← Back
BuildNYC
Factory, industrial, semi-fireproof
34 NORMAN AVENUE
BROOKLYN · Greenpoint · BIN 3065941
💬 Discuss this project
1931Year Built
1Stories
F4Building Class
M1-1Zoning
—Gross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Factory, industrial, semi-fireproof · Owner of record: Norman Dobbin · 0.91 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofTeak New York, Caffe Panna44p · 5 filings · 20 docs
Floor 1Teak New York, Caffe Panna122p · 19 filings · 20 docs
CellarTeak New York13p · 3 filings · 20 docs
Sub-BasementOut Of Home Holdings, LLC12p · 1 filing · 8 docs
Site & exteriorNorman Dobbin LLC59p · 14 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Out of Home Holdings11810/04/2026
Howard Machine Design203/21/2026
Norman Dobbin103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Building Brothers3203/21/2026
R H Drummond Exp203/21/2026
Expediting103/21/2026
Sol Building Consulting Services1903/21/2026
D R Brown1203/21/2026
Municipal Building Consultants603/21/2026
LMS-Ace Services303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Balaton ConsultingSign hanger610/04/2026
Thomas MaintenanceGeneral Contractor507/08/2026
North Shore Neon Signspecialty_contractor507/08/2026
Red Hook Sign and ElectricSign hanger407/08/2026
Irwin Friedman & SonsFire Protection307/08/2026
Cooper WorksGeneral Contractor307/08/2026
AMS ContractorScaffold303/21/2026
Accurate MechanicalPlumbing207/08/2026
Irwin Friedman & SonsPlumbing207/08/2026
Red Hook Sign and Electricspecialty_contractor207/08/2026
Thomas MaintenanceScaffold104/09/2026
North Shore Neon SignGeneral Contractor104/09/2026
3-G ServicesGeneral Contractor104/09/2026
Mechanical East Cospecialty_contractor104/09/2026
Green Apple Electrical ServicesElectrical103/22/2026
Idea BuildersScaffold104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Green Design Construction4145708/30/2024
Mottola Rini Engineers, P3251308/27/2024
Jack Green Associates422208/05/2024
Hardie & Associates, Cons3760206/12/2024
Metrospec Sia6420204/11/2024
EDG2578302/28/2023
Soil Mechanics Drilling2325807/27/2022
Infinity Design Consultan2760101/01/2022
Building Lifecycle
All (222)Filed (51)Permit Issued (36)Signed Off (32)Violation (19)Inspection (14)Objection (40)Special Inspection (30)
09/21/2026
Objection resolved — Resolved
09/21/2026
Objection resolved — Resolved
09/21/2026
Objection resolved — Resolved
09/21/2026
Objection resolved — Resolved
07/08/2026
Objection raised — Other
07/08/2026
Objection raised — Other
07/08/2026
Objection raised — Other
07/08/2026
Objection raised — Other
07/07/2026
Filed — Alteration
Scope of work is to reflect as-built conditions per the request from the audit division to resolve open comments in relation to ALT- CO, DOB # B08010856-I1
B01424430-I1
06/30/2026
Special inspection requirement — Final
02/20/2026
Violation issued (FDNY_NOV, closed)
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/03/2025
Filed — Alteration CO
INTERIOR RENOVATION TO ADD INTERIOR WALLS AND DOORS TO EXISTING SPACE. (NO DEMOLITION OR CHANGE OF EXTERIOR ENVELOPE OF THE BUILDING)
B08010856-P4
12/17/2024
Objection resolved — Addressed
12/16/2024
Objection raised — Other
12/04/2024
Filed — Alteration CO
INTERIOR RENOVATION TO ADD INTERIOR WALLS AND DOORS TO EXISTING SPACE. (NO DEMOLITION OR CHANGE OF EXTERIOR ENVELOPE OF THE BUILDING)
B08010856-P3
11/20/2024
Signed off — Alteration
PROPOSED RENOVATION INCLUDING REPAIR AND REPLACEMENT PART ROOF STRUCTURE AND WATERPROOFING SYSTEM, REPLACE PARAPETS, AND REMOVE ALL EXISTING INTERIOR NON-BEARING PARTITIONS AS INDICATED ON PLANS SUBMITTED HEREWITH.
B00762984-I1
11/19/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00676925-I1
11/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/01/2024
Signed off — Alteration
Decorative facade alteration on Dobbin Street and on part of Norman Avenue related to new retail tenant improvements
B01024978-I1
10/31/2024
Signed off — Alteration
Installation of Storm Piping & Sump Pump and Installation & Removal of Plumbing Fixtures. As per plans filed herewith, no change to use, occupancy or egress.
B08054893-I1
10/09/2024
Signed off — Alteration
PROPOSED FOOTING FOR GROUND SIGN (SOUTH) FILED UNDER SEPARATE APPLICATION # B00632472. SIGN STRUCTURE FILED UNDER SEPARATE APPLICAITON # B00632457.
B00632464-I1
10/09/2024
Signed off — Alteration
PROPOSED FOOTING FOR GROUND SIGN (NORTH) FILED UNDER SEPARATE APPLICATION # B00632445. SIGN STRUCTURE FILED UNDER SEPARATE APPLICATION # B00598742.
B00632431-I1
10/07/2024
Signed off — Alteration
ADD NEW TEMPORARY CONSTRUCTION FENCE
B00697064-I1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/10/2024
Filed — Alteration CO
INTERIOR RENOVATION TO ADD INTERIOR WALLS AND DOORS TO EXISTING SPACE. (NO DEMOLITION OR CHANGE OF EXTERIOR ENVELOPE OF THE BUILDING)
B08010856-P2
09/10/2024
Signed off — Alteration
Installation of (2) New Sprinkler Heads at basement level. As per plans filed herewith, no change to use occupancy or egress.
B00914925-I1
09/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/30/2024
Signed off — Alteration
MECHANICAL A/C AND AIR DUCT WORK ASSOCIATED WITH THE INTERIOR ALTERATIONS OF AN EXISTING VACANT SPACE TO INSTALL A NEW RETAIL STORE. IN THE NORTHEAST CORNER OF THE TENANT SPACE THERE WILL BE A SMALL ACCESSORY CAFE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01028847-I1
08/30/2024
Filed — Alteration
MECHANICAL A/C AND AIR DUCT WORK ASSOCIATED WITH THE INTERIOR ALTERATIONS OF AN EXISTING VACANT SPACE TO INSTALL A NEW RETAIL STORE. IN THE NORTHEAST CORNER OF THE TENANT SPACE THERE WILL BE A SMALL ACCESSORY CAFE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01028847-P1
08/29/2024
Signed off — Alteration
NEW MECHANICAL WORK ASSOCIATED WITH TENANT FIT OUT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00946442-I1
08/28/2024
Signed off — Alteration
SPRINKLER WORK ASSOCIATED WITH THE INTERIOR ALTERATIONS OF AN EXISTING VACANT SPACE TO INSTALL A NEW RETAIL STORE. IN THE NORTHEAST CORNER OF THE TENANT SPACE THERE WILL BE A SMALL ACCESSORY CAFE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01029814-I1
08/28/2024
Special inspection requirement — HVAC-R and service water heating equipment
Anthony Rini, III
08/28/2024
Special inspection requirement — HVAC-R and service water heating system controls
Anthony Rini, III
08/28/2024
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
Anthony Rini, III
08/28/2024
Special inspection requirement — Final
Anthony Rini, III
08/28/2024
Special inspection requirement — Maintenance information
Anthony Rini, III
08/28/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Anthony Rini, III
08/28/2024
Special inspection requirement — Mechanical Systems
Anthony Rini, III
08/28/2024
Special inspection requirement — Shutoff dampers
Anthony Rini, III
08/27/2024
Filed — Alteration
NEW MECHANICAL WORK ASSOCIATED WITH TENANT FIT OUT AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00946442-P1
08/23/2024
Special inspection requirement — Shutoff dampers
Anthony Rini, III
08/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
Anthony Rini, III
08/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Anthony Rini, III
08/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
Anthony Rini, III
08/23/2024
Special inspection requirement — Exhaust and Vent Systems in Plenums and Ducts
Anthony Rini, III
08/23/2024
Special inspection requirement — Maintenance information
Anthony Rini, III
08/23/2024
Special inspection requirement — Mechanical Systems
Anthony Rini, III
08/23/2024
Special inspection requirement — Final
Anthony Rini, III
08/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
john senisi
08/13/2024
Special inspection requirement — Energy Code Compliance Inspections
john senisi
08/13/2024
Special inspection requirement — Duct leakage testing, insulation and design
john senisi
08/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
john senisi
08/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
john senisi
08/13/2024
Special inspection requirement — Final
john senisi
08/13/2024
Special inspection requirement — Maintenance information
john senisi
08/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
john senisi
08/13/2024
Special inspection requirement — Mechanical Systems
john senisi
08/13/2024
Special inspection requirement — Fire-Resistance Rated Construction
john senisi
08/12/2024
Permit issued — General Construction
B08010856-I1-GC
Latest 60 of 222 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCooper Works08/12/2024
DOB NOWSprinklersSigned-offIrwin Friedman & Son05/10/2024
DOB NOWPlumbingSigned-offIrwin Friedman & Sons05/10/2024
DOB NOWSprinklersSigned-offIrwin Friedman & Son05/10/2024
DOB NOWMechanical SystemsSigned-offMechanical East Co04/26/2024
DOB NOWGeneral ConstructionSigned-off3-G Services04/25/2024
DOB NOWSprinklersSigned-offIrwin Friedman & Son12/08/2023
DOB NOWSprinklersSigned-offAnthony Disabato11/30/2023
DOB NOWPlumbingSigned-offAnthony Disabato11/30/2023
DOB NOWMechanical SystemsSigned-offCooper Works11/20/2023
DOB NOWGeneral ConstructionSigned-offCooper Works11/14/2023
DOB NOWGeneral ConstructionSigned-offThomas Maintenance10/26/2023
DOB NOWPlumbingSigned-offIrwin Friedman & Sons09/15/2023
DOB NOWConstruction FenceSigned-offThomas Maintenance01/05/2023
DOB NOWStructuralSigned-offThomas Maintenance11/03/2022
DOB NOWStructuralSigned-offThomas Maintenance09/30/2022
DOB NOWFoundationSigned-offThomas Maintenance08/24/2022
DOB NOWFoundationSigned-offThomas Maintenance08/24/2022
DOB NOWFoundationSigned-offNorth Shore Neon Sign08/04/2022
DOB NOWFoundationSigned-offNorth Shore Neon Sign08/04/2022
DOB NOWConstruction FenceSigned-offIdea Builders03/15/2022
DOB NOWSidewalk ShedSigned-offAMS Contractor02/15/2022
DOB NOWStructuralSigned-offNorth Shore Neon Sign02/02/2022
DOB NOWStructuralSigned-offNorth Shore Neon Sign02/02/2022
DOB NOWStructuralSigned-offNorth Shore Neon Sign02/02/2022
DOB NOWSignSigned-offNorth Shore Neon Sign Co01/26/2022
DOB NOWSignSigned-offNorth Shore Neon Sign Co01/26/2022
DOB NOWSignSigned-offNorth Shore Neon Sign Co01/25/2022
DOB NOWSignSigned-offNorth Shore Neon Sign Co01/25/2022
DOB NOWSignSigned-offNorth Shore Neon Sign Co01/25/2022
DOB NOWStructuralSigned-offRed Hook Sign and Electric11/27/2019
DOB NOWStructuralSigned-offRed Hook Sign and Electric11/27/2019
DOB NOWSignSigned-offRed Hook Sign and Electric11/04/2019
DOB NOWSignSigned-offRed Hook Sign and Electric11/01/2019
DOB NOWSignSigned-offRed Hook Sign and Electric11/01/2019
DOB NOWSignSigned-offRed Hook Sign and Electric11/01/2019
BISPLISSUEDJ Jekowsky & Sons04/09/1993
BISBLISSUEDJ Jekowsky & Sons04/09/1993
5 projects · most recent 02/24/2025
General Wiring
FiledStatusContractorScope
02/24/2025CompleteGreen Apple Electrical ServicesGeneral Wiring
10/17/2024CompleteKJK ElectricGeneral Wiring
06/05/2024CompleteGreen Apple Electrical ServicesGeneral Wiring
03/24/2024CompleteElpo Electrical Contg3 meters, 2 new_meters
07/09/2020CompleteKwong Ming ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
11/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/13/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/13/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/10/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/07/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/25/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/22/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/08/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/08/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/08/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 98
DateRequirementInspectorRole
06/30/2026Final—progress
08/28/2024Mechanical SystemsAnthony Rini, IIIspecial
08/28/2024FinalAnthony Rini, IIIprogress
08/28/2024HVAC-R and service water heating equipmentAnthony Rini, IIIenergy_progress
08/28/2024Exhaust and Vent Systems in Plenums and DuctsAnthony Rini, IIIspecial
08/28/2024HVAC-R and service water piping design and insulationAnthony Rini, IIIenergy_progress
08/28/2024Shutoff dampersAnthony Rini, IIIenergy_progress
08/28/2024HVAC-R and service water heating system controlsAnthony Rini, IIIenergy_progress
08/28/2024Maintenance informationAnthony Rini, IIIenergy_progress
08/23/2024HVAC-R and service water heating system controlsAnthony Rini, IIIenergy_progress
08/23/2024Shutoff dampersAnthony Rini, IIIenergy_progress
08/23/2024HVAC-R and service water heating equipmentAnthony Rini, IIIenergy_progress
08/23/2024HVAC-R and service water piping design and insulationAnthony Rini, IIIenergy_progress
08/23/2024Maintenance informationAnthony Rini, IIIenergy_progress
08/23/2024FinalAnthony Rini, IIIprogress
08/23/2024Mechanical SystemsAnthony Rini, IIIspecial
08/23/2024Exhaust and Vent Systems in Plenums and DuctsAnthony Rini, IIIspecial
08/13/2024Energy Code Compliance Inspectionsjohn senisiprogress
08/13/2024Finaljohn senisiprogress
08/13/2024HVAC-R and service water heating equipmentjohn senisienergy_progress
08/13/2024Maintenance informationjohn senisienergy_progress
08/13/2024HVAC-R and service water piping design and insulationjohn senisienergy_progress
08/13/2024Duct leakage testing, insulation and designjohn senisienergy_progress
08/13/2024HVAC-R and service water heating system controlsjohn senisienergy_progress
08/13/2024Fire-Resistance Rated Constructionjohn senisiprogress
Latest 25 of 98.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Teak New YorkRetailFloor 1
Project B01029814 Alteration · LOC Issued · 04/20/2024
Project B01024978 Alteration · LOC Issued · 04/19/2024
Project B01028847 Alteration · LOC Issued · 04/19/2024
Caffe PannaRestaurant / Food ServiceFloor 1, Roof
Project B00946442 Alteration · LOC Issued · 11/10/2023
Project B00946448 Alteration · LOC Issued · 11/10/2023
Project B00946452 Alteration · LOC Issued · 11/10/2023
Project B00946395 Alteration · LOC Issued · 10/27/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 228 on file (BIS + DOB NOW)
▸Plans & Drawings51
▸DOB NOWPlans/Sketch45
08/31/2026B00642615-I1Request digital key ↗
08/31/2026B00632551-I1Request digital key ↗
08/31/2026B00632543-I1Request digital key ↗
Showing 3 of 45 on file for this type
▸DOB NOWPlans/Sketch - Sign4
09/02/2026B00239551-I1Request digital key ↗
09/02/2026B00239540-I1Request digital key ↗
09/02/2026B00239516-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Structural2
09/02/2026B00239609-I1Request digital key ↗
09/02/2026B00239567-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications134
▸DOB NOWProgress Inspector Seal & Signature51
09/02/2026B00946395-I1Open ↗
09/01/2026B00632464-S1Open ↗
09/01/2026B00632464-S1Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature51
08/31/2026B00642615-I1Open ↗
08/31/2026B00632551-I1Open ↗
08/31/2026B00632543-I1Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature32
09/23/2026B00914925-P1Open ↗
09/23/2026B00946452-I1Open ↗
09/02/2026B00946395-I1Open ↗
Showing 3 of 32 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos23
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/31/2026B00642615-I1Open ↗
08/31/2026B00633328-I1Open ↗
08/31/2026B00632457-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form6
08/25/2026B01028847-I1Open ↗
08/24/2026B01029814-I1Open ↗
08/24/2026B01024978-I1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/14/2026B00762984-I1Open ↗
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT4
08/31/2026B00632431-I1Open ↗
08/31/2026B00632431-P1Open ↗
08/31/2026B00632464-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Plot Diagram2
08/31/2026B00632431-I1Open ↗
08/31/2026B00632464-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/31/2026B00632431-I1Open ↗
08/31/2026B00632464-I1Open ↗
▸Other Documents3
▸DOB NOWTR5H Test Report2
08/31/2026B00632431-S1Open ↗
08/31/2026B00632464-S1Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type