORIS BALKHIYEV
04/08/2026
Special inspection requirement — Duct leakage testing, insulation and design
BORIS BALKHIYEV
02/19/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/01/2026
Signed off — Alteration
Plumbing work in conjunction with Interior Renovations of Apartment 3D as per plans provided. No change to Use, Egress or Occupancy under this application.
M01204555-I1
01/31/2026
Special inspection requirement — Final
BORIS BALKHIYEV
01/31/2026
Special inspection requirement — Final
BORIS BALKHIYEV
01/31/2026
Special inspection requirement — Mechanical Systems
BORIS BALKHIYEV
01/31/2026
Special inspection requirement — Lighting in dwelling units
BORIS BALKHIYEV
01/30/2026
Signed off — Alteration
Plumbing work in conjunction with Interior Renovations of Apartment 3D as per plans provided. No change to Use, Egress or Occupancy under this application.
M01204555-S1
01/30/2026
Filed — Alteration
Plumbing work in conjunction with Interior Renovations of Apartment 3D as per plans provided. No change to Use, Egress or Occupancy under this application.
M01204555-P4
01/30/2026
Special inspection requirement — Energy Code Compliance Inspections
Peter Rissetto
01/30/2026
Special inspection requirement — Final
Peter Rissetto
01/30/2026
Special inspection requirement — Lighting in dwelling units
Peter Rissetto
01/30/2026
Special inspection requirement — Lighting in dwelling units
Peter Rissetto
01/30/2026
Special inspection requirement — Final
Peter Rissetto
01/30/2026
Special inspection requirement — Energy Code Compliance Inspections
Peter Rissetto
01/20/2026
Permit issued — Plumbing
M01309619-S1-PL
01/08/2026
Filed — Alteration
Plumbing work in conjunction with Interior Renovations of Apartment 3D as per plans provided. No change to Use, Egress or Occupancy under this application.
M01204555-P3
01/05/2026
Permit issued — General Construction
M01309619-I1-GC
12/02/2025
Objection resolved — Addressed
12/02/2025
Objection resolved — Addressed
11/18/2025
Objection resolved — Addressed
11/17/2025
Objection raised — Plumbing
11/14/2025
Objection raised — Plumbing
11/14/2025
Objection raised — Scope
11/05/2025
Filed — Alteration
APPLICATION FILED FOR THE REPAIR/REPLACE OF PARTITIONS, CEILING, & FINISHES IN KITCHEN AND BATHROOM. ALL WORK IS NON-STRUCTURAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01309619-I1
11/05/2025
Filed — Alteration
APPLICATION FILED FOR THE REPAIR/REPLACE OF PARTITIONS, CEILING, & FINISHES IN KITCHEN AND BATHROOM. ALL WORK IS NON-STRUCTURAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01309619-S1
10/28/2025
Special inspection requirement — Lighting in dwelling units
Howard Bader
10/28/2025
Special inspection requirement — Final
Howard Bader
10/28/2025
Special inspection requirement — Lighting controls
Howard Bader
10/22/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/15/2025
Filed — Alteration
Plumbing work per submitted plans and in connection with the interior renovation of unit 9C. No change in use, occupancy or egress with this filing.
M01280347-P1
10/15/2025
Filed — Alteration
Plumbing work per submitted plans and in connection with the interior renovation of unit 9C. No change in use, occupancy or egress with this filing.
M01280347-P2
10/15/2025
Special inspection requirement — Final
KAY LEONG-AKERLOF
10/15/2025
Special inspection requirement — Post-installed Anchors
BORIS BALKHIYEV
10/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BORIS BALKHIYEV
10/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/02/2025
Filed — Alteration
Plumbing work in conjunction with Interior Renovations of Apartment 3D as per plans provided. No change to Use, Egress or Occupancy under this application.
M01204555-P2
09/24/2025
Permit issued — Plumbing
M01280347-S1-PL
09/23/2025
Permit issued — General Construction
M01280347-I1-GC
09/18/2025
Filed — Alteration
Plumbing work per submitted plans and in connection with the interior renovation of unit 9C. No change in use, occupancy or egress with this filing.
M01280347-I1
09/18/2025
Filed — Alteration
Plumbing work per submitted plans and in connection with the interior renovation of unit 9C. No change in use, occupancy or egress with this filing.
M01280347-S1
Latest 60 of 204 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBent Mechanical06/26/2026
DOB NOWGeneral ConstructionPermit IssuedLoyola Painting & Construction06/02/2026
DOB NOWMechanical SystemsPermit IssuedLoyola Painting & Construction06/02/2026
DOB NOWPlumbingPermit IssuedR.J.C. Mechanical01/20/2026
DOB NOWGeneral ConstructionSigned-offBanner Construction01/05/2026
DOB NOWPlumbingPermit IssuedBent Mechanical09/24/2025
DOB NOWGeneral ConstructionSigned-offLoyola Painting & Construction09/23/2025
DOB NOWPlumbingSigned-offPipe Solutions Advis06/12/2025
DOB NOWGeneral ConstructionSigned-offReliant Renovations05/22/2025
DOB NOWMechanical SystemsSigned-offArista Air Conditioning04/16/2025
DOB NOWStructuralSigned-offCH Co04/14/2025
DOB NOWSuspended ScaffoldSigned-offNY Wonder Construction Co11/25/2024
DOB NOWSidewalk ShedSigned-offKings Group NY11/14/2024
DOB NOWPlumbingSigned-offJoe Parziale Plumbing Co06/06/2024
DOB NOWGeneral ConstructionSigned-offGurri Installation10/17/2023
DOB NOWPlumbingSigned-offAAA Total Plumbing10/12/2023
DOB NOWPlumbingSigned-offQMB Plumbing & Heating09/14/2023
DOB NOWGeneral ConstructionSigned-offGlobal Design Concept09/01/2023
DOB NOWMechanical SystemsSigned-offInterior Profile02/21/2023
DOB NOWGeneral ConstructionSigned-offInterior Profile04/07/2022
DOB NOWPlumbingSigned-offJoe Parziale Plumbing Co03/16/2022
DOB NOWSidewalk ShedPermit IssuedJJS Builders09/18/2018
BISPLISSUEDDumont Plumbing & Heating02/12/2020
BISOTISSUEDMonaco Group USA03/22/2019
BISPLISSUEDDumont Plumbing & Heating02/15/2019
BISPLISSUEDAqueduct Mechanical01/11/2019
BISOTISSUEDMonaco Group USA12/21/2018
BISPLISSUEDCape Plumbing07/06/2018
BISOTISSUEDN.Y. Preferred Development06/08/2018
BISPLISSUEDAll Pro Plumbing & Heating06/01/2018
BISOTISSUEDN.Y. Preferred Development05/25/2018
BISPLISSUEDMaxwell Plumbing Mechanical10/12/2017
BISOTISSUEDExecutive Building10/11/2017
BISMHISSUEDExecutive Building10/11/2017
BISMHISSUEDNovo Design10/03/2017
BISEQISSUEDSkyworx Contracting09/25/2017
BISEQISSUEDSkyworx Contracting09/13/2017
BISPLISSUEDGenet Plumbing and Heating08/23/2017
BISMHISSUEDExecutive Building08/17/2017
BISOTISSUEDExecutive Building08/16/2017
+ 32 more permits on file
1 project · most recent 05/05/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/05/2026Permit IssuedLoyola Painting & ConstructionAir Conditioning Systems
Cooling
3 projects · most recent 09/28/2026
Gas Water/Sanitary
FiledStatusContractorScope
09/28/2026Permit IssuedR.J.C. MechanicalGas, Water/Sanitary
05/05/2026Permit IssuedBent MechanicalGas, Water/Sanitary
10/15/2025Permit IssuedBent MechanicalGas, Water/Sanitary
22 projects · most recent 10/05/2026
General Wiring
FiledStatusContractorScope
10/05/2026Permit IssuedJoseph Weinstein ElectricGeneral Wiring
07/08/2026CompleteJoseph Weinstein Electric—
06/17/2026Permit IssuedE & M Electrical NYGeneral Wiring
04/08/2026CompleteE & M Electrical NYGeneral Wiring
01/13/2026Permit IssuedPower Surge ElectricGeneral Wiring
06/15/2025CompleteLightwire ElectricGeneral Wiring
05/06/2025CompleteJoseph Weinstein Electric—
04/10/2025CompleteJoseph Weinstein Electric—
03/24/2025CompleteJoseph Weinstein ElectricGeneral Wiring
03/20/2025Permit IssuedApproved ElectricGeneral Wiring
01/21/2025CompleteJoseph Weinstein ElectricGeneral Wiring
12/09/2024CompleteJoseph Weinstein ElectricGeneral Wiring
11/14/2024CompleteHigh Quality Electric of—
10/16/2024CompleteJoseph Weinstein ElectricGeneral Wiring
05/17/2023CompleteJoseph Weinstein ElectricGeneral Wiring
1 project · most recent 09/28/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
09/28/2026Permit IssuedR.J.C. MechanicalTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
02/19/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/23/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/12/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/13/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/05/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/27/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
09/17/2026Fire-Resistant Penetrations and JointsHoward Baderspecial
09/17/2026Lighting in dwelling unitsHoward Baderenergy_progress
09/17/2026Lighting controlsHoward Baderenergy_progress
09/17/2026FinalHoward Baderprogress
04/08/2026Maintenance informationBORIS BALKHIYEVenergy_progress
04/08/2026HVAC-R and service water heating system controlsBORIS BALKHIYEVenergy_progress
04/08/2026HVAC-R and service water heating equipmentBORIS BALKHIYEVenergy_progress
04/08/2026Energy Code Compliance InspectionsBORIS BALKHIYEVprogress
04/08/2026Duct leakage testing, insulation and designBORIS BALKHIYEVenergy_progress
01/31/2026FinalBORIS BALKHIYEVprogress
01/31/2026FinalBORIS BALKHIYEVprogress
01/31/2026Mechanical SystemsBORIS BALKHIYEVspecial
01/31/2026Lighting in dwelling unitsBORIS BALKHIYEVenergy_progress
01/30/2026Energy Code Compliance InspectionsPeter Rissettoprogress
01/30/2026FinalPeter Rissettoprogress
01/30/2026Lighting in dwelling unitsPeter Rissettoenergy_progress
01/30/2026Lighting in dwelling unitsPeter Rissettoenergy_progress
01/30/2026FinalPeter Rissettoprogress
01/30/2026Energy Code Compliance InspectionsPeter Rissettoprogress
10/28/2025Lighting in dwelling unitsHoward Baderenergy_progress
10/28/2025FinalHoward Baderprogress
10/28/2025Lighting controlsHoward Baderenergy_progress
10/15/2025FinalKAY LEONG-AKERLOFprogress
10/15/2025Post-installed AnchorsBORIS BALKHIYEVspecial
10/15/2025Fire-Resistant Penetrations and JointsBORIS BALKHIYEVspecial
Latest 25 of 47.
▾Documents — 558 on file (BIS + DOB NOW)
▸Plans & Drawings34
▸DOB NOWPlans/Sketch34
09/06/2026M00080021-I1Request digital key ↗
09/03/2026M00649113-P1Request digital key ↗
09/03/2026M00649113-I1Request digital key ↗
Showing 3 of 34 on file for this type
▸Applications & Permits118
▸BISWORK PERMIT APPLICATION53
03/22/2019123400961Open ↗
02/19/2019122386024Open ↗
01/14/2019123400961Open ↗
Showing 3 of 53 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION34
11/18/2019123355010Open ↗
04/22/2019122386024Open ↗
01/22/2019122386024Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWLPC Approval/Permit30
09/27/2026M01309619-P1Open ↗
09/27/2026M01309619-P2Open ↗
09/03/2026M00649113-I1Open ↗
Showing 3 of 30 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications142
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION45
12/24/2019123400961Open ↗
12/24/2019123400961Open ↗
10/24/2018122968752Open ↗
Showing 3 of 45 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature32
09/27/2026M01309619-P1Open ↗
09/27/2026M01309619-P2Open ↗
09/03/2026M00649113-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature29
09/27/2026M01309619-P1Open ↗
09/27/2026M01309619-P1Open ↗
09/27/2026M01309619-P1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/27/2026M01309619-P1Open ↗
09/05/2026M01204555-P1Open ↗
09/01/2026M00649126-I1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
09/14/2016122882274Open ↗
09/13/2016122882265Open ↗
08/26/2016122867273Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
09/14/2016122882274Open ↗
09/14/2016122882274Open ↗
09/13/2016122882265Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment40
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE17
04/22/2019122386024Open ↗
08/24/2018123400961Open ↗
07/10/2018123355010Open ↗
Showing 3 of 17 on file for this type
▸BISSELF-CERT PLUMBING NOTICE15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection11
▸BISTenant Protection Plan and Notes9
08/24/2018123400961Open ↗
02/22/2018123355010Open ↗
04/11/2017123062470Open ↗
Showing 3 of 9 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
01/09/2017122968752Open ↗
09/20/2016122840523Open ↗
▸Environmental & Asbestos48
▸DOB NOWDEP ACP-5: Asbestos Assessment Report29
09/27/2026M01309619-P1Open ↗
09/27/2026M01309619-P2Open ↗
09/03/2026M00649113-I1Open ↗
Showing 3 of 29 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)15
08/24/2018123400961Open ↗
02/22/2018123355010Open ↗
04/11/2017123062470Open ↗
Showing 3 of 15 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/24/2026M01125879-I1Open ↗
▸Energy Compliance34
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS22
12/24/2019123400961Open ↗
12/24/2019123400961Open ↗
10/24/2018122968752Open ↗
Showing 3 of 22 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
12/24/2019123400961Open ↗
10/24/2018122968752Open ↗
05/25/2018122840523Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
06/03/2022123355010Open ↗
▸BISLIGHTING IN DWELLING UNITS1
06/03/2022123355010Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
09/03/2026M00649126-I1Open ↗
▸Inspections & Test Reports3
▸BISMECHANICAL SYSTEMS1
06/03/2022123355010Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
08/15/2017123062470Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
06/03/2022123355010Open ↗
▸Approvals, Objections & Sign-offs39
▸BISLANDMARKS APPROVAL12
12/24/2019123400961Open ↗
12/13/2018123355010Open ↗
05/25/2018122840523Open ↗
Showing 3 of 12 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
03/06/2023123355010Open ↗
12/24/2019123400961Open ↗
10/24/2018122968752Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
03/30/2022123355010Open ↗
12/24/2019123400961Open ↗
12/28/2016122968752Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSUPERSEDING LETTER3
02/19/2019122386024Open ↗
10/18/2017122877173Open ↗
Showing 2 of 3 on file for this type
▸BISLANDMARKS SIGNOFF2
06/07/2022123355010Open ↗
Showing 1 of 2 on file for this type
▸BISFINAL1
06/03/2022123355010Open ↗
▸BISSHED LETTER1
09/18/2017122882274Open ↗
▸Cost, Insurance & Ownership33
▸BISCOST AFFIDAVIT31
12/24/2019123400961Open ↗
11/25/2019123355010Open ↗
10/24/2018122968752Open ↗
Showing 3 of 31 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
06/03/2022123355010Open ↗
▸Filing & Intake Forms46
▸BISADDITIONAL INFORMATION18
12/13/2018123355010Open ↗
09/18/2018123400961Open ↗
08/24/2018123400961Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING COVER SHEET17
08/24/2018123400961Open ↗
02/22/2018123355010Open ↗
04/11/2017123062470Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM10
12/24/2019123400961Open ↗
11/18/2019123355010Open ↗
04/22/2019122386024Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M00649113-P1Open ↗
▸Other Documents10
▸DOB NOWManufacturer's Specifications4
08/13/2026M01140144-P3Open ↗
08/13/2026M01140144-P2Open ↗
08/13/2026M01140144-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/13/2026M01140144-P1Open ↗
08/13/2026M01140144-I1Open ↗
08/13/2026M01140144-P2Open ↗
Showing 3 of 4 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
12/21/2018123400961Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M01205197-I1Open ↗