← Back
BuildNYC
Walk-up cooperative
321 CLINTON AVENUE
BROOKLYN · Clinton Hill · BIN 3055312
💬 Discuss this project
1875Year Built
3.5Stories
C6Building Class
R6BZoning
21,500 sfGross Floor Area
12Units
Rent Stabilized3 Active Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 321 Clinton Ave Housing · 9,000 sf lot · 2.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 4 docs
Floor 3Under Construction14p · 3 filings · 20 docs
Floor 28p · 2 filings · 17 docs
Floor 1Handrail addition to existing building entry stairUnder Construction9p · 3 filings · 17 docs
Cellar2p · 1 filing · 5 docs
Site & exterior10p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
321 Clinton Ave Housing910/04/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Brown & Poliner Architects110/28/2026
New Air Solution107/02/2026
CL Engineering404/09/2024
None102/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J Building Consulting803/21/2026
Big Orange Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MR Air NYCspecialty_contractor509/30/2026
GstructionGeneral Contractor203/21/2026
Intelogic ElectricElectrical103/22/2026
Excellent GeneralGeneral Contractor111/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New Air Solution8418107/02/2026
CL Engineering6781404/09/2024
Amaracon Testing & Inspec5842102/29/2024
Building Lifecycle
11/20/2026
Permit issued — General Construction
B01473249-I1-GC
10/28/2026
Filed — Alteration
ADDITION OF HANDRAIL TO EXISTING BUILDING ENTRY STAIR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
B01473249-I1
10/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
10/12/2026
Special inspection requirement — Final
09/29/2026
Permit issued — Mechanical Systems
B01397968-I1-MS
90 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedExcellent General11/20/2026
DOB NOWMechanical SystemsPermit IssuedMr. Air NYC09/29/2026
DOB NOWStructuralSigned-offGstruction04/11/2024
DOB NOWMechanical SystemsSigned-offMr. Air NYC03/04/2024
DOB NOWMechanical SystemsSigned-offMr. Air NYC05/09/2023
1 project · most recent 07/02/2026
Air Conditioning Systems
FiledStatusContractorScope
07/02/2026Permit IssuedMr. Air NYCAir Conditioning Systems
3 projects · most recent 08/19/2026
HVAC Wiring General Wiring
FiledStatusContractorScope
08/19/2026Permit IssuedTesta ElectricGeneral Wiring
02/23/2024CompleteIntelogic ElectricHVAC Wiring
02/24/2023CompleteIntelogic ElectricHVAC Wiring
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
10/16/2026Tenant Protection Plan Compliance—special
10/12/2026Final—progress
06/13/2026HVAC-R and service water heating equipmentXIUCHENG LIenergy_progress
06/13/2026HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
06/13/2026HVAC-R and service water heating system controlsXIUCHENG LIenergy_progress
06/13/2026Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
06/13/2026Maintenance informationXIUCHENG LIenergy_progress
06/13/2026Tenant Protection Plan ComplianceXIUCHENG LIspecial
05/06/2026Mechanical Systems—special
05/06/2026Final—progress
04/11/2024Mechanical SystemsCHRISTIAN LOZADAspecial
04/11/2024Maintenance informationCHRISTIAN LOZADAenergy_progress
04/11/2024HVAC-R and service water heating system controlsCHRISTIAN LOZADAenergy_progress
04/11/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
04/11/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
04/11/2024HVAC-R and service water piping design and insulationCHRISTIAN LOZADAenergy_progress
04/11/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
04/11/2024FinalCHRISTIAN LOZADAprogress
04/11/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
04/06/2024Fire-Resistant Penetrations and JointsCHRISTIAN LOZADAspecial
04/06/2024Mechanical SystemsCHRISTIAN LOZADAspecial
04/06/2024Energy Code Compliance InspectionsCHRISTIAN LOZADAprogress
04/06/2024FinalCHRISTIAN LOZADAprogress
04/06/2024Permanent certificateCHRISTIAN LOZADAenergy_progress
04/06/2024HVAC-R and service water heating equipmentCHRISTIAN LOZADAenergy_progress
Latest 25 of 49.
39 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account