| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01026346 ↗ | 1535 BROADWAY MANHATTAN | Alteration | Permit Issued | 05/16/2024 | 06/23/2026 | Design JFK&M CONSULTING ENGINEERS Filer METROPOLIS GROUP INC | MODIFICATION TO EXISTING MECHANICAL SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M01251062 ↗ | 270 WEST 43 STREET MANHATTAN | Alteration | Signed-off | 08/21/2025 | 01/12/2026 | Hereby filing for interior renovation of hotel rooms located on floors 9 -20. No change to use, egress or occupancy in this application. | |
| M01282432 ↗ | 5 CHATHAM SQUARE MANHATTAN | Alteration | Signed-off | 10/21/2025 | 10/30/2025 | Design TPG ARCHITECTURE, LLP Owner MALACHITE REALTY GROUP Filer BOHLER ENGINEERING | Installation of nonload-bearing partitions and renovation of interior space to banking facility. Work includes interior construction, finish… |
| M01285706 ↗ | 5 CHATHAM SQUARE MANHATTAN | Alteration | Signed-off | 10/17/2025 | 10/30/2025 | Design SEVERUD ASSOCIATES | Renovation of interior spaces, including infill of an existing elevator pit at the first floor and infill of an existing elevator shaft and … |
| M01285774 ↗ | 5 CHATHAM SQUARE MANHATTAN | Alteration | Permit Issued | 10/21/2025 | 10/30/2025 | Design EMTEC CONSULTANTS Owner MALACHITE REALTY GROUP Filer BOHLER ENGINEERING | Installation of new mechanical equipment for new tenant space. No change in use, occupancy, or egress. |
| M01242170 ↗ | 80 WEST STREET MANHATTAN | Alteration | Permit Issued | 07/02/2025 | 07/31/2025 | Design MLG ARCHITECTS | Install permanent channels on building facade for flood barrier system. No change to use egress or occupancy on this application. |
| Name | Projects together | Most recent |
|---|---|---|
| MONTROY DEMARCO ARCHITECTURE, LLP | 15 | 11/15/2022 |
| MG ENGINEERING D.P.C. | 14 | 11/15/2022 |
| GRUSKIN ARCHITECTURE + DESIGN PC | 12 | 07/08/2025 |
| ACHESON DOYLE PARTNERS ARCHITECTS | 8 | 08/21/2025 |
| EMTEC CONSULTANTS | 6 | 06/17/2026 |
| JFK&M CONSULTING ENGINEERS | 6 | 10/03/2025 |
| SOUTHPORT ENGINEERING ASSOCIATES | 6 | 05/21/2024 |
| STEVEN PAUL HAMMER | 6 | 06/28/2024 |
| SEVERUD ASSOCIATES | 5 | 10/17/2025 |
| TPG ARCHITECTURE, LLP | 5 | 12/15/2025 |
| BEYER BLINDER BELLE | 4 | 12/10/2025 |
| GACE DPC | 2 | 02/13/2025 |
| A DEGREE OF FREEDOM STRUCTURAL ENGI | 1 | 12/09/2021 |
| CAESAR BUSTAMANTE, AIA | 1 | 04/12/2022 |
| IAQ SYSTEMS INC | 1 | 05/13/2026 |
| MLG ARCHITECTS | 1 | 07/02/2025 |
| PENNONI ASSOCIATES | 1 | 01/06/2021 |
| RIGID STRUCTURAL DESIGN, LLC | 1 | 12/06/2024 |
| STEVEN CAPRI,PE CONSULTING ENGINEER | 1 | 12/12/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| VERTCON BUILDERS LLC | 1 | 10/03/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| 100 WALL INVESTMENTS, LLC | 13 | 04/04/2022 |
| HMC TIMES SQUARE HOTEL LP | 11 | 10/03/2025 |
| MARRIOTT INTERNATIONAL | 11 | 12/10/2025 |
| GRAND SLAM NEW YORK LLC | 4 | 11/14/2023 |
| MIDWOOD INVESTMENT & DEVELOPMENT | 3 | 06/17/2026 |
| 161 EAST 86TH STREET COMPANY LLC | 2 | 04/04/2023 |
| BENJAMIN WU MD PC | 2 | 04/09/2024 |
| COLLIERS | 2 | 06/27/2024 |
| Hazan Management LLC | 2 | 04/21/2025 |
| MALACHITE REALTY GROUP | 2 | 05/12/2026 |
| REVIT GROUP LLC | 2 | 11/29/2023 |
| 477 86THSTREET,LLC | 1 | 06/23/2021 |
| 635 MADISON MEMBER LLC | 1 | 01/06/2021 |
| AXIUM CONSTRUCTION CORP | 1 | 10/23/2019 |
| CUSHMAN & WAKEFIELD | 1 | 11/15/2022 |
| JEMB REALTY | 1 | 06/28/2024 |
| VANGUARD INVESTORS LTD | 1 | 09/24/2020 |
| Name | Projects together | Most recent |
|---|---|---|
| METROPOLIS GROUP INC | 20 | 10/03/2025 |
| RIZZO GROUP | 14 | 11/15/2022 |
| A1 EXPEDITING SERVICE CORP. | 12 | 12/10/2025 |
| BOHLER ENGINEERING | 5 | 06/17/2026 |
| ARCHETYPE CONSULTANTS, INC. | 4 | 06/27/2024 |
| BURNHAM NATIONWIDE INC | 4 | 04/21/2025 |
| GILLMAN CONSULTING INC | 1 | 06/28/2024 |
| MICHAEL ZENREICH ARCHITECT, PC | 1 | 12/09/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01026346 ↗ | 1535 BROADWAY MANHATTAN | Alteration | Permit Issued | 05/16/2024 | 06/23/2026 | Design JFK&M CONSULTING ENGINEERS Filer METROPOLIS GROUP INC | MODIFICATION TO EXISTING MECHANICAL SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M01251062 ↗ | 270 WEST 43 STREET MANHATTAN | Alteration | Signed-off | 08/21/2025 | 01/12/2026 | Hereby filing for interior renovation of hotel rooms located on floors 9 -20. No change to use, egress or occupancy in this application. | |
| M01282432 ↗ | 5 CHATHAM SQUARE MANHATTAN | Alteration | Signed-off | 10/21/2025 | 10/30/2025 | Design TPG ARCHITECTURE, LLP Owner MALACHITE REALTY GROUP Filer BOHLER ENGINEERING | Installation of nonload-bearing partitions and renovation of interior space to banking facility. Work includes interior construction, finish… |
| M01285706 ↗ | 5 CHATHAM SQUARE MANHATTAN | Alteration | Signed-off | 10/17/2025 | 10/30/2025 | Design SEVERUD ASSOCIATES | Renovation of interior spaces, including infill of an existing elevator pit at the first floor and infill of an existing elevator shaft and … |
| M01285774 ↗ | 5 CHATHAM SQUARE MANHATTAN | Alteration | Permit Issued | 10/21/2025 | 10/30/2025 | Design EMTEC CONSULTANTS Owner MALACHITE REALTY GROUP Filer BOHLER ENGINEERING | Installation of new mechanical equipment for new tenant space. No change in use, occupancy, or egress. |
| M01242170 ↗ | 80 WEST STREET MANHATTAN | Alteration | Permit Issued | 07/02/2025 | 07/31/2025 | Design MLG ARCHITECTS | Install permanent channels on building facade for flood barrier system. No change to use egress or occupancy on this application. |
| M01246556 ↗ | 1311 BROADWAY MANHATTAN | Alteration | Signed-off | 07/08/2025 | 07/16/2025 | REMOVAL & INSTALLATION OF INTERIOR NON-LOAD BEARING WALLS AS PER PLANS - VERIZON. NO CHANGE IN USE, EGRESS OR OCCUPANCY | |
| M00573200 ↗ | 201 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 11/14/2024 | 02/18/2025 | Design GACE DPC Owner Marriott International | Structural modifications as per plans filed herewith. No change to use, egress, or occupancy. |
| M00510761 ↗ | 201 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 05/04/2021 | 01/07/2025 | Design GACE DPC Owner MARRIOTT INTERNATIONAL | Structural renovations including new elevator at 20th floor and new generator room with support framing from 17th to 20th floor as per plans… |
| Q01149795 ↗ | 37-38 74 STREET QUEENS | Alteration | Permit Issued | 12/06/2024 | 12/09/2024 | Design RIGID STRUCTURAL DESIGN, LLC | Installation of a temporarily Plywood enclosure system per plan submitted.. Work shall comply with 2022 building codes chapter 33. No change… |
| Q01125946 ↗ | 37-38 74 STREET QUEENS | Alteration | Permit Issued | 11/08/2024 | 12/04/2024 | Design TPG ARCHITECTURE, LLP Filer BOHLER ENGINEERING | Proposed banking fit out from existing jewelry store. Renovation of interior non-load bearing partitions and related finishes for tenant (Fl… |
| Q01125956 ↗ | 37-38 74 STREET QUEENS | Alteration | Permit Issued | 11/06/2024 | 12/04/2024 | Design EMTEC CONSULTANTS Filer BOHLER ENGINEERING | HVAC modifications and associated duct work for tenant fit out (Flushing Bank) and related finishes as per plans. There will be no change in… |
| Q01126009 ↗ | 37-38 74 STREET QUEENS | Alteration | Permit Issued | 11/06/2024 | 12/04/2024 | Design SEVERUD ASSOCIATES Filer BOHLER ENGINEERING | Interior renovations to include vestibule modifications and egress stairs from lower level for tenant fit out (Flushing Bank) and related fi… |
| M01107539 ↗ | 1535 BROADWAY MANHATTAN | Alteration | Signed-off | 11/14/2024 | 11/27/2024 | Design JFK&M CONSULTING ENGINEERS | MODIFICATION TO EXISTING MCHANICAL SYSTEM AND RELATED DUCT WORK AS SHOWN ON DRAWIGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01096653 ↗ | 1535 BROADWAY MANHATTAN | Alteration | Signed-off | 11/12/2024 | 11/26/2024 | architectural | |
| M01026336 ↗ | 1535 BROADWAY MANHATTAN | Alteration | Permit Issued | 04/25/2024 | 11/08/2024 | Filer METROPOLIS GROUP INC | INTERIOR RENOVATION OF CEILINGS, DOORS AND FINISHES AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00510186 ↗ | 201 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 05/04/2021 | 11/04/2024 | Owner MARRIOTT INTERNATIONAL | Mechanical additions, modifications, and demolition as per plans filed herewith. No change to use, egress, or occupancy. |
| M00504147 ↗ | 201 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 05/04/2021 | 11/01/2024 | Design BEYER BLINDER BELLE Owner MARRIOTT INTERNATIONAL | INTERIOR FIT OUT ONLY as per plans filed herewith. No change to use, egress, or occupancy. ALT CO approved under DOB NOW application M005041… |
| 123898121BIS | 270 WEST 43 STREET MANHATTAN | — | ISSUED | 11/21/2019 | 10/22/2024 | — | OT |
| M01062062 ↗ | 1400 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 06/25/2024 | 07/05/2024 | Owner COLLIERS | Architectural work in retail space on 1st floor as indicated on drawings. |
| M01068968 ↗ | 1311 BROADWAY MANHATTAN | Alteration | Signed-off | 06/28/2024 | 07/05/2024 | Design STEVEN PAUL HAMMER Owner JEMB REALTY Filer GILLMAN CONSULTING INC | MODIFICATION TO EXISTING HVAC SYSTEM AS PER PLANS - VERIZON SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01062067 ↗ | 1400 AVENUE OF THE AMER MANHATTAN | Alteration | Signed-off | 06/27/2024 | 07/03/2024 | Design STEVEN PAUL HAMMER Owner COLLIERS | Mechanical work in retail space on 1st floor as indicated on drawings. |
| M01068872 ↗ | 1311 BROADWAY MANHATTAN | Alteration | Signed-off | 06/27/2024 | 07/03/2024 | REMOVAL & INSTALLATION OF INTERIOR NON-LOAD BEARING WALLS AS PER PLANS - VERIZON. NO CHANGE IN USE, EGRESS OR OCCUPANCY | |
| M01022038 ↗ | 1535 BROADWAY MANHATTAN | Alteration | Signed-off | 04/24/2024 | 06/12/2024 | Filer METROPOLIS GROUP INC | INTERIOR RENOVATION OF PARTITIONS, CEILINGS, DOORS AND FINISHES AS SHOWN ON DRAWING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01026285 ↗ | 1535 BROADWAY MANHATTAN | Alteration | Signed-off | 05/16/2024 | 06/12/2024 | Design JFK&M CONSULTING ENGINEERS Filer METROPOLIS GROUP INC | MODIFICATION TO EXISTING MECHANICAL SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M01026358 ↗ | 1535 BROADWAY MANHATTAN | Alteration | Signed-off | 04/24/2024 | 06/12/2024 | Design JFK&M CONSULTING ENGINEERS Filer METROPOLIS GROUP INC | MODIFICATION TO EXISTING MECHANICAL SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M01026380 ↗ | 1535 BROADWAY MANHATTAN | Alteration | Signed-off | 04/22/2024 | 06/05/2024 | Filer METROPOLIS GROUP INC | INTERIOR RENOVATION OF CEILINGS, DOORS AND FINISHES AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01026385 ↗ | 1535 BROADWAY MANHATTAN | Alteration | Signed-off | 05/02/2024 | 06/04/2024 | Design JFK&M CONSULTING ENGINEERS Filer METROPOLIS GROUP INC | MODIFICATION TO EXISTING MECHANICAL SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M00949348 ↗ | 1535 BROADWAY MANHATTAN | Alteration | Signed-off | 12/19/2023 | 05/30/2024 | Filer METROPOLIS GROUP INC | REMEDIAL DRYWALL REPAIRS AS SHOW ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M00952036 ↗ | 1535 BROADWAY MANHATTAN | Alteration | Signed-off | 12/27/2023 | 05/30/2024 | Filer METROPOLIS GROUP INC | METAL RAILING INSTALLATION AS SHOW ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M00955916 ↗ | 1535 BROADWAY MANHATTAN | Alteration | Signed-off | 12/19/2023 | 05/30/2024 | Filer METROPOLIS GROUP INC | Minor partition work, patch of ceilings and walls per drawings. No change to use, egress or occupancy. |
| M00957998 ↗ | 1535 BROADWAY MANHATTAN | Alteration | Signed-off | 12/21/2023 | 05/30/2024 | Design JFK&M CONSULTING ENGINEERS Filer METROPOLIS GROUP INC | APPLICATION FILED TO INSTALL A NEW KITCHEN EXHAUST SYSTEM CONNECTED TO AN EXISTING TYPE 1 KITCHEN HOOD AND NEW DISHWASHER EQUIPMENT WITHIN T… |
| M01015587 ↗ | 1535 BROADWAY MANHATTAN | Alteration | Signed-off | 04/23/2024 | 05/30/2024 | INTERIOR RENOVATION OF CEILINGS, DOORS AND FINISHES AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | |
| M00504091 ↗ | 201 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 04/30/2021 | 02/20/2024 | Owner MARRIOTT INTERNATIONAL | Mechanical modifications and demolition as per plans filed herewith. No change to use, egress, or occupancy. |
| M00504199 ↗ | 201 PARK AVENUE SOUTH MANHATTAN | Alteration CO | Permit Issued | 06/04/2021 | 02/20/2024 | Design BEYER BLINDER BELLE Owner Marriott International | Filed herewith to change use & occupancy on the rooftop and for change on egress on floors 19 & 20 as per plans filed herewith. |
| M00504445 ↗ | 201 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 04/30/2021 | 02/20/2024 | Design BEYER BLINDER BELLE Owner MARRIOTT INTERNATIONAL | Interior renovations and modifications as per plans filed herewith. No change to use, egress, or occupancy. |
| M00573221 ↗ | 201 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 11/02/2021 | 02/20/2024 | Owner MARRIOTT INTERNATIONAL | Mechanical modifications including hood and duct work in the cellar and 1st floor existing kitchens working with commercial cooking equipmen… |
| M00684044 ↗ | 201 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 04/12/2022 | 02/20/2024 | Design CAESAR BUSTAMANTE, AIA | Description. Installation of Temporary Construction Barrier. |
| M00795128 ↗ | 201 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 11/04/2022 | 02/20/2024 | Design BEYER BLINDER BELLE Owner MARRIOTT INTERNATIONAL | Alt 2 Directive 2 for a temporary Use Permit Filing as per plans filed herewith. |
| X00908818 ↗ | 237 EAST FORDHAM ROAD BRONX | Alteration | Signed-off | 09/07/2023 | 09/15/2023 | Owner GRAND SLAM NEW YORK LLC Filer METROPOLIS GROUP INC | Herewith filing for interior 1st floor general construction and storefront work as per plans. No change to use, egress or occupancy. |
| X00909137 ↗ | 237 EAST FORDHAM ROAD BRONX | Alteration | Signed-off | 09/11/2023 | 09/12/2023 | Design STEVEN PAUL HAMMER Owner GRAND SLAM NEW YORK LLC Filer METROPOLIS GROUP INC | Herewith filing for new mechanical system installation as per plans. No change to use, egress, or occupancy. |
| X00919324 ↗ | 237 EAST FORDHAM ROAD BRONX | Alteration | Signed-off | 09/11/2023 | 09/12/2023 | Owner GRAND SLAM NEW YORK LLC Filer METROPOLIS GROUP INC | HEREWITH FILING FOR NEW STOREFRONT AWNING/STEEL FRAMING PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. |
| Q00227046 ↗ | 213-07 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 10/23/2019 | 07/29/2023 | Design STEVEN PAUL HAMMER Owner AXIUM CONSTRUCTION Filer BURNHAM NATIONWIDE INC | Filing herewith mechanical modifications as per drawings submitted. No change in use, egress or occupancy. |
| X00888726 ↗ | 237 EAST FORDHAM ROAD BRONX | Alteration | Signed-off | 07/19/2023 | 07/28/2023 | Owner GRAND SLAM NEW YORK LLC Filer METROPOLIS GROUP INC | Herewith filing for interior 1st floor non-structural partition demo as per plans. No change to use, egress or occupancy. |
| X00884389 ↗ | 237 EAST FORDHAM ROAD BRONX | Alteration | Signed-off | 07/19/2023 | 07/27/2023 | HEREWITH FILING FOR PLYWOOD CONSTRUCTION SITE FENCE PER PLANS. | |
| M08014239 ↗ | 201 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 11/04/2022 | 06/27/2023 | Owner MARRIOTT INTERNATIONAL | Modifications to existing mechanical systems as per plans filled herewith. No change in use, egress or occupancy. |
| M08014191 ↗ | 201 PARK AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 11/04/2022 | 06/16/2023 | Owner MARRIOTT INTERNATIONAL | Modifications to existing mechanical systems as per plans filled herewith. No change in use, egress or occupancy. |
| B00841611 ↗ | 8616 21 AVENUE BROOKLYN | Alteration | Signed-off | 03/23/2023 | 06/13/2023 | Design EMTEC CONSULTANTS Owner BENJAMIN WU MD PC Filer BURNHAM NATIONWIDE INC | Filing herewith application for mechanical systems modifications to existing tenant space. |
| 121900951BIS | 1400 AVENUE OF THE AMER MANHATTAN | — | ISSUED | 02/03/2014 | 06/01/2023 | — | MH, OT, PL |
| M00808345 ↗ | 157 EAST 86 STREET MANHATTAN | Alteration | Signed-off | 04/04/2023 | 05/04/2023 | Filer METROPOLIS GROUP INC | INSTALLATION OF A TEMPORARY CONSTRUCTION FENCE |
| M00808320 ↗ | 157 EAST 86 STREET MANHATTAN | Alteration | Signed-off | 04/04/2023 | 04/29/2023 | Filer METROPOLIS GROUP INC | REMOVAL OF FACADE ENTRY AS SHOWN ON DRAWING. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B00841567 ↗ | 8616 21 AVENUE BROOKLYN | Alteration | Signed-off | 03/23/2023 | 04/11/2023 | Design TPG ARCHITECTURE, LLP Owner BENJAMIN WU MD PC Filer BURNHAM NATIONWIDE INC | Interior renovations of existing commercial space. |
| B00791619 ↗ | 1623 KINGS HIGHWAY BROOKLYN | Alteration | Signed-off | 11/30/2022 | 12/14/2022 | Owner REVIT GROUP LLC | Refixturing of the interior sales areas for an existing tenant space |
| B00791637 ↗ | 1623 KINGS HIGHWAY BROOKLYN | Alteration | Signed-off | 12/07/2022 | 12/14/2022 | Design STEVEN PAUL HAMMER Owner REVIT GROUP LLC | Mechanical work to include relocation of existing diffusers into new ceiling |
| M08033354 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 11/15/2022 | 11/23/2022 | Owner CUSHMAN & WAKEFIELD Filer RIZZO GROUP | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 8th floor (Metis Associates- Suite 802) … |
| M08033364 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 11/15/2022 | 11/21/2022 | Design MG ENGINEERING D.P.C. | Modifications to the existing HVAC system on the 8th floor (Metis Associates- Suite 802) as per plans. No change to use, egress or occupanc… |
| M08010996 | 100 WALL STREET MANHATTAN | — | Signed-off | — | 10/20/2022 | — | Stair removal and infill as per plans. No change to use, egress or occupancy. |
| M08010971 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 10/13/2022 | 10/17/2022 | Stair removal as per plans. No change to use, egress or occupancy. | |
| M00734298 ↗ | 2228 BROADWAY MANHATTAN | Alteration | Signed-off | 06/02/2022 | 08/23/2022 | Filer METROPOLIS GROUP INC | Interior fit-out of retail space including removal and installation of non bearing partitions and related finishes, and removal of an extra … |
| M00734662 ↗ | 2228 BROADWAY MANHATTAN | Alteration | Signed-off | 06/02/2022 | 08/22/2022 | Design STEVEN PAUL HAMMER Filer METROPOLIS GROUP INC | Installation of water cooled AC units, condensate pump, Electrical heating coils, fans and related grilles and diffusers as per plans filed … |
| M00738711 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 06/02/2022 | 07/12/2022 | Design SEVERUD ASSOCIATES | Structural modifications on the 24th floor (Marketing Floor 25- Trinity Life Sciences- Suite 2500) as per plans. No change to use, egress o… |
| M00738676 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 06/17/2022 | 07/11/2022 | Minor demolition with installation of new interior partitions, doors, suspended ceilings and finishes on the 24th floor (Marketing Floor 25-… | |
| M00738738 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 06/23/2022 | 07/11/2022 | Design MG ENGINEERING D.P.C. | Modifications to the existing HVAC system on the 24th floor (Marketing Floor 25- Trinity Life Sciences- Suite 2500) as per plans. No change… |
| M00702931 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 04/06/2022 | 04/08/2022 | Minor demolition with installation of new interior partitions, doors, suspended ceilings and finishes on the 3rd floor (Suite 302) as per pl… | |
| M00702960 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 04/04/2022 | 04/08/2022 | Design MG ENGINEERING D.P.C. Filer RIZZO GROUP | Modifications to the existing HVAC system on the 3rd floor (Suite 302) as per plans. No change to use, egress or occupancy. |
| M00703523 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 04/06/2022 | 04/08/2022 | Design SEVERUD ASSOCIATES | Furnish and install structural steel for movable partition on the 3rd floor (Suite 302) as per plans. No change to use, egress or occupancy… |
| M00690222 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 03/29/2022 | 04/05/2022 | Filer RIZZO GROUP | Removal and disposal of interior partitions, doors, suspended ceilings and finishes with patch and repair of walls and floors on the 5th flo… |
| M00690235 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 04/01/2022 | 04/05/2022 | Design MG ENGINEERING D.P.C. | Modifications to the existing HVAC system on the 5th floor (Suite 501 & 502) as per plans. No change to use, egress or occupancy. |
| M00690479 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 03/28/2022 | 04/05/2022 | Filer RIZZO GROUP | Removal and disposal of interior partitions, doors, suspended ceilings and finishes with patch and repair of walls and floors on the 11th fl… |
| M00690800 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 03/28/2022 | 04/05/2022 | Removal of interior partitions, doors, suspended ceilings and finishes with patch and repair of walls and floors on the 19th floor (Marketin… | |
| M00690557 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 03/31/2022 | 04/04/2022 | Design MG ENGINEERING D.P.C. | Modifications to the existing HVAC system on the 11th floor (Suite 1102 & Corridor) as per plans. No change to use, egress or occupancy. |
| M00690672 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 03/28/2022 | 04/04/2022 | Removal and disposal of interior partitions, doors, suspended ceilings and finishes with patch and repair of walls and floors on the 13th Fl… | |
| M00690689 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 03/30/2022 | 04/04/2022 | Design MG ENGINEERING D.P.C. Filer RIZZO GROUP | Modifications to the existing HVAC system on the 13th floor (Marketing Floor 14, Suite 1402 & Corridor) as per plans. No change to use, egr… |
| M00690815 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 03/31/2022 | 04/04/2022 | Design MG ENGINEERING D.P.C. Filer RIZZO GROUP | Modifications to the existing HVAC system on the 19th floor (Marketing Floor 20, Suite 2000 & Corridor) as per plans. No change to use, egr… |
| M00690858 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 03/28/2022 | 04/04/2022 | Filer RIZZO GROUP | Minor demolition with installation of new interior partitions, doors, suspended ceilings and finishes on the 20th floor (Marketing Floor 21,… |
| M00690865 ↗ | 100 WALL STREET MANHATTAN | Alteration | Permit Issued | 03/30/2022 | 04/04/2022 | Design MG ENGINEERING D.P.C. | Modifications to the existing HVAC system on the 20th floor (Marketing Floor 21, Suite 2101 & Corridor) as per plans. No change to use, egr… |
| M00690946 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 03/28/2022 | 04/04/2022 | Minor demolition with installation of new interior partitions, doors, suspended ceilings and finishes on the 21st floor (Marketing floor 22,… | |
| M00690954 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 03/30/2022 | 04/04/2022 | Design MG ENGINEERING D.P.C. | Modifications to the existing HVAC system on the 21st floor (Marketing floor 22, Suite 2201 & 2203) as per plans. No change to use, egress … |
| Q00669012 ↗ | 85-15 REEDER STREET QUEENS | Alteration | Signed-off | 02/07/2022 | 03/24/2022 | Design TPG ARCHITECTURE, LLP | Filing herewith application for general construction as per plan submitted. No change in use, egress or occupancy. |
| Q00669041 ↗ | 85-15 REEDER STREET QUEENS | Alteration | Signed-off | 02/22/2022 | 03/24/2022 | Design EMTEC CONSULTANTS | Filing herewith application for mechanical modifications as per plans submitted. No change in use, egress or occupancy. |
| M00628366 ↗ | 122 EAST 78 STREET MANHATTAN | Alteration | Signed-off | 12/09/2021 | 01/20/2022 | Filing application to repair concrete slab in the sub-cellar. | |
| M00639703 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 12/10/2021 | 12/17/2021 | Design MG ENGINEERING D.P.C. Filer RIZZO GROUP | Modifications to the existing HVAC system on the 5th floor (Dual Commercial) as per plans. No change to use, egress or occupancy. |
| M00639761 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 12/10/2021 | 12/17/2021 | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 7th floor (Manning & Kass) as per plans.… | |
| M00639823 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 12/10/2021 | 12/17/2021 | Filer RIZZO GROUP | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 11th floor (Bank of Taiwan) as per plans… |
| M00639694 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 12/10/2021 | 12/14/2021 | Filer RIZZO GROUP | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 5th floor (Dual Commercial) as per plans… |
| M00639780 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 12/10/2021 | 12/14/2021 | Design MG ENGINEERING D.P.C. Filer RIZZO GROUP | Modifications to the existing HVAC system on the 7th floor (Manning & Kass) as per plans. No change to use, egress or occupancy. |
| M00639844 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 12/10/2021 | 12/14/2021 | Design MG ENGINEERING D.P.C. Filer RIZZO GROUP | Modifications to the existing HVAC system on the 11th floor (Bank of Taiwan) as per plans. No change to use, egress or occupancy. |
| M00639897 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 12/10/2021 | 12/14/2021 | Filer RIZZO GROUP | Installation of new partitions, doors, suspended ceilings and finishes on the 16th floor (QC Terme- Marketing Floor 17) as per plans. No ch… |
| M00639913 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 12/10/2021 | 12/14/2021 | Design MG ENGINEERING D.P.C. | Modifications to the existing HVAC system on the 16th floor (QC Terme- Marketing Floor 17) as per plans. No change to use, egress or occupa… |
| M00613935 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 11/02/2021 | 12/10/2021 | Filer RIZZO GROUP | Minor demolition with installation of new partitions, doors, suspended ceilings and finishes (Suite 2400: Construction Floor 23/Marketing Fl… |
| M00613955 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 10/29/2021 | 12/10/2021 | Design MG ENGINEERING D.P.C. | Modifications to the existing HVAC system (Suite 2400- Construction Floor 23/Marketing Floor 24) as per plans. No change to use, egress or … |
| B00524718 ↗ | 477 86 STREET BROOKLYN | Alteration | Signed-off | 06/23/2021 | 07/19/2021 | Owner 477 86THSTREET,LLC Filer METROPOLIS GROUP INC | REMOVAL AND INSTALLATION OF PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWINGS. NO CHANGE TO USE EGRESS OR OCCUPANCY. |
| Q00540636 ↗ | 136-41 ROOSEVELT AVENUE QUEENS | Alteration | Signed-off | 07/06/2021 | 07/14/2021 | Design SEVERUD ASSOCIATES Owner Hazan Management LLC Filer BURNHAM NATIONWIDE INC | Filing herewith application for structural framing. No change in use, egress or occupancy. |
| Q00540551 ↗ | 136-41 ROOSEVELT AVENUE QUEENS | Alteration | Signed-off | 07/06/2021 | 07/13/2021 | Design TPG ARCHITECTURE, LLP | Filing herewith application for interior renovations band minor exterior work. Adding egress on the 1st floor. No change in use or occupancy… |
| Q00540674 ↗ | 136-41 ROOSEVELT AVENUE QUEENS | Alteration | Signed-off | 07/09/2021 | 07/13/2021 | Design EMTEC CONSULTANTS Owner Hazan Management LLC Filer BURNHAM NATIONWIDE INC | Filing herewith HVAC work as per plans submitted. No change in use, egress or occupancy. |
| Q00397029 ↗ | 89-00 SUTPHIN BOULEVARD QUEENS | Alteration | Signed-off | 09/24/2020 | 11/06/2020 | Design EMTEC CONSULTANTS Owner VANGUARD INVESTORS LTD Filer BURNHAM NATIONWIDE INC | Filing herewith mechanical work pertaining to tenant build out. No change in use, egress or occupancy. |
| 140963438BIS | 80 WEST STREET MANHATTAN | — | ISSUED | 10/19/2020 | 10/19/2020 | — | OT |
| M00348391 ↗ | 1695 3 AVENUE MANHATTAN | Alteration | Signed-off | 05/20/2020 | 10/16/2020 | Design IAQ SYSTEMS INC | INSTALLATION OF MECHANICAL SYSTEM AS SHOWN HEREWITH. NO CHANGES TO EGRESS, OCCUPANCY OR USE. |
| 440626501BIS | 89-00 SUTPHIN BOULEVARD QUEENS | — | ISSUED | 10/01/2020 | 10/01/2020 | — | OT |
| 440626495BIS | 89-00 SUTPHIN BOULEVARD QUEENS | — | ISSUED | 09/30/2020 | 09/30/2020 | — | OT |
| Building | Filings | Most Recent |
|---|---|---|
| 201 PARK AVENUE SOUTH ↗ | 43 | 07/08/2026 |
| 213-07 NORTHERN BOULEVARD ↗ | 1 | 07/08/2026 |
| 1311 BROADWAY ↗ | 4 | 07/08/2026 |
| 1535 BROADWAY ↗ | 22 | 07/08/2026 |
| 100 WALL STREET ↗ | 56 | 07/08/2026 |
| 237 EAST FORDHAM ROAD ↗ | 7 | 07/08/2026 |
| 477 86 STREET ↗ | 1 | 07/08/2026 |
| 89-00 SUTPHIN BOULEVARD ↗ | 1 | 07/08/2026 |
| 37-38 74 STREET ↗ | 6 | 07/08/2026 |
| 122 EAST 78 STREET ↗ | 1 | 07/08/2026 |
| 1400 AVENUE OF THE AMER ↗ | 2 | 07/08/2026 |
| 2228 BROADWAY ↗ | 3 | 07/08/2026 |
| 136-41 ROOSEVELT AVENUE ↗ | 4 | 07/08/2026 |
| 157 EAST 86 STREET ↗ | 3 | 07/08/2026 |
| 8616 21 AVENUE ↗ | 3 | 07/08/2026 |
| 85-15 REEDER STREET ↗ | 2 | 07/08/2026 |
| 5 CHATHAM SQUARE ↗ | 3 | 06/28/2026 |
| 1695 3 AVENUE ↗ | 1 | 06/28/2026 |
| 270 WEST 43 STREET ↗ | 1 | 04/09/2026 |
| 1623 KINGS HIGHWAY ↗ | 4 | 03/21/2026 |
| 80 WEST STREET ↗ | 2 | 03/21/2026 |
| 59 WEST 44 STREET ↗ | 2 | 03/21/2026 |
| 4250 BROADWAY ↗ | 2 | 03/21/2026 |