← Back
Elevator co-op, conversion from loft/warehouse
35 BOND STREET
MANHATTAN · BIN 1008431
💬 Discuss this project
1893Year Built
6Stories
D0Building Class
M1-5/R7XZoning
43,020 sfGross Floor Area
15Units
Rent Stabilized0 Open Violations
Elevator co-op, conversion from loft/warehouse · Owner of record: 35 BOND STREET CORP · 8,010 sf lot · 5.37 FAR built · Flood zone X
Locations of Work
General
Floor 61p · 1 filing · 20 docs
Floor 51p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 21p · 1 filing · 20 docs
Floor 1
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
35 BOND STREET4807/08/2026
35 BOND STREET CORP THE A203/22/2026
33 BLEECKER STREET103/22/2026
35-39 BOND ST603/21/2026
J G GNRL CONTRACT203/21/2026
MODERNLINK203/21/2026
35-39 BOND303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H J BUILDING CONSULTING203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
HUGH CHRYSLER ENGINEERING603/21/2026
BOYD CONSULTING203/21/2026
EUROCELT EXPEDITING, INC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
INTERSYSTEM INSTALLATIONGeneral Contractor907/08/2026
M&A PROJECTS RESTORATION*General Contractor303/21/2026
FREDERICK LEEElectrical203/21/2026
MICHAEL BAPTISTEElectrical103/21/2026
MR. AIR NYC CORPGeneral Contractor107/08/2026
DEMAR MECHANICAL INCPlumbing107/08/2026
DEMAR PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AIR SOLUTION INC8418107/16/2025
HUGH CHRYSLER ENGINEERING4251306/01/2022
SWL ENGINEERING INSPECTIO6912103/11/2021
Building Lifecycle
All (97)Filed (8)Permit Issued (9)Signed Off (5)Violation (41)Inspection (4)Objection (2)Special Inspection (28)
11/13/2025
Signed off — Alteration
Installation of a new ductless mini-split air conditioning system in Apartment #6 of the existing 6-story building with mechanical work as per plans filed herewith. No change in use, egress or certificate of occupancy.
M01251419-I1
09/04/2025
Permit issued — Mechanical Systems
M01251419-I1-MS
08/06/2025
Objection resolved — Addressed
07/31/2025
Objection raised — Plumbing
07/16/2025
Filed — Alteration
Installation of a new ductless mini-split air conditioning system in Apartment #6 of the existing 6-story building with mechanical work as per plans filed herewith. No change in use, egress or certificate of occupancy.
M01251419-I1
07/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
Tianchen Hu
07/12/2025
Special inspection requirement — Tenant Protection Plan Compliance
Tianchen Hu
07/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
Tianchen Hu
07/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Tianchen Hu
07/12/2025
Special inspection requirement — Maintenance information
Tianchen Hu
07/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Tianchen Hu
07/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Tianchen Hu
07/04/2025
Special inspection requirement — Final
Tianchen Hu
07/04/2025
Special inspection requirement — Mechanical Systems
Tianchen Hu
10/02/2023
Filed — Alteration
M00938104-I1
09/25/2023
Special inspection requirement — Tenant Protection Plan Compliance
09/22/2023
Special inspection requirement — Final
02/24/2023
Signed off — Alteration
RE-PIPE ALL GAS SUPPLY 4-7 INS W.C. GAS PRESSURE. ALL NEW LOW-PRESSURE GAS DISTRIBUTION FOR EXISTING BUILDING. NO CHANGE IN USE- EGRESS OR OCCUPANCY INVOLVED UNDER THIS APPLICATION.
M00580669-I1
11/02/2022
Violation issued (HPD, closed)
I
06/01/2022
Filed — Alteration
RE-PIPE ALL GAS SUPPLY 4-7 INS W.C. GAS PRESSURE. ALL NEW LOW-PRESSURE GAS DISTRIBUTION FOR EXISTING BUILDING. NO CHANGE IN USE- EGRESS OR OCCUPANCY INVOLVED UNDER THIS APPLICATION.
M00580669-P2
05/31/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
HUGH CHRYSLER
05/31/2022
Special inspection requirement — HVAC-R and service water heating equipment
HUGH CHRYSLER
05/31/2022
Special inspection requirement — HVAC-R and service water heating system controls
HUGH CHRYSLER
05/31/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
HUGH CHRYSLER
05/31/2022
Special inspection requirement — Energy Code Compliance Inspections
HUGH CHRYSLER
05/25/2022
Filed — Alteration
RE-PIPE ALL GAS SUPPLY 4-7 INS W.C. GAS PRESSURE. ALL NEW LOW-PRESSURE GAS DISTRIBUTION FOR EXISTING BUILDING. NO CHANGE IN USE- EGRESS OR OCCUPANCY INVOLVED UNDER THIS APPLICATION.
M00580669-P1
05/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
HUGH CHRYSLER
05/23/2022
Special inspection requirement — Energy Code Compliance Inspections
HUGH CHRYSLER
05/23/2022
Special inspection requirement — HVAC-R and service water heating equipment
HUGH CHRYSLER
05/23/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
HUGH CHRYSLER
05/23/2022
Special inspection requirement — HVAC-R and service water heating system controls
HUGH CHRYSLER
05/16/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/29/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/21/2022
Signed off — Alteration
FILING FOR SIDEWALK VAULT REPAIRS; NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00483492-I1
04/12/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
04/06/2022
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/11/2022
Permit issued — Plumbing
M00580669-I1-PL
10/25/2021
Permit issued — Plumbing
M00580669-I1-PL
10/19/2021
Filed — Alteration
RE-PIPE ALL GAS SUPPLY 4-7 INS W.C. GAS PRESSURE. ALL NEW LOW-PRESSURE GAS DISTRIBUTION FOR EXISTING BUILDING. NO CHANGE IN USE- EGRESS OR OCCUPANCY INVOLVED UNDER THIS APPLICATION.
M00580669-I1
06/23/2021
Violation issued (ECB, closed)
Plumbing
06/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/21/2021
Permit issued — Structural
M00483492-I1-ST
05/19/2021
Violation issued (ECB, closed)
Construction
05/19/2021
Violation issued (ECB, closed)
Construction
04/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/31/2021
Violation issued (ECB, closed)
Construction
03/31/2021
Violation issued (ECB, closed)
Construction
03/11/2021
Filed — Alteration
FILING FOR SIDEWALK VAULT REPAIRS; NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00483492-I1
03/09/2021
Special inspection requirement — Structural Steel - High Strength Bolting
JOSHUA LUCKRITZ
03/09/2021
Special inspection requirement — Post-installed Anchors
JOSHUA LUCKRITZ
03/09/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOSHUA LUCKRITZ
03/09/2021
Special inspection requirement — Final
Yakov Weinstein
03/09/2021
Special inspection requirement — Structural Steel - Welding
JOSHUA LUCKRITZ
03/09/2021
Special inspection requirement — Structural Steel - Details
JOSHUA LUCKRITZ
02/19/2021
Violation issued (ECB, closed)
Construction
02/19/2021
Violation issued (ECB, closed)
Construction
01/20/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/05/2021
Signed off — Alteration
INSTALLATION OF A TEMPORARY SCAFFOLD AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
M00202024-I1
01/05/2021
Signed off — Alteration
M00375309-I1
Latest 60 of 97 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMR. AIR NYC CORP09/04/2025
DOB NOWPlumbingSigned-offDEMAR MECHANICAL INC02/11/2022
DOB NOWPlumbingSigned-offDEMAR PLUMBING CORP10/25/2021
DOB NOWStructuralSigned-offM&A PROJECTS RESTORATION*05/21/2021
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION09/16/2020
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION09/04/2020
DOB NOWSidewalk ShedSigned-offINTERSYSTEM INSTALLATION07/27/2020
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION09/25/2019
DOB NOWSupported ScaffoldSigned-offINTERSYSTEM INSTALLATION07/31/2019
BISOTISSUEDM&A PROJECTS RESTORATION*09/09/2020
BISEQISSUEDM&A PROJECTS RESTORATION*08/21/2020
BISEQISSUEDM&A PROJECTS RESTORATION*08/30/2019
BISOTISSUEDF.SGROI CONSTRUCTION CO01/31/2017
BISOTISSUEDF.SGROI CONSTRUCTION CO11/03/2016
BISEQISSUEDJ& G GNRL CONTRACT INC10/28/2016
BISOTISSUEDO'HARE CONTRACTING SVCS I09/16/2014
BISOTISSUEDLAUNDRO COMBUSTION CORP02/04/2013
BISOTISSUEDOFFICE 606 DESIGN & CONST04/27/2010
BISEQISSUEDOUTDOOR INSTALLATIONS LLC07/27/2009
BISEQISSUEDOUTDOOR INSTALLATION LLC.03/19/2008
BISEQISSUEDOUTDOOR INSTALLATIONS LLC.03/19/2008
BISMHISSUEDPALONE BROTHERS AIR08/11/2000
BISOTISSUEDDEDALOS AND IKAROS CONSTRUCTION10/13/1999
BISSPRE-ISSUEDONOFRIO LODUCA PLBG CORP.10/05/1999
BISPLISSUEDONOFRIO LODUCA PLBG CORP09/20/1999
BISEQISSUEDMAXCON CORPORATION01/22/1999
BISOTISSUEDMAXCON CORPORATION01/22/1999
BISMHISSUEDMAXCON CORPORATION01/22/1999
BISEQISSUEDSPRING ENTERPRISES INC06/08/1994
BISEQISSUEDSPRING ENTERPRISES INC06/08/1994
BISSPISSUEDAMOK INC02/09/1994
BISPLISSUEDAMOK INC12/22/1993
BIS—ISSUEDEXPERT CONCRETE,INC.04/02/1991
BIS—ISSUEDEXPERT CONCRETE,INC.02/27/1991
3 projects · most recent 07/31/2026
HVAC Wiring
FiledStatusContractorScope
07/31/2026Permit IssuedJSP ELECTL CNTNG CORP18 meters
09/04/2025CompleteINTELOGIC ELECTRIC, INC.HVAC Wiring
08/23/2020CompleteSTEVEN FARKAS—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
05/16/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/29/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/12/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
04/06/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
07/12/2025HVAC-R and service water heating equipmentTianchen Huenergy_progress
07/12/2025Tenant Protection Plan ComplianceTianchen Huspecial
07/12/2025HVAC-R and service water heating system controlsTianchen Huenergy_progress
07/12/2025HVAC-R and service water piping design and insulationTianchen Huenergy_progress
07/12/2025Maintenance informationTianchen Huenergy_progress
07/12/2025Energy Code Compliance InspectionsTianchen Huprogress
07/12/2025Fire-Resistant Penetrations and JointsTianchen Huspecial
07/04/2025FinalTianchen Huprogress
07/04/2025Mechanical SystemsTianchen Huspecial
09/25/2023Tenant Protection Plan Compliance—special
09/22/2023Final—progress
05/31/2022Fire-Resistant Penetrations and JointsHUGH CHRYSLERspecial
05/31/2022HVAC-R and service water heating equipmentHUGH CHRYSLERenergy_progress
05/31/2022HVAC-R and service water heating system controlsHUGH CHRYSLERenergy_progress
05/31/2022HVAC-R and service water piping design and insulationHUGH CHRYSLERenergy_progress
05/31/2022Energy Code Compliance InspectionsHUGH CHRYSLERprogress
05/23/2022Fire-Resistant Penetrations and JointsHUGH CHRYSLERspecial
05/23/2022Energy Code Compliance InspectionsHUGH CHRYSLERprogress
05/23/2022HVAC-R and service water heating equipmentHUGH CHRYSLERenergy_progress
05/23/2022HVAC-R and service water piping design and insulationHUGH CHRYSLERenergy_progress
05/23/2022HVAC-R and service water heating system controlsHUGH CHRYSLERenergy_progress
03/09/2021Structural Steel - High Strength BoltingJOSHUA LUCKRITZspecial
03/09/2021Post-installed AnchorsJOSHUA LUCKRITZspecial
03/09/2021Structural Stability – Alterations of existing buildingsJOSHUA LUCKRITZspecial
03/09/2021FinalYakov Weinsteinprogress
Latest 25 of 28.
▾Documents — 198 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch6
09/04/2026M00483492-I1Request digital key ↗
09/03/2026M00580669-I1Request digital key ↗
09/03/2026M00580669-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00375309-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00202024-I1Request digital key ↗
▸Applications & Permits28
▸BISPLAN / WORK APPROVAL APPLICATION13
08/21/2020140940347Open ↗
07/06/2020140915071Open ↗
08/29/2019140866579Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION10
09/09/2020140940347Open ↗
08/21/2020140866579Open ↗
08/29/2019140866579Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWLPC Approval/Permit3
08/13/2026M00938104-I1Open ↗
08/13/2026M01251419-I1Open ↗
08/13/2026M00483492-I1Open ↗
▸BISSIDEWALK SHED APPLICATION & PERMIT1
09/09/2020140940347Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/06/2020140915071Open ↗
▸Seals & Professional Certifications61
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION15
10/03/2019123802215Open ↗
09/30/2019123802215Open ↗
08/09/2019123802215Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026M01251419-I1Open ↗
09/23/2026M01251419-I1Open ↗
08/29/2026M00375309-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026M01251419-I1Open ↗
08/27/2026M00580669-P1Open ↗
08/26/2026M00483492-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/03/2026M00580669-P2Open ↗
09/03/2026M00580669-P1Open ↗
09/03/2026M00580669-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
10/05/2016122885912Open ↗
09/17/2014122101439Open ↗
01/11/2013121482430Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
08/29/2019140866579Open ↗
10/27/2016140567385Open ↗
10/05/2016122885912Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
01/11/2013121482430Open ↗
07/27/2009120118103Open ↗
03/18/2008110112583Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
08/21/2020140940347Open ↗
07/06/2020140915071Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
08/29/2019140866579Open ↗
10/27/2016140567385Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
08/29/2019140866579Open ↗
10/27/2016140567385Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/11/2013121482430Open ↗
▸Safety & Tenant Protection8
▸BISTENANT PROTECTION PLAN AND NOTES6
08/21/2020140940347Open ↗
07/06/2020140915071Open ↗
08/29/2019140866579Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWTenant Protection Plan2
08/13/2026M00202024-I1Open ↗
08/13/2026M00375309-I1Open ↗
▸Environmental & Asbestos17
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
08/21/2020140940347Open ↗
07/06/2020140915071Open ↗
08/09/2019123802215Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/03/2026M00580669-P2Open ↗
09/03/2026M00580669-P1Open ↗
09/03/2026M00580669-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
07/27/2009120118103Open ↗
03/18/2008110112583Open ↗
03/12/2008110113467Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
03/03/2010120276281Open ↗
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
08/09/2019123802215Open ↗
10/05/2016122885912Open ↗
05/25/2016121482430Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
03/28/2022140940347Open ↗
05/25/2016121482430Open ↗
10/14/2015122101439Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/28/2022140940347Open ↗
08/21/2020140940347Open ↗
07/06/2020140915071Open ↗
▸BISTR8: Energy Code Progress Inspections1
09/05/2014122085867Open ↗
▸BISNYCECC EXEMPTION1
07/07/2020140915071Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/27/2016140567385Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00580669-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY9
03/28/2022140940347Open ↗
03/28/2022140940347Open ↗
03/28/2022140940347Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs18
▸BISLANDMARKS APPROVAL9
08/21/2020140940347Open ↗
07/06/2020140915071Open ↗
09/30/2019123802215Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
01/11/2013121482430Open ↗
03/03/2010120276281Open ↗
07/27/2009120118103Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/29/2022140940347Open ↗
05/25/2016121482430Open ↗
10/14/2015122101439Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/09/2019123802215Open ↗
▸BISLANDMARKS SIGNOFF1
03/28/2022140940347Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT10
03/28/2022140940347Open ↗
08/21/2020140940347Open ↗
07/06/2020140915071Open ↗
Showing 3 of 10 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
09/18/2014122101439Open ↗
▸Filing & Intake Forms19
▸BISEFILING COVER SHEET9
08/09/2019123802215Open ↗
10/05/2016122885912Open ↗
09/17/2014122101439Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION5
09/02/2020140940347Open ↗
07/07/2020140915071Open ↗
07/07/2020140915071Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
08/21/2020140940347Open ↗
07/06/2020140915071Open ↗
08/29/2019140866579Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM1
08/21/2020140866579Open ↗