← Back
BuildNYC
Elevator cooperative
The Chatsworth
344 WEST 72ND STREET · Name © OpenStreetMap contributors · BIN 1030972
💬 Discuss this project
1904Year Built
14Stories
D4Building Class
R10AZoning
199,502 sfGross Floor Area
149Units
LL97 CoveredRent Stabilized158 Active Violations 150 unresolved · 8 paperwork only 1 old, status unconfirmed ▸FISP: UNSAFE
Elevator cooperative · Owner of record: Chatsworth Realty · 19,425 sf lot · 10.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsChatsworth & Annex dryer installation1 filing
RoofChatsworth & Annex boiler filing14p · 13 filings · 20 docs
PenthouseUnit PH, Unit PH1, Unit PHE7p · 3 filings · 20 docs
Floor 15Material hoist and temp timber framing2 filings · 4 docs
Floor 14Chatsworth & Annex interior renovation8p · 6 filings · 20 docs
Floor 13Chatsworth & Annex boiler filing7p · 8 filings · 20 docs
Floor 12Unit 12G, Unit 12SUnder Construction9p · 7 filings · 20 docs
Floor 11Unit 10A, Unit 11014p · 5 filings · 12 docs
Floor 10Unit 10C, Unit 10IUnder Construction3 filings · 12 docs
Floor 9Unit 9C2 filings · 12 docs
Floor 8Unit 8C2 filings · 12 docs
Floor 7Unit 7S1p · 1 filing · 12 docs
Floor 6Unit 6A, Unit 6B, Unit 6H2p · 3 filings · 12 docs
Floor 5Unit 5CUnder Construction1 filing · 12 docs
Floor 4Unit 4H, Unit 4095p · 4 filings · 20 docs
Floor 3Unit 3A, Unit 3B, Unit 3H2p · 3 filings · 12 docs
Floor 2Unit 2N, Unit 2034 filings · 12 docs
Floor 1Unit 1A, Unit 1D, Unit 1N +17p · 17 filings · 12 docs
CellarPlumbing fixture replacement20p · 23 filings · 12 docs
Sub-CellarPlumbing fixture replacement17p · 6 filings · 20 docs
Site & exteriorChatsworth & Annex courtyard renovation7 filings · 20 docs
Filed — no permit issuedFacade repairs1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HFZ 344 West 72nd Street Owner26603/21/2026
Chatsworth Realty5003/21/2026
RSP Companies4810/04/2026
HFZ 344 W 72 St Owner303/21/2026
SPT Chatsworth Holdings303/21/2026
HFZ Capital Group103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A2 Architect2909/18/2026
Diaz Architects Inc., PA407/06/2026
MG Engineering5601/21/2026
AM Architect401/06/2026
Black Sheep Engineering Group203/13/2025
New Age203/08/2025
Montroy Architecture2002/13/2025
KZ Engineering112/10/2024
Framework Engineering106/13/2024
Yao W Guo Architect206/10/2024
Desimone Consulting Engineering605/29/2024
Ashraf404/29/2024
Amm Engineering211/08/2022
Enthink Engineers108/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Gillman Consulting16403/21/2026
Jenny Flores Expediting2203/21/2026
Sato Construction1003/21/2026
Municipal Building Consultants403/21/2026
Emg Industrail Chimney403/21/2026
Synergy Building Consultants103/21/2026
Platinum Services NY803/21/2026
Jack Jaffa & Associates303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Cavan BuildersGeneral Contractor5807/08/2026
Cod PlumbingPlumbing1707/08/2026
Real Deal DecorationGeneral Contractor1008/12/2026
Peter Miceli PlumbingPlumbing907/08/2026
Carreras Home ImprovementPlumbing808/12/2026
Sato Construction CoGeneral Contractor504/09/2026
Platinum Services NYScaffold507/08/2026
Arsenal ScaffoldScaffold403/21/2026
Ampacity ElectricalElectrical303/22/2026
Lippolis ElectricElectrical303/21/2026
The Metro GroupGeneral Contractor303/21/2026
Andamio ScaffoldingScaffold303/21/2026
The Metro GroupScaffold303/21/2026
CS BridgeScaffold203/21/2026
Pat Sementa P & H CoPlumbing207/08/2026
NU-Way Heating & Coolingspecialty_contractor207/08/2026
Cavan ElectricElectrical203/21/2026
Five Borough NYCFire Protection207/08/2026
Miller Plumbing & HeatingFire Protection107/08/2026
Mkon ConstructionGeneral Contractor104/09/2026
QMB Plumbing & HeatingPlumbing107/08/2026
Global Design ConceptGeneral Contractor107/08/2026
Simple Choice Plumbing and HTPlumbing107/08/2026
Nash Electric ServicesElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A2 Architect25041909/18/2026
Ameritesting7927407/06/2026
Domani Inspection Service8437101/21/2026
New Age Engineering7746403/08/2025
Framework Engineering8217106/13/2024
Yao W Guo Architect1754206/10/2024
MEP Inspections1102411/10/2021
Building Lifecycle
All (300)Filed (47)Permit Issued (44)Signed Off (40)Facade (FISP) (3)Violation (60)Inspection (23)Objection (53)Special Inspection (30)
10/01/2026
Signed off — Alteration
FACADE REPAIR AS PER PLANS FILED HEREWITH
M00854018-I1
09/18/2026
Filed — Alteration
HEREBY FILING FOR THE REMOVAL, REPLACEMENT, RELOCATION AND INSTALLATION OF FIXTURES IN CONJUNCTION WITH THE COMBINATION OF APARTMENTS. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01389838-P2
09/17/2026
Special inspection requirement — Lighting in dwelling units
Ann Macklin
09/17/2026
Special inspection requirement — HVAC-R and service water heating equipment
Ann Macklin
09/17/2026
Special inspection requirement — Final
Ann Macklin
09/17/2026
Special inspection requirement — Mechanical Systems
Ann Macklin
09/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Ann Macklin
09/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
09/17/2026
Special inspection requirement — HVAC-R and service water heating system controls
Ann Macklin
09/17/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Ann Macklin
09/17/2026
Special inspection requirement — Maintenance information
Ann Macklin
09/17/2026
Special inspection requirement — Shutoff dampers
Ann Macklin
08/11/2026
Signed off — Alteration
hereby filing to install plumbing fixtures, sprinkler heads and related piping for the renovation of the east penthouse as shown on plans filed herewith. No change to use, occupancy or egress.
M08032218-I1
08/11/2026
Permit issued — Plumbing
M01421031-S1-PL
08/11/2026
Permit issued — General Construction
M01421031-I1-GC
08/06/2026
Objection resolved — Resolved
08/03/2026
Objection raised — Scope
07/27/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/09/2026
Filed — Alteration
HEREBY FILING FOR THE REMOVAL, RELOCATION AND INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01421031-S1
07/09/2026
Filed — Alteration
HEREBY FILING FOR THE REMOVAL, RELOCATION AND INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01421031-I1
07/09/2026
Special inspection requirement — Air barrier - visual inspection
Ann Macklin
07/06/2026
Filed — Alteration
FACADE REPAIR AS PER PLANS FILED HEREWITH
M00854018-P4
06/23/2026
Signed off — Alteration
Hereby filing replace, relocate, and install new drains and fixtures in the courtyard as shown on plans filed herewith. NO change to use, occupancy or egress.
M00962786-S1
06/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
06/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Ann Macklin
06/23/2026
Special inspection requirement — Energy Code Compliance Inspections
Ann Macklin
06/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
Ann Macklin
06/23/2026
Special inspection requirement — Lighting in dwelling units
Ann Macklin
06/23/2026
Special inspection requirement — Final
Ann Macklin
06/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
06/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
Ann Macklin
06/23/2026
Special inspection requirement — Mechanical Systems
Ann Macklin
06/18/2026
Signed off — Alteration
Hereby filing replace, relocate, and install new drains and fixtures in the courtyard as shown on plans filed herewith. NO change to use, occupancy or egress.
M00962786-S2
06/15/2026
Permit issued — General Construction
M01389838-I1-GC
06/15/2026
Permit issued — Plumbing
M01389838-S1-PL
06/09/2026
Signed off — Alteration
Hereby filing to install new sprinkler heads and related piping for corridor outside the townhouses as shown on plans filed herewith. NO change to use, occupancy or egress.
M00787298-I1
06/09/2026
Signed off — Alteration
Hereby filing to install new sprinkler heads and related piping for corridor outside the townhouses as shown on plans filed herewith. NO change to use, occupancy or egress.
M00787298-S1
06/08/2026
Violation issued (HPD, open)
B
06/08/2026
Violation issued (HPD, open)
B
06/08/2026
Violation issued (HPD, open)
B
06/08/2026
Violation issued (HPD, open)
B
06/08/2026
Violation issued (HPD, open)
B
06/03/2026
Permit issued — General Construction
M01095074-I1-GC
05/27/2026
Filed — Alteration
HEREBY FILING FOR THE REMOVAL, REPLACEMENT, RELOCATION AND INSTALLATION OF FIXTURES IN CONJUNCTION WITH THE COMBINATION OF APARTMENTS. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01389838-S1
05/27/2026
Filed — Alteration
HEREBY FILING FOR THE REMOVAL, REPLACEMENT, RELOCATION AND INSTALLATION OF FIXTURES IN CONJUNCTION WITH THE COMBINATION OF APARTMENTS. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01389838-I1
05/26/2026
Special inspection requirement — Lighting in dwelling units
Ann Macklin
05/26/2026
Special inspection requirement — Maintenance information
Ann Macklin
05/26/2026
Special inspection requirement — Shutoff dampers
Ann Macklin
05/26/2026
Special inspection requirement — HVAC-R and service water heating system controls
Ann Macklin
05/26/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Ann Macklin
05/26/2026
Special inspection requirement — Mechanical Systems
Ann Macklin
05/26/2026
Special inspection requirement — Energy Code Compliance Inspections
Ann Macklin
05/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ann Macklin
05/26/2026
Special inspection requirement — Final
Ann Macklin
05/26/2026
Special inspection requirement — HVAC-R and service water heating equipment
Ann Macklin
05/22/2026
Filed — Alteration
HEREBY FILING FOR THE REMOVAL. REPLACEMENT, RELOCATION AND INSTALLATION OF NEW PLUMBING FIXTURES IN APARTMENT 5C LOCATED ON THE FIFTH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01342048-P2
05/22/2026
Filed — Alteration
HEREBY FILING FOR THE REMOVAL. REPLACEMENT, RELOCATION AND INSTALLATION OF NEW PLUMBING FIXTURES IN APARTMENT 5C LOCATED ON THE FIFTH FLOOR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01342048-P1
05/14/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/01/2026
Signed off — Alteration
hereby filing to install plumbing fixtures, sprinkler heads and related piping for renovation of the west penthouse as shown on plans filed herewith. No change to use, occupancy or egress.
M08032305-I1
04/20/2026
Violation issued (ECB, open)
Local Law
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedReal Deal Decoration08/11/2026
DOB NOWPlumbingPermit IssuedCarreras Home Improvement08/11/2026
DOB NOWPlumbingPermit IssuedCarreras Home Improvement06/15/2026
DOB NOWGeneral ConstructionPermit IssuedReal Deal Decoration06/15/2026
DOB NOWGeneral ConstructionSigned-offCavan Builders06/03/2026
DOB NOWSprinklersSigned-offMiller Plumbing & Heating03/20/2026
DOB NOWPlumbingPermit IssuedCarreras Home Improvements03/17/2026
DOB NOWPlumbingSigned-offSimple Choice Plumbing and HT02/27/2026
DOB NOWGeneral ConstructionPermit IssuedNU-Way Heating & Cooling02/11/2026
DOB NOWGeneral ConstructionPermit IssuedWise Construction Safety02/09/2026
DOB NOWPlumbingPermit IssuedCarreras Home Improvements02/09/2026
DOB NOWPlumbingSigned-offVin-Ray Plumbing & Heating12/08/2025
DOB NOWBoiler EquipmentSigned-offPeter Miceli Plumbing10/28/2025
DOB NOWPlumbingSigned-offVin-Ray Plumbing & Heating10/28/2025
DOB NOWPlumbingSigned-offVin-Ray Plumbing & Heating10/28/2025
DOB NOWStructuralSigned-offCavan Builders08/26/2025
DOB NOWGeneral ConstructionSigned-offCavan Builders08/26/2025
DOB NOWPlumbingSigned-offVin-Ray Plumbing & Heating07/29/2025
DOB NOWPlumbingSigned-offVin-Ray Plumbing & Heating07/29/2025
DOB NOWGeneral ConstructionSigned-offSato Construction Co07/03/2025
DOB NOWSupported ScaffoldPermit IssuedPlatinum Services NY04/21/2025
DOB NOWPlumbingSigned-offPeter Miceli Plumbing04/14/2025
DOB NOWPlumbingSigned-offPeter Miceli Plumbing04/14/2025
DOB NOWPlumbingSigned-offPeter Miceli Plumbing04/14/2025
DOB NOWPlumbingPermit IssuedPeter Miceli Plumbing04/14/2025
DOB NOWGeneral ConstructionSigned-offMkon Construction03/31/2025
DOB NOWSupported ScaffoldSigned-offCS Bridge02/11/2025
DOB NOWSupported ScaffoldPermit IssuedThe Metro Group12/10/2024
DOB NOWMechanical SystemsSigned-offThe Metro Group11/13/2024
DOB NOWSuspended ScaffoldSigned-offSato Construction Co11/06/2024
DOB NOWMechanical SystemsSigned-offCavan Builders08/29/2024
DOB NOWGeneral ConstructionSigned-offCavan Builders08/29/2024
DOB NOWMechanical SystemsSigned-offCavan Builders08/29/2024
DOB NOWGeneral ConstructionSigned-offCavan Builders08/29/2024
DOB NOWPlumbingSigned-offVin-Ray Plumbing & Heating08/26/2024
DOB NOWPlumbingSigned-offVin-Ray Plumbing & Heating08/26/2024
DOB NOWPlumbingSigned-offVin-Ray Plumbing & Heating08/26/2024
DOB NOWPlumbingSigned-offVin-Ray Plumbing & Heating08/26/2024
DOB NOWGeneral ConstructionSigned-offCavan Builders08/20/2024
DOB NOWStructuralSigned-offCavan Builders08/15/2024
+ 60 more permits on file
3 projects · most recent 09/18/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/18/2026Permit IssuedReal Deal DecorationAir Conditioning Systems
Cooling
Bosch RL030-IH2N-LRE 34,600 BTU · Heat Pump Outdoor ×4
07/09/2026Permit IssuedReal Deal DecorationAir Conditioning Systems
Cooling
Bosch RL042-I-H2N-LRE 42,000 BTU · Wshp ×1
05/22/2026Permit IssuedNU-Way Heating & CoolingAir Conditioning Systems
Cooling
Comfort Aire HBH042AICOALB 36,000 BTU ×1
3 projects · most recent 01/21/2026
FiledStatusContractorScope
01/21/2026Signed-offFive Borough NYC114 heads
11/13/2025Signed-offFive Borough NYC162 heads
08/19/2025Signed-offMiller Plumbing & Heating9 heads
8 projects · most recent 09/18/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
09/18/2026Permit IssuedCarreras Home ImprovementsGas, Water/Sanitary
07/09/2026Permit IssuedCarreras Home ImprovementsGas, Water/Sanitary
05/22/2026Permit IssuedCarreras Home ImprovementsGas, Water/Sanitary
01/21/2026Signed-offCod PlumbingGas, Storm, Water/Sanitary
11/13/2025Signed-offCod PlumbingGas, Storm, Water/Sanitary
08/19/2025Signed-offCod PlumbingGas, Water/Sanitary
03/24/2025Permit IssuedPeter Miceli PlumbingGas, Water/Sanitary
05/29/2024Signed-offCod PlumbingStorm, Water/Sanitary
25 projects · most recent 10/05/2026
General Wiring
FiledStatusContractorScope
10/05/2026Permit IssuedCavan ElectricGeneral Wiring
09/09/2026CompleteVma Electrical—
08/21/2026Permit IssuedCavan ElectricGeneral Wiring
07/22/2026Permit IssuedLTC Electrical ContractingGeneral Wiring
05/16/2026Permit Issued2AC ElectricGeneral Wiring
02/27/2025Permit IssuedAmpacity ElectricalGeneral Wiring
07/16/2024CompleteIntelogic Electric—
06/14/2024Permit IssuedArgon ElectricalGeneral Wiring
03/12/2024CompleteAmpacity ElectricalGeneral Wiring
03/12/2024CompleteAmpacity ElectricalGeneral Wiring
03/12/2024CompleteAmpacity ElectricalGeneral Wiring
02/19/2024CompleteWise Electric SolutionsGeneral Wiring
10/03/2023CompleteAmpacity ElectricalGeneral Wiring
10/03/2023CompleteAmpacity ElectricalGeneral Wiring
10/03/2023Permit IssuedAmpacity ElectricalGeneral Wiring
2 projects · most recent 08/19/2025
Concrete
FiledStatusContractorScope
08/19/2025Signed-offMiller Plumbing & Heating1 scope_items
05/29/2024Signed-offCod PlumbingConcrete
2 projects · most recent 12/10/2024
Scaffold
FiledStatusContractorScope
12/10/2024Permit IssuedThe Metro GroupScaffold
04/29/2024Permit IssuedPlatinum Services NYScaffold
▾Field Inspections (DOB CAP) — 53
DateTypeResultReport
07/27/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/14/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/08/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/03/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/02/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/31/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/10/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/01/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/19/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/28/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/28/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/28/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/14/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/08/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
Latest 25 of 53.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/17/2026Lighting in dwelling unitsAnn Macklinenergy_progress
09/17/2026Maintenance informationAnn Macklinenergy_progress
09/17/2026HVAC-R and service water piping design and insulationAnn Macklinenergy_progress
09/17/2026HVAC-R and service water heating system controlsAnn Macklinenergy_progress
09/17/2026Fire-Resistant Penetrations and JointsAnn Macklinspecial
09/17/2026Mechanical SystemsAnn Macklinspecial
09/17/2026Energy Code Compliance InspectionsAnn Macklinprogress
09/17/2026Shutoff dampersAnn Macklinenergy_progress
09/17/2026FinalAnn Macklinprogress
09/17/2026HVAC-R and service water heating equipmentAnn Macklinenergy_progress
07/09/2026Air barrier - visual inspectionAnn Macklinenergy_progress
06/23/2026Energy Code Compliance InspectionsAnn Macklinprogress
06/23/2026FinalAnn Macklinprogress
06/23/2026Lighting in dwelling unitsAnn Macklinenergy_progress
06/23/2026HVAC-R and service water heating system controlsAnn Macklinenergy_progress
06/23/2026Mechanical SystemsAnn Macklinspecial
06/23/2026Fire-Resistant Penetrations and JointsAnn Macklinspecial
06/23/2026HVAC-R and service water piping design and insulationAnn Macklinenergy_progress
06/23/2026HVAC-R and service water heating equipmentAnn Macklinenergy_progress
06/23/2026Fire-Resistant Penetrations and JointsAnn Macklinspecial
05/26/2026Mechanical SystemsAnn Macklinspecial
05/26/2026Fire-Resistant Penetrations and JointsAnn Macklinspecial
05/26/2026HVAC-R and service water heating equipmentAnn Macklinenergy_progress
05/26/2026HVAC-R and service water piping design and insulationAnn Macklinenergy_progress
05/26/2026Maintenance informationAnn Macklinenergy_progress
Latest 25 of 150.
▾Documents — 3,178 on file (BIS + DOB NOW)
▸Plans & Drawings132
▸DOB NOWPlans/Sketch128
09/03/2026M00521990-P1Request digital key ↗
09/03/2026M00521990-I1Request digital key ↗
09/03/2026M00521990-P2Request digital key ↗
Showing 3 of 128 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00267465-I1Request digital key ↗
Showing 1 of 3 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00268326-I1Request digital key ↗
▸Applications & Permits1,055
▸BISWORK PERMIT APPLICATION539
02/04/2026140213597Open ↗
12/12/2025121685373Open ↗
12/12/2025121685373Open ↗
Showing 3 of 539 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION398
01/13/2026121925300Open ↗
01/06/2026121751381Open ↗
12/15/2025121751381Open ↗
Showing 3 of 398 on file for this type
▸DOB NOWLPC Approval/Permit116
10/04/2026M01389838-P2Open ↗
10/04/2026M01389838-P1Open ↗
09/05/2026M00267465-I1Open ↗
Showing 3 of 116 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications562
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION211
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 211 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature130
10/04/2026M01389838-P2Open ↗
10/04/2026M01389838-P1Open ↗
09/05/2026M00267465-I1Open ↗
Showing 3 of 130 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature99
10/05/2026M00787298-P1Open ↗
10/04/2026M01389838-P1Open ↗
10/04/2026M01389838-P2Open ↗
Showing 3 of 99 on file for this type
▸DOB NOWProgress Inspector Seal & Signature64
10/04/2026M01389838-P2Open ↗
10/04/2026M01389838-P2Open ↗
09/21/2026M01421031-I1Open ↗
Showing 3 of 64 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment216
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE105
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 105 on file for this type
▸BISSCHEDULE B - PLUMBING67
01/13/2026121925300Open ↗
12/04/2025122694539Open ↗
10/09/2025121791007Open ↗
Showing 3 of 67 on file for this type
▸BISSELF-CERT PLUMBING NOTICE33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISHEATING SYSTEMS3
03/05/2026121751381Open ↗
02/05/2025121891783Open ↗
Showing 2 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection30
▸BISTenant Protection Plan and Notes24
10/21/2025122141592Open ↗
06/11/2024121925300Open ↗
Showing 2 of 24 on file for this type
▸DOB NOWTenant Protection Plan4
09/05/2026M00267465-I1Open ↗
Showing 1 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos225
▸DOB NOWDEP ACP-5: Asbestos Assessment Report119
10/04/2026M01389838-P2Open ↗
10/04/2026M01389838-P1Open ↗
09/05/2026M00267465-I1Open ↗
Showing 3 of 119 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)79
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 79 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance35
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports60
▸BISTECHNICAL REPORT: RESPONSIBILITY24
11/12/2025122078599Open ↗
Showing 1 of 24 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)6
03/05/2026121751381Open ↗
02/05/2025121891783Open ↗
Showing 2 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION5
03/05/2026121751381Open ↗
Showing 1 of 5 on file for this type
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS4
03/05/2026121751381Open ↗
01/08/2026122040068Open ↗
11/12/2025122078599Open ↗
Showing 3 of 4 on file for this type
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING3
03/05/2026121751381Open ↗
01/08/2026122040068Open ↗
11/12/2025122078599Open ↗
▸BISSTRUCTURAL STEEL - WELDING3
03/05/2026121751381Open ↗
01/08/2026122040068Open ↗
11/12/2025122078599Open ↗
▸BISMECHANICAL SYSTEMS3
03/05/2026121751381Open ↗
02/05/2025121891783Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCONCRETE - CAST-IN-PLACE2
03/05/2026121751381Open ↗
01/08/2026122040068Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs216
▸BISLANDMARKS APPROVAL73
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 73 on file for this type
▸BISSUPERSEDING LETTER43
02/04/2026140213597Open ↗
12/12/2025121685373Open ↗
12/12/2025121685373Open ↗
Showing 3 of 43 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST24
01/12/2026122040068Open ↗
09/03/2025121891783Open ↗
Showing 2 of 24 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION20
03/13/2025121844941Open ↗
Showing 1 of 20 on file for this type
▸BISADMINISTRATIVE OBJECTIONS14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE12
08/11/2025121237027Open ↗
08/06/2025121237027Open ↗
Showing 2 of 12 on file for this type
▸BISFINAL9
01/08/2026122040068Open ↗
11/12/2025122078599Open ↗
03/13/2025121891783Open ↗
Showing 3 of 9 on file for this type
▸BISLANDMARKS SIGNOFF7
03/13/2025121891783Open ↗
Showing 1 of 7 on file for this type
▸BISSHED LETTER6
03/13/2025121844941Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWLandmark Approval5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Cost, Insurance & Ownership188
▸BISCOST AFFIDAVIT123
04/28/2025121237027Open ↗
Showing 1 of 123 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT47
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 47 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE10
11/15/2024121237027Open ↗
Showing 1 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW37
01/08/2026122040068Open ↗
03/13/2025121891783Open ↗
Showing 2 of 7 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms341
▸BISADDITIONAL INFORMATION150
03/03/2026121751381Open ↗
02/24/2026121900201Open ↗
12/18/2025122694539Open ↗
Showing 3 of 150 on file for this type
▸BISEFILING COVER SHEET104
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 104 on file for this type
▸BISBOROUGH INTAKE FORM84
02/04/2026140213597Open ↗
12/12/2025121685373Open ↗
12/12/2025121685373Open ↗
Showing 3 of 84 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents99
▸DOB NOWProof of Historic Building73
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 73 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION13
03/03/2026121751381Open ↗
Showing 1 of 13 on file for this type
▸DOB NOWManufacturer's Specifications5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWCalculations5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSupporting Document: Fee Exempt3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type