← Back
Walk-up cooperative
315 3 STREET
BROOKLYN · BIN 3020919
💬 Discuss this project
1920Year Built
4Stories
C6Building Class
R6BZoning
8,272 sfGross Floor Area
8Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 315 THIRD STREET HOUSING CORPORATION · 2,573 sf lot · 3.21 FAR built · Flood zone X
Locations of Work
Mechanical
Roof1p · 1 filing · 5 docs
Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS803/22/2026
315 THIRD STREET HOUSING CORPORATION103/22/2026
OWNER OF 315 83RD ST.103/22/2026
315 3RD STREET HOUSING203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MCDC102/24/2026
BAYSIDE ENGINEERING PC103/26/2024
MOHAMMAD AHEAD, PE105/08/2023
CL ENGINEERING P.C.202/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J BUILDING CONSULTING603/21/2026
CDEM203/21/2026
ARSENAL BUILDING CONSULTANTS LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & G CONSTRUCTION SVCSGeneral Contractor603/21/2026
MR. AIR NYC CORPGeneral Contractor407/08/2026
RICHARD NEUElectrical103/22/2026
RIDGE CONTRACTING CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244102/24/2026
SD TESTING & INSPECTION S7010103/26/2024
CL ENGINEERING P.C.6781202/04/2022
Building Lifecycle
All (48)Filed (5)Permit Issued (5)Signed Off (2)Violation (8)Special Inspection (28)
03/02/2026
Permit issued — Mechanical Systems
B01356573-I1-MS
02/24/2026
Filed — Alteration
INSTALLATION OF NEW HVAC SPLIT UNIT FOR APT. 2A OF EXISTING FOUR STORY RESIDENTIAL BUILDING. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
B01356573-I1
02/06/2026
Special inspection requirement — Mechanical Systems
NARESH MAHANGU
02/06/2026
Special inspection requirement — Ventilation and air distribution system
NARESH MAHANGU
02/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
NARESH MAHANGU
02/06/2026
Special inspection requirement — Maintenance information
NARESH MAHANGU
02/06/2026
Special inspection requirement — Duct leakage testing, insulation and design
NARESH MAHANGU
02/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
NARESH MAHANGU
02/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
NARESH MAHANGU
02/06/2026
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
02/06/2026
Special inspection requirement — Final
PETER CHO
07/03/2024
Signed off — Alteration
B01018910-I1
04/24/2024
Permit issued — Mechanical Systems
B01018910-I1-MS
03/26/2024
Filed — Alteration
B01018910-I1
03/26/2024
Special inspection requirement — Tenant Protection Plan Compliance
XIUCHENG LI
03/12/2024
Special inspection requirement — Mechanical Systems
XIUCHENG LI
03/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
XIUCHENG LI
03/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
XIUCHENG LI
03/12/2024
Special inspection requirement — Permanent certificate
XIUCHENG LI
03/12/2024
Special inspection requirement — Maintenance information
XIUCHENG LI
03/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
03/12/2024
Special inspection requirement — Final
XIUCHENG LI
03/12/2024
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
03/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/09/2023
Permit issued — Sidewalk Shed
B00866809-I1-SH
05/09/2023
Permit issued — Supported Scaffold
B00866809-I1-SF
05/08/2023
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLDING. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
B00866809-I1
03/01/2022
Signed off — Alteration
INSTALL NEW SPLIT A/C AT CELLAR AND 1ST FLOOR AT APT#1B OF EXISTING 4 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B00641997-I1
02/04/2022
Filed — Alteration
INSTALL NEW SPLIT A/C AT CELLAR AND 1ST FLOOR AT APT#1B OF EXISTING 4 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B00641997-P1
02/04/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRISTIAN LOZADA
02/04/2022
Special inspection requirement — Mechanical Systems
CHRISTIAN LOZADA
02/04/2022
Special inspection requirement — Energy Code Compliance Inspections
CHRISTIAN LOZADA
02/04/2022
Special inspection requirement — Final
CHRISTIAN LOZADA
02/04/2022
Special inspection requirement — HVAC-R and service water heating system controls
CHRISTIAN LOZADA
02/04/2022
Special inspection requirement — Permanent certificate
CHRISTIAN LOZADA
02/04/2022
Special inspection requirement — Maintenance information
CHRISTIAN LOZADA
02/04/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
CHRISTIAN LOZADA
02/04/2022
Special inspection requirement — HVAC-R and service water heating equipment
CHRISTIAN LOZADA
12/16/2021
Permit issued — Mechanical Systems
B00641997-I1-MS
12/10/2021
Filed — Alteration
INSTALL NEW SPLIT A/C AT CELLAR AND 1ST FLOOR AT APT#1B OF EXISTING 4 STORY BUILDING. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
B00641997-I1
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/14/2002
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/11/2000
Violation issued (HPD, open)
B
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/25/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/08/1992
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offRIDGE CONTRACTING CORP03/02/2026
DOB NOWMechanical SystemsSigned-offMR. AIR NYC CORP04/24/2024
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS05/09/2023
DOB NOWSupported ScaffoldPermit IssuedJ & G CONSTRUCTION SVCS05/09/2023
DOB NOWMechanical SystemsSigned-offMR. AIR NYC CORP12/16/2021
BISOTISSUEDNY BEST01/27/2006
1 project · most recent 02/24/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/24/2026Signed-offRIDGE CONTRACTING CORPHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MMZXZ5D42NL 36,000 BTU · Vrf Outdoor ×1
1 project · most recent 04/28/2023
FiledStatusContractorScope
04/28/2023Permit IssuedRICHARD NEU—
1 project · most recent 05/08/2023
Scaffold Sidewalk Shed
FiledStatusContractorScope
05/08/2023Permit IssuedJ & G CONSTRUCTION SVCSScaffold, Sidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
02/06/2026Mechanical SystemsNARESH MAHANGUspecial
02/06/2026Ventilation and air distribution systemNARESH MAHANGUenergy_progress
02/06/2026HVAC-R and service water heating system controlsNARESH MAHANGUenergy_progress
02/06/2026Maintenance informationNARESH MAHANGUenergy_progress
02/06/2026Duct leakage testing, insulation and designNARESH MAHANGUenergy_progress
02/06/2026HVAC-R and service water heating equipmentNARESH MAHANGUenergy_progress
02/06/2026HVAC-R and service water piping design and insulationNARESH MAHANGUenergy_progress
02/06/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
02/06/2026FinalPETER CHOprogress
03/26/2024Tenant Protection Plan ComplianceXIUCHENG LIspecial
03/12/2024Mechanical SystemsXIUCHENG LIspecial
03/12/2024HVAC-R and service water heating system controlsXIUCHENG LIenergy_progress
03/12/2024HVAC-R and service water heating equipmentXIUCHENG LIenergy_progress
03/12/2024Permanent certificateXIUCHENG LIenergy_progress
03/12/2024Maintenance informationXIUCHENG LIenergy_progress
03/12/2024HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
03/12/2024FinalXIUCHENG LIprogress
03/12/2024Energy Code Compliance InspectionsXIUCHENG LIprogress
03/12/2024Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
02/04/2022Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
02/04/2022Mechanical SystemsCHRISTIAN LOZADAspecial
02/04/2022Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
02/04/2022FinalCHRISTIAN LOZADAprogress
02/04/2022HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
02/04/2022Permanent certificateCHRISTIAN LOZADAenergy_progress
Latest 25 of 28.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/31/2026B00641997-I1Request digital key ↗
08/31/2026B00641997-P1Request digital key ↗
08/27/2026B00866809-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature11
09/23/2026B01356573-I1Open ↗
09/23/2026B01356573-I1Open ↗
09/23/2026B01356573-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026B01356573-I1Open ↗
08/23/2026B01018910-I1Open ↗
08/23/2026B00641997-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/31/2026B00641997-P1Open ↗
08/31/2026B00641997-I1Open ↗
08/27/2026B00866809-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00641997-I1Open ↗