7 Open Violations 5 unresolved · 2 paperwork only ▸
Elevator apt, fireproof with stores · Owner of record: BG JUNCTION REALTY, LLC · 46,326 sf lot · 2.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipment
Roof8p · 2 filings · 10 docs
Floor 31p · 1 filing · 4 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKYLINE SCAFFOLDING GROUP2407/08/2026
34-20 JUNCTION DM2107/08/2026
BOGOPA SERVICE1403/22/2026
NY DEVELOPERS & MANAGEMEN1203/22/2026
NY DEVELOPERS403/22/2026
LEFRAK PROPERTY MANAGEMENT203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/06/2020$21.0M—HARTFORD LEASING LIMITED LIABILITY COMPANY → BG JUNCTION REALTY, LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RIGID STRUCTURAL DESIGN, LLC1108/18/2025
PLAN B ENGINEERING302/05/2025
KZ ENGINEERING, P.C105/13/2024
PAUL PERDEK, PROF. ENG. PLLC202/05/2024
AMM ENGINEERING PC101/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC2203/21/2026
A1 EXPEDITING SERVICE603/21/2026
AE DESIGN SOLUTION403/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY DEVELOPERS & MANAGEMENTGeneral Contractor1307/08/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor1107/08/2026
TURNER CONSTRUCTION COMPANYGeneral Contractor407/08/2026
LINE VENTURE GROUP LLCGeneral Contractor303/21/2026
REED DR. CONSTRUCTION CORGeneral Contractor303/21/2026
FIRST QUALITY ELECL LLCElectrical203/22/2026
FQE ELECTRIC LLCElectrical203/22/2026
P.H. WORKS INCPlumbing107/08/2026
SAFETY FIRE SPRINKLER CORPFire Protection107/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor107/08/2026
ABRAHAM FRIEDElectrical103/21/2026
Building Lifecycle
All (83)Filed (18)Permit Issued (23)Signed Off (8)Violation (23)Inspection (5)Objection (2)Special Inspection (1)Tax Incentive (3)
08/10/2026
Signed off — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01030133-I1
05/11/2026
Violation issued (HPD, closed)
A
04/15/2026
421-a(16) construction completed
02/16/2026
Signed off — Alteration
Installation of a temporary roof protection and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
Q01133924-I1
02/16/2026
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01133956-I1
02/16/2026
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01134001-I1
01/09/2026
Signed off — Alteration
EQUIPMENT USE: DUAL PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. CAR # 1 SHALL BE 7000# & CAR # 2 SHALL BE 6604# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEVATOR APPL SUBMITTED SEP.
Q01152446-I1
01/06/2026
Signed off — Alteration
Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
Q01134025-I1
12/17/2025
Permit issued — General Construction
Q01288646-I1-GC
11/12/2025
Permit issued — Supported Scaffold
Q01134001-I1-SF
11/05/2025
Permit issued — Protection and Mechanical Methods
Q01133924-I1-PMM
10/31/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/28/2025
Permit issued — Sidewalk Shed
Q01133956-I1-SH
10/22/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
10/04/2025
Violation issued (ECB, closed)
Unknown
10/01/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
09/25/2025
Permit issued — Curb Cut
Q00528155-Z5-CC
08/18/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01133956-P3
07/28/2025
Violation issued (ECB, closed)
Construction
07/28/2025
Violation issued (ECB, closed)
Construction
07/28/2025
Violation issued (ECB, closed)
Unknown
07/25/2025
Permit issued — Boiler Equipment
Q00528155-Z2-BE
07/16/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01134001-P2
06/12/2025
Filed — Alteration
Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
Q01134025-P1
06/11/2025
Violation issued (ECB, closed)
Construction
05/20/2025
Permit issued — Construction Fence
Q01030133-I1-FN
05/15/2025
Permit issued — Protection and Mechanical Methods
Q01152446-I1-PMM
04/21/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01134001-P1
04/10/2025
Violation issued (ECB, closed)
Construction
04/08/2025
Permit issued — Foundation
Q00528155-S2-FO
04/08/2025
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
04/08/2025
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
03/11/2025
Violation issued (ECB, closed)
Construction
03/11/2025
Violation issued (ECB, closed)
Unknown
02/24/2025
Filed — Alteration
Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
Q01134025-I1
02/24/2025
Permit issued — Protection and Mechanical Methods
Q01134025-I1-PMM
02/18/2025
Permit issued — Standpipe
Q00528155-Z1-EW-SD
02/05/2025
Filed — Alteration
EQUIPMENT USE: DUAL PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. CAR # 1 SHALL BE 7000# & CAR # 2 SHALL BE 6604# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEVATOR APPL SUBMITTED SEP.
Q01152446-P2
01/28/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01133956-P2
01/13/2025
Filed — Alteration
EQUIPMENT USE: DUAL PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. CAR # 1 SHALL BE 7000# & CAR # 2 SHALL BE 6604# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEVATOR APPL SUBMITTED SEP.
Q01152446-P1
01/09/2025
Filed — Alteration
Installation of a temporary roof protection and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
Q01133924-P1
12/11/2024
Permit issued — Protection and Mechanical Methods
Q01152446-I1-PMM
12/10/2024
Filed — Alteration
EQUIPMENT USE: DUAL PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. CAR # 1 SHALL BE 7000# & CAR # 2 SHALL BE 6604# CAPACITY. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP. ELEVATOR APPL SUBMITTED SEP.
Q01152446-I1
12/04/2024
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01133956-P1
11/18/2024
Permit issued — Supported Scaffold
Q01134001-I1-SF
11/12/2024
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01134001-I1
11/08/2024
Permit issued — Sidewalk Shed
Q01133956-I1-SH
11/05/2024
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01133956-I1
11/04/2024
Filed — Alteration
Installation of a temporary roof protection and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
Q01133924-I1
11/04/2024
Permit issued — Protection and Mechanical Methods
Q01133924-I1-PMM
09/05/2024
421-a(16) registration filed
08/12/2024
Violation issued (ECB, closed)
Construction
08/12/2024
Violation issued (ECB, closed)
Unknown
08/12/2024
Violation issued (ECB, closed)
Construction
08/12/2024
Violation issued (ECB, closed)
Construction
05/30/2024
Permit issued — Foundation
Q00528155-S2-FO
05/13/2024
Filed — Alteration
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q01030133-I1
05/13/2024
Permit issued — Construction Fence
Q01030133-I1-FN
04/19/2024
Permit issued — Foundation
Q00528155-S2-FO
04/02/2024
Signed off — Alteration
Q00993326-I1
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offLINE VENTURE GROUP LLC12/17/2025
DOB NOWSupported ScaffoldSigned-offSKYLINE SCAFFOLDING GROUP11/12/2025
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP11/05/2025
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP10/28/2025
DOB NOWCurb CutSigned-offNY DEVELOPERS & MANAGEMEN09/25/2025
DOB NOWBoiler EquipmentSigned-offP.H. WORKS INC07/25/2025
DOB NOWConstruction FenceSigned-offNY DEVELOPERS & MANAGEMEN05/20/2025
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/15/2025
DOB NOWFoundationSigned-offNY DEVELOPERS & MANAGEMEN04/08/2025
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP02/24/2025
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP02/18/2025
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP12/11/2024
DOB NOWSupported ScaffoldSigned-offSKYLINE SCAFFOLDING GROUP11/18/2024
DOB NOWSidewalk ShedSigned-offSKYLINE SCAFFOLDING GROUP11/08/2024
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP11/04/2024
DOB NOWFoundationSigned-offNY DEVELOPERS & MANAGEMEN05/30/2024
DOB NOWConstruction FenceSigned-offNY DEVELOPERS & MANAGEMEN05/13/2024
DOB NOWFoundationSigned-offNY DEVELOPERS & MANAGEMEN04/19/2024
DOB NOWFoundationSigned-offTURNER CONSTRUCTION COMPANY01/30/2024
DOB NOWSidewalk ShedSigned-offARSENAL SCAFFOLD INC01/23/2024
DOB NOWFoundationSigned-offTURNER CONSTRUCTION COMPANY12/16/2022
DOB NOWFoundationSigned-offTURNER CONSTRUCTION COMPANY12/22/2021
DOB NOWConstruction FenceSigned-offREED DR. CONSTRUCTION COR12/09/2021
BIS—RE-ISSUEDTITAN INDUSTRIAL SVC CORP03/25/2024
BISEQISSUEDTITAN INDUSTRIAL SVC CORP02/14/2024
BIS—ISSUEDTITAN INDUSTRIAL SVC CORP02/14/2024
BISPLISSUEDPLUMBING & HTG DOCTOR INC07/23/2018
BISMHISSUEDB & B 21 MANAGEMENT INC05/17/2018
BISSPISSUEDBRUCHE MECHANICAL NY LLC12/21/2017
BISOTISSUEDPROCIDA CONSTRUCTION CORP.08/12/2014
BISMHISSUEDPROCIDA CONSTRUCTION CORP.08/12/2014
BIS—ISSUEDCHOI DESIGN07/29/2014
BISOTISSUEDPROCIDA CONSTRUCTION CORP.05/12/2014
BISOTISSUEDKENAN SIGN & AWNING CORP02/19/2014
BISEQISSUEDKENAN SIGN & AWNING CORP02/19/2014
BIS—ISSUEDNEPTUNE SIGNS&AWNINGS INC02/19/2014
BIS—ISSUEDNEPTUNE SIGNS&AWNINGS INC02/19/2014
BIS—ISSUEDNEPTUNE SIGNS&AWNINGS INC02/18/2014
BISFPISSUEDNY FIRE LLC12/31/2013
BISOTISSUEDPROCIDA CONSTRUCTION CORP.09/16/2013
+ 20 more permits on file
5 projects · most recent 01/28/2025
FiledStatusContractorScope
01/28/2025CancelledFQE ELECTRIC LLC1 meters, 1 new_meters
10/28/2024CompleteTOP SHELF ELECTRIC CORP—
03/29/2024Permit IssuedCONTACT ELECTRIC CORP1 meters, 1 new_meters
03/25/2024Permit IssuedPOLARIS ELEC'L CONST CORP1 meters, 1 new_meters
01/25/2024CompleteNASH ELECTRIC SERVICES IN—
2 projects · most recent 05/13/2024
Fence
FiledStatusContractorScope
05/13/2024Signed-offNY DEVELOPERS & MANAGEMENFence
02/05/2024Signed-offNY DEVELOPERS & MANAGEMENFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
10/31/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
10/22/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
10/01/2025Pass-Final Boiler Equipment InspectionPassView ↗
04/08/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
04/08/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
11/29/2021FinalPaul Perdekprogress
▾Documents — 365 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/23/2026Q00993326-I1Request digital key ↗
08/23/2026Q00953991-P1Request digital key ↗
08/23/2026Q00953991-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits87
▸BISPLAN / WORK APPROVAL APPLICATION46
10/22/2021421807539Open ↗
11/20/2018421633058Open ↗
05/24/2018421633058Open ↗
Showing 3 of 46 on file for this type
▸BISWORK PERMIT APPLICATION34
07/02/2025421807539Open ↗
07/02/2025421807539Open ↗
04/18/2025421807539Open ↗
Showing 3 of 34 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications6
12/18/2018421633058Open ↗
09/09/2014420881255Open ↗
09/09/2014420880489Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/30/2014420836723Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTAX LOT- FINAL LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING RESOLUTION DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications49
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION23
09/24/2025421807539Open ↗
09/24/2025421807539Open ↗
12/18/2018421633058Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/23/2026Q00953991-I1Open ↗
08/22/2026Q01030133-I1Open ↗
08/21/2026Q01133924-I1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
05/24/2018421633058Open ↗
11/27/2017421575520Open ↗
06/26/2014420826725Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
05/24/2018421633058Open ↗
11/27/2017421575520Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/29/2026Q00638449-I1Open ↗
▸Trade Schedules & Equipment46
▸BISSCHEDULE B - PLUMBING12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSELF-CERT PLUMBING NOTICE10
04/14/2014420177882Open ↗
04/01/2014420177882Open ↗
04/01/2014420177882Open ↗
Showing 3 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS6
12/18/2018421633058Open ↗
05/09/2016420177882Open ↗
05/09/2016420177882Open ↗
Showing 3 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
05/24/2018421633058Open ↗
02/20/2018421575520Open ↗
11/27/2017421575520Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
12/18/2018421633058Open ↗
05/09/2016420177882Open ↗
05/09/2016420177882Open ↗
Showing 3 of 6 on file for this type
▸BISSEWER CUT-OFF1
09/24/2025421807539Open ↗
▸BISWATER CUT-OFF1
09/24/2025421807539Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
07/25/2014420836723Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
04/01/2014420177882Open ↗
▸BISGAS CUT-OFF1
09/24/2025421807539Open ↗
▸BISELECTRIC CUT-OFF1
09/24/2025421807539Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST3
10/02/2014420177882Open ↗
Showing 1 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
09/24/2025421807539Open ↗
▸BISSTREET TREE SUPPORTING DOCUMENT1
08/06/2014420836723Open ↗
▸BISST-1 Street Tree Checklist1
09/18/2014420177882Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
09/24/2025421807539Open ↗
▸Environmental & Asbestos17
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
09/24/2025421807539Open ↗
05/24/2018421633058Open ↗
11/27/2017421575520Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISRODENT CONTROL1
09/24/2025421807539Open ↗
▸Energy Compliance22
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
12/18/2018421633058Open ↗
05/24/2018421633058Open ↗
03/09/2018421575520Open ↗
Showing 3 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS5
12/18/2018421633058Open ↗
09/30/2014420836723Open ↗
09/06/2014420881264Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports1
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs37
▸BISLETTERS - SUPPORTING DOCUMENTATION14
09/24/2025421807539Open ↗
05/10/2016420177882Open ↗
04/11/2016400660502Open ↗
Showing 3 of 14 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
12/18/2018421633058Open ↗
05/11/2018421575520Open ↗
10/11/2016420836723Open ↗
Showing 3 of 13 on file for this type
▸BISSUPERSEDING LETTER4
04/18/2025421807539Open ↗
03/19/2014420177882Open ↗
Showing 2 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership34
▸BISCOST AFFIDAVIT27
12/18/2018421633058Open ↗
05/24/2018421633058Open ↗
05/11/2018421575520Open ↗
Showing 3 of 27 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE6
07/03/2025421807539Open ↗
05/06/2025421807539Open ↗
08/22/2014420177882Open ↗
Showing 3 of 6 on file for this type
▸BISSTEEL AFFIDAVIT- FINAL1
12/05/2014420177882Open ↗
▸Filing & Intake Forms35
▸BISADDITIONAL INFORMATION13
04/18/2025421807539Open ↗
11/23/2018421633058Open ↗
05/08/2015420836723Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING COVER SHEET13
10/22/2021421807539Open ↗
05/24/2018421633058Open ↗
11/27/2017421575520Open ↗
Showing 3 of 13 on file for this type
▸BISBOROUGH INTAKE FORM9
12/01/2025421807539Open ↗
07/03/2025421807539Open ↗
04/18/2025421807539Open ↗
Showing 3 of 9 on file for this type
▸Other Documents7
▸BISPLOT DIAGRAM4
10/11/2016420836723Open ↗
Showing 1 of 4 on file for this type
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS2
02/12/2014420472848Open ↗
02/03/2014420924806Open ↗
▸BISCOMMUNITY BOARD NOTIFICATION1
09/24/2025421807539Open ↗