← Back
BuildNYC
Elevator apt, fireproof with stores
Independence Plaza
316 GREENWICH STREET · BIN 1083241
💬 Discuss this project
1975Year Built
39Stories
D6Building Class
C6-4Zoning
1,970,736 sfGross Floor Area
1,349Units
LL97 CoveredRent Stabilized80 Active Violations 60 unresolved · 20 paperwork only ▸
Elevator apt, fireproof with stores · Owner of record: IP Mortgage Borrower · 186,631 sf lot · 10.56 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofStellar Management1 filing · 3 docs
Floor 6Stellar Management1p · 2 filings · 12 docs
Floor 5
Floor 4
Floor 3
Floor 2Sidewalk shed installationUnder Construction1p · 1 filing · 6 docs
Floor 1Van Leewan Ice Cn1am56p · 10 filings · 20 docs
CellarStellar Management25p · 6 filings · 20 docs
BasementStellar Management2p · 1 filing · 18 docs
Sub-BasementStellar Management5p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
IP Mortgage Borrower803/21/2026
Associates303/21/2026
Angle Greenwich Associates303/21/2026
Washington Plaza Tow203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HTX Building Consulting203/21/2026
J A Expediting1403/21/2026
Metropolis Group1803/21/2026
YBL NY403/21/2026
BSGNY603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & L Service NYCGeneral Contractor707/08/2026
RJB Contracting CartingGeneral Contractor303/21/2026
Lanmar Electric ServiceElectrical203/21/2026
Speedway PlumbingFire Protection207/08/2026
Speedway PlumbingPlumbing207/08/2026
Econair SupplyGeneral Contractor107/08/2026
Ranco ElectricalElectrical103/21/2026
Aki Renovations GroupScaffold107/08/2026
Flytiger P & HPlumbing107/08/2026
Flytiger PLB & HeatingFire Protection107/08/2026
PipestylistsPlumbing107/08/2026
QMB Plumbing & HeatingFire Protection107/08/2026
LCS Restorationspecialty_contractor104/09/2026
Omd ElectricalElectrical103/21/2026
Omd ElectricalElectrical103/22/2026
Ranieri NicolaElectrical103/21/2026
Aki Renovations GroupGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SY Engineering5149607/25/2024
AA Building & Inspection1519110/24/2023
Tariq M. Bashir, P.E5915110/24/2023
Delta Testing Labs687609/28/2022
All City Engineering7115211/04/2020
KL Innovative Design7225209/04/2020
Building Lifecycle
All (106)Filed (27)Permit Issued (16)Signed Off (6)Violation (21)Inspection (6)Special Inspection (30)
12/18/2025
Permit issued — Structural
M00936043-I1-GC-CX
12/12/2025
Violation issued (ECB, open)
Unknown
07/17/2025
Signed off — Alteration
MODIFICATIONS TO EXISTING PLUMBING AT RETAIL SPACES
M00297971-I1
08/22/2024
Signed off — Alteration
Installation of air cooled HVAC unit, associated ductwork, and toilet exhaust fan.
M00659078-I1
07/25/2024
Filed — Alteration
Installation of air cooled HVAC unit, associated ductwork, and toilet exhaust fan.
M00659078-P3
07/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SUNGBOM YI
07/25/2024
Special inspection requirement — Mechanical Systems
SUNGBOM YI
07/25/2024
Special inspection requirement — Final
ERIC BERLENT
07/25/2024
Special inspection requirement — Energy Code Compliance Inspections
SUNGBOM YI
07/25/2024
Special inspection requirement — HVAC-R and service water heating system controls
SUNGBOM YI
07/25/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
SUNGBOM YI
07/25/2024
Special inspection requirement — Duct leakage testing, insulation and design
SUNGBOM YI
07/25/2024
Special inspection requirement — HVAC-R and service water heating equipment
SUNGBOM YI
06/20/2024
Filed — Alteration
Installation of air cooled HVAC unit, associated ductwork, and toilet exhaust fan.
M00659078-P2
02/15/2024
Filed — Alteration
Installation of air cooled HVAC unit, associated ductwork, and toilet exhaust fan.
M00659078-P1
12/18/2023
Violation issued (HPD, closed)
A
11/02/2023
Signed off — Alteration
Filing application for plumbing work at 1st floor commerical space. No change in use, egress or occupancy.
M00659020-I1
11/01/2023
Signed off — Alteration
Filing application for the interior renovation of existing commercial space. No change in use or occupancy.
M00658942-I1
10/24/2023
Filed — Alteration
M00936043-I1
09/19/2023
Special inspection requirement — Final
TARIQ BASHIR
09/19/2023
Special inspection requirement — Tenant Protection Plan Compliance
Younes Abouyaala
09/19/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
TARIQ BASHIR
07/25/2023
Permit issued — Mechanical Systems
M00659078-I1-MS
06/23/2023
Violation issued (ECB, open)
Construction
12/13/2022
Signed off — Alteration
STRUCTURAL MODIFICATIONS ASSOCIATED WITH STOREFRONT RENOVATION
M00275553-I1
12/01/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/29/2022
Special inspection requirement — Structural Steel - Details
RICHARD GREENWALD
09/29/2022
Special inspection requirement — Concrete - Cast-In-Place
RICHARD GREENWALD
09/29/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD GREENWALD
09/29/2022
Special inspection requirement — Final
RICHARD GREENWALD
09/29/2022
Special inspection requirement — Structural Steel - Welding
RICHARD GREENWALD
09/29/2022
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
09/28/2022
Filed — Alteration
STRUCTURAL MODIFICATIONS ASSOCIATED WITH STOREFRONT RENOVATION
M00275553-P1
09/21/2022
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
09/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
09/21/2022
Special inspection requirement — Sprinkler Systems
RICHARD GREENWALD
09/02/2022
Filed — Alteration
MODIFICATIONS TO EXISTING PLUMBING AT RETAIL SPACES
M00297971-P3
09/02/2022
Filed — Alteration
SPRINKLER MODIFICATIONS ASSOCIATED WITH RENOVATION AT RETAIL SPACES
M00297973-P2
08/09/2022
Permit issued — Sprinklers
M00297973-I1-EW-SP
06/24/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/22/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/03/2022
Signed off — Alteration
FILE SP JOB FOR 1ST RETAIL SPACE IN CONJUNCTION WITH ALT2 JOB# M00658942 , NO CHANGE IN USE, EGRESS OR OCCUPANCY .
M00717153-I1
05/17/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/17/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/16/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/10/2022
Filed — Alteration
Filing application for plumbing work at 1st floor commerical space. No change in use, egress or occupancy.
M00659020-P1
05/04/2022
Filed — Alteration
FILE SP JOB FOR 1ST RETAIL SPACE IN CONJUNCTION WITH ALT2 JOB# M00658942 , NO CHANGE IN USE, EGRESS OR OCCUPANCY .
M00717153-P1
05/04/2022
Special inspection requirement — Sprinkler Systems
SUNGBOM YI
05/04/2022
Special inspection requirement — Sprinkler Systems
SUNGBOM YI
04/26/2022
Permit issued — Sprinklers
M00717153-I1-EW-SP
04/19/2022
Filed — Alteration
FILE SP JOB FOR 1ST RETAIL SPACE IN CONJUNCTION WITH ALT2 JOB# M00658942 , NO CHANGE IN USE, EGRESS OR OCCUPANCY .
M00717153-I1
04/07/2022
Permit issued — Plumbing
M00659020-I1-PL
04/04/2022
Permit issued — Mechanical Systems
M00659078-I1-MS
03/24/2022
Permit issued — General Construction
M00658942-I1-GC
03/18/2022
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
03/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
03/18/2022
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
03/18/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD GREENWALD
03/18/2022
Special inspection requirement — Structural Steel - Welding
RICHARD GREENWALD
03/18/2022
Special inspection requirement — Concrete - Cast-In-Place
RICHARD GREENWALD
Latest 60 of 106 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedLCS Restoration12/18/2025
DOB NOWMechanical SystemsSigned-offJ & L Service NYC07/25/2023
DOB NOWSprinklersPermit IssuedSpeedway Plumbing08/09/2022
DOB NOWSprinklersSigned-offFlytiger PLB & Heating04/26/2022
DOB NOWPlumbingSigned-offFlytiger P & H04/07/2022
DOB NOWMechanical SystemsSigned-offJ & L Service NYC04/04/2022
DOB NOWGeneral ConstructionSigned-offJ & L Service NYC03/24/2022
DOB NOWPlumbingSigned-offSpeedway Plumbing08/11/2021
DOB NOWMechanical SystemsPermit IssuedEconair Supply12/24/2020
DOB NOWSprinklersPermit IssuedSpeedway Plumbing10/15/2020
DOB NOWPlumbingSigned-offSpeedway Plumbing10/14/2020
DOB NOWSprinklersPermit IssuedQMB Plumbing & Heating08/21/2020
DOB NOWMechanical SystemsPermit IssuedRJB Contracting Carting06/15/2020
DOB NOWStructuralSigned-offAki Renovations Group06/10/2020
DOB NOWPlumbingSigned-offT & T Plumbing06/10/2020
DOB NOWConstruction FencePermit IssuedAki Renovations Group01/16/2020
BISOTISSUEDThe Harvey Group04/12/2021
BISOTISSUEDCube Builders Group NY03/30/2021
BISOTISSUEDAki Renovations Group01/05/2021
BISOTISSUEDCube Builders Group NY12/02/2020
BISOTISSUEDAki Renovations Group06/24/2020
BISOTISSUEDSMVP Management02/19/2020
BISOTISSUEDAki Renovations Group02/14/2020
BISOTISSUEDAki Renovations Group02/03/2020
BISOTISSUEDThe Harvey Group09/13/2019
BISOTISSUEDThe Harvey Group01/22/2019
BISOTISSUEDThe Harvey Group08/23/2018
BISOTISSUEDAki Renovations Group05/09/2017
BISOTISSUEDAki Renovations Group01/03/2017
BISOTISSUEDAki Renovations Group11/03/2016
BISOTISSUEDAki Renovations03/07/2014
BISOTISSUEDAki Renovations03/07/2014
BISEQISSUEDSpring Enterpris04/01/2002
BISEQISSUEDSpring Enterpris03/26/2001
BISMHISSUEDNurminen Construction of03/09/2001
BISPLISSUEDMetro Mechanical Group02/23/2001
BISFPISSUEDSentinel Fire CTRL02/21/2001
BISEQISSUEDSpring Enterpris11/08/2000
BISEQISSUEDAtlantic Heydt12/17/1998
BISEQISSUEDEmpire Heydt Scaffold02/23/1998
+ 5 more permits on file
1 project · most recent 11/04/2020
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/04/2020Permit IssuedEconair SupplyAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric PUHY-EP144TNU-A 144,000 BTU · Vrf Outdoor ×3
PUHY-EP120TNU-A 120,000 BTU · Vrf Outdoor ×2
PUHY-EP96TNU-A 96,000 BTU · Vrf Outdoor ×2
PUHY-EP72TNU-A 72,000 BTU · Vrf Outdoor ×1
Heating
Mitsubishi Electric PUHY-EP144TNU-A 160,000 BTU · Vrf Outdoor ×3
PUHY-EP96TNU-A 108,000 BTU · Vrf Outdoor ×2
PUHY-EP72TNU-A 80,000 BTU · Vrf Outdoor ×1
— PUHY-EP120TNU-A 135,000 BTU · Condensing Unit ×2
1 project · most recent 09/02/2022
FiledStatusContractorScope
09/02/2022Permit IssuedSpeedway Plumbing—
1 project · most recent 09/04/2020
Water/Sanitary
FiledStatusContractorScope
09/04/2020Signed-offPipestylistsWater/Sanitary
5 projects · most recent 02/07/2023
General Wiring
FiledStatusContractorScope
02/07/2023Permit IssuedOmd Electrical5 meters, 1 new_meters
04/06/2022CompleteFirst Star ElectricGeneral Wiring
11/02/2020Permit IssuedFive Stars Electrical ContractingGeneral Wiring
08/20/2020CompleteFive Stars Electrical Contracting—
02/12/2019Permit IssuedI.K.E. Electrical—
1 project · most recent 11/03/2020
Steel
FiledStatusContractorScope
11/03/2020——Steel
1 project · most recent 05/05/2020
Fence
FiledStatusContractorScope
05/05/2020Permit IssuedAki Renovations GroupFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/01/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/24/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/22/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/17/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/17/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
07/25/2024Fire-Resistant Penetrations and JointsSUNGBOM YIspecial
07/25/2024Mechanical SystemsSUNGBOM YIspecial
07/25/2024FinalERIC BERLENTprogress
07/25/2024Energy Code Compliance InspectionsSUNGBOM YIprogress
07/25/2024HVAC-R and service water heating system controlsSUNGBOM YIenergy_progress
07/25/2024HVAC-R and service water piping design and insulationSUNGBOM YIenergy_progress
07/25/2024Duct leakage testing, insulation and designSUNGBOM YIenergy_progress
07/25/2024HVAC-R and service water heating equipmentSUNGBOM YIenergy_progress
09/19/2023FinalTARIQ BASHIRprogress
09/19/2023Tenant Protection Plan ComplianceYounes Abouyaalaspecial
09/19/2023Structural Stability – Alterations of existing buildingsTARIQ BASHIRspecial
09/29/2022Structural Steel - DetailsRICHARD GREENWALDspecial
09/29/2022Concrete - Cast-In-PlaceRICHARD GREENWALDspecial
09/29/2022Structural Stability – Alterations of existing buildingsRICHARD GREENWALDspecial
09/29/2022FinalRICHARD GREENWALDprogress
09/29/2022Structural Steel - WeldingRICHARD GREENWALDspecial
09/29/2022Post-installed AnchorsRICHARD GREENWALDspecial
09/21/2022Post-installed AnchorsRICHARD GREENWALDspecial
09/21/2022Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
09/21/2022Sprinkler SystemsRICHARD GREENWALDspecial
05/04/2022Sprinkler SystemsSUNGBOM YIspecial
05/04/2022Sprinkler SystemsSUNGBOM YIspecial
03/18/2022Post-installed AnchorsRICHARD GREENWALDspecial
03/18/2022Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
03/18/2022Post-installed AnchorsRICHARD GREENWALDspecial
Latest 25 of 56.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Van Leewan Ice Cn1amRestaurant / Food ServiceFloor 1
Project M00659020 Alteration · LOC Issued · 02/28/2022
Project M00659078 Alteration · LOC Issued · 02/28/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 328 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch10
09/02/2026M00658942-I1Request digital key ↗
09/02/2026M00659078-P3Request digital key ↗
09/02/2026M00659078-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Plumbing6
09/05/2026M00297971-P1Request digital key ↗
09/05/2026M00297971-P3Request digital key ↗
09/05/2026M00297971-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/05/2026M00297973-I1Request digital key ↗
09/04/2026M00380740-I1Request digital key ↗
08/15/2026M00297973-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence3
09/05/2026M00292310-I1Request digital key ↗
08/15/2026M00292310-P1Request digital key ↗
08/15/2026M00292310-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Structural3
09/05/2026M00275553-I1Request digital key ↗
09/05/2026M00275553-P1Request digital key ↗
09/04/2026M00406050-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00419162-I1Request digital key ↗
▸Applications & Permits35
▸BISPLAN / WORK APPROVAL APPLICATION23
11/14/2025123784690Open ↗
11/01/2022123784690Open ↗
10/28/2022123784690Open ↗
Showing 3 of 23 on file for this type
▸BISWORK PERMIT APPLICATION12
12/02/2020140982293Open ↗
02/21/2020123839640Open ↗
02/18/2020123784690Open ↗
Showing 3 of 12 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISFLOOD ZONE DESIGN CERTIFICATION1
11/25/2020140982293Open ↗
▸Seals & Professional Certifications116
▸DOB NOWProgress Inspector Seal & Signature29
09/02/2026M00659078-I1Open ↗
09/02/2026M00659078-I1Open ↗
09/02/2026M00659078-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
09/05/2026M00275553-I1Open ↗
09/05/2026M00275553-P1Open ↗
09/05/2026M00297971-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/23/2026M00297973-I1Open ↗
09/23/2026M00297973-I1Open ↗
09/23/2026M00297973-I1Open ↗
Showing 3 of 20 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
02/12/2020123839640Open ↗
02/12/2020123839640Open ↗
01/31/2020123784690Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
11/25/2020140982293Open ↗
02/12/2020123839640Open ↗
01/31/2020123784690Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
11/25/2020140982293Open ↗
08/22/2018140796271Open ↗
05/08/2017140637425Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
11/25/2020140982293Open ↗
08/22/2018140796271Open ↗
05/08/2017140637425Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
02/12/2020123839640Open ↗
01/31/2020123784690Open ↗
01/11/2019123527077Open ↗
▸Safety & Tenant Protection17
▸DOB NOWTenant Protection Plan9
09/05/2026M00297971-P1Open ↗
09/05/2026M00297971-P3Open ↗
09/05/2026M00297971-P2Open ↗
Showing 3 of 9 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES7
09/10/2018121191209Open ↗
08/22/2018140796271Open ↗
05/08/2017140637425Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREE CHECKLIST1
09/10/2018121191209Open ↗
▸Environmental & Asbestos32
▸DOB NOWDEP ACP-5: Asbestos Assessment Report24
09/05/2026M00275553-I1Open ↗
09/05/2026M00275553-P1Open ↗
09/05/2026M00297971-P1Open ↗
Showing 3 of 24 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
11/25/2020140982293Open ↗
02/12/2020123839640Open ↗
01/31/2020123784690Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance38
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS12
01/31/2020123784690Open ↗
01/11/2019123527077Open ↗
05/01/2018140570861Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
10/28/2022123784690Open ↗
10/27/2022123784690Open ↗
10/27/2022123784690Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS5
11/25/2020140982293Open ↗
05/08/2017140637425Open ↗
11/02/2016140570861Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
05/01/2018140570861Open ↗
05/01/2018140637425Open ↗
03/09/2015140169582Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026M00658942-I1Open ↗
08/13/2026M00659078-I1Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
10/30/2025123784690Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/19/2025123784690Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
10/30/2025123784690Open ↗
▸BISEXTERIOR LIGHTING POWER1
10/30/2025123784690Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY11
10/27/2022123784690Open ↗
10/13/2022123784690Open ↗
10/12/2022123784690Open ↗
Showing 3 of 11 on file for this type
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
11/24/2025123784690Open ↗
05/01/2018140570861Open ↗
05/01/2018140637425Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
06/14/2018121191209Open ↗
03/06/2017121191209Open ↗
03/06/2017121191209Open ↗
▸BISFINAL1
10/30/2025123784690Open ↗
▸BISBSA/CPC APPROVAL1
04/24/2018121191209Open ↗
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT15
11/25/2020140982293Open ↗
02/12/2020123839640Open ↗
01/31/2020123784690Open ↗
Showing 3 of 15 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
05/08/2017140637425Open ↗
11/02/2016140570861Open ↗
03/07/2014140169476Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/21/2025123784690Open ↗
▸Filing & Intake Forms21
▸BISEFILING JOB APPLICATION COVER SHEET6
11/25/2020140982293Open ↗
08/22/2018140796271Open ↗
05/08/2017140637425Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION6
11/01/2022123784690Open ↗
10/28/2022123784690Open ↗
03/23/2020123839640Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM5
03/23/2020123839640Open ↗
05/01/2018140570861Open ↗
05/01/2018140637425Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
02/12/2020123839640Open ↗
01/31/2020123784690Open ↗
01/11/2019123527077Open ↗
Showing 3 of 4 on file for this type