| Owner | Filings | Most Recent |
|---|---|---|
| CONSOLIDATED EDISON CO. OF NY | 185 | 09/13/2026 |
| CON EDISON | 83 | 09/13/2026 |
| TDI-USA HOLDINGS | 4 | 09/13/2026 |
| CONSOLITADED EDISON CO | 111 | 07/08/2026 |
| CHPE | 21 | 07/08/2026 |
| NEW YORK POWER AUTHORITY | 15 | 04/09/2026 |
| CONSOLITADED EDISON CO OF NY | 67 | 03/22/2026 |
| CONSOLIDATED EDISON OF NEW YORK | 15 | 03/22/2026 |
| CON EDISON CO OF NY | 7 | 03/22/2026 |
| TRANSMISSION DEVELOPERS | 5 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| CHA CONSULTING INC. | 8 | 07/14/2026 |
| Tectonic Engineering Consultants, G | 2 | 06/17/2026 |
| WALTER T. GORMAN, P.E., P.C. | 25 | 05/26/2026 |
| BGA, LLC | 3 | 04/15/2026 |
| THEODORE YEN | 1 | 03/27/2026 |
| RICHARD PUSWALD PE | 1 | 12/11/2025 |
| WESTBROOK ASSOCIATED ENGINEERS | 1 | 12/04/2025 |
| S.M. BERGER ARCHITECTURE PC | 11 | 12/02/2025 |
| WAYPOINT CONSULTING GROUP | 2 | 11/21/2025 |
| BLACK SHEEP ENGINEERING GROUP | 2 | 11/07/2025 |
| MOTT MACDONALD | 1 | 07/24/2025 |
| HDR | 1 | 07/23/2025 |
| WILLIAM R. HEIDEN, III | 1 | 06/25/2025 |
| SARGENT AND LUNDY | 5 | 06/19/2025 |
| PARSONS CORPORATION | 5 | 11/13/2024 |
| D&B ENGINEERS AND ARCHITECTS, P.C. | 12 | 07/17/2024 |
| ATANE | 4 | 07/17/2024 |
| EVAN CLOUGH | 1 | 05/28/2024 |
| ANCORA ENGINEERING, PLLC | 4 | 04/04/2024 |
| KEVIN M. FINN, P.E., INC. | 1 | 06/26/2023 |
| FIRE & RISK ALLIANCE, LLC | 1 | 06/15/2023 |
| WALTER E. WOOD CONSULTING | 1 | 06/13/2023 |
| CHA | 2 | 03/03/2023 |
| CHA ARCHITECTURE, PC | 2 | 03/02/2023 |
| MR ARCHITECTS PLLC | 1 | 12/22/2021 |
| Representative | Filings | Most Recent |
|---|---|---|
| WALTER T GORMAN PE | 50 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 22 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 12 | 03/21/2026 |
| WALTER T. GORMAN, PE, PC | 11 | 03/21/2026 |
| CONSTRUCTION PERMIT SERVICES | 6 | 03/21/2026 |
| AE DESIGN SOLUTION | 4 | 03/21/2026 |
| FRIEDMAN ASSOCIATES II | 2 | 03/21/2026 |
| EXPEDITE DEM | 8 | 03/21/2026 |
| METROPOLIS GROUP INC | 2 | 03/21/2026 |
| CROWN DESIGN CONSULTING | 10 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| V.H.I CONSTRUCTION CORP | General Contractor | 42 | 07/08/2026 |
| ACME INDUSTRIAL INC | General Contractor | 21 | 07/08/2026 |
| D'ONOFRIO GENERAL CONTRACTORS | General Contractor | 17 | 09/07/2026 |
| GIANFIA CORP | General Contractor | 15 | 07/08/2026 |
| CON EDISON COMPANY INC | General Contractor | 15 | 07/08/2026 |
| HOLT CONSTRUCTION CORP | General Contractor | 14 | 07/08/2026 |
| KIEWIT INFRASTRUCTURE CO | General Contractor | 13 | 07/08/2026 |
| INTERNATIONAL ASB. REMOV | General Contractor | 10 | 07/15/2026 |
| EAGLE SCAFFOLDING SVCS INC | General Contractor | 8 | 07/08/2026 |
| E-J ELECTRIC INSTALLATION | General Contractor | 5 | 07/08/2026 |
| ACS SYSTEM ASSOCIATES INC. | General Contractor | 5 | 07/08/2026 |
| M & S BUILDING SERVICES I | Plumbing | 4 | 07/08/2026 |
| ATTRI ENTERPRISES INC | General Contractor | 4 | 03/21/2026 |
| WILLIAMS SPECIALTY SERVIC | General Contractor | 4 | 07/08/2026 |
| GRINNELL LLC | Fire Protection | 3 | 07/08/2026 |
| DEBORAH BRADLEY CONS & MG | General Contractor | 3 | 07/08/2026 |
| NYC FIRE SPRINKLER CORP | Fire Protection | 3 | 07/08/2026 |
| SATELLITE PLUMBING CORP | Plumbing | 2 | 07/08/2026 |
| SKH MECHANICAL CORP | Fire Protection | 2 | 07/08/2026 |
| DESIGN PROCURE BUILD LLC | General Contractor | 2 | 03/21/2026 |
| O'LEARY CONSTRUCTION INC | General Contractor | 2 | 07/08/2026 |
| POSILLICO CIVIL INC | General Contractor | 2 | 03/21/2026 |
| STARR INDUSTRIES LLC | General Contractor | 2 | 04/09/2026 |
| PAR PLUMBING CO., INC | Plumbing | 2 | 07/08/2026 |
| SATELLITE EAST PLBG. INC | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| TECTONIC ENGINEERING CONS | 106 | 48 | 07/14/2026 |
| WALTER T. GORMAN, P.E., P | 268 | 13 | 06/17/2026 |
| CATALPA SPECIAL INSPECTIO | 2004 | 11 | 12/02/2025 |
| PROJECT TACTICAL SOLUTION | 5859 | 1 | 05/28/2024 |
| ANCORA ENGINEERING, PLLC | 6818 | 2 | 04/04/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | D'ONOFRIO GENERAL CONTRACTORS | 08/31/2026 |
| DOB NOW | General Construction | Permit Issued | D'ONOFRIO GENERAL CONTRACTORS | 08/31/2026 |
| DOB NOW | General Construction | Permit Issued | RIMANI GROUP INC | 08/28/2026 |
| DOB NOW | Foundation | Permit Issued | D'ONOFRIO GENERAL CONTRACTORS | 07/17/2026 |
| DOB NOW | Foundation | Permit Issued | INTERNATIONAL ASB. REMOV | 07/14/2026 |
| DOB NOW | Structural | Signed-off | INTERNATIONAL ASB. REMOV | 06/25/2026 |
| DOB NOW | General Construction | Signed-off | GIANFIA CORP | 06/18/2026 |
| DOB NOW | General Construction | Permit Issued | CON EDISON COMPANY INC | 05/01/2026 |
| DOB NOW | General Construction | Permit Issued | CON EDISON COMPANY INC | 05/01/2026 |
| DOB NOW | General Construction | Permit Issued | CON EDISON COMPANY INC | 05/01/2026 |
| DOB NOW | General Construction | Permit Issued | CON EDISON COMPANY INC | 04/30/2026 |
| DOB NOW | General Construction | Permit Issued | CON EDISON COMPANY INC | 04/30/2026 |
| DOB NOW | General Construction | Permit Issued | CON EDISON COMPANY INC | 04/30/2026 |
| DOB NOW | General Construction | Permit Issued | CON EDISON COMPANY INC | 04/30/2026 |
| DOB NOW | General Construction | Permit Issued | CON EDISON COMPANY INC | 04/30/2026 |
| DOB NOW | General Construction | Signed-off | KIEWIT INFRASTRUCTURE CO | 03/31/2026 |
| DOB NOW | Plumbing | Signed-off | M & S BUILDING SERVICES I | 03/17/2026 |
| DOB NOW | General Construction | Signed-off | KIEWIT INFRASTRUCTURE CO | 02/09/2026 |
| DOB NOW | Mechanical Systems | Signed-off | ACME INDUSTRIAL INC | 12/30/2025 |
| DOB NOW | Structural | Permit Issued | D'ONOFRIO GENERAL CONTRAC | 12/30/2025 |
| DOB NOW | Mechanical Systems | Signed-off | ACME INDUSTRIAL INC | 12/30/2025 |
| DOB NOW | General Construction | Signed-off | E-J ELECTRIC INSTALLATION | 12/15/2025 |
| DOB NOW | Mechanical Systems | Signed-off | ACME INDUSTRIAL INC | 12/11/2025 |
| DOB NOW | Supported Scaffold | Signed-off | EAGLE SCAFFOLDING SVCS IN | 12/11/2025 |
| DOB NOW | Mechanical Systems | Signed-off | ACME INDUSTRIAL INC | 12/10/2025 |
| DOB NOW | General Construction | Permit Issued | KIEWIT INFRASTRUCTURE CO | 12/10/2025 |
| DOB NOW | General Construction | Permit Issued | CON EDISON COMPANY INC | 11/25/2025 |
| DOB NOW | General Construction | Permit Issued | CON EDISON COMPANY INC | 11/14/2025 |
| DOB NOW | General Construction | Permit Issued | V.H.I CONSTRUCTION CORP | 11/13/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | STARR INDUSTRIES LLC | 11/07/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | STARR INDUSTRIES LLC | 11/06/2025 |
| DOB NOW | Mechanical Systems | Signed-off | ACME INDUSTRIAL INC | 10/31/2025 |
| DOB NOW | General Construction | Permit Issued | V.H.I CONSTRUCTION CORP | 10/29/2025 |
| DOB NOW | Structural | Permit Issued | D'ONOFRIO GENERAL CONTRAC | 10/27/2025 |
| DOB NOW | General Construction | Permit Issued | CON EDISON COMPANY INC | 10/06/2025 |
| DOB NOW | General Construction | Permit Issued | CON EDISON COMPANY INC | 10/06/2025 |
| DOB NOW | General Construction | Permit Issued | CON EDISON COMPANY INC | 10/06/2025 |
| DOB NOW | General Construction | Permit Issued | CON EDISON COMPANY INC | 10/06/2025 |
| DOB NOW | Mechanical Systems | Signed-off | FRESH MEADOW POWER-NE LLC | 09/17/2025 |
| DOB NOW | Mechanical Systems | Signed-off | FRESH MEADOW MECHANICAL C | 09/17/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 10/30/2025 | Signed-off | ACME INDUSTRIAL INC | Air Conditioning Systems | Cooling Carrier 50FE-M08A2A5-8W0A0 75 tons · Fan Coil Indoor ×1 |
| 06/19/2025 | Signed-off | E-J ELECTRIC INSTALLATION | Heating and Air Conditioning Systems | Heat / Cool Bard W36HF-B05VWXXXJ 33,000 BTU · Condensing Unit ×2 |
| 07/17/2024 | Permit Issued | ACS SYSTEM ASSOCIATES INC | Air Conditioning Systems | — |
| 07/17/2024 | Signed-off | D'ONOFRIO GENERAL CONTRAC | Associated Ducts and Piping, Ventilation Systems | |
| 10/28/2021 | Permit Issued | V.H.I CONSTRUCTION CORP | Others | Other __Junk__ abcd Condensing Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/17/2024 | Signed-off | GRINNELL LLC | 42 heads |
| 04/12/2024 | Signed-off | NYC FIRE SPRINKLER CORP | 194 heads |
| 03/02/2023 | Signed-off | NYC FIRE SPRINKLER CORP | 12 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/17/2024 | Signed-off | SATELLITE EAST PLBG. INC | Water/Sanitary |
| 09/26/2023 | Signed-off | M & S BUILDING SERVICES I | Storm |
| 03/02/2023 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| 02/22/2023 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/04/2026 | Permit Issued | TRANSEL ELEV. & ELEC. INC | General Wiring |
| 12/04/2025 | Permit Issued | PROVEN ELEC'L CONTRNG INC | General Wiring |
| 11/25/2025 | Permit Issued | J.A. LEE ELEC SVCS LLC | General Wiring |
| 10/14/2025 | Permit Issued | ROBERT B SAMUELS, INC | General Wiring |
| 10/02/2024 | Permit Issued | CONSOLIDATED EDISON CO | General Wiring |
| 09/24/2024 | Complete | CONSOLIDATED EDISON CO | — |
| 07/29/2024 | Complete | CONSOLIDATED EDISON CO | General Wiring |
| 05/24/2024 | Permit Issued | CONSOLIDATED EDISON CO | — |
| 05/21/2024 | Complete | CONSOLIDATED EDISON CO | — |
| 02/29/2024 | Complete | CONSOLIDATED EDISON CO | General Wiring |
| 02/26/2024 | Complete | CONSOLIDATED EDISON CO | — |
| 12/04/2023 | Complete | CONSOLIDATED EDISON CO | — |
| 12/04/2023 | Complete | CONSOLIDATED EDISON CO | — |
| 11/27/2023 | Permit Issued | POWERONE ELECT'L CONTRG | General Wiring |
| 10/25/2023 | Complete | CONSOLIDATED EDISON CO | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/14/2026 | Permit Issued | RIMANI GROUP INC | 1 scope_items |
| 06/17/2026 | Signed-off | INTERNATIONAL ASB. REMOV | Steel |
| 03/17/2026 | — | — | 2 scope_items |
| 12/04/2025 | Permit Issued | D'ONOFRIO GENERAL CONTRAC | Steel |
| 07/24/2025 | — | — | 1 scope_items |
| 07/23/2025 | Permit Issued | D'ONOFRIO GENERAL CONTRAC | Steel |
| 11/13/2024 | Signed-off | D'ONOFRIO GENERAL CONTRAC | Concrete |
| 07/17/2024 | Signed-off | D'ONOFRIO GENERAL CONTRAC | Steel |
| 07/03/2024 | Permit Issued | ATTRI ENTERPRISES INC | Steel, Masonry |
| 04/06/2023 | Permit Issued | O'LEARY CONSTRUCTION INC | 1 scope_items |
| 02/21/2023 | Permit Issued | HOLT CONSTRUCTION CORP | Steel, Concrete |
| 11/17/2021 | Permit Issued | V.H.I CONSTRUCTION CORP | 1 scope_items |
| 09/28/2021 | Permit Issued | GIANFIA CORP | Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/07/2025 | Permit Issued | STARR INDUSTRIES LLC | Sidewalk Shed |
| 04/04/2024 | Signed-off | INTERNATIONAL ASB. REMOV | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/23/2025 | Permit Issued | D'ONOFRIO GENERAL CONTRAC | Earthwork |
| Date | Type | Result | Report |
|---|---|---|---|
| 01/16/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/15/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 07/07/2025 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 04/04/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/02/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/26/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/14/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/14/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/27/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/26/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/19/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/25/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/27/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/05/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/30/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/31/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/16/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/11/2026 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | Abbas Family | special |
| 06/11/2026 | Structural Steel - Details | Abbas Family | special |
| 06/11/2026 | Structural Steel - High Strength Bolting | Abbas Family | special |
| 06/11/2026 | Structural Cold-Formed Steel | Abbas Family | special |
| 06/11/2026 | Open-web Steel Joists and Joist Girders | Abbas Family | special |
| 06/11/2026 | Final | Abbas Family | progress |
| 05/22/2026 | Deep Foundation Elements | Abbas Family | special |
| 05/20/2026 | Subsurface Investigations (Borings/Test Pits) | MARK STIER | special |
| 05/12/2026 | Subgrade Inspections | Abbas Family | special |
| 05/12/2026 | Final | Abbas Family | progress |
| 05/12/2026 | Footing and Foundation | Abbas Family | progress |
| 05/12/2026 | Subsurface Conditions – Fill Placement & In-Place Density | Abbas Family | special |
| 05/12/2026 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | Abbas Family | special |
| 05/12/2026 | Concrete - Precast | Abbas Family | special |
| 04/03/2026 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | GEORGE GHEBRYAL | special |
| 12/03/2025 | Final | Abbas Family | progress |
| 12/03/2025 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | Abbas Family | special |
| 12/01/2025 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | Abbas Family | special |
| 11/26/2025 | HVAC-R and service water heating equipment | Sanford Berger | energy_progress |
| 11/26/2025 | Maintenance information | Sanford Berger | energy_progress |
| 11/20/2025 | Final | Abbas Family | progress |
| 11/18/2025 | Fire-Resistant Penetrations and Joints | Sanford Berger | special |
| 11/18/2025 | Final | Sanford Berger | progress |
| 11/18/2025 | Mechanical Systems | Sanford Berger | special |
| 11/17/2025 | Final | Alejandro Molina | progress |