← Back
BuildNYC
Elevator apt, fireproof without stores
Van Dyke I (NYCHA)
345 LIVONIA AVENUE · Brownsville · BIN 3328129
💬 Discuss this project
1948Year Built
14Stories
D3Building Class
R6Zoning
458,572 sfGross Floor Area
592Units
LL97 Covered12 Active Violations 10 unresolved · 2 paperwork only 1 old, status unconfirmed ▸FISP: UNSAFEFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 323,438 sf lot · 1.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsNew York City Housing Authority2 filings
RoofNew York City Housing AuthorityUnder Construction1 filing · 16 docs
CellarMechanical demolition and HVAC work4 filings · 20 docs
Site & exteriorSupported pipe scaffolding installationUnder Construction5 filings · 16 docs
Filed — no permit issuedVan Dyke Building 22 facade restoration1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority8010/30/2026
Zoria Housing203/21/2026
Vikrant Contracti & BLD103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Dewberry Engineers510/24/2026
Pace Engineering112/01/2025
Shenoy Engineering407/24/2025
Kingston207/22/2025
Synergy Strategic Design Architects208/13/2024
RI Consulting Services306/14/2024
RLM Engineering106/06/2023
AI Engineers102/23/2023
Ronnette Riley Architect208/17/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Municipal Building Consultants503/21/2026
AE Design Solution203/21/2026
Neris403/21/2026
Synergy Strategic Design Architects103/21/2026
EDG103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & N Construction GroupScaffold1708/06/2026
Kordun ConstructionGeneral Contractor1407/08/2026
J & N Construction GroupGeneral Contractor410/30/2026
Kordun ConstructionPlumbing307/08/2026
Richards P and H CoPlumbing307/08/2026
Maximum Electrical ContractingElectrical103/21/2026
Alef Electrical ContractingElectrical103/21/2026
D.D.S. Mechanical PBG & HeatingPlumbing107/04/2026
N.Y.C. Housing AuthorityElectrical103/21/2026
Aujla ElectricElectrical103/22/2026
Infinity Electrical Contractors IElectrical103/21/2026
Eugene IovineElectrical103/21/2026
Abbey ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bureau Veritas Na6902610/24/2026
RI Consulting Services8904405/07/2026
MP Engineers & Architects1438308/13/2024
Leo Y Lee Associates2481102/20/2024
RLM Engineering6913106/06/2023
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 10, sub-cycle A)
The filing window opened 02/21/2025. 1 Cycle 10 filing on record, latest 02/18/2026, status Unsafe
11/02/2026
Permit expired, never signed off — Sidewalk Shed
The city's record still shows this permit as issued, with no sign-off on its filing
B01057131-I1-SH
11/02/2026
Permit expired, never signed off — Sidewalk Shed
The city's record still shows this permit as issued, with no sign-off on its filing
B01241171-I1-SH
10/31/2026
Signed off — Alteration
B01057114-I1
10/31/2026
Signed off — Alteration
Suspended scaffold outrigger system and materials hoist system for roof repairs, replacement and facade restoration works.
B01113420-I1
170 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJ & N Construction Group10/29/2026
DOB NOWSupported ScaffoldSigned-offJ & N Construction Group08/05/2026
DOB NOWSidewalk ShedPermit IssuedJ & N Construction Group08/04/2026
DOB NOWSidewalk ShedPermit IssuedJ & N Construction Group08/04/2026
DOB NOWSupported ScaffoldSigned-offJ & N Construction Group08/04/2026
DOB NOWSupported ScaffoldSigned-offJ & N Construction Group07/27/2026
DOB NOWMechanical SystemsSigned-offKordun Construction05/22/2026
DOB NOWSidewalk ShedPermit IssuedJ & N Construction Group05/13/2026
DOB NOWConstruction FencePermit IssuedJ & N Construction Group05/12/2026
DOB NOWPlumbingSigned-offKordun Construction03/18/2026
DOB NOWSuspended ScaffoldSigned-offJ&N Construction Group11/03/2025
DOB NOWGeneral ConstructionPermit IssuedJ & N Construction Group10/27/2025
DOB NOWPlumbingSigned-offD.D.S. Mechanical PBG & Heating08/25/2025
DOB NOWSupported ScaffoldSigned-offJ & N Construction Group07/25/2025
DOB NOWStructuralPermit IssuedKordun Construction07/23/2025
DOB NOWSidewalk ShedPermit IssuedJ & N Construction Group06/25/2025
DOB NOWConstruction FencePermit IssuedJ & N Construction Group05/15/2025
DOB NOWSidewalk ShedPermit IssuedJ & N Construction Group05/15/2025
DOB NOWMechanical SystemsSigned-offKordun Construction04/16/2025
DOB NOWGeneral ConstructionSigned-offKordun Construction04/16/2025
DOB NOWPlumbingSigned-offKordun Construction03/05/2025
DOB NOWSuspended ScaffoldSigned-offJ&N Construction Group10/09/2024
DOB NOWStructuralPermit IssuedKordun Construction08/01/2024
DOB NOWPlumbingPermit IssuedRichards P and H Co06/17/2024
DOB NOWSupported ScaffoldSigned-offJ & N Construction Group06/14/2024
DOB NOWSidewalk ShedPermit IssuedJ & N Construction Group06/10/2024
DOB NOWMechanical SystemsSigned-offKordun Construction04/08/2024
DOB NOWGeneral ConstructionSigned-offKordun Construction04/08/2024
DOB NOWSuspended ScaffoldSigned-offSkyline Restoration03/15/2024
DOB NOWMechanical SystemsSigned-offKordun Construction02/28/2024
DOB NOWPlumbingSigned-offKordun Construction02/28/2024
DOB NOWGeneral ConstructionSigned-offKordun Construction02/27/2024
DOB NOWPlumbingPermit IssuedRichards P and H Co06/14/2023
BISEQISSUEDZoria Housing10/26/2015
BISEQISSUEDZoria Housing09/01/2015
BISEQISSUEDVikrant Contracting & Builder09/01/2015
BISEQISSUEDTechnico Construction07/10/2014
BISEQISSUEDTechnico Construction03/04/2013
BISOTISSUEDM. Bhuiyan Construction Co06/14/2012
BISOTISSUEDM. Bhuiyan Construction Co04/09/2012
+ 11 more permits on file
4 projects · most recent 05/26/2026
Gas Water/Sanitary Storm
FiledStatusContractorScope
05/26/2026Signed-offKordun ConstructionGas, Water/Sanitary
07/24/2025Signed-offD.D.S. Mechanical PBG & HeatingGas
08/13/2024——Storm
06/06/2023Permit IssuedRichards P and H CoGas
6 projects · most recent 03/18/2025
General Wiring
FiledStatusContractorScope
03/18/2025Permit IssuedAujla Electric—
04/26/2024CompleteA.T.J. Electrical CoGeneral Wiring
08/14/2023Permit IssuedMeco Electric CoGeneral Wiring
01/25/2021CompleteCity Grid ElectricGeneral Wiring
08/16/2018CompleteJemco Electric ContractorsGeneral Wiring
07/28/2018CompleteZena Electric—
2 projects · most recent 07/22/2025
Scaffold Fence
FiledStatusContractorScope
07/22/2025Signed-offJ & N Construction GroupScaffold
06/08/2024Permit IssuedJ & N Construction GroupFence
1 project · most recent 05/07/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
05/07/2026Signed-offJ&N Construction GroupSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/07/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
08/18/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
08/10/2023Pass-Final PL - More than 10 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
10/14/2026Concrete - Cast-In-PlaceIBRAHIM MOURADspecial
10/14/2026FinalIBRAHIM MOURADprogress
10/14/2026Subsurface Conditions – Fill Placement & In-Place DensityIBRAHIM MOURADspecial
10/14/2026Structural Stability – Alterations of existing buildingsIBRAHIM MOURADspecial
10/14/2026Post-installed AnchorsIBRAHIM MOURADspecial
05/27/2026Post-installed AnchorsMD ISLAMspecial
05/07/2026Post-installed AnchorsMD ISLAMspecial
09/28/2025Post-installed AnchorsMD ISLAMspecial
09/10/2025Tenant Protection Plan Compliance—special
09/10/2025Structural Stability – Alterations of existing buildings—special
09/10/2025Post-installed Anchors—special
09/10/2025Masonry—special
09/10/2025Final—progress
08/04/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
08/04/2025Post-installed AnchorsIBRAHIM MOURADspecial
08/04/2025Tenant Protection Plan ComplianceIBRAHIM MOURADspecial
07/22/2025Post-installed AnchorsMd Istiaque Hasanspecial
07/18/2025Post-installed AnchorsIBRAHIM MOURADspecial
07/18/2025Tenant Protection Plan Compliance—special
07/18/2025Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
04/30/2025Fire-Resistant Penetrations and Joints—special
04/30/2025Tenant Protection Plan Compliance—special
04/30/2025Post-installed Anchors—special
03/05/2025Post-installed Anchors—special
03/05/2025Tenant Protection Plan Compliance—special
Latest 25 of 49.
197 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account