← Back
Office with commercial, 7-19 stories
31 EAST 32 STREET
MANHATTAN · Midtown South-Flatiron-Union Square · BIN 1017017
💬 Discuss this project
1915Year Built
12Stories
O6Building Class
C5-2Zoning
53,934 sfGross Floor Area
16Units
LL97 Covered0 Open ViolationsFISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: KIAMIE EAST 32 ST INC · 4,938 sf lot · 10.92 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Roof1p · 1 filing · 3 docs
Floor 13p · 2 filings · 12 docs
Cellar7p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WINDSOR MANAGEMENT6007/08/2026
CLASSIC CONSULTING GROUP507/08/2026
KIAMIE EAST 32ND STREET5303/22/2026
WINDSOR MANAGER CORP KLAM103/22/2026
WINSOR MANAGEMENT CO103/22/2026
L & M HUB ASSOCIATES LLC103/21/2026
119 WAVERLY PLACE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JS ARCHITECTURE DESIGN, PC207/14/2023
HNY CONSULTING ENGINEERS LLC1102/23/2023
SPIVAK ARCHITECTS P.C.109/10/2021
GREEN DESIGN108/06/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC2203/21/2026
WALTER T GORMAN PE203/21/2026
A1 EXPEDITING SERVICE CORP.103/21/2026
ATLANTIC BUILDING SUPPLY INC.203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LW INTERIOR REMODELING INGeneral Contractor603/21/2026
TAP PLUMBING CORPPlumbing507/08/2026
CLASSIC CONSULTING GROUPGeneral Contractor407/08/2026
EVERGREEN BUILDERS & CON*General Contractor407/08/2026
ALLSTATE SPRINKLER LLCFire Protection407/08/2026
OMADA CONSTRUCTION CORPGeneral Contractor203/21/2026
TOBON, VICTORElectrical103/21/2026
ANTHONY QUINONESElectrical103/21/2026
ONE TEN GROUP INCGeneral Contractor107/08/2026
TWINTECH ELECTRIC INCElectrical103/22/2026
ASR ENGINEERING PCElectrical103/21/2026
EVANGELISTA, FRANKElectrical103/21/2026
HINKE, WILLIAMElectrical103/21/2026
JACKUS, STEVEElectrical103/21/2026
JAY HELFGOTTElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DNA CONTROLLED INSPECTION554702/23/2023
Building Lifecycle
All (122)Filed (15)Permit Issued (18)Signed Off (10)Facade (FISP) (12)Violation (57)Special Inspection (10)
10/08/2024
Signed off — Alteration
M00903380-I1
02/19/2024
Cycle 9 facade report submitted
01/17/2024
Cycle 9 facade report signed — SWARMP
12/29/2023
Cycle 9 facade inspection completed
09/06/2023
Permit issued — General Construction
M00903380-I1-GC
07/14/2023
Filed — Alteration
M00903380-I1
03/02/2023
Signed off — Alteration
Install & Relocate Sprinkler heads along with associated piping as per drawings filed herewith. No changes in use, egress or occupancy.
M00215565-I1
02/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM FITZJOHN
02/24/2023
Special inspection requirement — Sprinkler Systems
WILLIAM FITZJOHN
02/23/2023
Filed — Alteration
Install & Relocate Sprinkler heads along with associated piping as per drawings filed herewith. No changes in use, egress or occupancy.
M00215565-P1
02/03/2023
Signed off — Alteration
Installation of new plumbing fixtures along with associated piping as per drawings filed herewith. No changes in use, egress or occupancy.
M00215531-I1
02/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2023
Signed off — Alteration
Remove/Relocate sprinkler heads along with related piping as per drawings filed herewith. No changes in use, egress or occupancy.
M00215409-I1
01/26/2023
Signed off — Alteration
M00215503-I1
01/26/2023
Signed off — Alteration
Filing post approval amendment to revised Plumbing scope of work gas section information as per revised drawings herewith.
M00215356-I1
01/26/2023
Signed off — Alteration
M00202995-I1
10/06/2022
Signed off — Alteration
INTERIOR RENOVATIONS TO EXISTING OFFICE SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00766536-I1
09/29/2022
Permit issued — General Construction
M00766536-I1-GC
09/26/2022
Filed — Alteration
INTERIOR RENOVATIONS TO EXISTING OFFICE SPACE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00766536-I1
08/16/2022
Signed off — Alteration
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
M00590066-I1
05/03/2022
Permit issued — General Construction
M00590066-I1-GC
09/15/2021
Permit issued — General Construction
M00590066-I1-GC
09/10/2021
Filed — Alteration
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
M00590066-I1
09/08/2021
Special inspection requirement — Final
Howard Spivak
07/06/2021
Signed off — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD300 PER SQUARE FEET. SIDEWALK SHED SHALL
M00206161-I1
01/12/2021
Permit issued — Sprinklers
M00215565-I1-EW-SP
01/08/2021
Permit issued — Sprinklers
M00215409-I1-EW-SP
12/24/2020
Special inspection requirement — Maintenance information
ALEXIS SCHLESSINGERMAN
12/22/2020
Filed — Alteration
Filing post approval amendment to revised Plumbing scope of work gas section information as per revised drawings herewith.
M00215356-P3
12/22/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM FITZJOHN
12/21/2020
Filed — Alteration
Installation of new plumbing fixtures along with associated piping as per drawings filed herewith. No changes in use, egress or occupancy.
M00215531-P1
12/14/2020
Special inspection requirement — Maintenance information
ALEXIS SCHLESSINGERMAN
11/12/2020
Permit issued — Plumbing
M00215531-I1-PL
09/25/2020
Permit issued — Sidewalk Shed
M00206161-I1-SH
09/07/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/07/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/14/2020
Permit issued — Plumbing
M00215356-I1-PL
03/18/2020
Filed — Alteration
Filing post approval amendment to revised Plumbing scope of work gas section information as per revised drawings herewith.
M00215356-P2
03/09/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM FITZJOHN
02/06/2020
Permit issued — Plumbing
M00215356-I1-PL
02/05/2020
Permit issued — Plumbing
M00215531-I1-PL
02/04/2020
Filed — Alteration
Filing post approval amendment to revised Plumbing scope of work gas section information as per revised drawings herewith.
M00215356-P1
01/31/2020
Special inspection requirement — Maintenance information
ALEXIS SCHLESSINGERMAN
11/06/2019
Permit issued — Mechanical Systems
M00215503-I1-MS
11/06/2019
Permit issued — Mechanical Systems
M00202995-I1-MS
11/01/2019
Permit issued — Plumbing
M00215531-I1-PL
10/04/2019
Permit issued — Sprinklers
M00215409-I1-EW-SP
10/02/2019
Permit issued — Sprinklers
M00215565-I1-EW-SP
10/01/2019
Filed — Alteration
M00215503-I1
10/01/2019
Filed — Alteration
M00202995-I1
09/20/2019
Filed — Alteration
Remove/Relocate sprinkler heads along with related piping as per drawings filed herewith. No changes in use, egress or occupancy.
M00215409-I1
09/20/2019
Permit issued — Sidewalk Shed
M00206161-I1-SH
09/17/2019
Filed — Alteration
Install & Relocate Sprinkler heads along with associated piping as per drawings filed herewith. No changes in use, egress or occupancy.
M00215565-I1
09/17/2019
Filed — Alteration
Installation of new plumbing fixtures along with associated piping as per drawings filed herewith. No changes in use, egress or occupancy.
M00215531-I1
09/13/2019
Filed — Alteration
Filing post approval amendment to revised Plumbing scope of work gas section information as per revised drawings herewith.
M00215356-I1
08/22/2019
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM FITZJOHN
08/22/2019
Special inspection requirement — Sprinkler Systems
WILLIAM FITZJOHN
08/06/2019
Filed — Alteration
ALTERATION TYPE 3 - CONSTRUCTION EQUIPMENT - SIDEWALK-SHED PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD300 PER SQUARE FEET. SIDEWALK SHED SHALL
M00206161-I1
08/06/2019
Permit issued — Sidewalk Shed
M00206161-I1-SH
05/06/2019
Cycle 8 facade report signed — SWARMP
Latest 60 of 122 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offOMADA CONSTRUCTION CORP09/06/2023
DOB NOWGeneral ConstructionSigned-offONE TEN GROUP INC09/29/2022
DOB NOWGeneral ConstructionSigned-offLW INTERIOR REMODELING IN05/03/2022
DOB NOWGeneral ConstructionSigned-offLW INTERIOR REMODELING IN09/15/2021
DOB NOWSprinklersSigned-offALLSTATE SPRINKLER LLC01/12/2021
DOB NOWSprinklersSigned-offALLSTATE SPRINKLER LLC01/08/2021
DOB NOWPlumbingSigned-offTAP PLUMBING CORP11/12/2020
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP09/25/2020
DOB NOWPlumbingSigned-offTAP PLUMBING CORP07/14/2020
DOB NOWPlumbingSigned-offTAP PLUMBING CORP02/06/2020
DOB NOWPlumbingSigned-offTAP PLUMBING CORP02/05/2020
DOB NOWMechanical SystemsSigned-offEVERGREEN BUILDERS & CON*11/06/2019
DOB NOWMechanical SystemsSigned-offEVERGREEN BUILDERS & CON*11/06/2019
DOB NOWPlumbingSigned-offTAP PLUMBING CORP11/01/2019
DOB NOWSprinklersSigned-offALLSTATE SPRINKLER LLC10/04/2019
DOB NOWSprinklersSigned-offALLSTATE SPRINKLER LLC10/02/2019
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP09/20/2019
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP08/06/2019
BISOTISSUEDHIGH TECH CONSTRUCTION SY02/04/2020
BISOTISSUEDEVERGREEN BUILDERS & CON*08/22/2019
BISPLISSUEDEAST MEADOW PLBG & MECH08/22/2018
BISOTISSUEDONE TEN GROUP INC08/01/2018
BISOTISSUEDONE TEN GROUP INC12/13/2017
BISOTISSUEDB RAJ SUN CORP11/13/2013
BISOTISSUEDB RAJ SUN CORP05/09/2013
BISOTISSUEDWORLDKOR CONSTRUCTION CORP08/02/2006
BISMHISSUEDWORLDKOR CONSTRUCTION CORP08/02/2006
BISSPISSUEDC.R.U. MECHAN & HEATIN IN05/05/2006
BISPLISSUEDC.R.U. MECHAN & HEAT INC05/05/2006
BISMHISSUEDWORLDKOR CONSTRUCTION CORP04/20/2006
BISOTISSUEDWORLDKOR CONSTRUCTION CORP04/20/2006
BISFPISSUEDNEW YORK BUSINESS FIRE SYSTEM IN02/21/2006
BISPLISSUEDPLUMBING & HTG DOCTOR INC01/06/2006
BISMHISSUEDVESSEL DEVELOPMENT INC/TAINTECON12/30/2005
BISOTISSUEDJLS COMMERCIAL BUILDERS INC11/02/2005
BISOTRE-ISSUEDCUT& DRY CONST08/04/2005
BISOTISSUEDCUT DRY CONTR.05/27/2005
BISEQISSUEDROCKLEDGE SCAFFOLD CORP01/13/2005
BISOTISSUEDADS CONSTRUCTION CORP11/09/2004
BISOTISSUEDCUT AND DRY CONSTRUCTION06/30/2004
+ 1 more permits on file
5 projects · most recent 09/19/2023
General Wiring
FiledStatusContractorScope
09/19/2023CompleteQUEUE ELEC'L CONTRS, INCGeneral Wiring
06/13/2023CompleteCENTRIFUGAL ELECTRIC LLCGeneral Wiring
02/02/2022CompleteTIKVAH ELECTRIC CO, INC.General Wiring
08/06/2019Permit IssuedRICHARD NEU—
05/07/2018CompleteTWINTECH ELECTRIC INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
02/24/2023Fire-Resistant Penetrations and JointsWILLIAM FITZJOHNspecial
02/24/2023Sprinkler SystemsWILLIAM FITZJOHNspecial
09/08/2021FinalHoward Spivakprogress
12/24/2020Maintenance informationALEXIS SCHLESSINGERMANenergy_progress
12/22/2020Fire-Resistant Penetrations and JointsWILLIAM FITZJOHNspecial
12/14/2020Maintenance informationALEXIS SCHLESSINGERMANenergy_progress
03/09/2020Fire-Resistant Penetrations and JointsWILLIAM FITZJOHNspecial
01/31/2020Maintenance informationALEXIS SCHLESSINGERMANenergy_progress
08/22/2019Fire-Resistant Penetrations and JointsWILLIAM FITZJOHNspecial
08/22/2019Sprinkler SystemsWILLIAM FITZJOHNspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
SpearOfficeFloor 4
Project M00590066 Alteration · LOC Issued · 09/10/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 170 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00215531-I1Request digital key ↗
09/05/2026M00215356-I1Request digital key ↗
08/15/2026M00215356-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch3
09/03/2026M00590066-I1Request digital key ↗
09/01/2026M00766536-I1Request digital key ↗
08/29/2026M00903380-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
09/05/2026M00215565-I1Request digital key ↗
09/05/2026M00215565-P1Request digital key ↗
09/05/2026M00215409-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00215503-I1Request digital key ↗
09/05/2026M00202995-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00206161-I1Request digital key ↗
▸Applications & Permits22
▸BISWORK PERMIT APPLICATION12
02/04/2020123776805Open ↗
09/16/2019123767405Open ↗
08/22/2019123686733Open ↗
Showing 3 of 12 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION10
02/24/2023123686733Open ↗
02/24/2023123686742Open ↗
12/09/2019123776805Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications54
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/05/2026M00215565-I1Open ↗
09/03/2026M00590066-I1Open ↗
08/29/2026M00903380-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
12/09/2019123776805Open ↗
08/19/2019123686742Open ↗
08/19/2019123686742Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
12/09/2019123776805Open ↗
08/19/2019123686742Open ↗
08/19/2019123686733Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
12/09/2019123776805Open ↗
08/19/2019123686742Open ↗
08/19/2019123686733Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026M00215531-P1Open ↗
08/26/2026M00215531-I1Open ↗
08/24/2026M00215409-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/31/2026M00215356-P1Open ↗
08/24/2026M00590066-I1Open ↗
08/24/2026M00215356-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/13/2013140129046Open ↗
05/09/2013140077477Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/13/2013140129046Open ↗
05/09/2013140077477Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
08/02/2018123462797Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
12/10/2018123462797Open ↗
▸BISEQUIPMENT USE PERMITS1
12/10/2018123462797Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
06/26/2019123767405Open ↗
08/02/2018123462797Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
09/05/2026M00215565-I1Open ↗
09/03/2026M00590066-I1Open ↗
08/29/2026M00903380-I1Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
12/09/2019123776805Open ↗
08/19/2019123686742Open ↗
08/19/2019123686733Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
12/09/2019123776805Open ↗
06/24/2019123767405Open ↗
12/10/2018123462797Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
09/11/2020123767405Open ↗
12/10/2018123462797Open ↗
04/06/2018123264957Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/09/2013140077477Open ↗
▸BISLIGHTING CONTROLS1
08/28/2020123776805Open ↗
▸BISINTERIOR LIGHTING POWER1
08/28/2020123776805Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/28/2020123776805Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/09/2013140077477Open ↗
▸Inspections & Test Reports6
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
02/23/2023123686742Open ↗
02/23/2023123686733Open ↗
08/28/2020123776805Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/11/2020123767405Open ↗
11/13/2013140129046Open ↗
05/09/2013140077477Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
02/24/2023123686742Open ↗
02/24/2023123686733Open ↗
09/11/2020123767405Open ↗
Showing 3 of 7 on file for this type
▸BISFINAL3
02/23/2023123686742Open ↗
02/23/2023123686733Open ↗
08/28/2020123776805Open ↗
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT13
02/23/2023123686742Open ↗
02/23/2023123686733Open ↗
12/09/2019123776805Open ↗
Showing 3 of 13 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
09/11/2020123767405Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/28/2020123776805Open ↗
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET6
12/09/2019123776805Open ↗
08/19/2019123686742Open ↗
08/19/2019123686733Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM2
12/10/2018123462797Open ↗
04/06/2018123264957Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
11/13/2013140129046Open ↗
05/09/2013140077477Open ↗