← Back
Condo, hotel / boatel
Marriott Vacation Club, New York City
33 WEST 37TH STREET · Name © OpenStreetMap contributors · Midtown-Times Square · BIN 1084661
💬 Discuss this project
2008Year Built
20Stories
RHBuilding Class
M1-9A/R12Zoning
50,729 sfGross Floor Area
529Units
LL97 Covered0 Open ViolationsFISP: SWARMP
Condo, hotel / boatel · Owner of record: 54M 33W37 LLC · 6,122 sf lot · 8.29 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Roof3p · 1 filing · 5 docs
Cellar4p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
54M 33W376003/22/2026
SUPERIOR103/22/2026
PLAZA CONSTRUCTION LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIGID STRUCTURAL DESIGN, LLC310/16/2025
PCS ENGINEERING109/29/2025
BUILDING CONSULTANTS, LTD.105/23/2025
ENGINEERED DESIGN GROUP202/03/2025
T. LAPORTA ARCHITECT102/03/2025
LEON SKVIRSKY PE311/06/2024
A&M CONSULTING104/08/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILDING BROTHERS603/21/2026
RIGGING CONSULTANTS603/21/2026
T LAPORTA ARCHITECT403/21/2026
Rigid Structural Design, LLC603/21/2026
JM ZONING, LLC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LANE REFRIGERATION CO.,INGeneral Contractor507/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor404/09/2026
ACTIVE SIGNSScaffold307/08/2026
4 STAR CONTRACTING INCGeneral Contractor208/16/2026
MELL RENOVATION SERVICESGeneral Contractor207/08/2026
WHITESTONE PLUMBING CORPFire Protection107/08/2026
ROBERT PESTONEElectrical103/21/2026
GREGORY PAPANTONIOUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PCS ENGINEERING3745309/29/2025
METRIC CONSULTING AND INS1803202/03/2025
METROSPEC SIA6420104/08/2020
Building Lifecycle
All (105)Filed (14)Permit Issued (15)Signed Off (6)Facade (FISP) (6)Violation (43)Inspection (3)Objection (4)Special Inspection (14)
08/18/2026
Signed off — Alteration
Exterior wall repairs, including: Sealant replacement; EIFS repairs and coating; balcony waterproofing; painting of steel framing.
M01227600-I1
08/14/2026
Permit issued — General Construction
M01227600-I1-GC
11/21/2025
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01217673-I1
11/14/2025
Signed off — Alteration
M01217713-I1
10/16/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01217673-P1
10/16/2025
Signed off — Alteration
Relocate and Remove Non-Load Bearing Walls in Cellar to Modify Existing Offices. No Change in Egress, Use, or Occupnancy
M01171445-S2
09/30/2025
Permit issued — Suspended Scaffold
M01286316-I1-SC
09/29/2025
Signed off — Alteration
Relocate and Remove Non-Load Bearing Walls in Cellar to Modify Existing Offices. No Change in Egress, Use, or Occupnancy
M01171445-I1
09/29/2025
Filed — Alteration
Suspended Scaffold for Facade Restoration as Shown on Plans
M01286316-I1
09/29/2025
Special inspection requirement — Post-installed Anchors
Michael Walsh
09/26/2025
Objection resolved — Addressed
09/23/2025
Objection raised — Other
09/17/2025
Special inspection requirement — Post-installed Anchors
Michael Walsh
09/12/2025
Filed — Alteration
Use of Suspended Scaffold for Facade Restoration
M01225604-P1
09/11/2025
Special inspection requirement — Post-installed Anchors
Michael Walsh
07/07/2025
Permit issued — General Construction
M01227600-I1-GC
06/05/2025
Objection resolved — Addressed
06/03/2025
Objection raised — Cost
05/30/2025
Permit issued — Suspended Scaffold
M01225604-I1-SC
05/29/2025
Filed — Alteration
Use of Suspended Scaffold for Facade Restoration
M01225604-I1
05/23/2025
Filed — Alteration
Exterior wall repairs, including: Sealant replacement; EIFS repairs and coating; balcony waterproofing; painting of steel framing.
M01227600-I1
05/16/2025
Special inspection requirement — Final
Jarol Ibarra
05/05/2025
Permit issued — Supported Scaffold
M01217713-I1-SF
05/02/2025
Filed — Alteration
M01217713-I1
05/01/2025
Permit issued — Sidewalk Shed
M01217673-I1-SH
04/30/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01217673-I1
04/02/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/02/2025
Inspection — Certified Sprinkler - SP - Roughing
Certified
View inspection ↗
04/01/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/11/2025
Permit issued — Sprinklers
M01171445-S2-EW-SP
02/19/2025
Permit issued — General Construction
M01171445-I1-GC
02/19/2025
Permit issued — Mechanical Systems
M01171445-S1-MS
02/03/2025
Filed — Alteration
Relocate and Remove Non-Load Bearing Walls in Cellar to Modify Existing Offices. No Change in Egress, Use, or Occupnancy
M01171445-S2
02/03/2025
Filed — Alteration
Relocate and Remove Non-Load Bearing Walls in Cellar to Modify Existing Offices. No Change in Egress, Use, or Occupnancy
M01171445-I1
02/03/2025
Filed — Alteration
Relocate and Remove Non-Load Bearing Walls in Cellar to Modify Existing Offices. No Change in Egress, Use, or Occupnancy
M01171445-S1
01/24/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
01/24/2025
Special inspection requirement — Sprinkler Systems
SAMI HAJJAR P.E
01/24/2025
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
01/24/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
12/24/2024
Permit issued — Sign
M01111158-I1-SG
12/24/2024
Permit issued — Sign
M01111169-I1-SG
12/24/2024
Permit issued — Sign
M01111180-I1-SG
11/06/2024
Filed — Alteration
FACE REPLACMENT OF EXISTING ILLUMINATED SIGN ON EXISTING MARQUEE # 120168166 (MARRIOTT VACATION CLUB)
M01111169-I1
11/06/2024
Filed — Alteration
M01111180-I1
11/06/2024
Filed — Alteration
FACE REPLACMENT OF EXISTING ILLUMINATED SIGN ON EXISTING MARQUEE #120168166 (MARRIOTT VACATION CLUB)
M01111158-I1
09/13/2024
Special inspection requirement — Final
LEON SKVIRSKY
09/13/2024
Special inspection requirement — Final
LEON SKVIRSKY
09/13/2024
Special inspection requirement — Final
LEON SKVIRSKY
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2023
Cycle 9 facade report submitted
02/21/2023
Cycle 9 facade report signed — SWARMP
02/16/2023
Cycle 9 facade inspection completed
02/02/2023
Violation issued (ECB, closed)
Construction
12/22/2022
Violation issued (ECB, closed)
Local Law
06/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/03/2020
Signed off — Alteration
PROPOSE TO REPLACE 2 141 TON COOLING TOWERS AND ASSOCIATED PUMPS AT ROOF LEVEL AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR MEANS OF EGRESS UNDER THIS APPLICATION.
M00340002-I1
08/27/2020
Permit issued — Mechanical Systems
M00340002-I1-MS
Latest 60 of 105 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-off4 STAR CONTRACTING INC08/14/2026
DOB NOWSuspended ScaffoldPermit Issued4 STAR CONTRACTING INC09/30/2025
DOB NOWGeneral ConstructionSigned-off4 STAR CONTRACTING INC07/07/2025
DOB NOWSuspended ScaffoldPermit Issued4 STAR CONTRACTING INC05/30/2025
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC05/05/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC05/01/2025
DOB NOWSprinklersSigned-offTEMPERINI MECHANICAL INC03/11/2025
DOB NOWGeneral ConstructionSigned-offMELL RENOVATION SERVICES02/19/2025
DOB NOWMechanical SystemsPermit IssuedMELL RENOVATION SERVICES02/19/2025
DOB NOWSignPermit IssuedACTIVE SIGNS INC12/24/2024
DOB NOWSignPermit IssuedACTIVE SIGNS INC12/24/2024
DOB NOWSignPermit IssuedACTIVE SIGNS INC12/24/2024
DOB NOWMechanical SystemsSigned-offLANE REFRIGERATION CO.,IN08/27/2020
DOB NOWMechanical SystemsSigned-offLANE REFRIGERATION CO.,IN05/27/2020
DOB NOWMechanical SystemsSigned-offLANE REFRIGERATION CO.,IN05/15/2020
BISPLISSUEDD.D.S. MECH PBG&HTG CORP03/08/2019
BISMHISSUEDLANE REFRIGERATION CO.,IN03/06/2019
BISSPISSUEDPAR FIRE PROTECTION LLC12/07/2018
BISSPISSUEDPAR FIRE PROTECTION LLC12/03/2018
BISOTISSUEDCAPITAL BUILDERS GROUP INC10/31/2018
BISSPISSUEDPAR FIRE PROTECTION LLC01/02/2018
BISSPISSUEDPAR FIRE PROTECTION LLC12/21/2017
BISOTISSUEDPLAZA CONSTRUCTION LLC05/11/2017
BISOTISSUEDPLAZA CONSTRUCTION LLC05/11/2017
BISMHISSUEDPLAZA CONSTRUCTION LLC05/11/2017
BISMHISSUEDPLAZA CONSTRUCTION LLC05/11/2017
BISMHISSUEDPLAZA CONSTRUCTION LLC05/11/2017
BISOTISSUEDPLAZA CONSTRUCTION LLC05/08/2017
BISOTISSUEDPLAZA CONSTRUCTION LLC05/08/2017
BISEQISSUEDKING HOIST & SCAFFOLDING03/15/2017
BISSPISSUEDPAR FIRE PROTECTION LLC01/31/2017
BISPLISSUEDPAR PLUMBING CO., INC01/04/2017
BISPLISSUEDPAR PLUMBING CO., INC01/04/2017
BISSPISSUEDPAR FIRE PROTECTION LLC01/04/2017
BISOTISSUEDPLAZA CONSTRUCTION LLC01/03/2017
BISMHISSUEDPLAZA CONSTRUCTION LLC01/03/2017
BISOTISSUEDPLAZA CONSTRUCTION LLC01/03/2017
BISOTISSUEDPLAZA CONSTRUCTION LLC01/03/2017
BISMHISSUEDPLAZA CONSTRUCTION LLC01/03/2017
BISOTISSUEDPLAZA CONSTRUCTION LLC12/30/2016
+ 25 more permits on file
1 project · most recent 02/03/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
02/03/2025Permit IssuedMELL RENOVATION SERVICESAir Conditioning Systems, Heating Systems
Cooling
Bosch WSHP-2 and CLO241VTCALT 2 tons · Wshp ×1
Heating
Bosch FHP-EM048-1VTC 2 tons · Wshp ×1
1 project · most recent 02/03/2025
FiledStatusContractorScope
02/03/2025Signed-offWHITESTONE PLUMBING CORP—
2 projects · most recent 04/29/2025
HVAC Wiring
FiledStatusContractorScope
04/29/2025CompleteBOROWIDE ELECT'L CONTR'S—
06/29/2020Permit IssuedHY-LEE ELECTRIC CO., INC.HVAC Wiring
2 projects · most recent 09/29/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/29/2025Permit Issued4 STAR CONTRACTING INCSuspended Scaffold (SC)
09/12/2025Permit Issued4 STAR CONTRACTING INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/02/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/02/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
04/01/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
09/29/2025Post-installed AnchorsMichael Walshspecial
09/17/2025Post-installed AnchorsMichael Walshspecial
09/11/2025Post-installed AnchorsMichael Walshspecial
05/16/2025FinalJarol Ibarraprogress
01/24/2025FinalSAMI HAJJAR P.Eprogress
01/24/2025Sprinkler SystemsSAMI HAJJAR P.Especial
01/24/2025Mechanical SystemsSAMI HAJJAR P.Especial
01/24/2025FinalSAMI HAJJAR P.Eprogress
09/13/2024FinalLEON SKVIRSKYprogress
09/13/2024FinalLEON SKVIRSKYprogress
09/13/2024FinalLEON SKVIRSKYprogress
04/06/2020HVAC and service water heating equipment Michael Risbergsenergy_progress
04/03/2020Mechanical SystemsMichael Risbergsspecial
04/03/2020FinalMichael Risbergsprogress
▾Documents — 460 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch13
08/25/2026M01111180-I1Request digital key ↗
08/25/2026M01111158-I1Request digital key ↗
08/25/2026M01111169-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00340002-I1Request digital key ↗
▸Applications & Permits122
▸BISPLAN / WORK APPROVAL APPLICATION66
11/21/2018123378102Open ↗
11/16/2018123505947Open ↗
11/14/2018123371378Open ↗
Showing 3 of 66 on file for this type
▸BISWORK PERMIT APPLICATION49
03/08/2019123378102Open ↗
03/06/2019123378102Open ↗
10/31/2018123371378Open ↗
Showing 3 of 49 on file for this type
▸BISPLACE OF ASSEMBLY6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPW1PLAN / WORK APPROVAL APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications127
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION55
06/18/2019123378102Open ↗
06/17/2019123378102Open ↗
06/17/2019123378102Open ↗
Showing 3 of 55 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST21
10/30/2018123371378Open ↗
03/21/2017123047112Open ↗
03/17/2017122992440Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT15
10/30/2018123371378Open ↗
03/21/2017123047112Open ↗
03/17/2017122992440Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
09/05/2026M00340002-I1Open ↗
08/25/2026M01111180-I1Open ↗
08/25/2026M01171445-S1Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/02/2026M01111158-I1Open ↗
09/01/2026M00340002-I1Open ↗
09/01/2026M00340002-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026M01286316-I1Open ↗
09/01/2026M00340002-I1Open ↗
08/28/2026M01171445-S1Open ↗
Showing 3 of 6 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment30
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE13
11/21/2018123378102Open ↗
12/12/2017122985742Open ↗
08/21/2017122985742Open ↗
Showing 3 of 13 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA7
03/11/2020123505947Open ↗
01/22/2020123505947Open ↗
05/03/2018122989659Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSIGN HANGER CERTIFICATE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
11/21/2018123378102Open ↗
10/30/2018123371378Open ↗
▸Environmental & Asbestos21
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026M01171445-S1Open ↗
08/25/2026M01171445-I1Open ↗
08/25/2026M01171445-S2Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/21/2018123378102Open ↗
10/30/2018123371378Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS19
06/17/2019123378102Open ↗
11/21/2018123378102Open ↗
10/30/2018123371378Open ↗
Showing 3 of 19 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
06/17/2019123378102Open ↗
▸Inspections & Test Reports1
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs35
▸BISADMINISTRATIVE OBJECTIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
03/11/2020123505947Open ↗
06/17/2019123378102Open ↗
08/15/2017122797688Open ↗
Showing 3 of 11 on file for this type
▸BISSUPERSEDING LETTER3
06/16/2017122908504Open ↗
05/26/2017122984020Open ↗
05/26/2017122984020Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION3
06/15/2017122900478Open ↗
06/15/2017122908504Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/23/2026M01217713-I1Open ↗
08/21/2026M01217673-I1Open ↗
08/21/2026M01217673-P1Open ↗
▸Cost, Insurance & Ownership25
▸BISCOST AFFIDAVIT24
03/11/2020123505947Open ↗
06/17/2019123378102Open ↗
02/20/2019123378102Open ↗
Showing 3 of 24 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms51
▸BISEFILING COVER SHEET32
11/21/2018123378102Open ↗
11/16/2018123505947Open ↗
10/30/2018123371378Open ↗
Showing 3 of 32 on file for this type
▸BISADDITIONAL INFORMATION11
08/21/2017122985742Open ↗
08/21/2017122984020Open ↗
07/26/2017122900478Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM6
03/11/2020123505947Open ↗
06/17/2019123378102Open ↗
03/08/2019123378102Open ↗
Showing 3 of 6 on file for this type
▸BISeFiling Job Application Cover Sheet2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents12
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
09/27/2018123515767Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWManufacturer's Specifications3
08/13/2026M01286316-I1Open ↗
08/13/2026M01225604-P1Open ↗
08/13/2026M01225604-I1Open ↗
▸DOB NOWCalculations3
08/13/2026M01225604-P1Open ↗
08/13/2026M01286316-I1Open ↗
08/13/2026M01225604-I1Open ↗
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type