| Owner | Filings | Most Recent |
|---|---|---|
| Mag Partners | 28 | 09/13/2026 |
| McDonalds | 8 | 07/08/2026 |
| Mutual Redevelopment Houses | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Aaxd | 5 | 03/26/2026 |
| UG Engineering Services | 5 | 02/19/2026 |
| SBLM Architects | 2 | 02/18/2026 |
| Cookfox Architects | 8 | 02/04/2026 |
| Jaros Baum & Bolles | 13 | 01/30/2026 |
| FL&M Engineering Design & Inspection | 7 | 06/02/2025 |
| Rigid Structural Design | 2 | 05/07/2025 |
| Gga Studios | 1 | 04/01/2025 |
| Patuxent Engineering | 8 | 08/14/2024 |
| Paul Perdek, Prof. Engineering | 2 | 05/03/2024 |
| Howard Shapiro & Associates | 2 | 02/27/2024 |
| WSP | 5 | 12/08/2023 |
| Advance Design Group | 1 | 10/24/2023 |
| Philip Habib & Associates | 1 | 09/13/2023 |
| Ancora Engineering | 3 | 09/01/2023 |
| Mueser Rutledge Consulting Engineering | 3 | 03/02/2023 |
| G. Blinn Consulting | 1 | 03/11/2022 |
| Leon Skvirsky PE | 2 | 02/01/2018 |
| Joel Phagoo P.E | 2 | 11/02/2017 |
| Representative | Filings | Most Recent |
|---|---|---|
| Rigid Structural Design | 11 | 03/21/2026 |
| SBLM | 7 | 03/21/2026 |
| Patuxent Engineering | 14 | 03/21/2026 |
| Howard I Shapiro Associates | 4 | 03/21/2026 |
| Metropolis Group | 52 | 03/21/2026 |
| Green Studio | 4 | 03/21/2026 |
| A1 Expediting Service | 8 | 03/21/2026 |
| AE Design Solution | 2 | 03/21/2026 |
| Building Brothers | 4 | 03/21/2026 |
| Domani Consulting | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Urban Atelier Group | General Contractor | 22 | 07/08/2026 |
| Dynamic Installation | Scaffold | 16 | 07/08/2026 |
| Dynamic Hoisting Scaff | Scaffold | 15 | 07/08/2026 |
| Arsenal Scaffold | Scaffold | 12 | 07/08/2026 |
| TT Mechanical | Plumbing | 10 | 07/08/2026 |
| N.Y. Sign Art | Sign hanger | 5 | 07/08/2026 |
| Urban Atelier Group | Scaffold | 4 | 03/21/2026 |
| S&E Bridge & Scaffold | Scaffold | 4 | 03/21/2026 |
| TTM Group | Fire Protection | 3 | 07/08/2026 |
| R.C. Structures | Scaffold | 3 | 07/08/2026 |
| Balaton Consulting | Sign hanger | 2 | 07/08/2026 |
| Metro Partners Group | General Contractor | 2 | 04/09/2026 |
| Tri Borough Scaffolding | Scaffold | 2 | 04/09/2026 |
| Aqua Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Cma Plumbing & Heating | Fire Protection | 1 | 07/04/2026 |
| Solas Electrical | Electrical | 1 | 03/22/2026 |
| TTM Group | General Contractor | 1 | 03/22/2026 |
| Nash Electric Services | Electrical | 1 | 03/22/2026 |
| Titan Industrial Service | Scaffold | 1 | 04/09/2026 |
| TT Mechanical | General Contractor | 1 | 04/09/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Whitestone Associates Engineering | 8144 | 7 | 02/19/2026 |
| Delta Testing Labs | 687 | 24 | 02/04/2026 |
| Urban Integrations | 7993 | 1 | 08/06/2024 |
| Mueser Rutledge Consulting | 977 | 4 | 12/01/2023 |
| WSP USA | 1848 | 3 | 12/01/2023 |
| Socotec | 301 | 1 | 02/16/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sign | Permit Issued | Skanska Building | 03/27/2026 |
| DOB NOW | Sign | Permit Issued | Skanska Building | 03/27/2026 |
| DOB NOW | Sign | Permit Issued | Skanska Building | 03/27/2026 |
| DOB NOW | Sign | Permit Issued | Skanska Building | 03/27/2026 |
| DOB NOW | Sign | Permit Issued | Skanska Building | 03/27/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Metro Partners Group | 03/02/2026 |
| DOB NOW | Plumbing | Signed-off | Aqua Plumbing & Heating | 02/17/2026 |
| DOB NOW | Sprinklers | Signed-off | Cma Plumbing & Heating | 02/11/2026 |
| DOB NOW | General Construction | Signed-off | Metro Partners Group | 02/10/2026 |
| DOB NOW | Suspended Scaffold | Signed-off | New Roc Contracting | 12/16/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Urban Atelier Group | 08/21/2025 |
| DOB NOW | Curb Cut | Signed-off | Urban Atelier Group | 06/26/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Dynamic Hoisting Scaff | 05/19/2025 |
| DOB NOW | Construction Fence | Signed-off | Arsenal Scaffold | 05/06/2025 |
| DOB NOW | General Construction | Signed-off | Urban Atelier Group | 04/16/2025 |
| DOB NOW | Standpipe | Signed-off | TT Mechanical | 04/07/2025 |
| DOB NOW | Supported Scaffold | Signed-off | Arsenal Scaffold | 03/20/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Arsenal Scaffold | 03/20/2025 |
| DOB NOW | General Construction | Permit Issued | Urban Atelier Group | 01/22/2025 |
| DOB NOW | Support of Excavation | Signed-off | Urban Atelier Group | 01/22/2025 |
| DOB NOW | Standpipe | Signed-off | TT Mechanical | 01/16/2025 |
| DOB NOW | Sprinklers | Signed-off | TTM Group | 01/16/2025 |
| DOB NOW | Construction Fence | Signed-off | Arsenal Scaffold | 01/13/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Arsenal Scaffold | 01/13/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | Arsenal Scaffold | 01/13/2025 |
| DOB NOW | Plumbing | Signed-off | TT Mechanical | 01/06/2025 |
| DOB NOW | Support of Excavation | Signed-off | Urban Atelier Group | 12/12/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Urban Atelier Group | 12/12/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | New Roc Contracting | 12/11/2024 |
| DOB NOW | General Construction | Permit Issued | Urban Atelier Group | 12/11/2024 |
| DOB NOW | Support of Excavation | Signed-off | Urban Atelier Group | 11/08/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | New Roc Contracting | 08/07/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Dynamic Hoisting Scaff | 08/06/2024 |
| DOB NOW | Supported Scaffold | Signed-off | Dynamic Hoisting Scaff | 08/06/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Dynamic Hoisting Scaff | 08/06/2024 |
| DOB NOW | Standpipe | Signed-off | TT Mechanical | 07/30/2024 |
| DOB NOW | Standpipe | Signed-off | TTM Group | 07/27/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Dynamic Hoisting Scaff | 06/03/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | New Roc Contracting | 05/30/2024 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Dynamic Hoisting Scaff | 05/30/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 02/04/2026 | Signed-off | Urban Atelier Group | Air Conditioning Systems, Associated Ducts and Piping, Ventilation Systems | Cooling Lennox VPB096H4M-36 96,000 BTU · Fan Coil Indoor ×45 VPB072H4M-36 72,000 BTU ×12 VPB120H4M-36 120,000 BTU · Rooftop Unit ×9 VPB144H4M-36 144,000 BTU · Rooftop Unit ×6 VPC018H4M-3P 18,000 BTU · Fan Coil Indoor ×6 VRB144H4M-3G 144,000 BTU · Rooftop Unit ×6 VRB192H4M-3G 192,000 BTU · Rooftop Unit ×6 MPC009S4S-1P 9,000 BTU · Rooftop Unit ×3 MPC012S4S-1P 12,000 BTU · Rooftop Unit ×3 MPC018S4S-1P 16,000 BTU · Rooftop Unit ×3 MPC036S4S-1P 36,000 BTU · Rooftop Unit ×3 VPB072H4M-3G 72,000 BTU · Rooftop Unit ×3 Daikin RXYQ120AAYDA 121,200 BTU · Vrf Outdoor ×6 RXYQ168AAYDA 165,600 BTU · Vrf Outdoor ×6 RXYQ96XAYDA 5,827 CFM · Vrf Outdoor ×21 RXYQ72XAYDA 5,544 CFM · Vrf Outdoor ×15 REYQ96XAYDB 7,989 CFM · Vrf Outdoor ×6 RXYQ120XAYDA 6,286 CFM · Vrf Outdoor ×4 RXYQ144XAYDA 8,228 CFM · Vrf Outdoor ×4 REYQ144XATJB 9,480 CFM · Vrf Outdoor ×1 REYQ72XATJB 7,283 CFM · Vrf Outdoor ×1 Aaon CFA-031-D-A-3-GJ00K:0-00-00-00-AN0-1-JE00-00H0J00-00000DB 293,000 BTU · Rooftop Unit ×1 CFA-031-D-A-3-GJ00K:0-00-00-00-AN0-1-JE0A-00H0J00-00000DB 293,000 BTU ×2 York YMAE0140 816,000 BTU · Chiller ×3 Aermec NYK 0550 68 tons · Heat Pump Outdoor ×1 Ventilation Swegon N/A 5,200 CFM ×10 |
| 06/25/2025 | Signed-off | Urban Atelier Group | Air Conditioning Systems | Cooling Lennox VPB072H4M-36 72,000 BTU ×3 VPB120H4M-36 120,000 BTU · Rooftop Unit ×2 VPB144H4M-36 144,000 BTU · Rooftop Unit ×2 VPB096H4M-36 96,000 BTU · Fan Coil Indoor ×1 |
| — | — | — | Air Conditioning Systems | Cooling Lennox VPB072H4M-36 72,000 BTU ×3 VPB120H4M-36 120,000 BTU · Rooftop Unit ×2 VPB144H4M-36 144,000 BTU · Rooftop Unit ×2 VPB096H4M-36 96,000 BTU · Fan Coil Indoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/19/2026 | Signed-off | Cma Plumbing & Heating | — |
| 02/04/2026 | Signed-off | TTM Group | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/19/2026 | Signed-off | Aqua Plumbing & Heating | Water/Sanitary |
| 02/04/2026 | Signed-off | TT Mechanical | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/08/2026 | Complete | Electric Essentials | General Wiring |
| 07/20/2026 | Permit Issued | Spectrum on Broadway-Electric | — |
| 07/20/2026 | Permit Issued | Spectrum on Broadway-Electric | — |
| 07/20/2026 | Permit Issued | Spectrum on Broadway-Electric | — |
| 04/18/2024 | Permit Issued | Horsepower Electric | General Wiring |
| 02/06/2024 | Complete | Robert B Samuels | General Wiring |
| 01/18/2024 | Complete | Solas Electrical | — |
| 01/18/2024 | Complete | Solas Electrical | — |
| 01/10/2024 | Complete | Nash Electric Services | — |
| 01/10/2024 | Complete | Nash Electric Services | — |
| 06/06/2023 | Complete | Nash Electric Services | — |
| 01/26/2018 | Permit Issued | City Electrical Sign Erectors | — |
| 01/26/2018 | Permit Issued | City Electrical Sign Erectors | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/04/2026 | Signed-off | Urban Atelier Group | Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/04/2026 | Signed-off | Urban Atelier Group | Fence |
| 11/02/2017 | Permit Issued | Dynamic Installation | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/18/2026 | Signed-off | Metro Partners Group | Tenant Protection Plan 72 Hour |
| 02/04/2026 | Signed-off | Urban Atelier Group | Earthwork |
| Date | Type | Result | Report |
|---|---|---|---|
| 03/23/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/02/2026 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 12/03/2025 | Fail-Final Curb Cut Non-Directive 14 | Fail | View ↗ |
| 09/29/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 09/22/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 09/08/2025 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 08/27/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/20/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/02/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/30/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 06/24/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/10/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 06/02/2025 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 06/02/2025 | Pass-Final SP - Up to 9 Requested Floors | Pass | View ↗ |
| 05/29/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/29/2025 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 05/22/2025 | Certified StandPipe-Fire Pump (SD)-Fire Pump Test | Certified | View ↗ |
| 05/22/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 05/19/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 12/18/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/21/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 11/04/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/04/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/09/2024 | Certified StandPipe - SD - Alarm Sys 64/09 - Finish | Certified | View ↗ |
| 05/09/2024 | Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet) | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 03/18/2026 | Final | DAMIR RAHMAN | progress |
| 03/18/2026 | Final | DAMIR RAHMAN | progress |
| 03/18/2026 | Final | DAMIR RAHMAN | progress |
| 02/23/2026 | Fire-Resistance Rated Construction | Mudar Khantamr | progress |
| 02/23/2026 | Final | Mudar Khantamr | progress |
| 02/23/2026 | Fire-Resistant Penetrations and Joints | Mudar Khantamr | special |
| 02/23/2026 | Tenant Protection Plan Compliance | Mudar Khantamr | special |
| 02/20/2026 | Tenant Protection Plan Compliance | Mudar Khantamr | special |
| 02/20/2026 | Sprinkler Systems | Mudar Khantamr | special |
| 02/17/2026 | Air barrier - visual inspection | Jennifer Sze | energy_progress |
| 02/17/2026 | Exterior Insulation and Finish Systems (EIFS) | Jennifer Sze | special |
| 02/17/2026 | Fire-Resistant Penetrations and Joints | RICHARD GREENWALD | special |
| 02/17/2026 | Energy Code Compliance Inspections | RICHARD GREENWALD | progress |
| 02/17/2026 | Fire-Resistance Rated Construction | RICHARD GREENWALD | progress |
| 02/17/2026 | Fenestration air leakage | Jennifer Sze | energy_progress |
| 02/17/2026 | Vestibules | Jennifer Sze | energy_progress |
| 02/17/2026 | Fenestration and door U-factor and product ratings | Jennifer Sze | energy_progress |
| 02/17/2026 | Fenestration areas | Jennifer Sze | energy_progress |
| 02/17/2026 | Air barrier continuity plan testing | Jennifer Sze | energy_progress |
| 02/17/2026 | Insulation placement and R values | Jennifer Sze | energy_progress |
| 02/17/2026 | Protection of exposed foundation insulation | RICHARD GREENWALD | energy_progress |
| 02/16/2026 | Tenant Protection Plan Compliance | — | special |
| 02/16/2026 | Post-installed Anchors | Mudar Khantamr | special |
| 02/16/2026 | Fire-Resistant Penetrations and Joints | Mudar Khantamr | special |
| 02/13/2026 | Metering | RICHARD GREENWALD | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Lidl | Retail | Cellar, Floor 1, Roof | Project M01374009 Project M01374030 Project M01374040 Project M01374047 Project M01355138 Project M01356110 Project M01356114 |
| Met Fresh Supermarket | Retail | Floor 1 | Project M00983037 |
| McDonald's USA | Restaurant / Food Service | Floor 1 | Project M00012344 Project M00012348 |