Condo, residential tower (mixed-use, multi-family elevator) [derived]
The Hamilton Condominium
330 WEST 145 STREET · Hamilton Heights-Sugar Hill · BIN 1090561
💬 Discuss this project
2001Year Built
8Stories
RMBuilding Class
R8AZoning
104,739 sfGross Floor Area
78Units
LL97 CoveredRent Stabilized8 Open Violations ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 19,542 sf lot · 5.36 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Roof2p · 1 filing · 17 docs
Floor 82p · 2 filings · 8 docs
Floor 75p · 1 filing · 17 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exterior27p · 4 filings · 20 docs
Filed — no permit issued34p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HARLEM PROPERTY MANAGEMENT1707/08/2026
DEPT OF HOUSING PRESERVATION1203/21/2026
HOUSING PRESERVATION DEVELOP1103/21/2026
J S WATERPROOFING LLC SUITE 2407/08/2026
GCC CONTRACTING GROUP403/21/2026
GOTHAM CONSTRUCTION403/21/2026
HAMILTON COMMERCIAL403/21/2026
GOTHAM REAL ESTATE MANAGERS203/21/2026
HAMILTON OWNERS203/21/2026
HPD203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SALAM ENTERPRISES403/21/2026
EDWARD F ZEVALLOS ARCHITECT403/21/2026
RAND ENGINEERING ARCHITECTURE403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPIRE SCAFFOLDING & HOISTGeneral Contractor607/08/2026
J&S WATERPROOFING LLCGeneral Contractor507/08/2026
GC LEADER CONSTRUCTION COGeneral Contractor303/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAND ENGINEERING & ARCHIT266209/08/2023
EDWARD F ZEVALLOS ARCHITE1025210/27/2021
Building Lifecycle
All (175)Filed (13)Permit Issued (10)Signed Off (5)Facade (FISP) (8)Violation (60)Inspection (3)Objection (47)Special Inspection (29)
11/17/2025
Violation issued (HPD, closed)
I
02/17/2025
Objection resolved — Addressed
02/12/2025
Special inspection requirement — Maintenance information
02/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
02/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
02/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
11/29/2024
Objection raised — Other
11/29/2024
Objection raised — Other
11/20/2024
Filed — Alteration CO
Convert existing retail store, "use group VI" to daycare nursery, occupancy group I-4, "use group III." Remove non-bearing as per plans, install new nonbearing partitions; new doors, .. Repair PVC flooring, replace missing ceiling tiles.
M01043428-S4
11/19/2024
Filed — Alteration CO
Convert existing retail store, "use group VI" to daycare nursery, occupancy group I-4, "use group III." Remove non-bearing as per plans, install new nonbearing partitions; new doors, .. Repair PVC flooring, replace missing ceiling tiles.
M01043428-S2
11/19/2024
Filed — Alteration CO
Convert existing retail store, "use group VI" to daycare nursery, occupancy group I-4, "use group III." Remove non-bearing as per plans, install new nonbearing partitions; new doors, .. Repair PVC flooring, replace missing ceiling tiles.
M01043428-S3
11/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
11/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
10/31/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/31/2024
Special inspection requirement — Post-installed Anchors
08/28/2024
Special inspection requirement — Lighting controls
OLUFEMI FALADE
08/28/2024
Special inspection requirement — Energy Code Compliance Inspections
OLUFEMI FALADE
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
08/27/2024
Objection resolved — Addressed
05/20/2024
Objection raised — Other
05/20/2024
Objection raised — Other
05/17/2024
Objection raised — Other
05/17/2024
Objection raised — Energy
05/17/2024
Objection raised — Other
05/17/2024
Objection raised — Other
05/17/2024
Objection raised — Other
05/17/2024
Objection raised — Other
05/17/2024
Objection raised — Other
05/17/2024
Objection raised — Other
05/17/2024
Objection raised — Other
05/17/2024
Objection raised — Other
05/17/2024
Objection raised — Other
05/17/2024
Objection raised — Other
05/17/2024
Objection raised — Other
05/17/2024
Objection raised — Other
05/17/2024
Objection raised — Other
05/17/2024
Objection raised — Other
05/17/2024
Objection raised — Other
05/17/2024
Objection raised — Other
05/17/2024
Objection raised — Other
05/08/2024
Filed — Alteration CO
Convert existing retail store, "use group VI" to daycare nursery, occupancy group I-4, "use group III." Remove non-bearing as per plans, install new nonbearing partitions; new doors, .. Repair PVC flooring, replace missing ceiling tiles.
M01043428-I1
Latest 60 of 175 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJ&S WATERPROOFING LLC06/10/2023
DOB NOWGeneral ConstructionSigned-offJ&S WATERPROOFING LLC09/08/2022
DOB NOWSupported ScaffoldSigned-offSPIRE SCAFFOLDING & HOIST04/29/2022
DOB NOWSidewalk ShedSigned-offSPIRE SCAFFOLDING & HOIST04/29/2022
DOB NOWProtection and Mechanical MethodsPermit IssuedJ&S WATERPROOFING LLC03/31/2022
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.03/08/2022
DOB NOWGeneral ConstructionSigned-offGC LEADER CONSTRUCTION CO02/17/2022
DOB NOWSidewalk ShedSigned-offSPIRE SCAFFOLDING & HOIST11/04/2021
DOB NOWSupported ScaffoldSigned-offSPIRE SCAFFOLDING & HOIST11/04/2021
DOB NOWGeneral ConstructionSigned-offJ&S WATERPROOFING LLC10/31/2021
BISEQISSUEDGCC CONTRACTING GROUP INC05/21/2013
BISOTISSUEDQUALITY BUILDING CONSTRUTION05/21/2013
BISEQISSUEDGCC CONTRACTING GROUP INC11/26/2012
BISPLISSUEDJAG PLBG & MECH INC03/21/2012
BIS—ISSUEDA.M.A HOLDINGS INC02/28/2012
BIS—ISSUEDA.M.A HOLDINGS INC02/28/2012
BIS—ISSUEDA.M.A HOLDINGS INC02/02/2012
BISEQISSUEDDUANE READE12/07/2011
BISMHISSUEDDUANE READE12/07/2011
BIS—ISSUEDNATIONAL MAINTENANCE INC04/28/2006
BIS—ISSUEDNATIONAL MAINTENANCE INC04/28/2006
BIS—ISSUEDNATIONAL MAINTENANCE INC04/28/2006
BISMHISSUEDGREAT NORTH INTERIORS05/11/2005
BISOTISSUEDGREAT NORTH INTERIORS05/11/2005
BISSPISSUEDASHLAR MECHANICAL CORP12/09/2003
BISEQISSUEDGOTHAM CONSTRUCTION CORP12/03/2003
BIS—ISSUEDGOTHAM CONSTRUCTION CORP12/03/2003
BIS—ISSUEDNY SIGN CITY INC10/06/2003
BIS—ISSUEDNY SIGN CITY INC10/06/2003
BISOTISSUEDDABOCO INC AND DUANE READE INC10/03/2003
BISBLISSUEDB H PLUMB HEAT CORP09/03/2003
BISSPISSUEDPACE PLBG CORP07/07/2003
BISEQISSUEDUNITED HOISTING CORP04/25/2003
BISEQISSUEDREGIONAL SCAFFOLD AND HOISTING04/24/2003
BIS—ISSUEDGOTHAM CONSTRUCTION CORP12/30/2002
BISEQISSUEDGOTHAM CONSTRUCTION CORP12/30/2002
BISEQISSUEDREGIONAL SCAFFOLD AND HOISTING12/11/2002
BISEQISSUEDUNITED HOISTING CORP10/24/2002
BISPLISSUEDCARDOZ CORP08/01/2002
BIS—ISSUEDGOTHAM CONSTRUCTION CORP06/21/2002
+ 12 more permits on file
2 projects · most recent 08/17/2022
General Wiring
FiledStatusContractorScope
08/17/2022CompleteTOP NOTCH ELECTRIC INCGeneral Wiring
11/18/2021CompleteNASH ELECTRIC SERVICES IN—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
11/28/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/28/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
02/12/2025Maintenance information—energy_progress
02/12/2025HVAC-R and service water heating system controls—energy_progress
02/12/2025HVAC-R and service water piping design and insulation—energy_progress
02/12/2025HVAC-R and service water heating equipment—energy_progress
11/04/2024Tenant Protection Plan Compliance—special
11/04/2024Tenant Protection Plan Compliance—special
10/31/2024Fire-Resistant Penetrations and Joints—special
10/31/2024Post-installed Anchors—special
08/28/2024Lighting controlsOLUFEMI FALADEenergy_progress
08/28/2024Energy Code Compliance InspectionsOLUFEMI FALADEprogress
04/30/2024Fire-Resistant Penetrations and Joints—special
09/11/2023MasonryYevgeniy Gurevichspecial
09/11/2023Structural Stability – Alterations of existing buildingsYevgeniy Gurevichspecial
09/11/2023Post-installed AnchorsYevgeniy Gurevichspecial
09/11/2023FinalYevgeniy Gurevichprogress
09/11/2023Energy Code Compliance InspectionsYevgeniy Gurevichprogress
09/11/2023Insulation placement and R valuesYevgeniy Gurevichenergy_progress
09/11/2023Air barrier - visual inspectionYevgeniy Gurevichenergy_progress
08/09/2023MasonryYevgeniy Gurevichspecial
08/09/2023Post-installed AnchorsYevgeniy Gurevichspecial
08/09/2023Structural Stability – Alterations of existing buildingsYevgeniy Gurevichspecial
08/09/2023Energy Code Compliance InspectionsYevgeniy Gurevichprogress
08/09/2023FinalYevgeniy Gurevichprogress
08/09/2023Air barrier - visual inspectionYevgeniy Gurevichenergy_progress
08/09/2023Insulation placement and R valuesYevgeniy Gurevichenergy_progress
Latest 25 of 29.
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/03/2026M00551038-I1Request digital key ↗
09/03/2026M00542091-P1Request digital key ↗
09/03/2026M00542091-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits18
▸BISWORK PERMIT APPLICATION10
05/22/2013140040685Open ↗
05/22/2013121542116Open ↗
11/26/2012140040685Open ↗
Showing 3 of 10 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
05/25/2021141002386Open ↗
02/06/2019123249797Open ↗
03/14/2013121542116Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/03/2026M00551038-I1Open ↗
09/03/2026M00542091-I1Open ↗
09/03/2026M00542091-P1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
04/08/2014121542116Open ↗
03/14/2013121542116Open ↗
12/02/2011120913315Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026M00542091-I1Open ↗
08/25/2026M00542091-I1Open ↗
08/25/2026M00542091-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026M00542091-I1Open ↗
08/25/2026M00542091-P1Open ↗
08/24/2026M00614715-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/25/2021141002386Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/26/2012140040685Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/26/2012140040685Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/26/2012140040685Open ↗
▸Trade Schedules & Equipment3
▸BISSELF-CERT PLUMBING NOTICE2
07/31/2012120897477Open ↗
07/02/2012120897477Open ↗
▸BISSCHEDULE B - PLUMBING1
11/17/2011120897477Open ↗
▸Safety & Tenant Protection10
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist8
09/03/2026M00551038-I1Open ↗
09/03/2026M00542091-P1Open ↗
09/03/2026M00542091-I1Open ↗
Showing 3 of 8 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
05/25/2021141002386Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026M01043428-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/03/2026M00542091-I1Open ↗
09/03/2026M00542091-P1Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/17/2011120897477Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/08/2014121542116Open ↗
03/14/2013121542116Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00542091-I1Open ↗
08/13/2026M00614675-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY1
11/22/2011120897477Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/25/2021141002386Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/08/2014121542116Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/25/2021141002386Open ↗
▸Approvals, Objections & Sign-offs14
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
09/03/2026M00542091-P1Open ↗
09/03/2026M00542091-I1Open ↗
08/13/2026M01043428-S4Open ↗
Showing 3 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
03/14/2013121542116Open ↗
12/02/2011120913315Open ↗
12/02/2011120913306Open ↗
Showing 3 of 5 on file for this type
▸BISSHED LETTER1
05/22/2013140040685Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/08/2012120913315Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
04/08/2014121542116Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
05/25/2021141002386Open ↗
02/06/2019123249797Open ↗
04/08/2014121542116Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET6
02/06/2019123249797Open ↗
03/14/2013121542116Open ↗
12/02/2011120913315Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
05/25/2021141002386Open ↗
11/26/2012140040685Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/27/2026M01043428-I1Open ↗