← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Colonnade
347 WEST 57 STREET · Hell's Kitchen · BIN 1026058
💬 Discuss this project
1982Year Built
45Stories
RMBuilding Class
C6-4Zoning
218,208 sfGross Floor Area
262Units
LL97 CoveredRent Stabilized13 Open Violations 7 unresolved · 6 paperwork only ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: THE COLONNADE CONDOMINIUM · 12,251 sf lot · 17.81 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
Roof8p · 4 filings · 20 docs
Floor 443p · 1 filing · 11 docs
Floor 43
Floor 42
Floor 41
Floor 40
Floor 393p · 1 filing · 16 docs
Floor 38
Floor 37
Floor 36
Floor 35
Floor 3417p · 3 filings · 20 docs
Floor 337p · 2 filings · 20 docs
Floor 32
Floor 31
Floor 30
Floor 295p · 1 filing · 20 docs
Floor 281p · 1 filing · 6 docs
Floor 271 filing · 5 docs
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21Under Construction3p · 1 filing · 6 docs
Floor 20Under Construction3p · 1 filing · 6 docs
Floor 19Under Construction3p · 1 filing · 6 docs
Floor 18Under Construction3p · 1 filing · 6 docs
Floor 17Under Construction3p · 1 filing · 6 docs
Floor 16
Floor 15
Floor 14Under Construction3p · 1 filing · 6 docs
Floor 131p · 1 filing · 9 docs
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 28p · 2 filings · 20 docs
Floor 1
Site & exterior6p · 2 filings · 12 docs
Filed — no permit issued7p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AKAM ASSOCIATES, INC.6109/13/2026
COLONNADE CONDOMINIUM2903/21/2026
COLONNADE903/21/2026
KINGS GROUP NY604/09/2026
COLLONADE503/21/2026
PYRAMID RESTORATION NY404/09/2026
HUDSON 1701-1706209/13/2026
JONAL MEDICAL ASSOCIATES203/21/2026
BRL CONSTRUCYION CORP103/22/2026
BRONX103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J A EXPEDITING1003/21/2026
CHRISTOPHER TEETER RA403/21/2026
HIERARCH-E203/21/2026
RIGGING CONSULTANTS203/21/2026
METROPOLIS GROUP INC803/21/2026
J CALLAHAN CONSULTING1003/21/2026
JOANNA KARAGIANNIS203/21/2026
ARSENAL BUILDING CONSULTANTS LLC203/21/2026
ANAT OFER ART ADVISORY103/21/2026
BERNARDO GAMBA103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
UNITED ELITE GROUP INCGeneral Contractor1007/08/2026
CASTCAPA CONSTRUCTION LLCGeneral Contractor607/08/2026
POWER POINT ELECTRIC INCElectrical503/22/2026
BRL CONSTRUCTION CORPGeneral Contractor407/08/2026
WF PLUMBING AND HEATING LPlumbing307/08/2026
KINGS GROUP NY CORPGeneral Contractor304/09/2026
BEST PRICE RENOVATIONS LLGeneral Contractor203/21/2026
CRYSTAL COMFORT INCGeneral Contractor203/21/2026
ORBIT PLBG & HTG INCPlumbing207/08/2026
LEONARD KRITZElectrical103/21/2026
MARIO CASTROElectrical103/21/2026
GRYGLEWSKI DARIUSZElectrical103/21/2026
SENAD MEHOVICElectrical103/21/2026
UPDATE SYSTEMS ELECTRICALElectrical103/22/2026
ALL CITY ELECTRICAL INCElectrical103/22/2026
DARIUSZ GRYGLEWSKIElectrical103/21/2026
CHRIS RICHEYElectrical103/21/2026
APRILAKIS, EVANGELINAElectrical103/21/2026
DESIMONE BUILDERS LLCGeneral Contractor104/10/2026
ELEMENTS DESIGN BUILD LLCGeneral Contractor106/27/2026
HELLO CHAPTER LLCGeneral Contractor107/08/2026
BROWN, JERMAINEElectrical103/21/2026
NEST BUILDERS CORPGeneral Contractor107/08/2026
ATTRACTIVE LIGHTING ELECLElectrical103/22/2026
ALKLEM PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIKOLAI KATZ ARCHITECT3482307/08/2026
LYDON ASSOCIATE5183104/07/2026
SHAHRISH SHUVO ENGINEERIN8524104/02/2026
AK CONSULTING SERVICES, I6198403/13/2025
GROUP-S LLC5216109/13/2024
PSI AGENCY INC.254805/06/2024
VILLA PEX CONSULTING ENGI8408103/06/2024
GEIGER ENGINEERING. PC689109/15/2022
LEDER-LUIS ARCHITECTURAL1553107/22/2022
Building Lifecycle
All (236)Filed (33)Permit Issued (36)Signed Off (12)Facade (FISP) (27)Violation (60)Inspection (24)Objection (14)Special Inspection (30)
08/04/2026
Cycle 10 facade report signed — SAFE
08/01/2026
Objection raised — Accessibility
08/01/2026
Objection raised — Accessibility
07/31/2026
Cycle 10 facade report submitted
07/29/2026
Cycle 10 facade inspection completed
07/09/2026
Signed off — Alteration
inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Diego Buri Cumbe
M01309815-I1
07/08/2026
Filed — Alteration
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 29-C ON THE 29TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01088328-P1
07/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/23/2026
Permit issued — General Construction
M01372864-I1-GC
06/22/2026
Special inspection requirement — Fire-Resistance Rated Construction
Nikolai Katz
06/22/2026
Special inspection requirement — Final
Nikolai Katz
06/22/2026
Special inspection requirement — Lighting controls
Nikolai Katz
06/22/2026
Special inspection requirement — Mechanical Systems
Nikolai Katz
06/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Nikolai Katz
06/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
Nikolai Katz
06/22/2026
Special inspection requirement — Interior lighting power
Nikolai Katz
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nikolai Katz
06/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Nikolai Katz
06/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
Nikolai Katz
04/28/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/08/2026
Permit issued — General Construction
M01380514-I1-GC
04/07/2026
Filed — Alteration
Propose interior renovation of apartment 27D. Removal and installation of non load bearing partitions and related finishes all as per plans herewith filed. No change in use, egress or occupancy filed under this application.
M01372864-I1
04/02/2026
Filed — Alteration
REPAIR OF EXISTING FIRE RATED WALLS IN COMMON HALLWAYS
M01380514-I1
03/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/26/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/26/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/13/2026
Permit issued — General Construction
M01308331-I1-GC
02/10/2026
Permit issued — Plumbing
M01308331-S1-PL
02/04/2026
Permit issued — Plumbing
M01088328-S1-PL
01/30/2026
Objection resolved — Addressed
01/08/2026
Permit issued — Suspended Scaffold
M01329763-I1-SC
12/29/2025
Objection resolved — Addressed
12/29/2025
Objection resolved — Addressed
12/15/2025
Signed off — Alteration
M00825252-I1
12/12/2025
Permit issued — Suspended Scaffold
M01329763-I1-SC
12/09/2025
Filed — Alteration
ROPE ACCESS INSTALLATION FOR FACADE ACCESS AND INSPECTIONS
M01329763-I1
12/08/2025
Objection raised — Cost
12/08/2025
Objection raised — Scope
12/08/2025
Objection raised — Scope
12/02/2025
Permit issued — Suspended Scaffold
M01309815-I1-SC
11/20/2025
Filed — Alteration
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APT. 44-E ON THE 44TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01308331-I1
11/20/2025
Filed — Alteration
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APT. 44-E ON THE 44TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01308331-S1
11/05/2025
Permit issued — Suspended Scaffold
M01309815-I1-SC
10/29/2025
Filed — Alteration
inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Diego Buri Cumbe
M01309815-I1
10/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nikolai Katz
10/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nikolai Katz
10/24/2025
Special inspection requirement — Interior lighting power
Nikolai Katz
10/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Nikolai Katz
10/24/2025
Special inspection requirement — Lighting controls
Nikolai Katz
10/24/2025
Special inspection requirement — Final
Nikolai Katz
09/17/2025
Permit issued — Mechanical Systems
M01088328-I1-GC-CX
09/09/2025
Cycle 9 facade report submitted
09/09/2025
Cycle 9 facade report signed — SAFE
08/22/2025
Signed off — Alteration
FILING FOR FACADE REPAIR AS PER PLANS FILED HEREWITH. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
M00778378-I1
08/21/2025
Cycle 9 facade inspection completed
07/15/2025
Permit issued — General Construction
M00778378-I1-GC
06/18/2025
Permit issued — Suspended Scaffold
M01016794-I1-SC
06/10/2025
Permit issued — General Construction
M00778378-I1-GC
Latest 60 of 236 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offELEMENTS DESIGN BUILD LLC06/23/2026
DOB NOWGeneral ConstructionPermit IssuedDESIMONE BUILDERS04/08/2026
DOB NOWGeneral ConstructionSigned-offBRL CONSTRUCTION02/13/2026
DOB NOWPlumbingSigned-offWF PLUMBING AND HEATING L02/10/2026
DOB NOWPlumbingSigned-offWF PLUMBING AND HEATING L02/04/2026
DOB NOWSuspended ScaffoldPermit IssuedTC ZONE INC01/08/2026
DOB NOWSuspended ScaffoldPermit IssuedCONSTRUCTED CORP12/12/2025
DOB NOWSuspended ScaffoldSigned-offSTREAMLINE CONSULTANTS NY12/02/2025
DOB NOWSuspended ScaffoldSigned-offSTREAMLINE CONSULTANTS NY11/05/2025
DOB NOWMechanical SystemsPermit IssuedBRL CONSTRUCTION09/17/2025
DOB NOWGeneral ConstructionSigned-offCASTCAPA CONSTRUCTION07/15/2025
DOB NOWSuspended ScaffoldPermit IssuedSPD CONSTRUCTION CORP06/18/2025
DOB NOWGeneral ConstructionSigned-offCASTCAPA CONSTRUCTION06/10/2025
DOB NOWPlumbingSigned-offWF PLUMBING AND HEATING L03/03/2025
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP01/13/2025
DOB NOWMechanical SystemsSigned-offCRYSTAL COMFORT09/20/2024
DOB NOWGeneral ConstructionSigned-offHELLO CHAPTER LLC08/15/2024
DOB NOWGeneral ConstructionSigned-offNEST BUILDERS CORP07/26/2024
DOB NOWGeneral ConstructionSigned-offCASTCAPA CONSTRUCTION05/29/2024
DOB NOWMechanical SystemsSigned-offUNITED ELITE GROUP INC05/28/2024
DOB NOWGeneral ConstructionSigned-offUNITED ELITE GROUP INC05/28/2024
DOB NOWSuspended ScaffoldPermit IssuedSPD CONSTRUCTION CORP03/14/2024
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP01/19/2024
DOB NOWMechanical SystemsPermit IssuedBEST PRICE RENOVATIONS LL08/02/2023
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC06/14/2023
DOB NOWGeneral ConstructionSigned-offCASTCAPA CONSTRUCTION05/25/2023
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP02/13/2023
DOB NOWGeneral ConstructionSigned-offUNITED ELITE GROUP INC01/12/2023
DOB NOWMechanical SystemsSigned-offUNITED ELITE GROUP INC01/12/2023
DOB NOWPlumbingSigned-offLIQUID TECH PLBG&HTG,INC08/03/2022
DOB NOWGeneral ConstructionSigned-offBRL CONSTRUCTION08/02/2022
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC05/06/2022
DOB NOWGeneral ConstructionSigned-offUNITED ELITE GROUP INC03/01/2022
DOB NOWMechanical SystemsSigned-offUNITED ELITE GROUP INC03/01/2022
DOB NOWPlumbingSigned-offALKLEM PLUMBING INC02/10/2022
DOB NOWGeneral ConstructionPermit IssuedBRL CONSTRUCTION11/30/2021
BISOTISSUEDBRL CONSTRUCTION CORP05/23/2023
BISOTISSUEDL J & A CONSTRUCTION CORP08/01/2019
BISPLISSUEDRITE WAY HEATING CORP04/02/2019
BISOTISSUEDTODERIC INC03/18/2019
+ 46 more permits on file
2 projects · most recent 07/08/2026
Heating and Air Conditioning Systems Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/08/2026Permit IssuedBRL CONSTRUCTION CORPHeating and Air Conditioning Systems
Heat / Cool
Ambiance Air CL-140 387 CFM · Fan Coil Indoor ×1
FRC-140 15,000 BTU ×1
WL-140 387 CFM · Fan Coil Indoor ×1
07/22/2022Permit IssuedBEST PRICE RENOVATIONS LLAir Conditioning Systems
Cooling
Mitsubishi Electric PUMY-P60NKMU2 60,000 BTU · Vrf Outdoor ×1
1 project · most recent 11/20/2025
Gas Water/Sanitary
FiledStatusContractorScope
11/20/2025Signed-offWF PLUMBING AND HEATING LGas, Water/Sanitary
25 projects · most recent 09/01/2026
General Wiring Lighting
FiledStatusContractorScope
09/01/2026Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
08/31/2026Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
06/23/2026Permit IssuedTHE METRO GROUP ELECTRICGeneral Wiring
05/28/2026CompleteS.A.L. ELECTRIC CO INC.—
02/09/2026CompleteZIN ELECTRICAL, INC—
01/05/2026Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
10/10/2025Permit IssuedLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
09/18/2025CompleteATTRACTIVE LIGHTING ELECLGeneral Wiring
03/13/2025CompleteY.S ELECTRICGeneral Wiring, Lighting
02/02/2025CompleteKYL ELECTRIC LLCGeneral Wiring
08/06/2024CompleteEIS ELECTRIC CORP DBAGeneral Wiring
07/03/2024CancelledPOWER POINT ELECTRIC INCGeneral Wiring
06/20/2024Permit IssuedPOWER POINT ELECTRIC INCGeneral Wiring
05/13/2024Permit IssuedPOWER POINT ELECTRIC INCGeneral Wiring
04/19/2024Permit IssuedPOWER POINT ELECTRIC INCGeneral Wiring
3 projects · most recent 12/09/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
12/09/2025Permit IssuedTC ZONE INC—
10/29/2025Signed-offSTREAMLINE CONSULTANTS NY—
03/08/2024Permit IssuedSPD CONSTRUCTION CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 24
DateTypeResultReport
07/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/28/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/28/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/26/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/26/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/28/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/07/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/23/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/21/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/28/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/18/2022Pass-Final CND-Occupancy InspectionPassView ↗
06/23/2022Pass-Final CND-Occupancy InspectionPassView ↗
06/16/2022Fail-Final CND-Occupancy InspectionFailView ↗
04/08/2022Fail-Final CND-Occupancy InspectionFailView ↗
04/07/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/07/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
06/22/2026Fire-Resistance Rated ConstructionNikolai Katzprogress
06/22/2026Mechanical SystemsNikolai Katzspecial
06/22/2026HVAC-R and service water heating system controlsNikolai Katzenergy_progress
06/22/2026HVAC-R and service water heating equipmentNikolai Katzenergy_progress
06/22/2026Interior lighting powerNikolai Katzenergy_progress
06/22/2026HVAC-R and service water piping design and insulationNikolai Katzenergy_progress
06/22/2026Lighting controlsNikolai Katzenergy_progress
06/22/2026Energy Code Compliance InspectionsNikolai Katzprogress
06/22/2026FinalNikolai Katzprogress
06/22/2026Fire-Resistant Penetrations and JointsNikolai Katzspecial
10/24/2025FinalNikolai Katzprogress
10/24/2025Interior lighting powerNikolai Katzenergy_progress
10/24/2025Fire-Resistant Penetrations and JointsNikolai Katzspecial
10/24/2025Energy Code Compliance InspectionsNikolai Katzprogress
10/24/2025Fire-Resistance Rated ConstructionNikolai Katzprogress
10/24/2025Lighting controlsNikolai Katzenergy_progress
03/24/2025HVAC-R and service water heating system controlsMAHFUZAR RAHMANenergy_progress
03/24/2025Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
03/24/2025Heating SystemsMAHFUZAR RAHMANspecial
03/24/2025Mechanical SystemsMAHFUZAR RAHMANspecial
03/24/2025Energy Code Compliance InspectionsMAHFUZAR RAHMANprogress
03/24/2025FinalLilian Weinreichprogress
03/24/2025HVAC-R and service water piping design and insulationMAHFUZAR RAHMANenergy_progress
12/13/2024Fire-Resistant Penetrations and JointsMAHFUZAR RAHMANspecial
12/13/2024Heating SystemsMAHFUZAR RAHMANspecial
Latest 25 of 75.
▾Documents — 712 on file (BIS + DOB NOW)
▸Plans & Drawings33
▸DOB NOWPlans/Sketch33
09/03/2026M00508047-I1Request digital key ↗
09/03/2026M00552597-I1Request digital key ↗
09/02/2026M00649197-I1Request digital key ↗
Showing 3 of 33 on file for this type
▸Applications & Permits117
▸BISPLAN / WORK APPROVAL APPLICATION57
12/09/2022141008219Open ↗
09/01/2022121825141Open ↗
05/16/2022141008219Open ↗
Showing 3 of 57 on file for this type
▸BISWORK PERMIT APPLICATION53
05/23/2023141008219Open ↗
08/06/2019123574523Open ↗
08/01/2019123574523Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit6
09/02/2026M00759026-I1Open ↗
08/13/2026M00759026-P1Open ↗
08/13/2026M01380514-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
05/16/2022141008219Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
08/06/2020123920739Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
02/19/2020123574523Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026M00498948-I1Open ↗
▸Seals & Professional Certifications171
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION46
09/23/2019140819997Open ↗
09/23/2019140819997Open ↗
03/26/2019140643720Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWProgress Inspector Seal & Signature32
09/01/2026M00649197-I1Open ↗
09/01/2026M00649197-I1Open ↗
09/01/2026M00649197-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature30
09/03/2026M00552597-I1Open ↗
09/02/2026M00649197-I1Open ↗
09/02/2026M00648097-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/01/2026M00649197-I1Open ↗
09/01/2026M00649197-I1Open ↗
09/01/2026M00759470-I1Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
02/21/2019123574523Open ↗
01/18/2019123592601Open ↗
05/31/2017122895849Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT6
02/21/2019123574523Open ↗
01/18/2019123592601Open ↗
05/17/2017140643720Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
04/15/2022141008219Open ↗
06/16/2020140897493Open ↗
01/08/2019140819997Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
05/17/2017140643720Open ↗
04/13/2016140479042Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
04/15/2022141008219Open ↗
05/17/2017140643720Open ↗
Showing 2 of 3 on file for this type
▸BISProfessional and Owner Certification (POC3)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment51
▸BISSCHEDULE B - PLUMBING18
01/08/2019140819997Open ↗
11/21/2017140717918Open ↗
Showing 2 of 18 on file for this type
▸BISSELF-CERT PLUMBING NOTICE17
12/28/2015122479790Open ↗
Showing 1 of 17 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
02/21/2019123574523Open ↗
01/18/2019123592601Open ↗
03/24/2016122554333Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS4
07/26/2018123329031Open ↗
Showing 1 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
07/26/2018123329031Open ↗
Showing 1 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection72
▸DOB NOWHPD-2: Clinton Special District Anti-Harassment Checklist25
09/03/2026M00552597-I1Open ↗
09/02/2026M00759026-I1Open ↗
08/18/2026M01372864-I1Open ↗
Showing 3 of 25 on file for this type
▸BISANTI-HARASSMENT CHECKLIST: CLINTON12
06/16/2020140897493Open ↗
01/18/2019123592601Open ↗
01/08/2019140819997Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWCertificate of No Harassment12
09/03/2026M00552597-I1Open ↗
09/02/2026M00759026-I1Open ↗
08/18/2026M01372864-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTenant Protection Plan and Notes8
06/16/2020140897493Open ↗
02/21/2019123574523Open ↗
01/18/2019123592601Open ↗
Showing 3 of 8 on file for this type
▸BISHPD-2 - Clinton Special district Anti-Harassment Checklist6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWStreet Tree Checklist4
08/13/2026M00498948-P1Open ↗
08/13/2026M00498948-P3Open ↗
08/13/2026M00498948-P2Open ↗
Showing 3 of 4 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
04/09/2019123574523Open ↗
▸BISCLINTON DISTRICT: ANTI-HARASSMENT CHECKLIST1
08/06/2020123920739Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M00498948-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/13/2026M00498948-I1Open ↗
▸Environmental & Asbestos58
▸DOB NOWDEP ACP-5: Asbestos Assessment Report23
09/03/2026M00552597-I1Open ↗
09/02/2026M00649197-I1Open ↗
09/02/2026M00648097-I1Open ↗
Showing 3 of 23 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)17
06/16/2020140897493Open ↗
02/21/2019123574523Open ↗
01/18/2019123592601Open ↗
Showing 3 of 17 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/20/2026M01308331-S1Open ↗
08/15/2026M01308331-I1Open ↗
08/13/2026M01088328-S1Open ↗
Showing 3 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
11/10/2015122554333Open ↗
▸Energy Compliance44
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS23
09/23/2019140819997Open ↗
09/23/2019140819997Open ↗
02/21/2019123574523Open ↗
Showing 3 of 23 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
09/23/2019140819997Open ↗
10/23/2018140717918Open ↗
07/13/2018123329031Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
06/16/2020140897493Open ↗
01/24/2019140819997Open ↗
01/08/2019140819997Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026M00649197-I1Open ↗
08/13/2026M00759026-I1Open ↗
08/13/2026M00645214-I1Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
05/17/2017140643720Open ↗
▸Inspections & Test Reports10
▸BISTECHNICAL REPORT: RESPONSIBILITY9
09/07/2023141008219Open ↗
03/21/2023141008219Open ↗
06/16/2020140897493Open ↗
Showing 3 of 9 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
04/15/2022141008219Open ↗
▸Approvals, Objections & Sign-offs38
▸BISADMINISTRATIVE OBJECTIONS16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST13
09/07/2023141008219Open ↗
09/23/2019140819997Open ↗
03/26/2019140643720Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION6
09/22/2022141008219Open ↗
01/18/2019123592601Open ↗
12/08/2017120775134Open ↗
Showing 3 of 6 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCCD1-Construction Code Determination1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership43
▸BISCOST AFFIDAVIT41
04/15/2022141008219Open ↗
06/16/2020140897493Open ↗
09/23/2019140819997Open ↗
Showing 3 of 41 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms58
▸BISEFILING COVER SHEET22
07/08/2020123920739Open ↗
02/21/2019123574523Open ↗
01/18/2019123592601Open ↗
Showing 3 of 22 on file for this type
▸BISADDITIONAL INFORMATION19
11/30/2022141008219Open ↗
01/30/2019140819997Open ↗
01/24/2019140819997Open ↗
Showing 3 of 19 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
04/15/2022141008219Open ↗
06/16/2020140897493Open ↗
12/10/2018140819997Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM8
02/19/2020123574523Open ↗
02/13/2020121825141Open ↗
09/23/2019140819997Open ↗
Showing 3 of 8 on file for this type
▸Other Documents10
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
05/13/2016122479790Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWIRA Certification2
08/13/2026M01329763-I1Open ↗
08/13/2026M01309815-I1Open ↗
▸BISVERIFY DOB PLAN NAMING STANDARD IS MET1
08/06/2020123920739Open ↗
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFinal Survey1
08/13/2026M00498948-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01016794-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01016794-I1Open ↗