← Back
BuildNYC
Elevator apt, fireproof with stores
Independence Plaza
350 GREENWICH STREET · BIN 1083239
💬 Discuss this project
1975Year Built
39Stories
D6Building Class
C6-4Zoning
1,970,736 sfGross Floor Area
1,349Units
LL97 CoveredRent Stabilized80 Active Violations 60 unresolved · 20 paperwork only ▸
Elevator apt, fireproof with stores · Owner of record: IP Mortgage Borrower · 186,631 sf lot · 10.56 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1MatchafulUnder Construction48p · 5 filings · 20 docs
CellarStellar Management9p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
IP Mortgage Borrower403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB Building Consulting603/21/2026
Atelier New York Architecture603/21/2026
Metropolis Group1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
P.S.I. MechanicalPlumbing207/08/2026
Speedway PlumbingFire Protection207/08/2026
Speedway PlumbingPlumbing207/08/2026
FolorGeneral Contractor209/03/2026
CM PlumbingPlumbing107/08/2026
Valentis ElectricElectrical103/22/2026
Allstate Electrical ContElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Ryan Special Engineering2018302/04/2026
Delta Testing Labs687509/02/2022
Building Lifecycle
All (76)Filed (11)Permit Issued (9)Signed Off (4)Violation (20)Inspection (2)Special Inspection (30)
09/02/2026
Permit issued — Mechanical Systems
M01347326-S1-MS
04/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/02/2026
Permit issued — Plumbing
M01347326-S2-PL
02/12/2026
Permit issued — General Construction
M01347326-I1-GC
02/04/2026
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION TO THE ARCH. DESIGNS, PROVIDE INSTALLATION OF FIXTURES AS INDICATED THROUGHOUT THE SET FOR A TENANT FIT-OUT. NO CHANGE IN USE, EGRESS AND OCCUPANCY
M01347326-S1
02/04/2026
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION TO THE ARCH. DESIGNS, PROVIDE INSTALLATION OF FIXTURES AS INDICATED THROUGHOUT THE SET FOR A TENANT FIT-OUT. NO CHANGE IN USE, EGRESS AND OCCUPANCY
M01347326-S2
02/03/2026
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION TO THE ARCH. DESIGNS, PROVIDE INSTALLATION OF FIXTURES AS INDICATED THROUGHOUT THE SET FOR A TENANT FIT-OUT. NO CHANGE IN USE, EGRESS AND OCCUPANCY
M01347326-I1
01/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
01/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
01/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
William Ryan
01/20/2026
Special inspection requirement — Maintenance information
William Ryan
01/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
William Ryan
01/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
William Ryan
01/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
William Ryan
01/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
01/19/2026
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
01/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
William Ryan
01/19/2026
Special inspection requirement — Maintenance information
William Ryan
01/19/2026
Special inspection requirement — Shutoff dampers
William Ryan
01/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
William Ryan
01/19/2026
Special inspection requirement — Duct leakage testing, insulation and design
William Ryan
01/19/2026
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
01/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Ryan
01/19/2026
Special inspection requirement — Energy Code Compliance Inspections
William Ryan
01/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
William Ryan
01/19/2026
Special inspection requirement — Interior lighting power
William Ryan
01/15/2026
Special inspection requirement — Final
William Ryan
01/15/2026
Special inspection requirement — Mechanical Systems
William Ryan
01/15/2026
Special inspection requirement — Final
William Ryan
11/17/2025
Violation issued (HPD, closed)
I
09/30/2025
Signed off — Alteration
MODIFICATION TO SPRINKLER SYSTEMS ASSOCIATED WITH RENOVATION OF EXISTING STOREFRONT AND RETAIL SPACES
M00297962-I1
07/17/2025
Signed off — Alteration
PLUMBING MODIFICATIONS ASSOCIATED WITH RENOVATION OF EXISTING STOREFRONT AND RETAIL SPACES
M00297961-I1
05/08/2024
Violation issued (HPD, closed)
C
09/21/2022
Special inspection requirement — Sprinkler Systems
RICHARD GREENWALD
09/21/2022
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
09/21/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
09/02/2022
Filed — Alteration
MODIFICATION TO SPRINKLER SYSTEMS ASSOCIATED WITH RENOVATION OF EXISTING STOREFRONT AND RETAIL SPACES
M00297962-P2
08/09/2022
Permit issued — Plumbing
M00297961-I1-PL
05/12/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RICHARD GREENWALD
05/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
05/11/2022
Filed — Alteration
PLUMBING MODIFICATIONS ASSOCIATED WITH RENOVATION OF EXISTING STOREFRONT AND RETAIL SPACES
M00297961-P1
05/09/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RICHARD GREENWALD
05/09/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
02/17/2022
Special inspection requirement — Post-installed Anchors
RICHARD GREENWALD
09/15/2021
Permit issued — Sprinklers
M00297962-I1-EW-SP
09/08/2021
Filed — Alteration
MODIFICATION TO SPRINKLER SYSTEMS ASSOCIATED WITH RENOVATION OF EXISTING STOREFRONT AND RETAIL SPACES
M00297962-P1
04/16/2021
Violation issued (HPD, closed)
I
04/16/2021
Violation issued (HPD, closed)
A
10/14/2020
Permit issued — Plumbing
M00297961-I1-PL
10/14/2020
Permit issued — Sprinklers
M00297962-I1-EW-SP
02/25/2020
Signed off — Alteration
PLUMBING FILED IN APARTMENT 51A. PLUMBING WORK AS PER PLANS. GENERAL CONSTRUCTION FILED UNDER JOB #140873339. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00249693-I1
02/25/2020
Signed off — Alteration
PLUMBING FILED IN APARTMENT 55A. PLUMBING WORK AS PER PLANS. GENERAL CONSTRUCTION FILED UNDER #____. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00241545-I1
02/19/2020
Filed — Alteration
PLUMBING MODIFICATIONS ASSOCIATED WITH RENOVATION OF EXISTING STOREFRONT AND RETAIL SPACES
M00297961-I1
02/11/2020
Filed — Alteration
MODIFICATION TO SPRINKLER SYSTEMS ASSOCIATED WITH RENOVATION OF EXISTING STOREFRONT AND RETAIL SPACES
M00297962-I1
11/20/2019
Filed — Alteration
PLUMBING FILED IN APARTMENT 51A. PLUMBING WORK AS PER PLANS. GENERAL CONSTRUCTION FILED UNDER JOB #140873339. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00249693-P1
11/19/2019
Permit issued — Plumbing
M00249693-I1-PL
11/01/2019
Permit issued — Plumbing
M00241545-I1-PL
10/21/2019
Filed — Alteration
PLUMBING FILED IN APARTMENT 51A. PLUMBING WORK AS PER PLANS. GENERAL CONSTRUCTION FILED UNDER JOB #140873339. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00249693-I1
10/21/2019
Filed — Alteration
PLUMBING FILED IN APARTMENT 55A. PLUMBING WORK AS PER PLANS. GENERAL CONSTRUCTION FILED UNDER #____. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M00241545-I1
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedFolor09/02/2026
DOB NOWPlumbingPermit IssuedCM Plumbing03/02/2026
DOB NOWGeneral ConstructionSigned-offFolor02/12/2026
DOB NOWPlumbingSigned-offSpeedway Plumbing08/09/2022
DOB NOWSprinklersSigned-offSpeedway Plumbing09/15/2021
DOB NOWPlumbingSigned-offSpeedway Plumbing10/14/2020
DOB NOWSprinklersSigned-offSpeedway Plumbing10/14/2020
DOB NOWPlumbingSigned-offP.S.I. Mechanical11/19/2019
DOB NOWPlumbingSigned-offP.S.I. Mechanical11/01/2019
BISOTISSUEDThe Harvey Group10/23/2019
BISOTISSUEDMja Services09/11/2014
BISOTISSUEDAki Renovations06/20/2014
BISFPISSUEDMaster Fire Systems09/15/2003
BISCCISSUEDEfg Consulting07/06/1998
1 project · most recent 02/04/2026
Water/Sanitary
FiledStatusContractorScope
02/04/2026Permit IssuedCM PlumbingWater/Sanitary
3 projects · most recent 02/19/2026
General Wiring
FiledStatusContractorScope
02/19/2026CompleteAllstate Electrical ContGeneral Wiring
02/12/2020CompleteValentis ElectricGeneral Wiring
02/12/2020CompleteValentis ElectricGeneral Wiring
1 project · most recent 02/04/2026
FiledStatusContractorScope
02/04/2026Permit IssuedFolor1 scope_items
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/13/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
01/20/2026Fire-Resistant Penetrations and JointsWilliam Ryanspecial
01/20/2026Tenant Protection Plan ComplianceWilliam Ryanspecial
01/20/2026HVAC-R and service water heating equipmentWilliam Ryanenergy_progress
01/20/2026Maintenance informationWilliam Ryanenergy_progress
01/20/2026HVAC-R and service water heating system controlsWilliam Ryanenergy_progress
01/20/2026HVAC-R and service water piping design and insulationWilliam Ryanenergy_progress
01/19/2026HVAC-R and service water piping design and insulationWilliam Ryanenergy_progress
01/19/2026Fire-Resistant Penetrations and JointsWilliam Ryanspecial
01/19/2026Tenant Protection Plan ComplianceWilliam Ryanspecial
01/19/2026HVAC-R and service water heating system controlsWilliam Ryanenergy_progress
01/19/2026Maintenance informationWilliam Ryanenergy_progress
01/19/2026Shutoff dampersWilliam Ryanenergy_progress
01/19/2026HVAC-R and service water heating equipmentWilliam Ryanenergy_progress
01/19/2026Duct leakage testing, insulation and designWilliam Ryanenergy_progress
01/19/2026Tenant Protection Plan ComplianceWilliam Ryanspecial
01/19/2026Fire-Resistant Penetrations and JointsWilliam Ryanspecial
01/19/2026Energy Code Compliance InspectionsWilliam Ryanprogress
01/19/2026Fire-Resistance Rated ConstructionWilliam Ryanprogress
01/19/2026Interior lighting powerWilliam Ryanenergy_progress
01/15/2026FinalWilliam Ryanprogress
01/15/2026Mechanical SystemsWilliam Ryanspecial
01/15/2026FinalWilliam Ryanprogress
09/21/2022Sprinkler SystemsRICHARD GREENWALDspecial
09/21/2022Post-installed AnchorsRICHARD GREENWALDspecial
09/21/2022Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
Latest 25 of 33.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
MatchafulRestaurant / Food ServiceFloor 1
Project M01347326 Alteration · Permit Entire · 02/03/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 153 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch - Plumbing5
09/05/2026M00241545-I1Request digital key ↗
09/05/2026M00249693-I1Request digital key ↗
09/05/2026M00297961-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch3
08/19/2026M01347326-S2Request digital key ↗
08/19/2026M01347326-S1Request digital key ↗
08/19/2026M01347326-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
09/05/2026M00297962-I1Request digital key ↗
08/15/2026M00297962-P2Request digital key ↗
08/15/2026M00297962-P1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION4
10/15/2019140873357Open ↗
10/15/2019140873339Open ↗
09/10/2014140250369Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION4
10/28/2019140873339Open ↗
10/23/2019140873357Open ↗
09/10/2014140250369Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications64
▸DOB NOWSpecial Inspector Seal & Signature18
09/01/2026M01347326-I1Open ↗
09/01/2026M01347326-I1Open ↗
09/01/2026M00297962-P1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026M01347326-I1Open ↗
09/01/2026M01347326-I1Open ↗
09/01/2026M01347326-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/05/2026M00249693-P1Open ↗
09/05/2026M00249693-I1Open ↗
09/05/2026M00297962-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
02/13/2020140873339Open ↗
02/13/2020140873339Open ↗
02/05/2020140873357Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
10/15/2019140873357Open ↗
10/15/2019140873339Open ↗
09/10/2014140250369Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
10/15/2019140873357Open ↗
10/15/2019140873339Open ↗
09/10/2014140250369Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
10/15/2019140873357Open ↗
10/15/2019140873339Open ↗
09/10/2014140250369Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWTenant Protection Plan5
08/13/2026M00297962-I1Open ↗
08/13/2026M00297961-I1Open ↗
08/13/2026M00297962-P2Open ↗
Showing 3 of 5 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES2
10/15/2019140873357Open ↗
10/15/2019140873339Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/05/2026M00249693-P1Open ↗
09/05/2026M00249693-I1Open ↗
09/05/2026M00297962-P2Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
10/15/2019140873357Open ↗
10/15/2019140873339Open ↗
09/10/2014140250369Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
02/13/2020140873339Open ↗
02/13/2020140873339Open ↗
02/05/2020140873357Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
10/15/2019140873357Open ↗
10/15/2019140873339Open ↗
09/10/2014140250369Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
02/13/2020140873339Open ↗
02/05/2020140873357Open ↗
03/18/2015140214694Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
10/15/2019140873357Open ↗
10/15/2019140873339Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
10/15/2019140873357Open ↗
10/15/2019140873339Open ↗
06/20/2014140214694Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
02/13/2020140873339Open ↗
02/05/2020140873357Open ↗
03/18/2015140214694Open ↗
Showing 3 of 4 on file for this type
▸Cost, Insurance & Ownership15
▸BISCOST AFFIDAVIT11
02/13/2020140873339Open ↗
02/13/2020140873339Open ↗
02/05/2020140873357Open ↗
Showing 3 of 11 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
10/15/2019140873357Open ↗
10/15/2019140873339Open ↗
09/10/2014140250369Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms8
▸BISEFILING JOB APPLICATION COVER SHEET4
10/15/2019140873357Open ↗
10/15/2019140873339Open ↗
09/10/2014140250369Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
02/13/2020140873339Open ↗
02/05/2020140873357Open ↗
▸BISADDITIONAL INFORMATION2
10/22/2019140873339Open ↗
10/22/2019140873357Open ↗