← Back
BuildNYC
Elevator cooperative
336 CENTRAL PARK WEST
MANHATTAN · BIN 1031646
💬 Discuss this project
1929Year Built
15Stories
D4Building Class
R10AZoning
202,485 sfGross Floor Area
97Units
LL97 CoveredRent Stabilized0 Active Violations 1 old, status unconfirmed ▸FISP: SAFE
Elevator cooperative · Owner of record: 336 Tenants · 15,750 sf lot · 12.86 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsTwo Charlton Owners CORP.4 filings
RoofTwo Charlton Owners CORP.2p · 3 filings · 14 docs
BulkheadTwo Charlton Owners CORP.1p · 1 filing · 6 docs
Floor 16Unit 16C, Unit 16D, Unit 16E +1Under Construction7p · 2 filings · 14 docs
Floor 15Unit 15B, Unit 15D2 filings · 14 docs
Floor 14Unit 14A, Unit 14E, Unit 14F1 filing
Floor 13
Floor 12Unit 12E, Unit 12F1 filing · 7 docs
Floor 11Unit 11E, Unit 11F1 filing · 14 docs
Floor 10
Floor 9Unit 9A, Unit 9F
Floor 8Unit 8E2p · 2 filings · 8 docs
Floor 7
Floor 6Unit 6B
Floor 5Unit 5B1 filing
Floor 4
Floor 3Unit 3B, Unit 3E2 filings · 14 docs
Floor 2Unit 2A, Unit 2E
Floor 1Unit 1C, Unit 1D, Unit 1E2p · 4 filings
CellarOrsid Realty CORP.1 filing
Site & exteriorTwo Charlton Owners CORP.6 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
336 Tenants13103/22/2026
Two Charlton Owners3207/08/2026
336 Central Park Tenants303/21/2026
Misrad Associates203/21/2026
336 Central Park West Owners203/21/2026
NYC Department of Housing Preservation and Development103/21/2026
Owner Occupant103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Platinum Services NY1003/21/2026
Meszaros Engineering2803/21/2026
Midtown Preservation Architecture803/21/2026
Green Light Expediting403/21/2026
AE Design Solution2803/21/2026
NYC Approvals403/21/2026
J A Expediting203/21/2026
Socotec603/21/2026
Municipal Building Consultants303/21/2026
Premier Expediting Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Spring ScaffoldingScaffold2107/08/2026
DNA ContractingGeneral Contractor903/21/2026
Platinum Services NYScaffold807/08/2026
Juno ContractingGeneral Contractor707/08/2026
DBF Studiospecialty_contractor507/08/2026
Tower ServicesGeneral Contractor404/09/2026
Empire NY InstallationsScaffold407/08/2026
DBF StudioGeneral Contractor303/21/2026
Outdoor InstallationsGeneral Contractor303/21/2026
Juno ContractingScaffold307/08/2026
Adriatic Plumbing & Heatingspecialty_contractor307/08/2026
Best Interiors ManagementGeneral Contractor203/21/2026
Golden I ConstructionGeneral Contractor203/21/2026
Renwood InteriorsGeneral Contractor208/27/2026
Fiu Corp Dba Fiu ElectricElectrical203/22/2026
ZMK ConstructionGeneral Contractor203/21/2026
Demari ServicesGeneral Contractor204/09/2026
Paul Quinn Plumbing & HeatingPlumbing203/21/2026
Morgan Construction NYGeneral Contractor103/21/2026
Tade ConstructionGeneral Contractor103/21/2026
Trojan InteriorsGeneral Contractor107/08/2026
William PasterGeneral Contractor103/21/2026
Zoric ConstructionGeneral Contractor103/21/2026
AMNPlumbing103/21/2026
Carreras Home ImprovementPlumbing103/21/2026
CC Controlled PlumbingPlumbing103/21/2026
DonatoPlumbing103/21/2026
Edgecombe PLG HeatingPlumbing103/21/2026
Forte Express P HPlumbing103/21/2026
Georges MechanicalPlumbing103/21/2026
Go Pro Plumbing & Heating Co IPlumbing103/21/2026
Jack LichtenbergerPlumbing103/21/2026
Leakless PlumbingPlumbing103/21/2026
Mad Plumbing & HeatingPlumbing103/21/2026
Ma PlumbingPlumbing103/21/2026
Mario MoramaroPlumbing103/21/2026
Mike Dimaggio Plumbing & HeatingPlumbing103/21/2026
N Pagano Plumbing & HeatingPlumbing103/21/2026
Rentom GroupPlumbing103/21/2026
Iceberg Mechanicalspecialty_contractor107/08/2026
Trojan Interiorsspecialty_contractor107/08/2026
Adriatic Plumbing & HeatingPlumbing107/08/2026
Astoria P & HPlumbing107/08/2026
Crossfield Plumbing & HeatingPlumbing107/08/2026
Hydrokinetic Plumbing & Heating IPlumbing107/01/2026
James Simpson & SonPlumbing107/08/2026
Monarch Plumbing & HeatingPlumbing107/08/2026
P.S.I. MechanicalPlumbing107/08/2026
Ascuatech ElectricalElectrical103/22/2026
VSP MechanicalPlumbing107/08/2026
E & M Electrical NYElectrical103/21/2026
A D Winston ServiceGeneral Contractor103/21/2026
Belmont ElectricalGeneral Contractor103/21/2026
BP AirconditioningGeneral Contractor103/21/2026
Carreras Home ImprovementGeneral Contractor103/21/2026
C C Controlled CombustionGeneral Contractor103/21/2026
East Side Design & BuildGeneral Contractor107/08/2026
Hamilton Air CompanyGeneral Contractor103/21/2026
In House GroupGeneral Contractor103/21/2026
JB & JB ConstructionGeneral Contractor107/08/2026
J EverittGeneral Contractor103/21/2026
John Hummel Custom BLDGeneral Contractor103/21/2026
Louis TurchioeGeneral Contractor103/21/2026
Manhattanites ConstructionGeneral Contractor104/09/2026
AbrtdeGeneral Contractor112/30/2003
Aerial Design Build ServicesGeneral Contractor208/08/2018
A.M.K. ContractingGeneral Contractor108/24/2017
Aqueduct MechanicalPlumbing108/23/2018
Blue Water ConstructionGeneral Contractor307/14/2017
Brighton Contractors NYCGeneral Contractor106/17/2011
BSDGeneral Contractor107/31/2008
Buski Trade DevelopmentGeneral Contractor107/06/2017
Carrera's Home ImprovementGeneral Contractor101/26/2006
CC Controlled CombustionGeneral Contractor112/24/1998
Ceprine ConstructionGeneral Contractor105/17/2017
Coriolis EffectPlumbing109/01/2005
CSC RenoGeneral Contractor111/27/2020
D. EdgarGeneral Contractor205/12/2006
Dyckman Plumbing and HeatingPlumbing106/23/2011
Effective PLPlumbing112/18/1996
Effective PlumbingPlumbing106/21/2000
George's MechanicalPlumbing102/27/2004
Ghi Construction GroupGeneral Contractor109/12/2008
Hadley-Brickhouse AccessibleGeneral Contractor110/17/1997
Harvard Plumbing & HeatingPlumbing207/27/2012
Hite InteriorsGeneral Contractor109/14/2005
Jam ServicePlumbing106/06/2006
JFW ContracringGeneral Contractor104/27/1998
J.h.murrayGeneral Contractor107/05/2000
J & M IndustriesGeneral Contractor206/11/2009
Magnum Plumbing & HeatingPlumbing108/12/2008
Mark RemodelingGeneral Contractor110/20/2005
Mark Snyder InteriorGeneral Contractor109/03/1999
Mge DevelopmentGeneral Contractor106/29/2011
Michael Dimaggio Plumbing and HeatingPlumbing111/14/2001
Orion Plumbing & HeatingPlumbing112/12/2013
Outdoor InstallationGeneral Contractor111/30/2006
Poler ContractingGeneral Contractor112/10/2009
Preferred MechanicalPlumbing105/07/1996
Psec Plumbing & HeatingPlumbing109/17/2009
Psec Plumbing & HeatingPlumbing109/20/2005
QMB Plumbing & HeatingPlumbing109/01/2009
Rakus PlumbingPlumbing112/14/2005
Reyvin Plumbing & HeatingPlumbing108/24/2017
Salmark ConstructionGeneral Contractor105/31/2006
Skyline RestorationGeneral Contractor106/03/2024
Spring ScaffoldingGeneral Contractor107/21/2003
Steel InsustriesGeneral Contractor311/19/2010
Tade ConstructionGeneral Contractor105/12/2003
Tade XonstructionGeneral Contractor108/29/2001
T.B.R.General Contractor211/24/1998
TGN ContractingGeneral Contractor109/24/2004
Tiago & Sons EnterprisesGeneral Contractor109/21/2012
Top Plumbing GroupPlumbing107/31/2018
Viper InteriorsGeneral Contractor106/17/2005
Wyrne Plumbing & HeatingPlumbing109/19/2008
ZMK GroupGeneral Contractor106/15/2000
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ace Structural Engineering496205/13/2026
Wavic Engineering1733207/21/2025
Leo Y Lee Associates2481203/27/2025
Blockwork Design Build8258301/16/2025
Konoski Engineering9111107/23/2024
Midtown Preservation2634407/23/2024
Chen Engineering Services1826101/02/2024
Meszaros Engineering9631410/12/2023
Yao W Guo Architect1754105/23/2023
Richard H. Balser Engineering3028210/21/2022
Richard B. Kornblau, AIA3208210/21/2022
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 10, sub-cycle B)
The filing window opened 02/21/2026. 1 Cycle 10 filing on record, latest 04/13/2026, status Swarmp
10/02/2026
Filed — Alteration
Renovation of #3B on 3rd floor, partition work as per plan. No change in use, occupancy or exit.
M01398814-S1
09/01/2026
Objection resolved — Addressed
08/31/2026
Signed off — Alteration
DEMOLISH AND CONSTRUCT INTERIOR PARTITIONS, CEILINGS AND DOORSAS PER PLANS. NO CHANGE TO USE, BULK, AREA OR EGRESS.
M01050280-S2
08/27/2026
Objection raised — Other
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedRenwood Interiors08/26/2026
DOB NOWPlumbingPermit IssuedHydrokinetic Plumbing & Heating I06/29/2026
DOB NOWGeneral ConstructionPermit IssuedRenwood Interiors06/26/2026
DOB NOWSidewalk ShedSigned-offEmpire NY Installations I09/26/2025
DOB NOWSupported ScaffoldSigned-offEmpire NY Installations I09/25/2025
DOB NOWPlumbingSigned-offMonarch Plumbing & Heating08/01/2025
DOB NOWGeneral ConstructionSigned-offManhattanites Construction07/31/2025
DOB NOWGeneral ConstructionSigned-offTower Services03/27/2025
DOB NOWGeneral ConstructionSigned-offDemari Services03/25/2025
DOB NOWGeneral ConstructionSigned-offTower Services02/24/2025
DOB NOWGeneral ConstructionSigned-offTower Services01/31/2025
DOB NOWMechanical SystemsSigned-offIceberg Mechanical12/31/2024
DOB NOWGeneral ConstructionSigned-offDemari Services11/19/2024
DOB NOWSuspended ScaffoldPermit IssuedDemari Services10/07/2024
DOB NOWSupported ScaffoldSigned-offEmpire NY Installations I10/07/2024
DOB NOWSidewalk ShedSigned-offEmpire NY Installations I10/01/2024
DOB NOWPlumbingSigned-offP.S.I. Mechanical07/23/2024
DOB NOWGeneral ConstructionSigned-offTrojan Interiors07/16/2024
DOB NOWMechanical SystemsSigned-offTrojan Interiors07/12/2024
DOB NOWGeneral ConstructionSigned-offJuno Contracting04/15/2024
DOB NOWSidewalk ShedSigned-offPlatinum Services NY03/07/2024
DOB NOWStructuralSigned-offJuno Contracting02/23/2024
DOB NOWSuspended ScaffoldPermit IssuedJuno Contracting01/10/2024
DOB NOWSupported ScaffoldSigned-offPlatinum Services NY09/07/2023
DOB NOWGeneral ConstructionSigned-offJB & JB Construction07/11/2023
DOB NOWPlumbingSigned-offAstoria P & H06/09/2023
DOB NOWGeneral ConstructionSigned-offEast Side Design & Build06/09/2023
DOB NOWGeneral ConstructionSigned-offJuno Contracting03/31/2023
DOB NOWSupported ScaffoldPermit IssuedJuno Contracting03/17/2023
DOB NOWSidewalk ShedSigned-offPlatinum Services NY03/16/2023
DOB NOWGeneral ConstructionSigned-offAdriatic Plumbing Heating01/11/2023
DOB NOWPlumbingSigned-offAdriatic Plumbing & Heating01/09/2023
DOB NOWGeneral ConstructionSigned-offDBF Studio01/04/2023
DOB NOWGeneral ConstructionSigned-offDBF Studio10/14/2022
DOB NOWPlumbingSigned-offEmr Mechanical04/20/2022
DOB NOWMechanical SystemsSigned-offDBF Studio04/11/2022
DOB NOWGeneral ConstructionSigned-offDBF Studio04/11/2022
DOB NOWGeneral ConstructionSigned-offAdriatic Plumbing Heating02/10/2022
DOB NOWPlumbingSigned-offKMB Construction Services02/06/2022
DOB NOWGeneral ConstructionSigned-offJuno Contracting01/27/2022
+ 60 more permits on file
1 project · most recent 01/16/2025
Air Conditioning Systems
FiledStatusContractorScope
01/16/2025Signed-offTrojan InteriorsAir Conditioning Systems
5 projects · most recent 10/02/2026
Gas Water/Sanitary
FiledStatusContractorScope
10/02/2026——Gas, Water/Sanitary
05/13/2026Permit IssuedHydrokinetic Plumbing & Heating IGas, Water/Sanitary
07/21/2025Signed-offMonarch Plumbing & HeatingGas, Water/Sanitary
01/16/2025Signed-offP.S.I. MechanicalGas, Water/Sanitary
06/16/2021Signed-offJames Simpson & SonGas, Water/Sanitary
22 projects · most recent 10/07/2026
General Wiring Lighting
FiledStatusContractorScope
10/07/2026CompleteApollo Electric USA—
08/26/2026Permit IssuedCentury ElectricGeneral Wiring
06/23/2026Permit IssuedEis Electric Corp DbaGeneral Wiring
08/05/2025CompleteE & M Electrical NYGeneral Wiring
10/25/2024CompleteApollo Electric USA—
09/23/2024CompleteMega Electrical Contracting—
07/17/2024CompleteCresco ElectricalGeneral Wiring
12/27/2023CompleteFiu Corp Dba Fiu ElectricGeneral Wiring
12/06/2022CompleteLaredo Electric—
10/27/2021CompleteIlluminous Electric—
10/13/2021CompleteAscuatech Electrical—
04/02/2021CompleteGsa ElectricGeneral Wiring
02/08/2021CompleteAllbright ElectricGeneral Wiring
11/30/2020CompleteGoodall Electric—
08/10/2020CompleteBelmont Electrical—
2 projects · most recent 09/20/2023
Scaffold Sidewalk Shed
FiledStatusContractorScope
09/20/2023Permit IssuedJuno ContractingScaffold
01/26/2018Permit IssuedSpring ScaffoldingSidewalk Shed
1 project · most recent 07/21/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/21/2025Signed-offMonarch Plumbing & HeatingTenant Protection Plan 72 Hour
2 projects · most recent 03/27/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
03/27/2025Permit IssuedDemari ServicesSuspended Scaffold (SC)
12/27/2023Permit IssuedJuno ContractingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 16
DateTypeResultReport
08/14/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/01/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/01/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/16/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/05/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/10/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/02/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/26/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/07/2022Pass-Final PL - More than 10 Requested FloorsPassView ↗
03/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
05/07/2026Final—progress
04/23/2026Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
04/23/2026Post-installed AnchorsANTHONY UGBEBORspecial
04/23/2026Energy Code Compliance InspectionsMARY CHANDRAHASANprogress
04/23/2026Fire-Resistance Rated ConstructionMARY CHANDRAHASANprogress
04/23/2026HVAC-R and service water piping design and insulationANTHONY UGBEBORenergy_progress
04/23/2026Fire-Resistant Penetrations and JointsANTHONY UGBEBORspecial
04/23/2026Energy Code Compliance InspectionsANTHONY UGBEBORprogress
04/23/2026Lighting controlsMARY CHANDRAHASANenergy_progress
04/23/2026Lighting in dwelling unitsMARY CHANDRAHASANenergy_progress
03/31/2026FinalMARY CHANDRAHASANprogress
07/03/2025Fire-Resistant Penetrations and JointsDARIUSZ LUCZAKspecial
06/25/2025Fire-Resistant Penetrations and JointsDARIUSZ LUCZAKspecial
06/25/2025Lighting in dwelling unitsDARIUSZ LUCZAKenergy_progress
06/25/2025Energy Code Compliance InspectionsDARIUSZ LUCZAKprogress
06/25/2025Finalisadora acostaprogress
06/25/2025Post-installed AnchorsDARIUSZ LUCZAKspecial
03/26/2025Structural Stability – Alterations of existing buildingsLeo Leespecial
03/26/2025Post-installed AnchorsLeo Leespecial
03/26/2025Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
01/21/2025Fire-Resistant Penetrations and JointsSteven Cummingsspecial
01/15/2025Fire-Resistant Penetrations and JointsSteven Cummingsspecial
07/17/2024Tenant Protection Plan ComplianceDennis Melespecial
07/08/2024HVAC-R and service water piping design and insulationchristopher konoskienergy_progress
07/08/2024Finalchristopher konoskiprogress
Latest 25 of 81.
1,187 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account